Harvey-Cleary Builders
Late notice of contest dismissed
Harvey-Cleary Builders was the general contractor at a Georgia construction site where OSHA issued an other-than-serious hazard communication citation. OSHA sent the citation by certified mail to the Maryland main-office address that the site superintendent had provided, and a company…
Delek Refining, Ltd.
Four refinery safety items affirmed and two vacated
OSHA cited six conditions at Delek's Texas oil refinery under the process safety management, machine guarding, and hazard communication standards. The Commission affirmed PSM items for failing to resolve process-hazard-analysis and audit findings inherited from the prior owner, holding that the…
Cranesville Block Co.
Review withdrawn and judge's ruling made final
The judge decided three consolidated dockets involving related Cranesville companies. The Secretary petitioned for Commission review only of issues in two companion dockets, not docket 10-0447. The Commission therefore severed 10-0447 and vacated its direction for review of that case. The judge's…
Dierzen-Kewanee Heavy Industries, LTD
Unabated hazards resulted in $133,100 in penalties
Dierzen-Kewanee manufactured dump-truck bodies at a former boiler factory in Illinois. After settling earlier OSHA citations, the company paid only the first penalty installment, did not provide requested abatement information, and left many cited conditions uncorrected for a follow-up inspection…
Sanderson Farms, Inc.
Unstable freezer pallet storage resulted in a $6,300 penalty
Sanderson Farms stored 2,200-to-2,500-pound pallets of frozen chicken on an aging freezer rack system with frequently damaged legs and little margin for placement error. A maintenance employee died from smoke inhalation and burns after beginning to cut a damaged rack leg while loaded pallets…
Cagle’s, Inc.
Waste-breading hazard items partly affirmed
Cagle's operated a chicken-processing plant where two employees died in a waste-breading trailer after carbon dioxide created an oxygen-deficient atmosphere. OSHA alleged that the trailer was a permit-required confined space and that Cagle's failed to label containers and train employees about…
Sturm Ruger & Co., Pine Tree Castings Division
Targeted inspection and settlements affirmed
OSHA used injury and illness data from Pine Tree Castings to select the handgun-casting facility for a programmed inspection under a nationwide targeting plan. Sturm Ruger challenged the data survey, inspection warrant, discovery rulings, evidence, and subpoenas. The Commission held that OSHA had…
North Atlantic Fish Company, Inc.
Broad fish-plant safety violations affirmed
OSHA's safety and health inspections of North Atlantic's Massachusetts fish-processing plant identified extensive fire, machine, electrical, chemical, respiratory, noise, storage, and powered-industrial-truck hazards. The judge affirmed most of the serious items, including general duty violations…
United Erie, Div. of Interstate Chemical Co., Inc.
Confined-space items affirmed as serious
A United Erie production employee died from oxygen deficiency after entering a 4,000-gallon chemical kettle. Judge G. Marvin Bober found that United lacked a site-specific permit-space program, atmospheric testing equipment, adequate attendant practices, entry permits, and complete rescue…
Aero Tec Laboratories, Inc.
Plant safety items largely affirmed with reduced penalties
Aero Tec manufactured fuel tanks and containment vessels at its New Jersey plant. The judge rejected its claim that OSHA had promised no penalties or exceeded the scope of consent because management accompanied the open inspection without objecting. The decision affirmed items involving an…
American Airlines, Inc.
FAA ground-operations manual does not preempt OSHA guardrail and hazard-communication citations after a fatal fall
American Airlines ran an aircraft maintenance and repair facility in Tulsa, Oklahoma. After a worker fell from the third story of a roughly 27-foot mobile "tail stand" work platform through unguarded floor openings to the ground and died, OSHA inspected and issued citations across two dockets…
General Cutlery Co., Inc.
Knife maker loses on almost every safety and health citation, including a willful hazard-communication violation
General Cutlery makes bayonets and household knives in Fremont, Ohio. After complaint inspections in May 1994, OSHA issued two sets of citations, later consolidated: safety violations (Docket No. 94-2015) and health violations (Docket No. 94-1933). The company, represented by its president, argued…
Marco Electronics Sales & Service
Locked exit and blocked fire extinguisher affirmed, penalties reduced
Marco Electronics Sales & Service repairs and sells electronic equipment in Corpus Christi, Texas. After a February 1993 inspection, OSHA cited the shop for a marked exit door that was locked, a fire extinguisher mounted low and blocked by a rolling work table and a TV being repaired, and two…
CNG Transmission Corporation
Mixed ruling on frac-tank hazards
CNG Transmission was preparing a natural-gas field for underground storage and used workers supplied by Union Drilling to monitor a frac-fluid flow-back operation. After the piping was changed so that fluid and gas flowed directly into a frac tank, two night-shift workers were found inside the tank…
Air Plastics, Inc.
Mixed ruling on pit hazards and chemical training
Air Plastics manufactured fiberglass tanks using molds mounted over production pits that employees entered during setup. The judge vacated a failure-to-abate general duty clause citation alleging hazardous confined-space atmospheres because OSHA did not prove that employees faced a significant risk…
Hamilton Fixture
Commission upholds expanded inspection and assesses $2,450
Hamilton Fixture manufactured wooden store-display fixtures at a plant in Hamilton, Ohio, with about 350 employees. OSHA began with a union complaint about safety practices and expanded the inspection plant-wide after the compliance officer calculated a lost-workday injury rate about three times…
United Technologies, Pratt & Whitney
Commission approves plating-shop settlement
Pratt & Whitney operated a plating shop at its West Palm Beach facility, where two maintenance employees were splashed with a cyanide solution during equipment-relocation work. OSHA cited alleged training, protective-equipment, warning-sign, labeling, and hazard-communication violations. The judge…
Trinity Industries, Inc.
Full-scope inspection warrant upheld
Trinity manufactured tanks and pressure vessels at a Sharonville, Ohio, facility. After an employee complaint, OSHA obtained a warrant authorizing a limited complaint inspection, a records review, and a full-scope inspection if neutral administrative-plan criteria were met. The facility's…
Conagra Flour Milling Co. & Its Successors
Flour-mill electrical and blowdown violations affirmed
Conagra operated a seven-story flour mill in Sherman, Texas, where combustible grain dust made the milling floors Class II, Division 2 hazardous locations. The Commission affirmed serious violations for using a grain tester and pedestal fan with exposed motor components that did not meet the…
What these documents are
- Commission decisions: Rulings by the Occupational Safety and Health Review Commission itself, the highest level of agency review. These are citable as Commission precedent, though a decision may have been appealed to a U.S. Court of Appeals after issuance.
- ALJ decisions: Rulings by OSHRC Administrative Law Judges after a hearing. When no Commissioner directs review, an ALJ decision becomes a final order under 29 U.S.C. § 661(j): it binds the parties in that case but is not binding precedent in other cases.
- Why finality matters: Every page here says which kind of decision you are reading, so you know whether it is precedent you can cite or a final order that only shows how one judge ruled on one set of facts.
- Where they come from: Every page links the official OSHRC public release, and the full text on the page is that release. The plain-English summaries are written by Ezel.