Change Order Template

Ready to Edit

CHANGE ORDER

Change Order No.: [____]
Date Issued: [__/__/____]
Project Name: [________________________________]
Project Number / Reference: [________________________________]


ARTICLE 1 — PARTIES AND MASTER AGREEMENT REFERENCE

1.1 Parties.

This Change Order ("Change Order" or "CO") is entered into by and between:

Owner / Client ("Owner"):
Name: [________________________________]
Address: [________________________________]
City, State, ZIP: [________________________________]
Contact Person: [________________________________]
Email: [________________________________]
Phone: [________________________________]

Contractor / Service Provider ("Contractor"):
Name: [________________________________]
Address: [________________________________]
City, State, ZIP: [________________________________]
Contact Person: [________________________________]
Email: [________________________________]
Phone: [________________________________]

1.2 Master Agreement Reference.

This Change Order modifies and is issued pursuant to the following agreement(s):

Document Title / Reference Number Date Executed
Master Agreement / Prime Contract [________________________________] [__/__/____]
Statement of Work / Scope [________________________________] [__/__/____]
Prior Change Order(s) (if any) [________________________________] [__/__/____]
Purchase Order (if applicable) [________________________________] [__/__/____]

1.3 Incorporation. This Change Order is incorporated into and forms part of the Master Agreement. Capitalized terms not defined herein have the meanings set forth in the Master Agreement.


ARTICLE 2 — DEFINITIONS

2.1 "Change Order Effective Date" means the date on which the last authorized signatory executes this Change Order, unless a different date is specified in Article 11.

2.2 "Contract Price" means the total compensation payable under the Master Agreement as adjusted by all prior Change Orders.

2.3 "Contract Time" means the period allowed for completion of the Work as adjusted by all prior Change Orders.

2.4 "Force Majeure Event" means any event beyond the reasonable control of the affected Party, including acts of God, fire, flood, earthquake, hurricane, tornado, epidemic, pandemic, war, terrorism, civil unrest, government action or regulation, labor disputes not involving the affected Party's employees, or supply chain disruptions not reasonably foreseeable at the time of the Master Agreement.

2.5 "Master Agreement" means the prime contract, service agreement, or other governing agreement identified in Article 1.2, together with all exhibits, schedules, and prior Change Orders.

2.6 "Original Contract Price" means the Contract Price stated in the Master Agreement prior to any Change Orders.

2.7 "Work" means all labor, materials, equipment, services, and deliverables required under the Master Agreement as modified by this Change Order.


ARTICLE 3 — DESCRIPTION OF CHANGE

3.1 Summary of Change.

[________________________________]
[________________________________]
[________________________________]

3.2 Detailed Scope of Change.

The following modifications to the Work are authorized by this Change Order:

Work Added:
| Item | Description | Specifications / Standards |
|------|-------------|---------------------------|
| 1 | [________________________________] | [________________________________] |
| 2 | [________________________________] | [________________________________] |
| 3 | [________________________________] | [________________________________] |

Work Deleted:
| Item | Description | Credit Amount |
|------|-------------|---------------|
| 1 | [________________________________] | $[________] |
| 2 | [________________________________] | $[________] |

Work Modified:
| Item | Original Requirement | Revised Requirement |
|------|---------------------|---------------------|
| 1 | [________________________________] | [________________________________] |
| 2 | [________________________________] | [________________________________] |

3.3 Deliverables Affected.

Deliverable Original Description Revised Description Revised Due Date
[________________________________] [________________________________] [________________________________] [__/__/____]
[________________________________] [________________________________] [________________________________] [__/__/____]

3.4 Specifications and Standards. Unless modified by this Change Order, all Work shall be performed in accordance with the specifications and standards set forth in the Master Agreement. Where this Change Order introduces new work items, such items shall conform to: [________________________________].


ARTICLE 4 — REASON FOR CHANGE

4.1 Category. Check all that apply:

☐ Owner / Client-Directed Scope Change
☐ Design Error or Omission
☐ Differing Site Conditions (Construction)
☐ Regulatory or Code Compliance Requirement
☐ Force Majeure Event (specify): [________________________________]
☐ Value Engineering / Cost Savings Proposal
☐ Schedule Acceleration Request
☐ Correction of Defective Specifications
☐ Unforeseen Conditions (specify): [________________________________]
☐ Third-Party Requirement (specify): [________________________________]
☐ Material Substitution (specify): [________________________________]
☐ Technology Change or Upgrade
☐ Price Escalation (permitted under Master Agreement)
☐ Mutual Agreement for Project Improvement
☐ Other (specify): [________________________________]

4.2 Detailed Justification.

[________________________________]
[________________________________]
[________________________________]

4.3 Supporting Documentation. The following documents are attached in support of this Change Order:

☐ Revised drawings or plans (Exhibit A)
☐ Revised specifications
☐ Cost estimate / quotation
☐ Vendor or subcontractor proposals
☐ Photographs or site documentation
☐ Regulatory or code references
☐ Correspondence authorizing the change
☐ Engineer's or architect's recommendation
☐ Other: [________________________________]


ARTICLE 5 — IMPACT ASSESSMENT

5.1 Schedule Impact.

Impact Category Assessment
Days Added to Contract Time [____] calendar days / [____] working days
Days Deducted from Contract Time [____] calendar days / [____] working days
Net Schedule Impact [____] calendar days / [____] working days
Critical Path Affected? ☐ Yes ☐ No
Float Consumed [____] days

5.2 Cost Impact Summary.

Category Addition (+) Deduction (−) Net Change
Direct Labor $[________] $[________] $[________]
Materials $[________] $[________] $[________]
Equipment $[________] $[________] $[________]
Subcontractor Costs $[________] $[________] $[________]
Overhead & Markup $[________] $[________] $[________]
Total $[________] $[________] $[________]

5.3 Resource Impact.

Resource Category Current Allocation Revised Allocation Change
Personnel (FTEs) [____] [____] [____]
Equipment Units [____] [____] [____]
Subcontractor Teams [____] [____] [____]

5.4 Risk Impact.

Risk Factor Low Medium High Description
Technical Complexity [________________________________]
Schedule Risk [________________________________]
Cost Overrun Risk [________________________________]
Quality Impact [________________________________]
Regulatory / Compliance [________________________________]
Safety Impact [________________________________]

ARTICLE 6 — COST ADJUSTMENT

6.1 Pricing Method. Check one:

☐ Lump Sum / Fixed Price
☐ Unit Price
☐ Time and Materials (T&M)
☐ Cost Plus Fixed Fee
☐ Cost Plus Percentage
☐ Combination (describe): [________________________________]

6.2 Itemized Cost Breakdown.

Line Item Description Quantity Unit Unit Price Extended Price
1 [________________________________] [____] [____] $[________] $[________]
2 [________________________________] [____] [____] $[________] $[________]
3 [________________________________] [____] [____] $[________] $[________]
4 [________________________________] [____] [____] $[________] $[________]
5 [________________________________] [____] [____] $[________] $[________]

6.3 Labor Rates.

Classification / Role Hourly Rate Estimated Hours Total
[________________________________] $[________] [____] $[________]
[________________________________] $[________] [____] $[________]
[________________________________] $[________] [____] $[________]

6.4 Markup and Overhead.

Category Rate (%) Base Amount Markup Amount
Contractor Overhead [____]% $[________] $[________]
Contractor Profit [____]% $[________] $[________]
Subcontractor Markup [____]% $[________] $[________]
Bond Premium (if applicable) [____]% $[________] $[________]
Insurance (if applicable) [____]% $[________] $[________]

6.5 Total Cost Adjustment.

Amount
Original Contract Price $[________]
Prior Approved Change Orders (total) $[________]
Contract Price Before This CO $[________]
This Change Order (net) $[________]
Revised Contract Price $[________]

6.6 Taxes. All amounts stated herein are exclusive of applicable sales, use, excise, or similar taxes unless expressly stated otherwise. Taxes, if applicable, shall be added in the amount of $[________] or as required by law.


ARTICLE 7 — SCHEDULE ADJUSTMENT

7.1 Current and Revised Milestones.

Milestone Original Date Current Date (with prior COs) Revised Date (this CO)
[________________________________] [__/__/____] [__/__/____] [__/__/____]
[________________________________] [__/__/____] [__/__/____] [__/__/____]
[________________________________] [__/__/____] [__/__/____] [__/__/____]
[________________________________] [__/__/____] [__/__/____] [__/__/____]

7.2 Critical Path Impact. This Change Order ☐ does / ☐ does not affect the critical path of the Project. If yes, the following critical path activities are affected: [________________________________].

7.3 Revised Substantial Completion Date.

Date
Original Substantial Completion Date [__/__/____]
Current Substantial Completion Date (with prior COs) [__/__/____]
Revised Substantial Completion Date (this CO) [__/__/____]

7.4 Revised Final Completion Date.

Date
Original Final Completion Date [__/__/____]
Current Final Completion Date (with prior COs) [__/__/____]
Revised Final Completion Date (this CO) [__/__/____]

7.5 Liquidated Damages. Any liquidated damages provisions in the Master Agreement shall apply based on the revised completion dates set forth in this Article 7, unless expressly modified herein.


ARTICLE 8 — PAYMENT TERMS

8.1 Payment Schedule. Payment for the additional Work authorized by this Change Order shall be made as follows:

☐ Progress payments in accordance with the Master Agreement payment schedule
☐ Lump sum upon completion of the Change Order Work
☐ Milestone-based payments per the following schedule:

Milestone Payment Amount Due Upon
[________________________________] $[________] [________________________________]
[________________________________] $[________] [________________________________]
[________________________________] $[________] [________________________________]

☐ Time and materials, invoiced: ☐ weekly / ☐ bi-weekly / ☐ monthly
☐ Other: [________________________________]

8.2 Invoice Requirements. Invoices for Change Order Work shall reference this Change Order number and shall be submitted to: [________________________________]. Each invoice shall include itemized costs, supporting documentation, and certification that the Work has been performed.

8.3 Retainage. Retainage on Change Order Work shall be held at [____]% of each progress payment, consistent with the Master Agreement unless modified herein. Retainage shall be released upon: [________________________________].

8.4 Prompt Payment. Owner shall pay undisputed amounts within [____] days of receipt of a proper invoice. Payment terms are subject to applicable prompt payment statutes in the jurisdiction governing this Change Order. Interest on late payments shall accrue at the rate of [____]% per month / per annum (or as required by applicable law, whichever is greater).

8.5 Disputed Amounts. If Owner disputes any portion of an invoice, Owner shall: (a) pay the undisputed portion within the time required by Article 8.4; (b) provide written notice of the disputed amount with specific reasons for the dispute within [____] days of receipt of the invoice; and (c) work in good faith to resolve the dispute. Withholding of disputed amounts shall not exceed [____]% of the disputed portion.


ARTICLE 9 — EFFECT ON MASTER AGREEMENT

9.1 Provisions Modified. This Change Order modifies the following provisions of the Master Agreement:

Master Agreement Section Nature of Modification
[________________________________] [________________________________]
[________________________________] [________________________________]
[________________________________] [________________________________]

9.2 Provisions Unchanged. Except as expressly modified by this Change Order, all terms and conditions of the Master Agreement, including without limitation provisions governing intellectual property, confidentiality, indemnification, limitation of liability, insurance, dispute resolution, and termination, remain in full force and effect.

9.3 Order of Precedence. In the event of a conflict between this Change Order and the Master Agreement, the documents shall control in the following order of precedence (highest to lowest):

  1. This Change Order No. [____]
  2. Prior Change Orders (in reverse chronological order)
  3. The Master Agreement (including all exhibits and schedules)
  4. The original Statement of Work / Scope of Work

9.4 Cumulative Effect. This Change Order, together with all prior Change Orders, represents the total adjustment to the Contract Price and Contract Time. The cumulative net change to date is:

Amount / Time
Cumulative Price Adjustment (all COs) $[________]
Cumulative Schedule Adjustment (all COs) [____] days

9.5 No Waiver. The issuance or execution of this Change Order does not constitute a waiver of either Party's rights under the Master Agreement, including the right to claim additional compensation or time extensions for changes not addressed herein.


ARTICLE 10 — REPRESENTATIONS AND WARRANTIES

10.1 Contractor Representations. Contractor represents and warrants that:

(a) The pricing set forth in this Change Order is complete and includes all costs necessary to perform the Change Order Work, except for items expressly identified as allowances or estimates.

(b) Contractor has reviewed the scope of the Change Order Work and has the capability, resources, and expertise to perform such Work in accordance with the Master Agreement standards.

(c) The Change Order Work will be performed in a professional and workmanlike manner, using materials of good quality and in accordance with applicable codes, laws, and regulations.

(d) Contractor has disclosed all known conditions that may affect the cost or schedule of the Change Order Work.

(e) This Change Order represents the full and complete adjustment to the Contract Price and Contract Time for the changes described herein. Contractor waives any further claim for additional compensation or time related to the matters addressed in this Change Order, except as expressly reserved.

10.2 Owner Representations. Owner represents and warrants that:

(a) The person executing this Change Order on behalf of Owner has the authority to do so and to bind Owner to its terms.

(b) Owner has approved the budget necessary to fund this Change Order.

(c) Owner will cooperate with Contractor in providing timely access, information, approvals, and decisions necessary for the performance of the Change Order Work.


ARTICLE 11 — AUTHORIZATION AND APPROVAL

11.1 Approval Authority. This Change Order has been reviewed and approved in accordance with the following authorization thresholds:

Approval Level Name / Title Authority Limit Signature Required
Project Manager [________________________________] Up to $[________] ☐ Yes ☐ No
Department Head / Director [________________________________] Up to $[________] ☐ Yes ☐ No
Vice President / Executive [________________________________] Up to $[________] ☐ Yes ☐ No
Board / Committee [________________________________] Over $[________] ☐ Yes ☐ No

11.2 Multi-Party Approval. Where the Master Agreement involves additional parties (e.g., architect, engineer, surety, lender), the following approvals are also required:

Role Name / Firm Approval Required? Approved?
Architect / Engineer [________________________________] ☐ Yes ☐ No ☐ Yes ☐ No
Surety / Bonding Company [________________________________] ☐ Yes ☐ No ☐ Yes ☐ No
Construction Lender [________________________________] ☐ Yes ☐ No ☐ Yes ☐ No
Other: [____________] [________________________________] ☐ Yes ☐ No ☐ Yes ☐ No

11.3 Effective Date. This Change Order is effective as of [__/__/____] ("Effective Date"), which is the date of the last authorized signature below unless otherwise specified.


ARTICLE 12 — GENERAL PROVISIONS

12.1 Governing Law. This Change Order shall be governed by and construed in accordance with the governing law provisions of the Master Agreement. If the Master Agreement is silent on governing law, this Change Order shall be governed by the laws of the State of [________________________________], without regard to conflict-of-law principles.

12.2 Written Modification Requirement. This Change Order may not be modified, amended, or supplemented except by a written instrument executed by both Parties. Oral modifications are not enforceable.

12.3 Counterparts and Electronic Signatures. This Change Order may be executed in counterparts, each of which shall be deemed an original. Electronic signatures shall be deemed valid and binding to the fullest extent permitted by applicable law, including the federal Electronic Signatures in Global and National Commerce Act (E-SIGN Act) and applicable state law.

12.4 Notices. All notices required or permitted under this Change Order shall be delivered in accordance with the notice provisions of the Master Agreement.

12.5 Severability. If any provision of this Change Order is held to be invalid or unenforceable, the remaining provisions shall continue in full force and effect.

12.6 Entire Agreement. This Change Order, together with the Master Agreement and all prior Change Orders, constitutes the entire agreement between the Parties with respect to the changes described herein and supersedes all prior negotiations, representations, and agreements relating to such changes.


ARTICLE 13 — EXECUTION

By executing this Change Order, each Party acknowledges that it has read, understands, and agrees to be bound by all terms and conditions set forth herein and in the Master Agreement as modified hereby.

OWNER / CLIENT:

Signature: _________________________________________
Printed Name: [________________________________]
Title: [________________________________]
Date: [__/__/____]

CONTRACTOR / SERVICE PROVIDER:

Signature: _________________________________________
Printed Name: [________________________________]
Title: [________________________________]
Date: [__/__/____]

ARCHITECT / ENGINEER (if applicable):

Signature: _________________________________________
Printed Name: [________________________________]
Title: [________________________________]
Date: [__/__/____]


EXHIBIT A — COST BREAKDOWN WORKSHEET

A.1 Direct Costs

Category Description Quantity Unit Unit Cost Total
Labor [________________________________] [____] hrs $[________] $[________]
Labor [________________________________] [____] hrs $[________] $[________]
Materials [________________________________] [____] [____] $[________] $[________]
Materials [________________________________] [____] [____] $[________] $[________]
Equipment [________________________________] [____] days $[________] $[________]
Equipment [________________________________] [____] days $[________] $[________]
Subcontractor [________________________________] LS $[________]
Subcontractor [________________________________] LS $[________]
Subtotal Direct Costs $[________]

A.2 Indirect Costs and Markup

Category Rate Base Amount
Overhead [____]% $[________] $[________]
Profit [____]% $[________] $[________]
Bond Premium [____]% $[________] $[________]
Insurance [____]% $[________] $[________]
Sales Tax [____]% $[________] $[________]
Subtotal Indirect Costs $[________]

A.3 Credits

Category Description Credit Amount
Deleted Work [________________________________] ($[________])
Material Substitution Savings [________________________________] ($[________])
Total Credits ($[________])

A.4 Total

Amount
Total Direct Costs $[________]
Total Indirect Costs $[________]
Total Credits ($[________])
Net Change Order Amount $[________]

EXHIBIT B — REVISED SCHEDULE

B.1 Schedule Comparison

Activity / Milestone Original Date Prior Revised Date New Revised Date Days Changed
[________________________________] [__/__/____] [__/__/____] [__/__/____] [____]
[________________________________] [__/__/____] [__/__/____] [__/__/____] [____]
[________________________________] [__/__/____] [__/__/____] [__/__/____] [____]
[________________________________] [__/__/____] [__/__/____] [__/__/____] [____]
[________________________________] [__/__/____] [__/__/____] [__/__/____] [____]

B.2 Critical Path Narrative

[________________________________]
[________________________________]
[________________________________]

B.3 Revised Gantt Chart or CPM Schedule

☐ Attached separately as Schedule Exhibit B-1
☐ Not applicable


EXHIBIT C — SCOPE CHANGE DETAILS

C.1 Narrative Description of Changed Work

[________________________________]
[________________________________]
[________________________________]
[________________________________]
[________________________________]

C.2 Revised Drawings / Plans

Drawing Number Title Revision Date
[________________________________] [________________________________] [____] [__/__/____]
[________________________________] [________________________________] [____] [__/__/____]

C.3 Revised Specifications

Specification Section Title Revision Date
[________________________________] [________________________________] [____] [__/__/____]
[________________________________] [________________________________] [____] [__/__/____]

C.4 Photographs and Site Documentation

☐ Attached separately as Exhibit C-1
☐ Not applicable


This template is provided for informational purposes only and does not constitute legal advice. Have this document reviewed by a qualified attorney licensed in your jurisdiction before use. Laws regarding contract modifications, prompt payment, and change order requirements vary by state and project type.

Ezel AI
Hi! Need help customizing this document? I can tailor every section to your specific case in minutes.
AI Legal Assistant
Ezel AI
Hi! Need help customizing this document? I can tailor every section to your specific case in minutes.

Insert Image

Insert Table

Watch Ezel in action (sample case)

All changes saved
Save
Export
Export as DOCX
Export as PDF
Generating PDF...
change_order_template_universal.pdf
Ready to export as PDF or Word
AI is editing...
Chat
Review

Customize this document with Ezel

  • Deep Legal Knowledge
    Understands case law, statutes, and legal doctrine.
  • Court-Ready Formatting
    Proper captions, certificates of service, and local rule compliance.
  • AI-Powered Editing on Your Timeline
    Edit as many times as you need. Tailor every section to your specific case.
  • Export as PDF & Word
    Download your finished document in professional PDF or DOCX format, ready to file or send.
Secure checkout via Stripe
Need to customize this document?

About This Template

A contract is a written record of what two or more parties agreed to and what happens if someone does not follow through. Clear language, defined terms, and clean signature blocks keep disputes small and enforceable. The most common mistakes in contracts come from vague promises, missing details about timing or payment, and skipping standard protective clauses like governing law and dispute resolution.