Mechanics Lien Claim - District of Columbia

District of Columbia Real Estate Updated October 14, 2026 Free Word and PDF

NOTICE OF INTENT TO CLAIM MECHANIC'S LIEN

District of Columbia — Direct Contractor

Before you use this notice: This form is for a contractor that contracted with the property owner or the owner's authorized agent for the project described below. A subcontractor or other claimant must check the separate statutory route before filing. D.C. Code §§ 40-301.01 and 40-301.02 govern this notice.

Recording requested by: [NAME AND ADDRESS]

Return recorded notice to: [NAME AND ADDRESS]

1. Claimant, owner, and property

Contractor / claimant or registered agent name: [FULL LEGAL NAME]

Contractor / claimant or registered agent address: [ADDRESS]

Owner or owner's registered agent name: [FULL LEGAL NAME]

Owner or owner's registered agent address: [ADDRESS]

Party against whose property interest the lien is claimed: [FULL LEGAL NAME]

Property street address, if available: [STREET ADDRESS, WASHINGTON, DC ZIP]

Legal description of the property: [COMPLETE LEGAL DESCRIPTION OR SEE EXHIBIT A]

Square: [NUMBER] Suffix: [SUFFIX OR NONE] Lot: [NUMBER]

The claimant contracted with [OWNER / OWNER'S AUTHORIZED AGENT NAME] for the construction, improvement, addition, or repair of the identified property. Contract date: [__/__/____]. Describe the work and the owner's direction or authorization: [DETAILS].

2. Work, materials, and amount claimed

Work performed: [DESCRIPTION]

Work commenced: [__/__/____] Work completed: [__/__/____ / NOT YET COMPLETED]

Materials furnished: [DESCRIPTION / NONE]

First material delivery: [__/__/____ / NOT APPLICABLE]

Last material delivery: [__/__/____ / NOT YET DELIVERED / NOT APPLICABLE]

Contract price or reasonable value absent an express contract: $[AMOUNT]

Payments received through the date of this notice: $[AMOUNT]

Other credits through the date of this notice: $[AMOUNT AND DESCRIPTION / ZERO]

Amount due or to become due and claimed as a lien, after those payments and credits: $[AMOUNT]

Basis and calculation: [EXPLAIN THE AMOUNT AND ATTACH AN ITEMIZATION IF NEEDED].

Claimant records this notice of intent against the owner's identified interest for that amount under D.C. Code §§ 40-301.01 and 40-301.02. Claimant states that the notice is being recorded [DURING CONSTRUCTION / WITHIN 90 DAYS AFTER THE EARLIER OF COMPLETION OR TERMINATION OF THE PROJECT]. Completion date: [__/__/____ / NOT YET COMPLETED]. Termination date: [__/__/____ / NOT TERMINATED].

3. Required supporting documents

Attach documents applicable under D.C. Code § 40-301.02(b)(7)-(8); the sworn statement required by subsection (b)(9) appears below:

☐ If claimant is a District entity or is doing business in the District within the meaning of applicable law, attach a current District license to do business and a District Department of Licensing and Consumer Protection certificate of good standing issued within 180 days before filing, to the extent available under applicable law.

☐ If claimant is an individual or non-District entity that is not doing business in the District but is required to be licensed by another governmental entity, attach that jurisdiction's current license and certificate evidencing good standing, to the extent available under applicable law.

☐ If this project is provided under a home improvement contract, attach a copy of that contract.

☐ If an authorized representative or counsel signs this notice for claimant, attach evidence of authority to execute it.

Attachments and explanation of any item that is unavailable or inapplicable: [LIST].

4. Sworn statement and signature

I, [CONTRACTOR OR AUTHORIZED REPRESENTATIVE NAME], state from personal knowledge, under penalty of perjury, that the contents of this notice of intent are true and correct to the best of my information and belief and that the claimant has a right to recover the amount claimed. If I sign as an authorized representative or counsel, I affirm that this notice is true and correct to the best of my knowledge and belief and have attached evidence of my authority.

Signature: ______________________________ Date: [__/__/____]

Printed name and capacity: [NAME AND CAPACITY]

JURAT — DISTRICT OF COLUMBIA, ss.:

Subscribed and sworn to before me by [SIGNER NAME] on [__/__/____].

Notary signature: ______________________________

Printed name: [NOTARY NAME] Commission expires: [__/__/____]

[NOTARIAL SEAL]

5. Recording and service directions

Record this notice in the land records during construction or within 90 days after the earlier of project completion or termination. A notice missing the content required by § 40-301.02(b) is void. Within five business days after recording, send the owner a copy of the recorded notice by certified mail to the current address or, if that address is unavailable in local public records, the last known address. If the certified mailing is returned unclaimed or undelivered, post a copy of the recorded notice on the property where generally visible from an entry point.

Recording date and instrument number: [DATE AND NUMBER]

Certified mail date, address, and tracking number: [DATE, ADDRESS, NUMBER]

If returned, date and location of posting: [DATE AND LOCATION / NOT APPLICABLE]

To enforce a valid lien, file suit under § 40-303.08 within 180 days after recording this notice and record a notice of pendency of action under § 42-1207(b) within ten days after filing suit, as required by § 40-303.13(a). Missing either enforcement step terminates the lien.

Exhibit A — Legal description or itemization (if attached)

[INSERT COMPLETE LEGAL DESCRIPTION OR ITEMIZATION; IDENTIFY EACH ATTACHMENT]

Insert Image

Insert Table

Watch Ezel in action (sample case)Choose a plan

All changes saved
Save
Export
Export as DOCX
Export as PDF
Generating PDF...
mechanics_lien_claim_dc.pdf
Ready to export as PDF or Word
AI is editing...
Chat
Review

Draft it in the editor

The AI drafts each section from your answers and you review every word. Drafting from scratch takes hours; finish yours for $99 one time.

  • Built on this template
    Uses the District of Columbia version and the statutes it cites.
  • Formatted like the template
    Captions, numbering and layout stay intact.
  • AI editing
    Rewrite any section from your own notes.
  • Export as PDF and Word
    Yours to review, sign, or file.
Secure checkout via Stripe
Need to customize this document?

About this template

Last updated
October 14, 2026
Citations checked
October 14, 2026
Jurisdiction
District of Columbia
Category
Real Estate

Legal authority

  • D.C. Code § 40-301.01 (Lien created; persons entitled)
  • D.C. Code § 40-301.02 (Notice of intent; 90-day deadline; required contents; certified-mail/posting to owner)
  • D.C. Code § 40-303.13 (Enforcement; suit within 180 days; notice of pendency within 10 days)

Real estate documents transfer ownership, define who can use a property, and record agreements between buyers, sellers, landlords, and tenants. Deeds, purchase agreements, leases, and easements have to be drafted to meet state recording requirements, and mistakes show up at closing or years later in title disputes. Good real estate paperwork moves transactions forward quickly and avoids the kind of problems that only surface when it is time to sell or refinance.

Not legal advice

This template is provided for informational purposes. We recommend having an attorney review any legal document before signing, especially for high-value or complex matters.

Checked against the law it cites

A reviewer verified this template's legal citations against the official source on October 14, 2026.

D.C. Code § 40-301.02(a)(1)-(2) (checked August 17, 2026): "The notice of intent shall be recorded during the construction or within 90 days after the earlier of the completion or termination of the project. Any contractor who records timely a notice of intent in accordance with subsection (a)(1) of this section, shall send to the owner, by certified mail to the current address (or if not available in the local public records, the last known address) of the owner, a copy of the notice of intent within 5 business days after the date of its recordation in the land records."

D.C. Code § 40-303.13(a) (checked August 17, 2026): "Any person with a lien and who has recorded a valid notice of intent shall only enforce the lien by: Filing suit under § 40-303.08 to enforce the lien at anytime within 180 days after the date that the notice of intent is recorded in the land records; and Recording, within 10 days of filing suit, a notice of pendency of action in accordance with § 42-1207(b) in the land records."

D.C. Code § 40-301.01 (checked October 14, 2026): "Every building erected, improved, added to, or repaired at the direction of the owner, or the owner’s authorized agent, and the land on which the same is erected, intended to be used in connection therewith, or necessary to the use and enjoyment thereof, to the extent of the right, title, and interest, at that time existing, of the owner, shall be subject to a lien in favor of the contractor who contracted with the owner, in the amount of the contract price or, in the absence of an express contract, the reasonable value of the project; provided, that to enforce the lien, the contractor claiming the lien shall record in the land records a notice of intent and comply with the other procedures prescribed in this chapter."

D.C. Code § 40-301.02(a)(1) (checked October 14, 2026): "A notice of intent that does not comply with subsection (b) of this section shall be void."

Draft your Mechanics Lien Claim in the editor

Answer a few questions, let the AI editor draft each section from your answers, review it, and download Word and PDF. $99 one time, or $249 per month for every document and every Ezel app.