Do not file from the blank form alone. A knowingly false lien can create
liability equal to three times the full amount filed, and an invalid claim can
be challenged on seven days' notice under Miss. Code Ann. § 85-7-429.


1. LIEN-EXISTENCE AND DEADLINE GATES

Mississippi counsel must complete every applicable item before the claim is
signed or presented for recording.

1.1 Claimant and Contract Chain

  • ☐ Claimant is a contractor, subcontractor, materialman, registered
    architect, professional engineer, or registered land surveyor within
    § 85-7-403.

  • ☐ Labor, services, or materials were furnished at the instance of the owner,
    a design professional, the contractor, or a subcontractor in direct privity
    with the contractor.

  • ☐ Claimant substantially complied with the controlling contract,
    subcontract, or purchase order.

  • ☐ Every contractor and subcontractor whose licensing status affects this
    claim held the license required by Title 31, Chapter 3 or Title 73, Chapter

  1. Copies are attached or retained.
    • ☐ The amount claimed is presently due under the contract chain after all
      payments, credits, offsets, valid waivers, and owner defenses.

1.2 Project, Bond, and Waiver Classification

  • ☐ Project is single-family residential construction.
  • ☐ Project is not single-family residential construction.
  • ☐ Claimant is in direct privity with the owner.
  • ☐ Claimant is in direct privity with the contractor.
  • ☐ Claimant lacks privity with the contractor; § 85-7-407 was reviewed.
  • ☐ A payment bond under § 31-5-51 or § 85-7-432 exists.
  • ☐ No qualifying payment bond substitutes for this claimant's lien under
    § 85-7-431, or Claimant is the contractor whose lien is not displaced.

  • ☐ Every interim or final waiver and any affidavit of nonpayment under
    § 85-7-419 has been reviewed. Unpaid amounts were preserved before the
    applicable statutory event made a payment-linked waiver conclusive.

1.3 Notice and Filing Calendar

Event Verified date / result
First furnishing or delivery [__/__/____]
§ 85-7-407 notice deadline, if applicable [__/__/____]
§ 85-7-407 notice actually sent [__/__/____] / ☐ Not applicable
§ 85-7-409 single-family pre-lien notice sent [__/__/____] / ☐ Not applicable
Earliest lien filing after § 85-7-409 notice [__/__/____]
Last work, labor, services, materials, or professional services [__/__/____]
Ninety-day lien filing deadline [__/__/____]
Planned lien filing date [__/__/____]
Two-business-day owner-copy deadline [__/__/____]
Two-business-day contractor-copy deadline [__/__/____] / ☐ Not applicable
One-hundred-eighty-day payment-action deadline [__/__/____]

The ninety-day period is measured from the claimant's own last qualifying
work, labor, services, materials, architectural services, surveying, or
engineering. Do not use project completion, invoice, demand, or payment date
unless counsel confirms it is also the statutory trigger.


2. THIRTY-DAY NOTICE UNDER § 85-7-407

Use this part only when the project is not single-family residential
construction and Claimant lacks privity with the contractor—or, if there is no
contractor, lacks privity with the owner. The notice is due within thirty days
following Claimant's first delivery of labor, services, or materials. Failure
to give it forfeits the lien right.

NOTICE OF FURNISHING

To: [CONTRACTOR NAME AND ADDRESS]

If there is no contractor, to Owner: [OWNER NAME AND ADDRESS]

Required information Entry
Claimant name [________________________________]
Claimant address [________________________________]
Claimant telephone [________________________________]
Person at whose instance the work/material was furnished [________________________________]
That person's address [________________________________]
Project name [________________________________]
Project location [________________________________]
Labor, services, or materials [________________________________]
Contract price or anticipated value, if known $[________________________________]
First delivery date [__/__/____]

Delivery method:

  • ☐ E-mail with confirmed receipt
  • ☐ Registered mail
  • ☐ Certified mail
  • ☐ Statutory overnight delivery

Sent on: [__/__/____] Tracking / confirmation: [____________________________]

Claimant: [________________________________]

By: ________________________________ Title: [____________________________]


3. SINGLE-FAMILY PRE-LIEN NOTICE UNDER §§ 85-7-409 AND 85-7-433(5)

Use this part only for single-family residential construction when Claimant is
a subcontractor, materialman, or design professional not in privity with the
owner. Deliver it to the owner by a reliable means at least ten days before
filing the claim.

PRE-LIEN NOTICE TO OWNER

To: [NAME AND ADDRESS OF OWNER]

TAKE NOTICE THAT THE UNDERSIGNED IS A PERSON HAVING A RIGHT TO A LIEN PURSUANT
TO SECTION 85-7-403, MISSISSIPPI CODE OF 1972, WHO DOES NOT HAVE A DIRECT
CONTRACT WITH THE OWNER, HAS PROVIDED LABOR, SERVICES OR MATERIALS FOR THE
IMPROVEMENT OF PROPERTY COMMONLY KNOWN AS:

[PROPERTY COMMON NAME AND ADDRESS]

("THE PROPERTY"), FOR THE SUM OF $[________________] FOR WHICH THE
UNDERSIGNED HAS NOT BEEN PAID, AND INTENDS TO FILE A CLAIM OF SPECIAL LIEN ON
THE SUBJECT PROPERTY IN TEN (10) OR MORE DAYS FROM THE DATE HEREOF.

SO NOTIFIED, THIS THE [____] DAY OF [________________], 20[____].

LIEN CLAIMANT: [PRINT NAME]

By: ________________________________ Title: [____________________________]

Delivery date: [__/__/____]

Reliable delivery method and proof: [________________________________]


4. CLAIM OF CONSTRUCTION LIEN

Prepared by: [NAME, FIRM, ADDRESS, TELEPHONE, E-MAIL]

After recording return to: [NAME AND ADDRESS]

STATE OF MISSISSIPPI

COUNTY OF [________________________________]

CLAIM

Claimant: [FULL LEGAL NAME], a [PERSON / ENTITY TYPE], whose mailing
address is [ADDRESS], and whose role is:

  • ☐ Contractor
  • ☐ Subcontractor
  • ☐ Materialman
  • ☐ Registered architect
  • ☐ Professional engineer
  • ☐ Registered land surveyor

Claimant claims a construction lien in the amount of
$[________________________________] on the following building, structure,
house, factory, mill, machinery, improvement, premises, or real estate owned by
[OWNER FULL LEGAL NAME]:

Property information Entry
Street address [________________________________]
County [________________________________]
Parcel / tax identification [________________________________]
Complete legal description [ATTACH EXHIBIT A]
Improvement [________________________________]

The claim became due on [__/__/____], which is the same date as Claimant's
last qualifying labor, services, or materials supplied to the premises or last
qualifying professional services furnished or performed.

Claimant furnished the following work, labor, services, materials, plans,
surveying, or engineering:

[DETAILED DESCRIPTION]

Claimant contracted with [NAME AND ADDRESS OF CONTRACTING PARTY] under a
[WRITTEN / ORAL] [CONTRACT / SUBCONTRACT / PURCHASE ORDER]. Claimant
substantially complied with that agreement. The amount above is due and owing
after all just credits, offsets, payments, and preserved waivers.

REQUIRED EXPIRATION AND OWNER NOTICES

The following expiration statement must appear on the recorded claim in at
least 12-point bold type:

THIS CLAIM OF LIEN EXPIRES AND IS VOID ONE HUNDRED EIGHTY (180) DAYS FROM THE
DATE OF FILING OF THE CLAIM OF LIEN IF A PAYMENT ACTION IS NOT FILED IN THAT
TIME PERIOD.

NOTICE TO OWNER OF PROPERTY: You have the right to contest this claim of lien
pursuant to Mississippi law.

EXECUTION

Claimant confirms that counsel has completed the gates in Part 1 and approved
the claim, amount, property description, required notices, execution method,
and filing date.

Signed on [__/__/____].

Claimant: [________________________________]

By: ________________________________

Printed name: [________________________________]

Title / authority: [________________________________]

Mississippi license number, if applicable: [________________________________]

OPTIONAL JURAT OR ACKNOWLEDGMENT

Section 85-7-405's statutory claim form does not itself state a separate
notarial ceremony. Complete this block only if Mississippi counsel and the
filing chancery clerk determine that a jurat or acknowledgment is required or
appropriate for the completed instrument.

State of Mississippi

County of [________________________________]

Sworn to or acknowledged before me on [__/__/____] by
[________________________________].

Notary Public: ________________________________

My commission expires: [__/__/____]


5. RECORDING AND TWO-BUSINESS-DAY SERVICE CERTIFICATE

Recording

Filed for record with the Chancery Clerk of [________________] County,
Mississippi, on [__/__/____] at [____:____] [a.m./p.m.].

Instrument / book and page: [________________________________]

Certificate of Post-Filing Delivery

I certify that no later than two business days after the filing stated above,
I sent a true and accurate copy of the recorded Claim of Lien as follows:

Recipient Address used Method Date Tracking / receipt
Owner or qualifying owner address / registered agent [________________] [________________] [__/__/____] [________________]
Contractor or registered agent, if Claimant is not the contractor [________________] [________________] [__/__/____] [________________]

Permitted methods are registered mail, certified mail, or statutory overnight
delivery. If the owner's address cannot be found, counsel must apply the
contractor-as-owner-agent route in § 85-7-405(1)(b). Retain the filed copy,
receipts, tracking, address research, and entity records.

Certified by: ________________________________

Printed name / title: [________________________________]

Date: [__/__/____]


6. POST-FILING CONTROL SHEET

  • ☐ Payment action deadline calendared for [__/__/____], no later than 180
    days after lien filing.

  • ☐ Counsel will file the required lis pendens with commencement of the
    payment or qualifying lien action and deliver copies to the owner and
    contractor.

  • ☐ Any Notice of Contest will be reviewed immediately. The operative outside
    deadline is the earlier of 90 days after filing of the contest notice or 180
    days after filing of the lien.

  • ☐ Any amendment will be recorded and sent to the owner in the manner required
    by § 85-7-405(1)(e).

  • ☐ When fully satisfied, Claimant will file a cancellation with the chancery
    clerk under § 85-7-421.


SOURCES AND REFERENCES

Verified 2026-08-25. The release-78 section histories and official enacted
texts establish the operative article and the 2019 payment-bond amendment.
Exact-citation bill-index screening found no enacted post-release change to
the retained §§ 85-7-403, 85-7-405, 85-7-407, 85-7-409, 85-7-419,
85-7-421, 85-7-423, or 85-7-429 propositions. Recheck current county
recording practices, project facts, contracts, licenses, payments, bonds,
waivers, notices, and deadlines immediately before use.

Insert Image

Insert Table

Watch Ezel in action (sample case)Choose a plan

All changes saved
Save
Export
Export as DOCX
Export as PDF
Generating PDF...
mechanics_lien_claim_ms.pdf
Ready to export as PDF or Word
AI is editing...
Chat
Review

Draft it in the editor

The AI drafts each section from your answers and you review every word. Drafting from scratch takes hours; finish yours for $99 one time.

  • Built on this template
    Uses the Mississippi version and the statutes it cites.
  • Formatted like the template
    Captions, numbering and layout stay intact.
  • AI editing
    Rewrite any section from your own notes.
  • Export as PDF and Word
    Yours to review, sign, or file.
Secure checkout via Stripe
Need to customize this document?

About this template

Last updated
August 25, 2026
Citations checked
August 25, 2026
Jurisdiction
Mississippi
Category
Real Estate

Legal authority

  • Miss. Code Ann. § 85-7-401 (definitions)
  • Miss. Code Ann. § 85-7-403 (eligible claimants, contract chain, amount, and licensing gate)
  • Miss. Code Ann. § 85-7-405 (validity gates, filing form, service, and payment action)
  • Miss. Code Ann. § 85-7-407 (30-day notice for a claimant lacking privity with the contractor; single-family exclusion)
  • Miss. Code Ann. § 85-7-409 (single-family residential pre-lien notice)
  • Miss. Code Ann. § 85-7-433(5) (statutory Pre-Lien Notice form)
  • Miss. Code Ann. § 85-7-419 (payment-linked waivers and affidavits of nonpayment)
  • Miss. Code Ann. § 85-7-421 (expiration and cancellation)
  • Miss. Code Ann. § 85-7-423 (notice-of-contest deadline)
  • Miss. Code Ann. § 85-7-429 (knowing false-lien liability and expungement procedure)
  • Miss. Code Ann. § 85-7-431 (payment-bond substitution for subcontractor and material-supplier liens)
  • Miss. Code Ann. § 85-7-432 (private-project payment bond)

Real estate documents transfer ownership, define who can use a property, and record agreements between buyers, sellers, landlords, and tenants. Deeds, purchase agreements, leases, and easements have to be drafted to meet state recording requirements, and mistakes show up at closing or years later in title disputes. Good real estate paperwork moves transactions forward quickly and avoids the kind of problems that only surface when it is time to sell or refinance.

Not legal advice

This template is provided for informational purposes. We recommend having an attorney review any legal document before signing, especially for high-value or complex matters.

Checked against the law it cites

A reviewer verified this template's legal citations against the official source on August 25, 2026.

Miss. Code Ann. § 85-7-401 (checked August 25, 2026): "Business day means any day that is not a Saturday, Sunday, or legal holiday. Payment action means a lawsuit, proof of claim in a bankruptcy case, or a binding arbitration. Residential property means single-family and two-family, three-family, and four-family residential real estate."

Miss. Code Ann. § 85-7-403 (checked August 25, 2026): "The following persons shall each have a special lien on the real estate or other property for which they furnish labor, services or materials: all contractors, all subcontractors and all materialmen; registered architects or professional engineers; and registered land surveyors. No lien shall exist in favor of any contractor or subcontractor who is not licensed as required or who contracts with any contractor or subcontractor who is not licensed as required."

Miss. Code Ann. § 85-7-405(1) (checked August 25, 2026): "The filing for record of the claim of lien in the office of the clerk of the chancery court of the county where the property is located within ninety (90) days after the claimant's last work performed, labor, services or materials provided, the furnishing of architectural services, or the furnishing or performing of surveying or engineering services. No later than two (2) business days after the claim of lien is filed of record, the lien claimant shall send a true and accurate copy of the claim of lien by registered or certified mail or statutory overnight delivery to the owner of the property."

Miss. Code Ann. § 85-7-407(2), (4) (checked August 25, 2026): "For any person having a right to a lien pursuant to Section 85-7-403 who does not have privity of contract with the contractor, or, if there is no contractor, with the owner, within thirty (30) days following the first delivery of labor, services or materials to the property, the person shall give a written notice to the contractor, or, if there is no contractor, to the owner. The provisions of this section do not apply to single-family residential construction."

Draft your Mechanics Lien Claim in the editor

Answer a few questions, let the AI editor draft each section from your answers, review it, and download Word and PDF. $99 one time, or $249 per month for every document and every Ezel app.