Mechanics Lien Release - Indiana

Indiana Real Estate Updated October 24, 2026 Free Word and PDF

MECHANICS' LIEN RELEASE — INDIANA

Indiana Code Title 32, Article 28 — Liens on Real Property


TABLE OF CONTENTS

  1. Full Release of Mechanics' Lien
  2. Partial Release of Mechanics' Lien
  3. Release by Undertaking (Surety Bond)
  4. Demand for Release of Mechanics' Lien
  5. Petition to Discharge Mechanics' Lien
  6. Recording Instructions
  7. Indiana Statutory Reference Table
  8. Practitioner Notes

1. FULL RELEASE OF MECHANICS' LIEN

RELEASE AND SATISFACTION OF MECHANIC'S LIEN

(IC 32-28-1-1)

RECORDING INFORMATION

Instrument Number: [________________________________]
County of Recording: [________________________________], Indiana
Date of Original Lien Recording: [__/__/____]


CLAIMANT INFORMATION

Name of Claimant (Lien Holder): [________________________________]
Address: [________________________________]
City: [________________________________] State: [____] Zip: [________]
Telephone: [________________________________]
Email: [________________________________]

PROPERTY OWNER INFORMATION

Name of Owner: [________________________________]
Address: [________________________________]
City: [________________________________] State: [____] Zip: [________]

CONTRACTOR (if different from Claimant)

Name: [________________________________]
Address: [________________________________]

PROPERTY DESCRIPTION

Property Address: [________________________________]
City: [________________________________] County: [________________________________], Indiana
Legal Description: [________________________________]
[________________________________]
[________________________________]
Parcel Number: [________________________________]

ORIGINAL LIEN INFORMATION

Date of Notice of Intention to Hold Mechanic's Lien Filed: [__/__/____]
Instrument Number: [________________________________]
Recorder's Office: [________________________________] County, Indiana
Original Lien Amount: $[________________________________]
Date Debt Became Due (as shown on lien record): [__/__/____]
Description of Labor/Materials: [________________________________]
[________________________________]


RELEASE AND SATISFACTION

The undersigned, being the owner, holder, or custodian of the Mechanic's Lien described above, hereby releases, discharges, and satisfies of record the said Mechanic's Lien, pursuant to IC 32-28-1-1. The undersigned states and certifies as follows:

Person executing this release: [SIGNER FULL LEGAL NAME], for [LIEN HOLDER NAME / SELF], in the capacity of [TITLE / SELF]. Use that same signer name in the acknowledgment, signature, and printed-name field below.

  1. The undersigned is the person, firm, or entity that holds, owns, or has custody of the Mechanic's Lien described above.

  2. The debt or obligation, and all interest thereon, secured by the above-described Mechanic's Lien has been fully paid, lawfully tendered, and discharged as follows:

☐ Payment in full received in the amount of $[________________________________]
☐ Payment received on [__/__/____] via: ☐ Check ☐ Wire Transfer ☐ Cash ☐ Other: [________________]
☐ Settlement performed and secured obligation fully discharged on [__/__/____]
☐ Judgment and secured obligation fully satisfied in Cause No. [________________________________]
☐ Other full discharge of the secured obligation: [________________________________]

  1. The undersigned hereby unconditionally releases, discharges, and satisfies of record the above-described Mechanic's Lien in its entirety.

  2. The undersigned consents to the recording of this Release and Satisfaction with the Recorder of [________________________________] County, Indiana.

  3. The undersigned waives and relinquishes any and all right, title, claim, lien, or interest in or to the above-described real property arising from the released Mechanic's Lien.

LIEN HOLDER SIGNATURE

Signature: ______________________________
Printed Name: [________________________________]
Title: [________________________________]
Date: [__/__/____]

NOTARIZATION

State of Indiana

County of [________________________________]

Before me, a Notary Public authorized to act in Indiana, personally appeared [________________________________], who acknowledged the execution of the foregoing Release and Satisfaction of Mechanic's Lien as his/her/their voluntary act and deed.

WITNESS my hand and Notarial Seal this [____] day of [________________], 20[____].

Notary Public: ______________________________
Printed Name: [________________________________]
My Commission Expires: [__/__/____]
Indiana County of Commission (or Indiana County of Primary Employment, if applicable): [________________________________]

[NOTARY SEAL]


PREPARER INFORMATION

This instrument was prepared by:
[________________________________]
[________________________________]
[________________________________]

I affirm, under the penalties for perjury, that I have taken reasonable care to redact each Social Security number in this document, unless required by law. [________________________________] (Signature)


2. PARTIAL RELEASE OF MECHANICS' LIEN

PARTIAL RELEASE AND SATISFACTION OF MECHANIC'S LIEN

(IC 32-28-1-1)

RECORDING INFORMATION

Instrument Number of Original Lien: [________________________________]
County of Recording: [________________________________], Indiana

PARTIES

Lien Holder: [________________________________]
Property Owner: [________________________________]
Property Address: [________________________________]
Parcel Number: [________________________________]
Legal Description: [________________________________]

ORIGINAL LIEN INFORMATION

Date Lien Recorded: [__/__/____]
Instrument Number: [________________________________]
Original Lien Amount: $[________________________________]

PARTIAL RELEASE

The undersigned Lien Holder hereby partially releases and satisfies the Mechanic's Lien described above as follows:

Person executing this partial release: [SIGNER FULL LEGAL NAME], for [LIEN HOLDER NAME / SELF], in the capacity of [TITLE / SELF]. Use that same signer name in the acknowledgment, signature, and printed-name field below.

  1. Amount of partial payment received: $[________________________________]
  2. Date of partial payment: [__/__/____]
  3. Remaining lien amount: $[________________________________]
  4. Description of work/materials covered by this partial release:
    [________________________________]
    [________________________________]

  5. Portion of property released:
    ☐ Entire property remains subject to lien for the remaining balance
    ☐ The following portion of the property is released from the lien:
    [________________________________]
    [________________________________]
    Parcel Number(s) released: [________________________________]

The Lien Holder releases and discharges the Mechanic's Lien to the extent of $[________________________________]. This instrument does not purport to release the remaining asserted amount of $[________________________________] against the unreleased property, if any.

LIEN HOLDER SIGNATURE

Signature: ______________________________
Printed Name: [________________________________]
Title: [________________________________]
Date: [__/__/____]

NOTARIZATION

State of Indiana

County of [________________________________]

On [__/__/____], before me personally appeared [________________________________], who acknowledged the execution of the foregoing instrument.

Notary Public: ______________________________
Printed Name: [________________________________]
My Commission Expires: [__/__/____]
Indiana County of Commission (or Indiana County of Primary Employment, if applicable): [________________________________]

[NOTARY SEAL]

This instrument was prepared by [PREPARER FULL NAME]. Governmental agency, if any: [AGENCY NAME / NONE].

I affirm, under the penalties for perjury, that I have taken reasonable care to redact each Social Security number in this document, unless required by law. [________________________________] (Preparer's Signature)


3. RELEASE BY UNDERTAKING (SURETY BOND)

WRITTEN UNDERTAKING TO DISCHARGE MECHANIC'S LIEN

(IC 32-28-3-11)

IMPORTANT: Under IC 32-28-3-11, in an action to foreclose a mechanic's lien, the defendant, owner, or any person having an interest in the property may file a written undertaking with surety, approved by the court. Upon approval, the court shall enter an order releasing the property from the lien.


IN THE [________________________________] COURT OF [________________________________] COUNTY, INDIANA

Party Role
[________________________________] Plaintiff
v.
[________________________________] Defendant

Cause No.: [________________________________]


WRITTEN UNDERTAKING WITH SURETY FOR DISCHARGE OF MECHANIC'S LIEN

(IC 32-28-3-11)

KNOW ALL PERSONS BY THESE PRESENTS:

PRINCIPAL

Name: [________________________________]
Address: [________________________________]
City: [________________________________] State: [____] Zip: [________]
Relationship to Property: ☐ Owner ☐ Defendant ☐ Mortgagee ☐ Other Interest Holder: [________________]

SURETY

Name of Surety Company: [________________________________]
Address: [________________________________]
City: [________________________________] State: [____] Zip: [________]
Authorized in Indiana: ☐ Yes

LIEN INFORMATION

Lien Claimant (Plaintiff): [________________________________]
Instrument Number: [________________________________]
Date of Lien Recording: [__/__/____]
Lien Amount: $[________________________________]
Undertaking Amount: $[________________________________]
Property Address: [________________________________]
County: [________________________________], Indiana

WHEREAS, [________________________________] ("Plaintiff/Lien Claimant") has filed an action (Cause No. [________________________________]) to foreclose a Mechanic's Lien against the above-described property; and

WHEREAS, the undersigned Principal has an interest in said property and desires to discharge the property from the lien pursuant to IC 32-28-3-11;

NOW, THEREFORE, the Principal and Surety undertake and are firmly bound that the Principal will pay any judgment that may be recovered in this action to foreclose the Mechanic's Lien, including costs and attorney's fees allowed by the court, if the claim on which the judgment is founded is found by the court to have been a lien on the property at the time the action was filed.

If such payment is made, this undertaking shall be void; otherwise, it shall remain in full force and effect.

PRINCIPAL

Signature: ______________________________
Printed Name: [________________________________]
Date: [__/__/____]

SURETY

By: ______________________________
Printed Name: [________________________________]
Title: [________________________________]
Date: [__/__/____]

[CORPORATE SEAL]


MOTION FOR APPROVAL OF UNDERTAKING AND RELEASE OF PROPERTY

COMES NOW [________________________________], and moves the Court to approve the foregoing Written Undertaking with Surety filed pursuant to IC 32-28-3-11, and to enter an order releasing the real property described therein from the Mechanic's Lien asserted by the Plaintiff.

In support of this Motion, the movant states:

  1. The Written Undertaking with Surety has been executed by the Principal and by [________________________________], a surety company authorized to transact surety business in Indiana.

  2. The undertaking provides that the Principal will pay any judgment recovered in this lien foreclosure action, including costs and attorney's fees, if the court finds the claim was a lien on the property when the action was filed.

  3. IC 32-28-3-11 provides that if an undertaking is filed and approved by the court, the court shall enter an order releasing the property from the lien.

WHEREFORE, the movant requests the Court approve the Written Undertaking and enter an order releasing the real property from the Mechanic's Lien.

Respectfully submitted,

______________________________
[________________________________]
Attorney for Movant
Indiana Attorney No. [________________________________]
[________________________________]
Telephone: [________________________________]
Email: [________________________________]


4. DEMAND FOR RELEASE OF MECHANICS' LIEN

WRITTEN DEMAND FOR RELEASE, DISCHARGE, AND SATISFACTION OF MECHANIC'S LIEN

(IC 32-28-1-1 and IC 32-28-1-2)

Date: [__/__/____]

VIA REGISTERED OR CERTIFIED MAIL, RETURN RECEIPT REQUESTED

To: [________________________________] ("Lien Holder")
[________________________________]
[________________________________]
[________________________________]

From: [________________________________] ("Demanding Party")
[________________________________]
[________________________________]
[________________________________]

RE: DEMAND TO RELEASE, DISCHARGE, AND SATISFY OF RECORD — MECHANIC'S LIEN

Property Address: [________________________________]
Parcel Number: [________________________________]
County: [________________________________], Indiana
Instrument Number: [________________________________]
Date of Lien Recording: [__/__/____]
Lien Amount: $[________________________________]

Dear [________________________________]:

Pursuant to Indiana Code 32-28-1-1 and IC 32-28-1-2, written demand is hereby made upon you, as the owner, holder, or custodian of the above-described Mechanic's Lien, to release, discharge, and satisfy of record the Mechanic's Lien identified above.

BASIS FOR DEMAND:

☐ Full Payment: The debt or obligation and all interest secured by the above-described Mechanic's Lien has been fully paid, lawfully tendered, and discharged. Payment of $[________________________________] was made on [__/__/____].

Use this statutory demand only after the debt or obligation secured by the lien, including interest, has been fully paid, lawfully tendered, and discharged under IC 32-28-1-1(b). A separate challenge based only on expiration or invalidity does not by itself trigger the fifteen-day duty and forfeiture in IC 32-28-1-2.

STATUTORY DEMAND:

Pursuant to IC 32-28-1-2, you are hereby demanded to release, discharge, and satisfy of record the above-described Mechanic's Lien not later than fifteen (15) days from the date you receive this written demand.

NOTICE: This demand is sent by registered/certified mail, return receipt requested, as required by IC 32-28-1-2.

CONSEQUENCES OF FAILURE TO COMPLY (IC 32-28-1-2):

If you fail, neglect, or refuse to release, discharge, and satisfy of record the above-described lien within fifteen (15) days of receipt of this demand, you shall:

  1. Forfeit and pay a sum not to exceed Five Hundred Dollars ($500.00) for such failure, neglect, or refusal;

  2. Pay costs incurred in enforcing the release; and

  3. Pay reasonable attorney's fees incurred in enforcing the release, discharge, or satisfaction of record.

Additionally, the Court may appoint a commissioner to release and satisfy the Mechanic's Lien on your behalf (IC 32-28-1-2).

PROOF OF FULL DISCHARGE ENCLOSED:

☐ Copy of canceled check(s) or payment confirmation
☐ Wire transfer confirmation
☐ Receipt of payment
☐ Settlement agreement
☐ Other evidence of full discharge: [________________________________]

Please govern yourself accordingly.

Sincerely,

______________________________
[________________________________]
[________________________________]
[________________________________]
[________________________________]


5. PETITION TO DISCHARGE MECHANICS' LIEN

IN THE [________________________________] COURT OF [________________________________] COUNTY, INDIANA

Party Role
[________________________________] Petitioner
v.
[________________________________] Respondent

Cause No.: [________________________________]
PETITION TO DISCHARGE MECHANIC'S LIEN


COMES NOW the Petitioner, [________________________________], and petitions this Court for an order discharging and releasing the Mechanic's Lien recorded by the Respondent, and states:

I. PARTIES

  1. Petitioner is:
    ☐ The owner of the real property described herein
    ☐ A mortgagor or person having the right to demand release of the lien
    Address: [________________________________]

  2. Respondent, [________________________________], is the owner, holder, or custodian of the Mechanic's Lien. Address: [________________________________]

II. PROPERTY

  1. The real property is located at [________________________________], [________________________________] County, Indiana, Parcel No. [________________________________], more particularly described as:
    [________________________________]
    [________________________________]

III. LIEN INFORMATION

  1. Respondent filed a Notice of Intention to Hold Mechanic's Lien against the above-described property, recorded with the Recorder of [________________________________] County, Indiana, on [__/__/____], as Instrument No. [________________________________], in the amount of $[________________________________].

IV. WRITTEN DEMAND

  1. On [__/__/____], Petitioner sent a written demand to Respondent, via registered/certified mail with return receipt requested, demanding release, discharge, and satisfaction of the Mechanic's Lien after full discharge of the secured obligation. A copy of the demand and proof of receipt are attached as Exhibit A.

  2. More than fifteen (15) days have elapsed since Respondent received the demand, and Respondent has failed, neglected, or refused to release, discharge, and satisfy the lien.

V. GROUNDS FOR DISCHARGE

  1. The debt or obligation and interest secured by the Mechanic's Lien were fully paid, lawfully tendered, and discharged on [__/__/____] under IC 32-28-1-1. The evidence of discharge is attached as Exhibit B: [________________________________].

VI. PRAYER FOR RELIEF

WHEREFORE, Petitioner respectfully requests that this Court:

A. Enter an order discharging and releasing the Mechanic's Lien (Instrument No. [________________________________]);
B. Direct the Recorder of [________________________________] County to record the order;
C. Appoint a commissioner to execute a release and satisfaction of the lien under IC 32-28-1-2(d), if necessary;
D. Award statutory forfeiture of up to $500.00 under IC 32-28-1-2(b);
E. Award costs and reasonable attorney fees under IC 32-28-1-2(b)–(c);
F. Grant such other relief as the Court deems just and proper.

Respectfully submitted,

______________________________
[________________________________]
Attorney for Petitioner
Indiana Attorney No. [________________________________]
[________________________________]
Telephone: [________________________________]
Email: [________________________________]


6. RECORDING INSTRUCTIONS

Indiana County Recorder

In Indiana, Mechanic's Liens are recorded with the Recorder (sometimes called the County Recorder) in the county where the property is located. Releases are recorded with the same office.

Filing Office:
Recorder of [________________________________] County, Indiana
[________________________________] (Address)

Recording Checklist:

☐ Executed Release and Satisfaction meeting recorder requirements
☐ Acknowledgment or proof checked under IC 36-2-11-16(c)
☐ Identify the original lien recording, including its Instrument Number
☐ Parcel number should be included
☐ Legal description or property address
☐ Preparer identification and Social Security number redaction affirmation under IC 36-2-11-15(b)–(d)
☐ Recording fee (consult the Recorder for current fees)

Indiana-Specific Requirements:

  • Recorder statements: For instruments covered by IC 36-2-11-15, subsections (b)–(d) require preparer identification and provide the form of the Social Security number redaction affirmation. Section 36-2-11-16 governs names, signatures, and acknowledgment or proof for instruments within its scope; both sections list exceptions.

Steps to Record:

  1. Prepare the Release and Satisfaction using Form 1 or 2 above.
  2. Include the SSN redaction affirmation.
  3. Have the Lien Holder execute the Release with acknowledgment or proof meeting the recorder's requirements.
  4. Present the document to the County Recorder.
  5. Pay the recording fee.
  6. Obtain a recorded copy with the new Instrument Number.
  7. Provide a copy to the property owner.

7. INDIANA STATUTORY REFERENCE TABLE

Topic Statute Key Provisions
Mechanic's Lien Right IC 32-28-3-1 Persons performing labor/furnishing materials have lien right
Advance Waiver Limit IC 32-28-3-16(a)–(b) For covered project classes, required waiver of lien or payment-bond rights before payment is void
Notice of Intention Filing Deadline IC 32-28-3-3(a)–(b) Within 60 days for work related to a Class 2 structure or auxiliary improvement on the same real estate; 90 days for other covered work
Duty to Satisfy of Record IC 32-28-1-1 Holder must release lien when debt is fully paid
Written Demand for Release IC 32-28-1-2 Demand by registered/certified mail triggers 15-day deadline
Penalty for Failure to Release IC 32-28-1-2 Up to $500 forfeiture + costs + reasonable attorney fees
Court Commissioner IC 32-28-1-2 Court may appoint commissioner to release lien
Undertaking (Surety Bond) IC 32-28-3-11 Written undertaking in pending foreclosure action; court approval
Effect of Undertaking IC 32-28-3-11 Court shall order release of property from lien
Lien Enforcement Deadline IC 32-28-3-6(a)–(c) Generally 1 year after recording; qualifying written and recorded credit may extend it
30-Day Notice to Foreclose IC 32-28-3-10(a) Owner or other interested person may give written notice; lienholder's failure to file within 30 days after receipt voids lien
Attorney Fees in Foreclosure IC 32-28-3-14(a)–(b) Plaintiff or lienholder recovering a judgment in any sum ordinarily receives reasonable fees, subject to subsection (b)'s owner-paid consideration exception

8. PRACTITIONER NOTES

A. The Written Demand Requirement

Under IC 32-28-1-2, the demand to release must be sent by registered or certified mail, return receipt requested. This is a strict procedural requirement. Failure to use registered or certified mail may render the demand ineffective for purposes of triggering the 15-day deadline and the statutory penalty.

B. Modest Statutory Penalty

Indiana's penalty for failure to release a satisfied lien is capped at $500, plus costs and reasonable attorney fees. While the dollar amount is relatively modest, the additional exposure to attorney fees can make continued refusal costly. The court may also appoint a commissioner to execute the release, bypassing the lien holder entirely.

C. One-Year Enforcement Deadline

Under IC 32-28-3-6, a mechanic's lien is generally void if a foreclosure action is not filed within one (1) year after recording the notice of intention to hold the lien, subject to the qualifying written and recorded credit in subsection (c). This means:

  • The ordinary one-year period runs from recording the notice of intention to hold the lien (as amended by P.L.45-2016)
  • A written credit satisfying IC 32-28-3-6(c) may extend the period
  • A qualifying written and recorded credit may set a later enforcement date under subsection (a)(2)
  • After expiration, identify the appropriate court or recorder route for clearing the record

D. 30-Day Notice to Foreclose

Under IC 32-28-3-10(a), an owner or other interested person may give the lienholder written notice to file a foreclosure action in the property's county. If the lienholder does not file within 30 days after receiving it, the lien is void. Registered or certified mail to the address in the recorded lien is the route specified in subsection (b) for recording an affidavit that leads to the recorder's release; the affidavit must also state the other statutory facts.

E. Advance Waiver Prohibition

IC 32-28-3-16(b) voids a covered contract term requiring a qualifying labor or materials provider to waive lien or payment-bond rights before payment. Subsection (a) excludes Class 2 structures, auxiliary improvements on the same real estate, and specified utility property. Section 32-28-3-1(e)–(f) separately addresses qualifying recorded no-lien contracts on listed project classes.

F. Undertaking in Foreclosure Only

The undertaking mechanism in IC 32-28-3-11 operates in a pending foreclosure action. The undertaking is filed in that case; court approval is required before the property is released from the lien.

G. Common Pitfalls

  1. Sending the demand by regular mail only. The statute requires registered or certified mail with return receipt requested.
  2. Relying on the 1-year expiration without confirming the recording date. Under IC 32-28-3-6 (as amended by P.L.45-2016), the one-year enforcement period runs from the date the notice of intention to hold the lien was recorded.
  3. Attempting to bond off a lien before suit is filed. The undertaking mechanism under IC 32-28-3-11 requires a pending foreclosure action.
  4. Ignoring a written notice to foreclose under § 32-28-3-10(a). Failure to file in the property's county within 30 days after receipt voids the lien.
  5. Omitting the preparer identification and SSN redaction affirmation. IC 36-2-11-15(b)–(d) governs those recorder statements.
  6. Assuming an advance waiver is enforceable without checking IC 32-28-3-16(a)–(b) and any qualifying § 32-28-3-1(e)–(f) no-lien contract.

H. Checklist for Releasing a Mechanics' Lien in Indiana

☐ Confirm full payment received and cleared
☐ Prepare Release and Satisfaction (Form 1 above)
☐ Include SSN redaction affirmation statement
☐ Have the Release notarized
☐ Record the Release with the County Recorder where the lien was filed
☐ Pay the recording fee
☐ Obtain a recorded copy with the new Instrument Number
☐ Provide a copy to the property owner
☐ If lien holder refuses, send Demand (Form 4) by certified/registered mail
☐ If demand fails after 15 days, file Petition to Discharge (Form 5)
☐ Close the lien file


This template is provided for informational purposes only and does not constitute legal advice. Indiana mechanics' lien law, including IC 32-28-3 and IC 32-28-1, is subject to legislative amendment. Consult a qualified Indiana attorney and verify all statutory citations before use.

Insert Image

Insert Table

Watch Ezel in action (sample case)Choose a plan

All changes saved
Save
Export
Export as DOCX
Export as PDF
Generating PDF...
mechanics_lien_release_in.pdf
Ready to export as PDF or Word
AI is editing...
Chat
Review

Draft it in the editor

The AI drafts each section from your answers and you review every word. Drafting from scratch takes hours; finish yours for $99 one time.

  • Built on this template
    Uses the Indiana version and the statutes it cites.
  • Formatted like the template
    Captions, numbering and layout stay intact.
  • AI editing
    Rewrite any section from your own notes.
  • Export as PDF and Word
    Yours to review, sign, or file.
Secure checkout via Stripe
Need to customize this document?

About this template

Last updated
October 24, 2026
Citations checked
October 24, 2026
Jurisdiction
Indiana
Category
Real Estate

Legal authority

  • Ind. Code § 32-28-1-1(b)–(c)
  • Ind. Code § 32-28-1-2(a)–(d)
  • Ind. Code § 32-28-3-1(e)–(f)
  • Ind. Code § 32-28-3-3(a)–(b)
  • Ind. Code § 32-28-3-6(a)–(c)
  • Ind. Code § 32-28-3-10(a)–(c)
  • Ind. Code § 32-28-3-11(a)–(c)
  • Ind. Code § 32-28-3-14(a)–(b)
  • Ind. Code § 32-28-3-16(a)–(b)
  • Ind. Code § 36-2-11-15(b)–(d)
  • Ind. Code § 36-2-11-16(c)
  • Ind. Code § 33-42-9-12(a)(5)

Real estate documents transfer ownership, define who can use a property, and record agreements between buyers, sellers, landlords, and tenants. Deeds, purchase agreements, leases, and easements have to be drafted to meet state recording requirements, and mistakes show up at closing or years later in title disputes. Good real estate paperwork moves transactions forward quickly and avoids the kind of problems that only surface when it is time to sell or refinance.

Not legal advice

This template is provided for informational purposes. We recommend having an attorney review any legal document before signing, especially for high-value or complex matters.

Checked against the law it cites

A reviewer verified this template's legal citations against the official source on October 24, 2026.

Ind. Code § 32-28-1-1(b)–(c) (checked October 18, 2026): "When the debt or obligation and the interest on the debt or obligation that the mortgage, mechanic's lien, judgment, or other lien secures has been fully paid, lawfully tendered, and discharged, the owner, holder, or custodian shall: (1) release; (2) discharge; and (3) satisfy of record; the mortgage, mechanic's lien, judgment, or other lien."

Ind. Code § 32-28-1-2(a)–(d) (checked October 18, 2026): "the owner, holder, or custodian fails, neglects, or refuses to release, discharge, and satisfy of record the mortgage, mechanic's lien, judgment, or other lien as required under section 1 of this chapter not later than fifteen (15) days after the date the owner, holder, or custodian receives the written demand."

Ind. Code § 32-28-3-1(e)–(f) (checked October 18, 2026): "A contract containing a provision or stipulation described in subsection (e) must meet the requirements of this subsection to be valid against subcontractors, mechanics, journeymen, laborers, or persons performing labor upon or furnishing materials or machinery for the property or improvement of the owner."

Ind. Code § 32-28-3-3(a)–(b) (checked October 18, 2026): "This subsection applies to a person that performs labor or furnishes materials or machinery described in section 1 of this chapter related to a Class 2 structure (as defined in IC 22-12-1-5) or an improvement on the same real estate auxiliary to a Class 2 structure (as defined in IC 22-12-1-5)."