Mechanics Lien Affidavit - Texas

Texas Real Estate Updated November 12, 2026 Free Word and PDF

NOTICE: THIS IS NOT A LIEN. THIS IS ONLY AN AFFIDAVIT CLAIMING A LIEN.

MECHANICS LIEN AFFIDAVIT

(State of Texas)
Pursuant to Tex. Prop. Code Chapter 53


RECORDING INFORMATION

Recording Requested By:

Name: [________________________________]

Address: [________________________________]

When Recorded, Return To:

Name: [________________________________]

Address: [________________________________]

City/State/ZIP: [________________________________]


I. PROJECT TYPE AND CLAIMANT TIER DETERMINATION

IMPORTANT: Texas mechanics lien law distinguishes between (1) Original Contractors (direct contract with the owner) and (2) Subcontractors/Suppliers of any tier. Different notice requirements and deadlines apply to each. Texas also provides a constitutional lien (Tex. Const. Art. XVI, § 37) that is self-executing for original contractors.

A. Claimant Tier

☐ Original Contractor — Direct contractual relationship with the property owner
☐ Subcontractor — Contract with the original contractor (any tier)
☐ Material Supplier — Furnished materials to the project
☐ Laborer — Performed labor on the project

B. Project Type

☐ Residential construction project — Construction or repair of an owner's residence under a residential construction contract (§ 53.001(8)–(10)); the residence may also be a homestead
☐ Other construction project — Apply the other-project deadlines
☐ Owner's homestead — Additional constitutional and § 53.254 requirements apply

C. Constitutional Lien vs. Statutory Lien

☐ Constitutional Lien (Tex. Const. Art. XVI, § 37) — Self-executing; available to mechanics, artisans, and materialmen who contract directly with the owner. Does not require filing or notice to be perfected, but recording provides constructive notice.

☐ Statutory Lien (Tex. Prop. Code Ch. 53) — Available to all tiers (original contractors, subcontractors, suppliers). Requires compliance with statutory notice and filing requirements.


II. CLAIMANT INFORMATION

Field Details
Claimant Name [________________________________]
Entity Type ☐ Individual ☐ Sole Proprietorship ☐ Corporation ☐ LLC ☐ Partnership ☐ Other: [____]
Mailing Address [________________________________]
Physical Address (if different) [________________________________]
City, State, ZIP [________________________________]
Phone [________________________________]
Email [________________________________]

III. PROPERTY OWNER INFORMATION

Field Details
Owner Name(s) [________________________________]
Owner Mailing Address [________________________________]
City, State, ZIP [________________________________]
Phone [________________________________]

IV. ORIGINAL CONTRACTOR INFORMATION

Field Details
Original Contractor Name [________________________________]
Mailing Address [________________________________]
City, State, ZIP [________________________________]
Phone [________________________________]

V. HIRING PARTY INFORMATION (If Different from Owner or Original Contractor)

Field Details
Hiring Party Name [________________________________]
Relationship to Project ☐ Subcontractor ☐ Sub-subcontractor ☐ Other: [____]
Mailing Address [________________________________]
City, State, ZIP [________________________________]

VI. PROPERTY DESCRIPTION

Street Address of Improved Property: [________________________________]

City: [________________________________] County: [________________________________], Texas

Legal Description:

[________________________________]
[________________________________]
[________________________________]

(Attach as Exhibit A if lengthy. The legal description must be sufficient to identify the property per Tex. Prop. Code § 53.054(a)(6).)

Property Tax Account / Parcel Number: [________________________________]


VII. LIEN AFFIDAVIT

AFFIDAVIT CLAIMING MECHANICS AND MATERIALMAN'S LIEN

BEFORE ME, the undersigned authority, on this day personally appeared [________________________________] ("Affiant"), who being by me duly sworn, on oath deposed and said:

A. Contractual Basis for Lien

The Claimant furnished labor, services, materials, and/or equipment for the improvement of the above-described property pursuant to:

☐ A written contract with the property Owner (Original Contractor) dated [__/__/____]
☐ A written contract with the Original Contractor dated [__/__/____]
☐ A written contract with the Subcontractor: [________________________________] dated [__/__/____]
☐ An oral agreement with: [________________________________]

B. Nature of Labor, Materials, or Equipment Furnished

  1. [________________________________]
  2. [________________________________]
  3. [________________________________]
  4. [________________________________]
  5. [________________________________]

C. Dates of Furnishing

Milestone Date
Date of First Furnishing [__/__/____]
Date of Last Furnishing [__/__/____]
Date Work Completed, Terminated, or Abandoned [__/__/____]

For a claimant other than an original contractor, list each month in which work was done or materials were furnished for which payment is requested (§ 53.054(a)(3)):

Furnishing Month Work or Materials for Which Payment Is Requested
[____________] [________________________________]
[____________] [________________________________]
[____________] [________________________________]

D. Amount of Lien Claimed

Item Amount
Total Contract Price $ [________________________________]
Total Value of Labor/Materials Furnished $ [________________________________]
Less: Payments Received $ [________________________________]
Less: Credits and Offsets $ [________________________________]
Net Amount of Lien Claimed $ [________________________________]

VIII. REQUIRED CONTENT OF AFFIDAVIT (Tex. Prop. Code § 53.054)

Pursuant to Tex. Prop. Code § 53.054, this affidavit contains:

☐ The signature of the claimant or another person signing on the claimant's behalf
☐ (a)(1) A sworn statement of the amount of the claim
☐ (a)(2) The name and last known address of the owner or reputed owner
☐ (a)(3) A general statement of the work and materials and, for a claimant other than an original contractor, each month for which payment is requested
☐ (a)(4) The name and last known address of the person by whom the claimant was employed or to whom the claimant furnished the material or labor
☐ (a)(5) The name and last known address of the original contractor
☐ (a)(6) A description of the property, legally sufficient for identification
☐ (a)(7) The claimant's name, mailing address, and any different physical address
☐ (a)(8) For a claimant other than an original contractor, the date and delivery method of each notice of the claim sent to the owner


IX. NOTICE COMPLIANCE — SUBCONTRACTORS AND SUPPLIERS

A. Notice to Owner and Original Contractor (Tex. Prop. Code § 53.056)

For an original contract entered into on or after January 1, 2022, a claimant other than an original contractor generally must send the statutory notice to the owner or reputed owner and original contractor. The deadline is the 15th day of the second month after the furnishing month for a residential construction project and the 15th day of the third month for another project. Use the normal-delivery month for undelivered specially fabricated materials.

☐ Claimant is an Original Contractor — § 53.056 notice not required
☐ § 53.056 notice(s) sent to owner and original contractor

Notice Record:

Month of Unpaid Work Residential / Other Notice Deadline Date Notice Sent Delivery Method Sent To
[____________] [____________] [__/__/____] [__/__/____] [____________] ☐ Owner ☐ Original Contractor
[____________] [____________] [__/__/____] [__/__/____] [____________] ☐ Owner ☐ Original Contractor
[____________] [____________] [__/__/____] [__/__/____] [____________] ☐ Owner ☐ Original Contractor
[____________] [____________] [__/__/____] [__/__/____] [____________] ☐ Owner ☐ Original Contractor

B. Method of Notice Delivery (Tex. Prop. Code § 53.003)

Notices must be delivered by one of the following:
☐ In-person delivery to the party entitled to notice or that party's agent
☐ Certified mail
☐ Other traceable, private delivery or mailing service that can confirm proof of receipt

C. Fund Trapping Effect

Under § 53.081, an owner receiving a § 53.056 notice may withhold from payments to the original contractor an amount necessary to pay the noticed claim and may do so immediately on receipt. Any personal-liability consequence requires separate analysis of the remaining Subchapter D requirements.


X. FILING DEADLINE COMPLIANCE

A. Original Contractors (Tex. Prop. Code § 53.052)

Projects other than residential construction:
The lien affidavit must be filed by the 15th day of the 4th month after the month in which the original contractor's work was completed, terminated, or abandoned, or the original contract was terminated.

Residential Construction Projects:
The lien affidavit must be filed by the 15th day of the 3rd month after the month in which the original contractor's work was completed, terminated, or abandoned.

B. Subcontractors and Suppliers (Tex. Prop. Code § 53.052(b)-(c))

For projects other than residential construction, the affidavit must be filed by the 15th day of the 4th month after the later of the claimant's last furnishing month or the normal-delivery month for undelivered specially fabricated materials. For residential construction projects, use the 15th day of the 3rd month after that later month.

C. Weekend/Holiday Extension (Tex. Prop. Code § 53.003(e), amended by S.B. 929 in 2025)

If the 15th or any other deadline falls on a Saturday, Sunday, or legal holiday, the deadline is automatically extended to the next day that is not a weekend or legal holiday.

D. Filing Calculation

Item Date/Info
Claimant's Role ☐ Original Contractor ☐ Subcontractor/Supplier
Project Type ☐ Residential construction project (3rd month) ☐ Other project (4th month)
Date of Last Furnishing / Completion [__/__/____]
Month of Last Furnishing [____________]
Filing Deadline (15th of applicable month) [__/__/____]
Adjusted Deadline (if weekend/holiday) [__/__/____]
Date This Affidavit is Being Filed [__/__/____]

☐ This affidavit is being filed within the applicable deadline


XI. SERVICE OF AFFIDAVIT ON OWNER (Tex. Prop. Code § 53.055)

Not later than the 5th day after filing the lien affidavit, the claimant must send a copy to the owner or reputed owner. A claimant other than an original contractor must also send a copy to the original contractor within that period.

Date Copy Sent to Owner: [__/__/____]

If claimant is not the original contractor, date copy sent to original contractor: [__/__/____]

Method of Delivery:
☐ Certified mail, return receipt requested
☐ Other traceable delivery confirming proof of receipt

Tracking Number: [________________________________]


XII. HOMESTEAD REQUIREMENTS

A. Texas Homestead Protection (Tex. Const. Art. XVI, § 50)

If the property is the owner's homestead, the following additional requirements apply:

☐ The written improvement contract was executed before labor or materials began; both spouses signed if the owner is married (§ 53.254(a)-(c)).
☐ The improvement contract was filed with the county clerk of the homestead county (§ 53.254(e)).
☐ The statutory notice at the top of this affidavit is at least 10-point boldface on the first recorded page (§ 53.254(f)).
☐ The work is ☐ new construction ☐ repair or renovation of existing improvements (Tex. Const. art. XVI, § 50(a)(5)).
☐ For repair or renovation financed by an extension of credit, the owner and spouse did not execute the contract before the fifth day after the owner's written credit application, unless the constitutional emergency-repair exception applies (§ 50(a)(5)(B)).
☐ For repair or renovation, the contract gives the owner three days after all parties sign to rescind without penalty or charge, unless the constitutional emergency-repair exception applies (§ 50(a)(5)(C)).
☐ For repair or renovation, the owner and spouse executed the contract only at the office of the third-party lender making the extension of credit, an attorney, or a title company (§ 50(a)(5)(D)).
☐ Before the owner executed a residential construction contract, the original contractor delivered the disclosure statement required by § 53.255.

CRITICAL: For work on a homestead, the original contract must be in writing and signed by both spouses (if married). Failure to meet this requirement may void the lien entirely as to the homestead.

B. Written Contract Required for Homestead

A mechanics lien on a Texas homestead requires a written contract signed by the owner (and both spouses, if married). Oral contracts do not support a homestead lien.


XIII. VERIFICATION

Affiant's Sworn Statement

Further, Affiant says:

  1. I have personal knowledge of the facts stated herein;
  2. The labor, services, materials, and/or equipment described herein were actually furnished for the improvement of the above-described property;
  3. The amount claimed is a just and true amount due after deducting all just credits and offsets;
  4. All required statutory notices under Tex. Prop. Code Chapter 53 have been given; and
  5. This affidavit is filed within the time required by law.

Signature of Affiant: ________________________________

Printed Name: [________________________________]

Title: [________________________________]

Date: [__/__/____]


XIV. NOTARY ACKNOWLEDGMENT

STATE OF TEXAS
County of [________________________________]

SWORN TO AND SUBSCRIBED before me on this [____] day of [________________________________], 20[____], by [________________________________], who is personally known to me or who produced [________________________________] as identification.

Notary Public Signature: ________________________________

Printed Name: [________________________________]

My Commission Expires: [__/__/____]

(SEAL)


XV. FILING INSTRUCTIONS AND KEY DEADLINES

A. Where to File

File (record) this Mechanics Lien Affidavit with the County Clerk of the county where the property is located.

B. Critical Deadlines Summary

Deadline Original Contractor Subcontractor/Supplier Statute
§ 53.056 notice to owner/original contractor N/A Residential: 15th day of 2nd month; other: 15th day of 3rd month after each unpaid furnishing month § 53.056
File lien affidavit (other than residential construction) 15th of 4th month after original contractor's work completed, terminated, or abandoned 15th of 4th month after later of last furnishing or normal delivery of undelivered specially fabricated materials § 53.052(a)(1), (b)
File lien affidavit (residential construction) 15th of 3rd month after original contractor's work completed, terminated, or abandoned 15th of 3rd month after later of last furnishing or normal delivery of undelivered specially fabricated materials § 53.052(a)(2), (c)
Send copy of filed affidavit Owner: within 5 days of filing Owner and original contractor: within 5 days of filing § 53.055
Commence foreclosure action By 1 year after last day claimant could have filed, subject to § 53.158(a-2) extension Same § 53.158

C. Recording Fees

Contact the [________________________________] County Clerk for current recording fees.


XVI. LIEN PRIORITY (Tex. Prop. Code §§ 53.123–53.124)

A. General Priority

  • For purposes of § 53.123, the lien generally begins when construction starts or materials are delivered to the land, provided the construction or materials are visible on inspection; see § 53.124(a)–(b) for the rule and its exceptions
  • The lien has priority over mortgages and encumbrances that attach after the inception date
  • The lien is subordinate to purchase money mortgages and pre-existing recorded encumbrances

B. Constitutional Lien Priority

A constitutional lien may arise without recording, but this affidavit does not establish priority against purchasers or lenders from the contract date alone. Determine priority against other interests before relying on an unrecorded claim. For statutory liens, apply the inception and priority rules in §§ 53.123–53.124, including the recording-date rule for claimants listed in § 53.021(3)–(5).


XVII. LIEN RELEASE AND BONDING PROVISIONS

A. Release of Lien

After the debt is paid with collected funds, the person who furnished the labor or materials must, within 10 days after receiving a written request, furnish the requester a release of the paid debt and any lien claimed to that extent. The release must be in a form that can be recorded; § 53.152 does not itself require the claimant to file it.

B. Bonding Off the Lien (Tex. Prop. Code §§ 53.171–53.172)

The owner or interested party may bond around the lien by filing a surety bond with the County Clerk. The bond must:

  • Be in an amount equal to double the liens claimed if the total is $40,000 or less; if the total exceeds $40,000, use the greater of 1.5 times the total or the total plus $40,000
  • Be issued by a surety authorized to do business in Texas
  • Be conditioned on payment of any judgment

C. Invalid and Fraudulent Liens

Tex. Prop. Code § 53.160 permits a verified motion to remove an invalid or unenforceable lien in a suit, subject to that section's grounds and procedures. Separately, a person injured by a fraudulent lien satisfying Tex. Civ. Prac. & Rem. Code § 12.002(a) may recover the greater of $10,000 or actual damages, plus court costs and reasonable attorney's fees; the court may also award exemplary damages.


XVIII. ENFORCEMENT

A. Enforcement Deadline (Tex. Prop. Code § 53.158)

An action to foreclose the lien must be commenced by the first anniversary of the last day the claimant could have filed the lien affidavit under § 53.052, unless a qualifying extension under § 53.158(a-2) applies.

B. Court of Jurisdiction

Enforcement actions are filed in the Texas District Court for the county in which the property is located.

C. Lis Pendens

Upon commencement of a lien enforcement action, the claimant should file a lis pendens with the County Clerk.


XIX. PRACTICE NOTES

  1. Constitutional vs. Statutory Lien. Texas provides a constitutional lien (Tex. Const. Art. XVI, § 37) for original contractors. Recording the lien provides constructive notice and is strongly recommended.

  2. Homestead Protections are Strict. Both spouses must sign the written contract for work on a homestead. Oral contracts do not support homestead liens.

  3. Monthly Deadline for Derivative Claimants. Calculate the § 53.056 deadline for each unpaid furnishing month. A consolidated notice must still be timely for every amount included. Section 53.057 separately governs unpaid retainage not wholly included in a § 53.056 notice.

  4. 15th-of-the-Month Deadlines. Texas filing deadlines are tied to the 15th of a specified month. Section 53.003(e), amended by S.B. 929 in 2025, extends a Chapter 53 deadline falling on a weekend or legal holiday to the next day that is not one.

  5. Withholding After Notice. Section 53.081 authorizes the owner to withhold the amount necessary to pay a § 53.056 claim immediately on receipt; do not describe that authorization as an unconditional duty without analyzing all of Subchapter D.

  6. Bond Amount. Section 53.172(3) uses double the liens claimed up to $40,000; above that, it uses the greater of 1.5 times the total or the total plus $40,000.

  7. Fraudulent-Lien Liability. Tex. Civ. Prac. & Rem. Code § 12.002 imposes the greater of $10,000 or actual damages, plus costs and attorney's fees, if its fraud and intent requirements are met.

  8. Retainage. Texas law addresses retainage under Tex. Prop. Code §§ 53.101-53.106. Understand retainage rules as they affect lien amounts.


SOURCES AND REFERENCES

  • Tex. Const. Art. XVI, § 37 — Constitutional Lien: https://statutes.capitol.texas.gov/Docs/CN/htm/CN.16/CN.16.37.htm
  • Tex. Prop. Code Chapter 53 — Mechanic's Liens: https://statutes.capitol.texas.gov/Docs/PR/htm/PR.53.htm
  • Texas Mechanics Lien Guide (Levelset): https://www.levelset.com/mechanics-lien/texas-lien-law-faqs/
  • Texas Mechanic's Lien Timeline — 2026 Guide: https://www.texaseasylien.com/faqs/how-are-the-dates-and-deadlines-calculated/
  • TAMU Real Estate Research Center — Mechanics' and Materialman's Liens: https://trerc.tamu.edu/article/mechanics-and-materialmans-liens-2402/

This template is provided for informational purposes only and does not constitute legal advice. An attorney licensed in Texas should review and customize this document before use. Texas mechanics lien law is among the most complex in the nation; strict compliance with all notice and filing requirements is essential.

Insert Image

Insert Table

Watch Ezel in action (sample case)Choose a plan

All changes saved
Save
Export
Export as DOCX
Export as PDF
Generating PDF...
mechanics_lien_claim_tx.pdf
Ready to export as PDF or Word
AI is editing...
Chat
Review

Draft it in the editor

The AI drafts each section from your answers and you review every word. Drafting from scratch takes hours; finish yours for $99 one time.

  • Built on this template
    Uses the Texas version and the statutes it cites.
  • Formatted like the template
    Captions, numbering and layout stay intact.
  • AI editing
    Rewrite any section from your own notes.
  • Export as PDF and Word
    Yours to review, sign, or file.
Secure checkout via Stripe
Need to customize this document?

About this template

Last updated
November 12, 2026
Jurisdiction
Texas
Category
Real Estate

Legal authority

  • Tex. Const. Art. XVI, § 37 (Constitutional lien for mechanics and materialmen)
  • Tex. Prop. Code § 53.001 (Definitions)
  • Tex. Prop. Code § 53.021 (Persons entitled to lien)
  • Tex. Prop. Code § 53.022 (Property to which lien extends)
  • Tex. Prop. Code § 53.052(a)-(d) (Filing deadlines by claimant and project type)
  • Tex. Prop. Code § 53.054 (Contents of lien affidavit)
  • Tex. Prop. Code § 53.056 (Notice to owner — subcontractors)
  • Tex. Prop. Code § 53.057 (Notice of claim for unpaid retainage)
  • Tex. Prop. Code § 53.158 (Period for bringing suit to foreclose lien)
  • Tex. Prop. Code § 53.106 (Affidavit of completion)
  • Tex. Prop. Code §§ 53.171–53.172 (Bonding off lien and bond amount)
  • Tex. Prop. Code § 53.254 (Homestead contract and affidavit notice)

Real estate documents transfer ownership, define who can use a property, and record agreements between buyers, sellers, landlords, and tenants. Deeds, purchase agreements, leases, and easements have to be drafted to meet state recording requirements, and mistakes show up at closing or years later in title disputes. Good real estate paperwork moves transactions forward quickly and avoids the kind of problems that only surface when it is time to sell or refinance.

Not legal advice

This template is provided for informational purposes. We recommend having an attorney review any legal document before signing, especially for high-value or complex matters.

Checked against the law it cites

The statutes this template relies on are listed under Legal authority.

Tex. Prop. Code § 53.021 (checked October 7, 2026): "A person has a lien if the person, under a contract with the owner or the owner's agent, trustee, receiver, contractor, or subcontractor: (1) labors or furnishes labor or materials for construction or repair of an improvement;"

Tex. Prop. Code § 53.152(a)-(b) (checked November 13, 2026): "not later than the 10th day after the date of receipt of a written request, furnish to the requesting person a release of the indebtedness and any lien claimed, to the extent of the indebtedness paid."

Tex. Prop. Code § 53.022(a) (checked October 7, 2026): "The lien extends to the improvements and to each lot of land necessarily connected."

Tex. Prop. Code § 53.052(a) (checked October 7, 2026): "An original contractor claiming the lien must file an affidavit with the county clerk: (1) for projects other than residential construction projects, not later than the 15th day of the fourth month after the month in which the original contractor's work was completed, terminated, or abandoned; or (2) for residential construction projects, not later than the 15th day of the third month after the month in which the original contractor's work was completed, terminated, or abandoned."

Draft your Mechanics Lien Affidavit in the editor

Answer a few questions, let the AI editor draft each section from your answers, review it, and download Word and PDF. $99 one time, or $249 per month for every document and every Ezel app.