CHANGE ORDER REQUEST
(Proposal for Change)
REQUEST INFORMATION
| COR Number: | COR-[Number] |
| Date Submitted: | [Date] |
| Response Required By: | [Date] |
| Priority: | ☐ Urgent ☐ Standard |
PROJECT INFORMATION
| Project Name: | [Project Name] |
| Project Number: | [Number] |
| Project Location: | [Address] |
PARTIES
| Owner: | [Owner Name] |
| Contractor: | [Contractor Name] |
| Architect: | [Architect Name] |
REQUEST ORIGINATED BY
☐ Owner
☐ Contractor
☐ Architect/Engineer
☐ Subcontractor: [Name]
☐ Other: [___]
1. DESCRIPTION OF PROPOSED CHANGE
1.1 Summary
[Brief one-sentence summary of the change]
1.2 Detailed Description
[Provide detailed description of the proposed change, including:
- Specific work to be added, deleted, or modified
- Location within the project
- Technical specifications or requirements
- Any special conditions or constraints]
1.3 Reason for Change
☐ Owner Request / Design Preference
☐ Unforeseen Site Condition
☐ Design Error or Omission
☐ Code Requirement / Regulatory
☐ Coordination Issue
☐ Value Engineering
☐ Material Unavailability / Substitution
☐ Other: [___]
Explanation:
[Explain the reason/necessity for the change]
2. REFERENCE DOCUMENTS
| Document Type | Number/ID | Date |
|---|---|---|
| RFI | [Number] | [Date] |
| Proposal Request | [Number] | [Date] |
| Architect's Supplemental Instruction | [Number] | [Date] |
| Drawing Revision | [Number] | [Date] |
| Field Observation | [Number] | [Date] |
| Submittal | [Number] | [Date] |
| Other | [___] | [Date] |
3. SCOPE OF WORK
3.1 Work to be Added
| Item | Description |
|---|---|
| 1 | [Description] |
| 2 | [Description] |
| 3 | [Description] |
3.2 Work to be Deleted
| Item | Description |
|---|---|
| 1 | [Description] |
| 2 | [Description] |
3.3 Work to be Modified
| Item | From | To |
|---|---|---|
| 1 | [Original] | [Modified] |
| 2 | [Original] | [Modified] |
4. PROPOSED COST
4.1 Cost Breakdown
LABOR:
| Classification | Hours | Rate | Amount |
|---|---|---|---|
| [Classification] | [___] | $[___] | $[___] |
| [Classification] | [___] | $[___] | $[___] |
| [Classification] | [___] | $[___] | $[___] |
| Labor Subtotal | $[___] |
MATERIALS:
| Item | Quantity | Unit Cost | Amount |
|---|---|---|---|
| [Material] | [___] | $[___] | $[___] |
| [Material] | [___] | $[___] | $[___] |
| [Material] | [___] | $[___] | $[___] |
| Material Subtotal | $[___] |
EQUIPMENT:
| Equipment | Duration | Rate | Amount |
|---|---|---|---|
| [Equipment] | [___] | $[___] | $[___] |
| Equipment Subtotal | $[___] |
SUBCONTRACTOR(S):
| Subcontractor | Trade | Amount |
|---|---|---|
| [Name] | [Trade] | $[___] |
| [Name] | [Trade] | $[___] |
| Subcontractor Subtotal | $[___] |
4.2 Cost Summary
| Amount | |
|---|---|
| Direct Labor | $[___] |
| Materials | $[___] |
| Equipment | $[___] |
| Subcontractors | $[___] |
| Other Direct Costs | $[___] |
| Subtotal Direct Costs | $[___] |
| Overhead ([___]%) | $[___] |
| Profit ([___]%) | $[___] |
| Bond Premium (if applicable) | $[___] |
| TOTAL ADDITIONS | $[___] |
4.3 Credits (If Applicable)
| Description | Amount |
|---|---|
| Deleted Labor | ($[___]) |
| Deleted Materials | ($[___]) |
| Other Credits | ($[___]) |
| TOTAL CREDITS | ($[___]) |
4.4 Net Cost Impact
| Amount | |
|---|---|
| Total Additions | $[___] |
| Total Credits | ($[___]) |
| NET COST OF CHANGE | $[___] |
5. PROPOSED TIME IMPACT
5.1 Schedule Impact
☐ No impact to project schedule
☐ Adds [___] calendar days to project schedule
☐ Reduces project schedule by [___] calendar days
☐ To be determined
5.2 Impact Analysis
Affected Activities:
- [Activity 1] - Impact: [___] days
- [Activity 2] - Impact: [___] days
- [Activity 3] - Impact: [___] days
Critical Path Impact:
☐ On critical path
☐ Not on critical path
☐ Analysis required
Explanation:
[Explain how and why the change impacts the schedule]
5.3 Mitigation (If Applicable)
[Describe any measures to minimize schedule impact]
6. SUPPORTING DOCUMENTATION
The following documents are attached:
☐ Detailed Cost Estimate
☐ Subcontractor Quote(s)
☐ Material Quote(s)
☐ Labor Hour Calculation
☐ Revised Drawings/Sketches
☐ Photographs
☐ Manufacturer Data
☐ Schedule Analysis/Fragnet
☐ Specification Reference
☐ Other: [___]
7. ALTERNATIVES CONSIDERED
Alternative 1: [Description]
- Cost: $[___]
- Time: [___] days
- Pros: [___]
- Cons: [___]
Alternative 2: [Description]
- Cost: $[___]
- Time: [___] days
- Pros: [___]
- Cons: [___]
Recommendation: [Which alternative and why]
8. IMPACT IF NOT APPROVED
[Describe the consequences if this change is not approved, including:
- Impact on project functionality
- Code compliance issues
- Safety concerns
- Schedule delays
- Other impacts]
9. WORK STATUS
☐ Work has NOT started - awaiting approval
☐ Work is in progress under Construction Change Directive
☐ Work has been completed - documentation/approval pending
10. CONTRACTOR'S CERTIFICATION
By submitting this Change Order Request, Contractor certifies that:
- The proposed pricing is accurate and based on actual costs
- All subcontractor and material costs have been verified
- The time impact analysis is based on current project schedule
- This request does not include any costs already covered under the Contract
- Supporting documentation is accurate and complete
SUBMITTED BY:
| Company: | [Contractor Name] |
| By: | _________________________________ |
| Name: | [Printed Name] |
| Title: | [Title] |
| Date: | _________________________________ |
| Phone: | [Phone] |
| Email: | [Email] |
11. REVIEW AND DISPOSITION
Architect/Engineer Review
| Reviewed By: | [Name] |
| Date: | [Date] |
| ☐ Recommend Approval | ☐ Recommend Approval with Modifications |
| ☐ Recommend Rejection | ☐ Requires Additional Information |
Comments:
[___]
Recommended Cost: $[___]
Recommended Time: [___] days
| Signature: | _________________________________ |
Owner Disposition
| Reviewed By: | [Name] |
| Date: | [Date] |
☐ APPROVED - Proceed with Change Order preparation
☐ APPROVED WITH MODIFICATIONS - See comments
☐ REJECTED - See comments
☐ PENDING - Additional information required
☐ DEFERRED - Hold for future decision
Approved Amount: $[___]
Approved Time: [___] days
Comments:
[___]
| Signature: | _________________________________ |
| Date: | _________________________________ |
DISTRIBUTION
☐ Owner
☐ Architect/Engineer
☐ Contractor
☐ Project File
☐ Subcontractor(s): [Names]
COR TRACKING LOG
| COR # | Date | Description | Cost | Time | Status |
|---|---|---|---|---|---|
| COR-001 | $ | days | |||
| COR-002 | $ | days | |||
| COR-003 | $ | days | |||
| COR-004 | $ | days | |||
| COR-005 | $ | days |
Status Codes: P = Pending, A = Approved, R = Rejected, D = Deferred, W = Withdrawn
[// GUIDANCE:
1. Submit COR promptly when change is identified
2. Do not proceed with changed work until approved (unless directed)
3. Provide complete supporting documentation
4. Maintain COR log throughout project
5. Track COR through approval process
6. Convert approved CORs to formal Change Orders]
Do more with Ezel
This free template is just the beginning. See how Ezel helps legal teams draft, research, and collaborate faster.
AI that drafts while you watch
Tell the AI what you need and watch your document transform in real-time. No more copy-pasting between tools or manually formatting changes.
- Natural language commands: "Add a force majeure clause"
- Context-aware suggestions based on document type
- Real-time streaming shows edits as they happen
- Milestone tracking and version comparison
Research and draft in one conversation
Ask questions, attach documents, and get answers grounded in case law. Link chats to matters so the AI remembers your context.
- Pull statutes, case law, and secondary sources
- Attach and analyze contracts mid-conversation
- Link chats to matters for automatic context
- Your data never trains AI models
Search like you think
Describe your legal question in plain English. Filter by jurisdiction, date, and court level. Read full opinions without leaving Ezel.
- All 50 states plus federal courts
- Natural language queries - no boolean syntax
- Citation analysis and network exploration
- Copy quotes with automatic citation generation
Ready to transform your legal workflow?
Join legal teams using Ezel to draft documents, research case law, and organize matters — all in one workspace.