Mechanics Lien Filing Package — Kansas

Kansas Real Estate Updated November 6, 2026 Free Word and PDF

Mechanics Lien Filing Package (KANSAS)


Quick-Reference Summary

Item Kansas Authority
Governing Statute K.S.A. §§ 60-1101 to 60-1110
Filing Office Clerk of the District Court of the county where the property is located (K.S.A. § 60-1102)
Who May File A claimant furnishing qualifying labor, equipment, materials, or supplies under an agreement described in § 60-1101 or § 60-1103(a); identify the claimant's agreement and on-site furnishing before choosing a filing route.
Claimant tier review Section 60-1103(a) includes a person furnishing at the site under an agreement with a contractor, subcontractor, or owner contractor; verify the actual contracting chain before excluding a lower-tier claimant.
Direct Contractor Pre-Lien Notice None required
Supplier / Subcontractor Residential Warning Conforming statement mailed to an owner or acknowledged in a signed owner statement; claimant affidavit attached to lien statement when required (K.S.A. § 60-1103a)
New Residential Notice of Intent Filed with district court clerk BEFORE recording of deed to good-faith purchaser; expires after 18 months unless a lien is filed (K.S.A. § 60-1103b)
Subcontractor Pre-Lien Notice — Commercial None required
Direct Contractor Filing Deadline Within 4 months of last furnishing labor/materials (K.S.A. § 60-1102(a))
Subcontractor / Supplier Filing Deadline Within 3 months of last furnishing labor/materials (K.S.A. § 60-1103(a)(1))
Notice of Extension (non-residential) Extends the subcontractor or supplier lien-filing deadline from 3 to 5 months after last furnishing if filed within 3 months; mail the notice by both certified and regular mail to the general contractor or construction manager, and a copy by regular mail to the owner if known (K.S.A. § 60-1103(e))
Service of § 60-1103 Lien Statement Give a copy to an owner, any recorded equitable-interest holder, and any party obligated to pay, using personal service, restricted mail, or the statute's narrow posting route (K.S.A. § 60-1103(c)).
Service Required for Residential Foreclosure No action to foreclose on residential real property may proceed unless any holder of a recorded equitable interest is served per § 60-1103(c)
Foreclosure Suit Deadline Generally within 1 year of filing the lien statement; if a promissory note was attached in lieu of an itemized statement, within 1 year after note maturity (K.S.A. § 60-1105(a))
Priority A direct-contractor lien has priority over encumbrances subsequent to that claimant's first on-site furnishing. Where two or more contracts cover the same improvement, § 60-1101 uses the earliest unsatisfied lien date, adjusted when an earlier lien is discharged.
Owner's Action If no foreclosure action has commenced, the landowner may petition under K.S.A. § 60-1108 for adjudication of the filed lien.
Filing Fee Confirm the current fee with the district court clerk before filing.
Direct-contractor extension (nonresidential) A § 60-1101 claimant may use the five-month filing window only after filing the § 60-1102(c) extension within four months of last furnishing and mailing it by certified and regular mail to the owner.

Part A — Pre-Lien Notice

A.1 — Supplier or Subcontractor Residential Warning Statement — K.S.A. § 60-1103a

Required for a supplier or subcontractor claim exceeding $250 when the improvement fits § 60-1103a(a), which covers specified owner-occupied existing residences and specified new construction that becomes the individual owner's principal personal residence. Mail the statement to any one owner or retain a signed and dated owner acknowledgment. Attach the claimant's affidavit of proper warning to the lien statement.


WARNING STATEMENT — NOTICE TO OWNER

NOTICE TO OWNER: [NAME OF SUPPLIER OR SUBCONTRACTOR] is a supplier or subcontractor providing materials or labor on Job No. [JOB NUMBER] at [RESIDENCE ADDRESS] under an agreement with [NAME OF CONTRACTOR]. Kansas law will allow this supplier or subcontractor to file a lien against your property for materials or labor not paid for by your contractor unless you have a waiver of lien signed by this supplier or subcontractor. If you receive a notice of filing of a lien statement by this supplier or subcontractor, you may withhold from your contractor the amount claimed until the dispute is settled.


Field Entry
Subcontractor / Supplier Name and Address [________________________________]
Owner Name [________________________________]
Property Address [________________________________]
Contractor Name [________________________________]
Description of Materials / Labor Furnished [________________________________]
Date First Furnished [__/__/____]
Date of Service of Warning Statement [__/__/____]
Compliance Method ☐ Mailed to owner ☐ Signed and dated owner acknowledgment retained

Signature: ________________________________ Date: [__/__/____]

Affidavit of Service (attach to lien statement when filed):

I, [_______________], being duly sworn, state that the foregoing conforming Warning Statement was properly given under K.S.A. § 60-1103a by [mailing to an owner / obtaining the owner's signed and dated acknowledgment] on [__/__/____].

________________________________
Affiant Signature, sworn before notary


A.2 — Notice of Intent to Perform (New Residential Property) — K.S.A. § 60-1103b

For a claimant under § 60-1101 or § 60-1103 seeking to preserve a lien after title to new residential property passes to a good-faith purchaser for value, file this notice with the district court clerk before the deed is recorded. The notice expires after 18 months unless the claimant files a lien within that period. A paid or discharged claimant must file a release and waiver under § 60-1103b(d).

IN THE DISTRICT COURT OF [_______________] COUNTY, KANSAS

NOTICE OF INTENT TO PERFORM
(K.S.A. § 60-1103b)

To the Clerk of the District Court:

The undersigned, being a [☐ subcontractor ☐ supplier ☐ contractor] furnishing labor, equipment, material, or supplies for an improvement to new residential property, gives notice of intent to perform as follows:

Field Entry
Name of Owner of the Real Estate [________________________________]
Name and Address of Contractor / Subcontractor / Supplier [________________________________]
Legal Description of the Real Estate [________________________________]
Parcel ID [________________________________]
Description of Labor / Materials Being Provided [________________________________]

The undersigned states that the undersigned is providing or will provide labor, equipment, material, or supplies for the construction of the new residential property described above.

Date: [__/__/____]

________________________________
[CLAIMANT NAME], [TITLE]
[ADDRESS / PHONE / EMAIL]

Filing Fee: $[__] (confirm with clerk). Keep the file-stamped copy and filing number for the later lien or release.


Part B — Claim of Mechanics Lien

IN THE DISTRICT COURT OF [_______________] COUNTY, KANSAS

MECHANIC'S LIEN STATEMENT
(K.S.A. §§ 60-1101 et seq.)

The undersigned claimant, by this verified statement, claims a mechanic's lien against the real property described below pursuant to Kansas law:

Item Entry
1. Name of Owner of Real Property [________________________________]
2. Owner Mailing Address [________________________________]
3. Name of Contractor [________________________________]
4. Name of Subcontractor (if applicable) [________________________________]
5. Name of Claimant [________________________________]
6. Claimant Address (sufficient for service of process) [________________________________]
7. Claimant Phone / Email [________________________________]
8. Claimant's Role ☐ Claimant under § 60-1101 ☐ Claimant under § 60-1103(a); describe agreement: [________________]
9. Property Street Address [________________________________]
10. County [________________________________]
11. Legal Description of Real Property [________________________________]
12. Parcel ID, if available [________________________________]
13. Description of Labor / Materials / Equipment / Supplies Furnished [________________________________]
14. Person With Whom Claimant Contracted [________________________________]
15. Date First Furnished [__/__/____]
16. Date Last Furnished [__/__/____]
17. Contract / Order Amount $[__________]
18. Payments Received $[__________]
19. Amount of Lien Claimed $[__________]

Itemized Statement: Attached as Exhibit A. (Or, if amount is evidenced by written instrument or promissory note, a copy is attached in lieu of itemization per K.S.A. § 60-1102(a)(4).)

VERIFICATION

STATE OF KANSAS, COUNTY OF [_______________], ss.

I, [_______________], being first duly sworn, depose and state: I am [the Claimant / [TITLE] of the Claimant] and am authorized to make this verification. I have read the foregoing Mechanic's Lien Statement and its contents are true and correct. The amount of $[__________] is justly due and owing the Claimant after allowance of all just credits and offsets. The labor, equipment, materials, or supplies described above were furnished and were used or consumed for the improvement of the real property described.

[If § 60-1103a applies:] The conforming Warning Statement was properly given on [__/__/____] as stated in the affidavit attached as Exhibit B.

[If § 60-1103b applies:] A Notice of Intent to Perform was filed with the Clerk of the District Court of [_______________] County, Kansas, on [__/__/____], filing No. [_______________], pursuant to K.S.A. § 60-1103b.

________________________________
Affiant Signature

Print Name / Title: [________________________________]

Subscribed and sworn to before me on [__/__/____] by [_______________].

________________________________
Notary Public — State of Kansas
My commission expires: [__/__/____]

[NOTARY SEAL]

Attached Exhibits:

  • Exhibit A — Itemized Statement of Account (or copy of contract / promissory note)
  • Exhibit B — Affidavit that Warning Statement was properly given, if applicable
  • Exhibit C — File-stamped Notice of Intent to Perform (new residential)

Part C — Notice of Filing a § 60-1103 Lien Claim — K.S.A. § 60-1103(c)

[CLAIMANT LETTERHEAD]

Date: [__/__/____]

TO: [OWNER NAME]
[OWNER ADDRESS]

Via: ☐ Personal service under K.S.A. § 60-304 or § 60-308, as applicable ☐ Restricted mail — Article No. [_______________] ☐ Posting on premises only where § 60-1103(c) permits it

Re: Mechanic's Lien Statement filed with the District Court Clerk of [_______________] County, Kansas, filing No. [_______________], against [PROPERTY ADDRESS]

You are hereby notified, pursuant to K.S.A. § 60-1103(c), that on [__/__/____] the undersigned filed a Mechanic's Lien Statement with the Clerk of the District Court of [_______________] County, Kansas, against the above-described real property in the amount of $[__________]. A true and correct copy of the filed Lien Statement is enclosed.

An action to foreclose this lien generally must be brought within one year after the lien statement was filed. If a promissory note was attached in lieu of an itemized statement, the year runs from the note's maturity (K.S.A. § 60-1105(a)). Demand is made for the amount due and any interest, costs, or fees recoverable on the facts and applicable law.

If no foreclosure action has commenced, K.S.A. § 60-1108 permits the landowner to petition the district court to adjudicate the lien.

Sincerely,

________________________________
[CLAIMANT NAME], [TITLE]
[CLAIMANT ADDRESS / PHONE / EMAIL]

[If property is residential — also serve any holder of a recorded equitable interest, e.g., contract-for-deed purchaser or other equitable owner, by the same methods.]

Retain proof of delivery or posting and identify each required recipient.


Part D — Suit to Foreclose — K.S.A. §§ 60-1105, 60-1106

IN THE DISTRICT COURT OF [_______________] COUNTY, KANSAS

Party Role
[CLAIMANT NAME], Plaintiff
v.
[OWNER NAME]; [ORIGINAL CONTRACTOR, IF PLAINTIFF IS A LOWER-TIER CLAIMANT]; [OTHER FILED LIEN CLAIMANTS]; [RECORD ENCUMBRANCERS WITHOUT PRIORITY OVER PLAINTIFF]; [OTHER NECESSARY PARTIES], Defendants

Case No.: [____________]
Division: [____________]

PETITION TO FORECLOSE MECHANIC'S LIEN [AND FOR BREACH OF CONTRACT]

COMES NOW Plaintiff [CLAIMANT NAME], by and through undersigned counsel, and for its Petition states:

Parties, Jurisdiction, and Venue

  1. Plaintiff is a [ENTITY TYPE] organized under the laws of [_______________] and conducting business in Kansas.

  2. Defendant [OWNER NAME] is, upon information and belief, the record owner of the Property at issue, located in [_______________] County, Kansas.

  3. Venue is proper under K.S.A. § 60-601(b)(3), the Property being located in this county. The joined lien claimants, record encumbrancers, and original contractor (if required) are identified under K.S.A. § 60-1106.

General Allegations

  1. On or about [__/__/____], Plaintiff entered into a [written / oral] contract with [HIRING PARTY] to furnish [DESCRIBE LABOR/MATERIALS/EQUIPMENT/SUPPLIES] for the improvement of the Property commonly known as [PROPERTY ADDRESS] and legally described as:

[LEGAL DESCRIPTION]

  1. Plaintiff furnished labor/materials beginning [__/__/____] and ending [__/__/____].

  2. The reasonable value of all labor/materials/equipment/supplies is $[__________]. Plaintiff has been paid $[__________]. The balance due and unpaid, after all just credits and offsets, is $[__________].

  3. [If § 60-1103a applies] On [__/__/____], Plaintiff properly gave the conforming Warning Statement, as evidenced by the affidavit attached as Exhibit A.

  4. [If § 60-1103b applies] On [__/__/____], Plaintiff filed a Notice of Intent to Perform with the Clerk of the District Court of [_______________] County, Kansas, filing No. [_______________], pursuant to K.S.A. § 60-1103b. A file-stamped copy is attached as Exhibit B.

  5. On [__/__/____], Plaintiff filed a verified Mechanic's Lien Statement with the Clerk of the District Court of [_______________] County, Kansas, against the Property in the amount of $[__________]. Plaintiff filed within [four months under § 60-1102(a) / three months under § 60-1103(a)(1) / the applicable five-month nonresidential extension after completing the notice steps under § 60-1102(c) or § 60-1103(e)] of last furnishing. A copy is attached as Exhibit C.

  6. [If Plaintiff claims under § 60-1103] Plaintiff gave a copy of the Lien Statement to an owner, any holder of a recorded equitable interest, and any party obligated to pay, by a method permitted under K.S.A. § 60-1103(c), as evidenced by Exhibit D.

  7. This action is commenced within [one year after filing the Lien Statement / one year after maturity of the promissory note attached in lieu of itemization], as required by K.S.A. § 60-1105(a).

Count I — Foreclosure of Mechanic's Lien

  1. Plaintiff incorporates the preceding paragraphs.

  2. Plaintiff has a valid and enforceable mechanic's lien against the Property in the amount of $[__________]. [If supported by the contract and applicable law, state the basis and amount of any interest claimed: [_______________].]

  3. Plaintiff is entitled to a judgment foreclosing its lien and ordering sale of the Property and improvements to satisfy the lien.

[If Plaintiff contracted with the hiring party] Count II — Breach of Contract

  1. Plaintiff incorporates the preceding paragraphs.

  2. [HIRING PARTY] breached the contract by failing to pay $[__________]. Plaintiff seeks judgment for that unpaid sum, [contractual or statutory interest under K.S.A. § 16-201 if due on the pleaded facts], costs, and [attorney's fees only if a stated contract provision or other identified authority permits them].

Prayer for Relief

WHEREFORE, Plaintiff prays for judgment:

A. Establishing and foreclosing Plaintiff's mechanic's lien against the Property in the amount of $[__________], with any separately supported interest and costs;
B. Ordering sale of the Property and improvements per K.S.A. § 60-2410 to satisfy the lien;
C. Determining priority among parties claiming an interest in the Property per K.S.A. § 60-1101;
D. [If the contract count applies] Judgment against [HIRING PARTY] for breach of contract in the amount of $[__________], plus any interest and fees supported by the pleaded contract and applicable law;
E. Costs of suit;
F. Such other and further relief, legal or equitable, as the Court deems just.

Dated: [__/__/____]

________________________________
[ATTORNEY NAME], KS Sup. Ct. No. [_____]
[FIRM NAME]
[ADDRESS / PHONE / EMAIL]
Attorney for Plaintiff

For this foreclosure petition, check that the summons is served or first publication made within 90 days after filing for K.S.A. § 60-2201(a) notice effect. If affected land lies in another county, evaluate the verified-statement filing in that county under § 60-2201(b).


Part E — Pre-Filing Checklist

Eligibility & Project Classification

☐ Confirmed the claimant's actual contract and furnishing facts fit K.S.A. § 60-1101 or § 60-1103(a), including any agreement with a contractor, subcontractor, or owner contractor
☐ Determined claimant's role: direct contractor vs. subcontractor/supplier
☐ Determined property type and whether the § 60-1103a residential definition applies

Pre-Lien Notice Requirements

☐ Direct contractor: No pre-lien notice required
☐ Subcontractor — commercial: No pre-lien notice required
☐ Supplier/subcontractor — qualifying residential claim over $250: Warning Statement mailed or acknowledged (§ 60-1103a) and affidavit prepared
☐ Claimant under § 60-1101 or § 60-1103 — new residential: if preserving a lien after passage of title to a good-faith purchaser, Notice of Intent to Perform filed before deed recording (§ 60-1103b); file-stamped copy and filing number retained
☐ Warning compliance documented: mailing or signed and dated owner acknowledgment

Timing

☐ Calculated filing deadline: four months under § 60-1102 or three months under § 60-1103 from the claimant's last qualifying labor or furnishing
☐ For nonresidential work: considered the correct five-month extension route, including notice within four months for a § 60-1101 claimant (§ 60-1102(c)) or within three months for a § 60-1103 claimant (§ 60-1103(e)), with required mailing
☐ Calendared the § 60-1105(a) foreclosure deadline from lien-statement filing or, if the note-in-lieu exception applies, note maturity
☐ Calendared 18-month expiration of any Notice of Intent to Perform

Lien Statement Contents

☐ Owner of record verified via Register of Deeds
☐ Legal description verified
☐ Parcel ID included
☐ Claimant address sufficient for service of process
☐ Contractor name stated (where claimant is sub)
☐ Itemized statement of amount, or copy of written instrument / promissory note, attached
☐ First and last furnishing dates documented
☐ Verification under oath, notarized
☐ If § 60-1103a applies: affidavit that Warning Statement was properly given attached
☐ If § 60-1103b applies: Notice of Intent to Perform file-stamped copy and filing number referenced

Filing

☐ Filed with Clerk of District Court of correct county
☐ Current filing fee confirmed with clerk and paid
☐ Case number / receipt retained
☐ File-stamped copy of lien obtained

Service of Lien Statement (K.S.A. § 60-1103 claimant)

☐ Method: ☐ Personal service under § 60-304 or § 60-308 ☐ Restricted mail ☐ Posted only if § 60-1103(c) permits it
☐ Served on at least one owner, any recorded equitable-interest holder, and any party obligated to pay
☐ Proof of service, mailing, or posting retained
☐ Where property is residential, confirmed that holder of recorded equitable interest was served (or none exists)

Foreclosure Calendar

☐ Applicable § 60-1105(a) foreclosure deadline calendared from filing or promissory-note maturity
☐ Necessary parties identified (§ 60-1106): filed lien claimants, nonpriority record encumbrancers, and original contractor if claimant is lower tier
☐ Summons service or first publication calendared within 90 days after petition filing for § 60-2201(a) notice effect; any other-county statement considered under § 60-2201(b)

Documentation Retained

☐ Contract / purchase orders / change orders
☐ Itemized invoices, time sheets, delivery tickets
☐ Photographs of work
☐ All correspondence with owner / GC re payment
☐ All notices, affidavits of service, return receipts
☐ File-stamped Mechanic's Lien Statement
☐ Receipts for filing and notarization fees


Sources and References

  • K.S.A. Chapter 60, Article 11 (Liens for Labor and Material) — full text: https://ksrevisor.gov/statutes/chapters/ch60/060_011_0000_section.html
  • K.S.A. § 60-1101 (Liens of contractors): https://ksrevisor.gov/statutes/chapters/ch60/060_011_0001.html
  • K.S.A. § 60-1102 (Filing and recording): https://ksrevisor.gov/statutes/chapters/ch60/060_011_0002.html
  • K.S.A. § 60-1103 (Liens of subcontractors): https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003.html
  • K.S.A. § 60-1103a (Warning Statement): https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003a.html
  • K.S.A. § 60-1103b (Notice of Intent to Perform): https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003b.html
  • K.S.A. § 60-1105 (Limitations on action): https://ksrevisor.gov/statutes/chapters/ch60/060_011_0005.html
  • Kansas Judicial Council — Mechanic's Lien Forms: https://www.kjc.ks.gov/legal-forms/chapter-60-civil-actions/other

Insert Image

Insert Table

Watch Ezel in action (sample case)Choose a plan

All changes saved
Save
Export
Export as DOCX
Export as PDF
Generating PDF...
mechanics_lien_filing_package_ks.pdf
Ready to export as PDF or Word
AI is editing...
Chat
Review

Draft it in the editor

The AI drafts each section from your answers and you review every word. Drafting from scratch takes hours; finish yours for $99 one time.

  • Built on this template
    Uses the Kansas version and the statutes it cites.
  • Formatted like the template
    Captions, numbering and layout stay intact.
  • AI editing
    Rewrite any section from your own notes.
  • Export as PDF and Word
    Yours to review, sign, or file.
Secure checkout via Stripe
Need to customize this document?

About this template

Last updated
November 6, 2026
Citations checked
November 6, 2026
Jurisdiction
Kansas
Category
Real Estate

Legal authority

  • K.S.A. § 60-1101
  • K.S.A. § 60-1102
  • K.S.A. § 60-1103
  • K.S.A. § 60-1103a
  • K.S.A. § 60-1103b
  • K.S.A. § 60-1104
  • K.S.A. § 60-1105
  • K.S.A. § 60-1106
  • K.S.A. § 60-1108

Real estate documents transfer ownership, define who can use a property, and record agreements between buyers, sellers, landlords, and tenants. Deeds, purchase agreements, leases, and easements have to be drafted to meet state recording requirements, and mistakes show up at closing or years later in title disputes. Good real estate paperwork moves transactions forward quickly and avoids the kind of problems that only surface when it is time to sell or refinance.

Not legal advice

This template is provided for informational purposes. We recommend having an attorney review any legal document before signing, especially for high-value or complex matters.

Checked against the law it cites

A reviewer verified this template's legal citations against the official source on November 6, 2026.

K.S.A. § 60-2201(a)-(b) (checked October 19, 2026): "When a petition has been filed in the district court pursuant to chapter 60 of the Kansas Statutes Annotated, the action is pending so as to charge third persons with notice of its pendency, and while pending no interest can be acquired by third persons in the subject matter thereof as against the plaintiff's claim; but such notice shall be of no avail unless the summons be served or the first publication made within ninety (90) days after the filing of the petition."

K.S.A. 60-1103(e) (checked October 14, 2026): "Notwithstanding subsection (a)(1), a lien for the furnishing of labor, equipment, materials or supplies on property other than residential property may be claimed pursuant to this section, and amendments thereto, within five months only if the claimant has filed a notice of extension within three months since last furnishing labor, equipment, materials or supplies to the job site. Such notice shall be filed in the office of the clerk of the district court of the county where such property is located and shall be mailed by certified and regular mail to the general contractor or construction manager and a copy to the owner by regular mail, if known."

K.S.A. 60-1103(a), (c) (checked November 6, 2026): "Any supplier, subcontractor or other person furnishing labor, equipment, material or supplies, used or consumed at the site of the property subject to the lien, under an agreement with the contractor, subcontractor or owner contractor may obtain a lien"

K.S.A. 60-1105(a) (checked November 6, 2026): "but if a promissory note has been attached to the lien statement in lieu of an itemized statement, the action shall be commenced within one year from the maturity of said note."

Draft your Mechanics Lien Filing Package — Kansas in the editor

Answer a few questions, let the AI editor draft each section from your answers, review it, and download Word and PDF. $99 one time, or $249 per month for every document and every Ezel app.