Energy Storage Agreement
ENERGY STORAGE AGREEMENT
Agreement Number: [________________________________]
Effective Date: [__/__/____]
TABLE OF CONTENTS
- Parties
- Recitals
- Definitions
- Agreement Structure
- System Specifications
- Development and Construction
- Operations and Dispatch
- Compensation
- Performance Guarantees
- Interconnection
- Insurance and Indemnification
- Term and Termination
- General Provisions
- Signatures
PARTIES
BESS DEVELOPER/OWNER:
Company Name: [________________________________]
Address: [________________________________]
City, State, ZIP: [________________________________]
Phone: [________________________________] Email: [________________________________]
OFFTAKER/HOST:
Name/Entity: [________________________________]
Address: [________________________________]
City, State, ZIP: [________________________________]
Phone: [________________________________] Email: [________________________________]
RECITALS
WHEREAS, Developer will design, construct, own, and operate a Battery Energy Storage System ("BESS") at [________________________________] ("Project Site"); and
WHEREAS, Offtaker desires to procure energy storage products and services from the BESS;
NOW, THEREFORE, the Parties agree as follows:
DEFINITIONS
- BESS — Battery Energy Storage System, including batteries, inverters, power conditioning systems, thermal management, and associated balance-of-plant equipment.
- Nameplate Capacity — The manufacturer-rated maximum energy storage capacity (MWh) and power output (MW) of the BESS.
- State of Charge (SOC) — The percentage of total energy capacity currently stored in the BESS.
- Round-Trip Efficiency (RTE) — Ratio of energy discharged to energy charged, expressed as a percentage.
- Degradation — The gradual reduction of BESS capacity over time due to cycling and aging.
- Commercial Operation Date (COD) — The date the BESS is fully operational and meets performance testing criteria.
AGREEMENT STRUCTURE
4.1 Agreement Type (select one):
☐ Power Purchase Agreement (PPA) — Developer sells capacity, energy, and ancillary services to Offtaker at agreed prices.
☐ Tolling Agreement — Offtaker supplies charging energy; Developer makes BESS capacity available for Offtaker's dispatch.
☐ Shared Savings — Parties share economic benefits from demand charge reduction, arbitrage, and ancillary services.
SYSTEM SPECIFICATIONS
| Specification | Value |
|---|---|
| Battery Technology | ☐ Lithium-Ion (LFP) ☐ Lithium-Ion (NMC) ☐ Flow Battery ☐ Other: [____] |
| Nameplate Power Rating | [________] MW |
| Nameplate Energy Capacity | [________] MWh |
| Duration | [________] hours |
| Guaranteed Round-Trip Efficiency | [____]% (minimum) |
| Expected Useful Life | [____] years |
| Guaranteed Cycles | [________] full-cycle equivalents over the term |
| Manufacturer | [________________________________] |
DEVELOPMENT AND CONSTRUCTION
6.1 Developer shall obtain all permits, interconnection approvals, and regulatory authorizations.
6.2 Key Milestones:
| Milestone | Target Date |
|---|---|
| Permitting Complete | [__/__/____] |
| Notice to Proceed | [__/__/____] |
| Mechanical Completion | [__/__/____] |
| Performance Testing | [__/__/____] |
| Guaranteed COD | [__/__/____] |
6.3 Delay Liquidated Damages: If COD is not achieved by the Guaranteed COD, Developer shall pay $[________] per day of delay, capped at $[________].
6.4 Developer bears all construction costs unless otherwise specified in Exhibit A.
OPERATIONS AND DISPATCH
7.1 Dispatch Authority: ☐ Developer ☐ Offtaker ☐ Shared per dispatch protocol in Exhibit B.
7.2 Permitted Uses:
☐ Peak shaving / demand charge management
☐ Energy arbitrage
☐ Frequency regulation and ancillary services
☐ Backup/resilience power
☐ Renewable energy integration (solar/wind firming)
☐ Wholesale market participation per FERC Order 841
7.3 Developer shall maintain the BESS and respond to outages within [____] hours.
7.4 Planned maintenance shall not exceed [____] days per year and requires [____] days' advance notice.
COMPENSATION
8.1 For PPA Structure:
- Capacity Payment: $[________] per MW-month
- Energy Payment: $[________] per MWh discharged
- Ancillary Service Revenue: ☐ Retained by Developer ☐ Shared [___]% / [___]%
8.2 For Tolling Structure:
- Fixed Monthly Tolling Fee: $[________] per MW-month
- Variable O&M Charge: $[________] per MWh throughput
8.3 Payment due within [____] days of monthly invoice.
PERFORMANCE GUARANTEES
9.1 Guaranteed Availability: [____]% annually.
9.2 Guaranteed Minimum Capacity: BESS shall maintain at least [____]% of Nameplate Energy Capacity through Year [____].
9.3 Performance Shortfall Liquidated Damages: $[________] per MWh of guaranteed but undelivered capacity.
9.4 Developer shall conduct annual capacity tests and provide results to Offtaker within [____] days.
INTERCONNECTION
10.1 Developer shall execute an interconnection agreement with [UTILITY NAME] and bear all interconnection costs.
10.2 BESS shall comply with IEEE 1547-2018 and applicable utility interconnection standards.
10.3 Point of Interconnection: [________________________________]
INSURANCE AND INDEMNIFICATION
11.1 Developer shall maintain: Commercial General Liability ($[________]); Property/Equipment Insurance (full replacement value); Environmental Liability ($[________]).
11.2 Each Party indemnifies the other for losses arising from its negligence or breach.
TERM AND TERMINATION
12.1 Initial Term: [____] years from COD.
12.2 Renewal: ☐ Automatic for [____]-year terms ☐ By mutual written agreement.
12.3 Termination for cause upon [____] days' notice and [____]-day cure period.
12.4 Upon termination, Developer shall remove the BESS within [____] days and restore the site.
GENERAL PROVISIONS
13.1 Governing Law: State of [________________________________].
13.2 Dispute Resolution: ☐ Mediation ☐ Arbitration ☐ Litigation.
13.3 Assignment: Requires prior written consent; Developer may assign to project financing lender.
13.4 Force Majeure: Standard force majeure provisions apply.
13.5 Entire Agreement: This Agreement and its Exhibits constitute the complete understanding.
SIGNATURES
BESS DEVELOPER/OWNER:
Signature: [________________________________] Date: [__/__/____]
Printed Name: [________________________________] Title: [________________________________]
OFFTAKER/HOST:
Signature: [________________________________] Date: [__/__/____]
Printed Name: [________________________________] Title: [________________________________]
EXHIBITS
- Exhibit A — Cost Allocation and Payment Schedule
- Exhibit B — Dispatch Protocol
- Exhibit C — System Technical Specifications
- Exhibit D — Site Plan
Sources and References
About This Template
Energy and utilities law covers contracts, permits, and regulatory filings for power generation, transmission, oil and gas, renewables, and utility service. Federal regulators and state public utility commissions have detailed procedural rules, and most commercial energy deals layer in tax credits, environmental compliance, and long-term pricing terms. Precision in these documents matters because energy contracts run for decades and the regulatory downside of getting them wrong is significant.
Important Notice
This template is provided for informational purposes. It is not legal advice. We recommend having an attorney review any legal document before signing, especially for high-value or complex matters.