Mechanics' Lien Release - Florida
MECHANICS' LIEN RELEASE
State of Florida
Governed by Florida Statutes Chapter 713, Part I - Construction Liens (F.S. § 713.001 et seq.)
PART 1: SATISFACTION AND DISCHARGE OF CONSTRUCTION LIEN
Pursuant to F.S. § 713.21
RECORDING REQUESTED BY:
Name: [________________________________]
Address: [________________________________]
City/State/ZIP: [________________________________]
WHEN RECORDED, RETURN TO:
Name: [________________________________]
Address: [________________________________]
City/State/ZIP: [________________________________]
THIS INSTRUMENT PREPARED BY OR UNDER THE SUPERVISION OF:
Natural person's printed name: [________________________________]
Post-office address: [________________________________]
SATISFACTION AND DISCHARGE OF CONSTRUCTION LIEN
County of Recording: [________________________________], Florida
Official Records Book: [________] Page: [________]
Instrument Number: [________________________________]
Date of Original Lien Recording: [__/__/____]
Clerk of the Circuit Court: [________________________________] County
PROPERTY INFORMATION:
Legal Description of Property:
[________________________________]
[________________________________]
[________________________________]
Folio/Parcel ID Number: [________________________________]
Street Address (if applicable): [________________________________]
City: [________________________________], Florida [________]
County: [________________________________]
PARTIES:
| Role | Information |
|---|---|
| Lienor (Releasing Party): | [________________________________] |
| Lienor Address: | [________________________________] |
| Lienor City/State/ZIP: | [________________________________] |
| Lienor Florida Contractor License No. (if applicable): | [________________________________] |
| Property Owner: | [________________________________] |
| Owner Address: | [________________________________] |
| General Contractor (if different): | [________________________________] |
ORIGINAL LIEN INFORMATION:
| Item | Detail |
|---|---|
| Date Claim of Lien Recorded: | [__/__/____] |
| Official Records Book: | [________] |
| Page: | [________] |
| Instrument Number: | [________________________________] |
| Amount of Original Lien Claim: | $[________________________________] |
| Nature of Work/Materials/Services: | [________________________________] |
| Date Services First Furnished: | [__/__/____] |
| Date Services Last Furnished: | [__/__/____] |
SATISFACTION AND DISCHARGE STATEMENT
This form uses F.S. § 713.21(2): a lienor's notarized satisfaction or release recorded in the clerk's office, with the original lien's official records reference number and recording date.
KNOW ALL PERSONS BY THESE PRESENTS:
The undersigned, [________________________________] ("Lienor"), being the holder of that certain Claim of Lien recorded on [__/__/____], in Official Records Book [________], Page [________], Instrument Number [________________________________], in the Official Records of [________________________________] County, Florida, against the real property described above, hereby acknowledges and states as follows:
-
Payment Received. Lienor acknowledges receipt of full payment in the amount of $[________________________________] on [__/__/____] in complete satisfaction of all amounts due and owing under the above-referenced Claim of Lien, including all principal, interest, costs, and any other charges.
-
Satisfaction and Discharge. Lienor hereby satisfies, releases, discharges, and cancels the above-referenced Claim of Lien in its entirety, pursuant to F.S. § 713.21. The lien is hereby released of record.
-
Official Records Reference. This Satisfaction and Discharge pertains to the Claim of Lien recorded in Official Records Book [________], Page [________], of the Official Records of [________________________________] County, Florida, with the recording date of [__/__/____] and Instrument Number [________________________________].
-
Authority. The undersigned represents and warrants that he/she/they have full authority to execute this Satisfaction and Discharge on behalf of the Lienor.
-
No Further Claims. Lienor agrees that it shall make no further claim of lien against the subject property for the services, labor, or materials described in the original Claim of Lien.
-
Recording Authorization. Lienor hereby authorizes the Clerk of the Circuit Court of [________________________________] County, Florida, to record this Satisfaction and Discharge in the Official Records.
EXECUTION
LIENOR SIGNATURE AND NOTARIZED ACKNOWLEDGMENT
LIENOR / RELEASING PARTY:
Signature: ______________________________
Printed Name: [________________________________]
Post-office address: [________________________________]
Title (if applicable): [________________________________]
Date: [__/__/____]
STATE OF FLORIDA
COUNTY OF [________________________________]
The foregoing instrument was acknowledged before me by means of ☐ physical presence or ☐ online notarization, this [____] day of [________________________________], 20[____], by [________________________________], who is personally known to me or who has produced [________________________________] as identification.
Notary Public: ______________________________
Printed Name: [________________________________]
My Commission Expires: [__/__/____]
Commission Number: [________________________________]
[NOTARY SEAL]
PART 2: PARTIAL SATISFACTION OF CONSTRUCTION LIEN
PARTIAL SATISFACTION AND DISCHARGE OF CONSTRUCTION LIEN
County of Recording: [________________________________], Florida
Original Lien Official Records Book: [________] Page: [________]
Instrument Number: [________________________________]
Date of Original Lien Recording: [__/__/____]
Prepared by or under the supervision of, natural person's name and post-office address: [________________________________]
The undersigned, [________________________________] ("Lienor"), being the holder of that certain Claim of Lien recorded on [__/__/____], in Official Records Book [________], Page [________], in the Official Records of [________________________________] County, Florida, for the original amount of $[________________________________], hereby states:
-
Partial Payment Received. Lienor acknowledges receipt of partial payment in the amount of $[________________________________] on [__/__/____].
-
Partial Satisfaction. Lienor hereby satisfies and discharges the above-referenced Claim of Lien to the extent of:
☐ Reduction in Amount. The lien amount is hereby reduced from $[________________________________] to $[________________________________]. The lien remains in full force and effect for the remaining balance of $[________________________________].
☐ Release of Portion of Property. The following portion of the property is hereby released:
[________________________________]
[________________________________]
Folio/Parcel ID: [________________________________]
The lien remains in full force and effect against the remaining property.
-
Remaining Lien. Except as expressly satisfied herein, the above-referenced Claim of Lien remains in full force and effect, and all rights of the Lienor to enforce the remaining lien are expressly reserved.
-
Enforcement Deadline. Lienor acknowledges that under F.S. § 713.22, an action to enforce a construction lien must be commenced within one (1) year from the date of recording the Claim of Lien.
LIENOR / RELEASING PARTY:
Signature: ______________________________
Printed Name: [________________________________]
Post-office address: [________________________________]
Date: [__/__/____]
Use the lienor signature and notarized acknowledgment block from Part 1 for this recorded partial release.
PART 3: TRANSFER OF LIEN TO SECURITY / BOND
TRANSFER OF CONSTRUCTION LIEN TO SURETY BOND
Pursuant to F.S. § 713.24
County of Recording: [________________________________], Florida
Original Lien Official Records Book: [________] Page: [________]
Instrument Number: [________________________________]
NOTICE OF TRANSFER OF LIEN TO BOND
NOTICE IS HEREBY GIVEN that pursuant to F.S. § 713.24, the construction lien described below has been transferred from the real property to a surety bond:
| Item | Detail |
|---|---|
| Lienor: | [________________________________] |
| Property Owner: | [________________________________] |
| Original Lien Amount: | $[________________________________] |
| Bond Amount: | $[________________________________] |
| Surety Company: | [________________________________] |
| Bond Number: | [________________________________] |
| Clerk of Court Where Bond Filed: | [________________________________] County |
| Date Bond Recorded: | [__/__/____] |
BOND REQUIREMENTS UNDER F.S. § 713.24:
Florida provides a specific statutory procedure for transferring a construction lien from real property to a surety bond:
Bond Amount Calculation:
The bond must be in an amount equal to:
- The amount of the lien claim; PLUS
- Interest at the legal rate for three (3) years; PLUS
- $5,000 or 25% of the amount demanded in the lien claim, whichever is greater
Bond Requirements:
- Must be executed by a surety insurer authorized and licensed to do business in Florida
- Conditioned upon payment of any judgment or decree in favor of the lienor
- Recorded with the Clerk of the Circuit Court in the county where the property is located
- After the bond or deposit is filed, the clerk records a transfer certificate and mails the lienor a copy of the certificate with a copy of the bond or deposit by registered or certified mail (§ 713.24(2)).
Effect of Bond:
- The lien is transferred from the real property to the bond
- The property is freed from the encumbrance
- The lienor must proceed against the bond rather than the property
- The lienor must commence suit on the bond within the same time period as for enforcing the original lien (1 year from date of recording the lien)
Who May File the Bond:
Any person having an interest in the real property subject to the lien may transfer the lien to a bond, including:
- The property owner
- A mortgagee
- A lessee
- Any other party with an interest in the property
CERTIFICATE OF TRANSFER BY BOND
This certifies that the Claim of Lien recorded in Official Records Book [________], Page [________], Instrument Number [________________________________], in the Official Records of [________________________________] County, Florida, has been transferred to a surety bond pursuant to F.S. § 713.24.
Bond Recording Information:
Official Records Book: [________] Page: [________]
Instrument Number: [________________________________]
Date Recorded: [__/__/____]
Filed by: [________________________________]
Date: [__/__/____]
PART 4: DEMAND FOR DISCHARGE OF CONSTRUCTION LIEN
DEMAND LETTER FOR DISCHARGE OF CONSTRUCTION LIEN
Date: [__/__/____]
VIA CERTIFIED MAIL, RETURN RECEIPT REQUESTED
To: [________________________________] (Lienor)
Address: [________________________________]
City/State/ZIP: [________________________________]
From: [________________________________] (Property Owner/Interested Party)
Address: [________________________________]
City/State/ZIP: [________________________________]
Re: Demand for Discharge of Construction Lien
Property: [________________________________]
Folio/Parcel ID: [________________________________]
County: [________________________________], Florida
Official Records Book: [________] Page: [________]
Instrument Number: [________________________________]
Date Recorded: [__/__/____]
Dear [________________________________]:
This letter constitutes a formal demand for the immediate discharge of the above-referenced construction lien.
FACTUAL BASIS FOR DEMAND:
☐ Full Payment Made. The lien claim has been paid in full. Payment in the amount of $[________________________________] was made on [__/__/____] via [________________________________].
☐ Lien Enforcement Period Expired. Under F.S. § 713.22, an action to enforce a construction lien must be commenced within one (1) year from the date the Claim of Lien was recorded. The lien was recorded on [__/__/____], and the one-year enforcement period expired on [__/__/____].
☐ Failure to Serve Lien. The lienor did not serve the Claim of Lien on the owner before recording or within 15 days after recording as F.S. § 713.08(4)(c) requires. The delay or failure prejudiced [PERSON ENTITLED TO RELY] by [SPECIFIC FACTS]. The lien is voidable only to the extent of that prejudice.
☐ Fraudulent Lien. Under F.S. § 713.31, a lien is fraudulent if it willfully exaggerates the amount or willfully claims work not performed or materials not furnished for the property.
☐ The lien is invalid because: [________________________________]
CONSEQUENCES OF FAILURE TO DISCHARGE:
- F.S. § 713.31 - Fraudulent Liens: A fraudulent lien is unenforceable; a damaged owner or other specified party may sue for resulting damages and recoverable fees and costs. Willful filing is a third-degree felony.
- Slander of Title: An invalid lien alone does not establish this separate claim; any requested relief must be supported by its elements and the facts.
- Attorney Fees: Section 713.29 applies to lien or bond enforcement actions. A party who prevails on a fraudulent-lien claim may seek the fees and costs allowed by § 713.31(2)(c).
- Bond Transfer: The property owner may transfer the lien to a surety bond under F.S. § 713.24, and the costs of doing so may be recoverable from the lienor.
DEMAND:
You are hereby demanded to execute and record a Satisfaction and Discharge of the above-referenced construction lien within fifteen (15) days of receipt of this demand.
Sincerely,
Signature: ______________________________
Printed Name: [________________________________]
Date: [__/__/____]
Enclosures:
☐ Copy of original Claim of Lien
☐ Proof of payment (if applicable)
☐ Draft Satisfaction and Discharge for execution
PART 5: COMPLAINT FOR STATUTORY SHOW CAUSE SUMMONS
Use this part when an interested party seeks the summons and possible cancellation process under F.S. § 713.21(4). A dispute over payment, timeliness, or fraud requiring a merits judgment may need a separately pleaded claim.
| Party | Role |
|---|---|
| [PLAINTIFF] | Plaintiff |
| v. | |
| [LIENOR] | Defendant |
In the Circuit Court of the [________] Judicial Circuit, in and for [________] County, Florida
Case No.: [________]
COMPLAINT UNDER F.S. § 713.21(4)
Plaintiff [________________________________] is an interested party in the real property described below because [STATE INTEREST]. Plaintiff seeks the statutory summons requiring Defendant/Lienor to show cause why the lien should not be enforced by action or vacated and canceled of record, and alleges:
- The property is located at [PROPERTY ADDRESS AND LEGAL DESCRIPTION] in [________] County, Florida. This Court is the circuit court for that county.
- Defendant recorded a Claim of Lien on [DATE] in the Official Records of [________] County at [BOOK/PAGE OR INSTRUMENT NUMBER], claiming $[________] against the property. A copy is attached as Exhibit A.
- Defendant/Lienor's address for service is [ADDRESS].
- Plaintiff requests the process authorized by F.S. § 713.21(4).
Relief requested. Plaintiff asks the clerk to issue a summons requiring Defendant/Lienor, within 20 days after service, to show cause why the lien should not be enforced by action or vacated and canceled of record. If Lienor fails to show cause or to commence an enforcement action before the summons return date, Plaintiff asks the Court to order cancellation of the lien and direct recording of the order. Plaintiff requests any further relief supported by separately pleaded facts and law.
Respectfully submitted,
Signature: ______________________________
Printed Name: [________________________________]
Florida Bar No., if counsel: [________________________________]
Firm, if counsel: [________________________________]
Address: [________________________________]
Phone: [________________________________]
Email: [________________________________]
RECORDING INSTRUCTIONS AND INFORMATION
Florida Clerk of the Circuit Court Recording
In Florida, construction liens and lien releases are recorded in the Official Records maintained by the Clerk of the Circuit Court in the county where the property is located.
Recording Requirements:
- Documents must be on 8.5" x 11" paper (white)
- Leave a 3-inch by 3-inch space at the top right of page one and a 1-inch by 3-inch space at the top right of later pages for the clerk (§ 695.26(1)(e))
- Black ink, legible typewritten or printed text
- Execution for this recorded lienor release: include the lienor's notarized signature (§ 713.21(2))
- Print the natural preparer's name and post-office address on each recorded release (§ 695.26(1)(b))
- Include Official Records Book/Page and Instrument Number referencing the original Claim of Lien
- Include Folio/Parcel ID number
- Recording fees: $10.00 for the first page, $8.50 for each additional page (verify current fees)
- Florida has 67 counties, each with its own Clerk of the Circuit Court
Florida Specific Notes:
- Florida calls its mechanics' liens "construction liens"
- The official records are maintained by the Clerk of the Circuit Court (not County Recorder)
- Florida allows online notarization for lien-related documents
- The Clerk will assign a new Instrument Number to the recorded release
FLORIDA-SPECIFIC STATUTORY REQUIREMENTS AND PRACTITIONER NOTES
Key Deadlines and Requirements
| Requirement | Detail |
|---|---|
| Notice to Owner | Required for most claimants (§ 713.06(2)) |
| Claim of Lien Recording | 90 days from final furnishing (§ 713.08(5)) |
| Service of Lien on Owner | Before recording or within 15 days after recording under § 713.08(4)(c), using § 713.18 service; late or missing service makes the lien voidable only to the extent of shown prejudice |
| Lien Enforcement | 1 year from recording of Claim of Lien (§ 713.22) |
| No Specific Release Deadline | Florida does not impose a specific statutory deadline for releasing a satisfied lien |
| Bond Amount Formula | Lien amount + 3 years interest + ($5,000 or 25% of claim, whichever is greater) (§ 713.24) |
| Fraudulent Lien Remedies | Actual damages, fees, costs, and statutorily limited punitive damages; willful filing is a third-degree felony (§ 713.31) |
| Prevailing Party Attorney Fees | Section 713.29 covers lien and bond enforcement actions; § 713.31(2)(c) supplies a separate remedy for a prevailing fraudulent-lien claimant |
Practitioner Notes
-
"Construction Lien" Terminology. Florida uses the term "construction lien" rather than "mechanics' lien." All filings and correspondence should use this terminology.
-
No Statutory Release Deadline. Florida does not have a specific statute requiring release within a set number of days after payment. An unreleased lien may support a claim if the separate requirements of that claim are proved; an invalid or satisfied lien alone does not establish slander of title or a fraudulent lien.
-
Recorded Satisfaction Under § 713.21(2). This form uses the lienor's notarized release, recorded with the original lien's official records reference number and recording date. Section 713.21 also provides other discharge routes; use the procedure that fits the facts.
-
Bond Transfer Formula. F.S. § 713.24 requires the lien amount plus interest at the legal rate for three years plus the greater of $5,000 or 25% of the lien claim for potential fees and costs.
-
Fraudulent Lien Statute. F.S. § 713.31 treats a willfully exaggerated lien, or a lien willfully claiming work or materials not furnished for the property, as fraudulent. F.S. § 713.235 addresses waivers of claims against payment bonds.
-
Attorney Fees. Section 713.29 covers an action to enforce a construction lien or bond claim. A fraudulent-lien claim has its own fee remedy under § 713.31(2)(c) when its statutory conditions are met.
-
Notice to Owner. Most lienors (except those contracting directly with the owner) must serve a Notice to Owner within 45 days of first furnishing labor or materials. Failure to serve this notice is a common basis for challenging a lien.
-
One-Year Enforcement Window. The lien must be enforced by commencing a foreclosure action within one year of recording. This is longer than many states.
-
Lis Pendens. Filing the clerk’s transfer certificate releases the real property from the transferred lien under § 713.24(2). If a foreclosure lis pendens remains in the record, address it in the pending action so the record reflects the transfer.
-
Contractor Licensing. Florida requires most contractors to be licensed. Filing frivolous liens or failing to release satisfied liens may result in disciplinary action by the Construction Industry Licensing Board.
SOURCES AND REFERENCES
- Florida Statutes Chapter 713, Part I: Construction Liens (§ 713.001 - 713.37)
- F.S. § 713.21: Discharge of lien
- F.S. § 713.24: Transfer of lien to security; bond
- F.S. § 713.22: Limitations on actions to enforce liens
- F.S. § 713.31: Fraudulent liens
- F.S. § 713.29: Attorney fees
- Florida Courts: https://www.flcourts.gov/
- Florida Department of Business and Professional Regulation: https://www.myfloridalicense.com/
This template is provided for informational purposes only by ezel.ai and does not constitute legal advice. Consult a qualified Florida attorney before using this form. Laws and recording requirements are subject to change.
About this template
- Last updated
- November 17, 2026
- Jurisdiction
- Florida
- Category
- Real Estate
Legal authority
- F.S. § 713.21 - Discharge of lien
- F.S. § 713.24 - Transfer of lien to security; bond
- F.S. § 713.22 - Duration of lien
- F.S. § 713.06 - Liens of persons not in privity; Notice to Owner
- F.S. § 713.08 - Claim of lien
- F.S. § 713.31 - Fraudulent liens
Real estate documents transfer ownership, define who can use a property, and record agreements between buyers, sellers, landlords, and tenants. Deeds, purchase agreements, leases, and easements have to be drafted to meet state recording requirements, and mistakes show up at closing or years later in title disputes. Good real estate paperwork moves transactions forward quickly and avoids the kind of problems that only surface when it is time to sell or refinance.
Not legal advice
This template is provided for informational purposes. We recommend having an attorney review any legal document before signing, especially for high-value or complex matters.
Checked against the law it cites
The statutes this template relies on are listed under Legal authority.
Fla. Stat. § 713.08(4)(c) (2026) (checked November 16, 2026): "Failure to serve any claim of lien in the manner provided in s. 713.18 before recording or within 15 days after recording shall render the claim of lien voidable to the extent that the failure or delay is shown to have been prejudicial"
Fla. Stat. § 695.26(1)(a), (b), (d) (2026) (checked November 15, 2026): "The name and post-office address of the natural person who prepared the instrument or under whose supervision it was prepared are legibly printed, typewritten, or stamped upon such instrument"
Fla. Stat. § 713.21(4) (2026) (checked November 17, 2026): "Upon filing a complaint by any interested party the clerk shall issue a summons to the lienor to show cause within 20 days after service of the summons"
Fla. Stat. § 713.21(2) (2026) (checked November 15, 2026): "The satisfaction or release must include the lienor’s notarized signature and set forth the official records’ reference number and recording date"
Draft your Mechanics' Lien Release in the editor
Answer a few questions, let the AI editor draft each section from your answers, review it, and download Word and PDF. $99 one time, or $249 per month for every document and every Ezel app.