CHANGE ORDER REQUEST

(Proposal for Change)


REQUEST INFORMATION

COR Number: COR-[Number]
Date Submitted: [Date]
Response Required By: [Date]
Priority: ☐ Urgent ☐ Standard

PROJECT INFORMATION

Project Name: [Project Name]
Project Number: [Number]
Project Location: [Address]

PARTIES

Owner: [Owner Name]
Contractor: [Contractor Name]
Architect: [Architect Name]

REQUEST ORIGINATED BY

☐ Owner
☐ Contractor
☐ Architect/Engineer
☐ Subcontractor: [Name]
☐ Other: [___]


1. DESCRIPTION OF PROPOSED CHANGE

1.1 Summary

[Brief one-sentence summary of the change]

1.2 Detailed Description

[Provide detailed description of the proposed change, including:
- Specific work to be added, deleted, or modified
- Location within the project
- Technical specifications or requirements
- Any special conditions or constraints]

1.3 Reason for Change

☐ Owner Request / Design Preference
☐ Unforeseen Site Condition
☐ Design Error or Omission
☐ Code Requirement / Regulatory
☐ Coordination Issue
☐ Value Engineering
☐ Material Unavailability / Substitution
☐ Other: [___]

Explanation:
[Explain the reason/necessity for the change]


2. REFERENCE DOCUMENTS

Document Type Number/ID Date
RFI [Number] [Date]
Proposal Request [Number] [Date]
Architect's Supplemental Instruction [Number] [Date]
Drawing Revision [Number] [Date]
Field Observation [Number] [Date]
Submittal [Number] [Date]
Other [___] [Date]

3. SCOPE OF WORK

3.1 Work to be Added

Item Description
1 [Description]
2 [Description]
3 [Description]

3.2 Work to be Deleted

Item Description
1 [Description]
2 [Description]

3.3 Work to be Modified

Item From To
1 [Original] [Modified]
2 [Original] [Modified]

4. PROPOSED COST

4.1 Cost Breakdown

LABOR:

Classification Hours Rate Amount
[Classification] [___] $[___] $[___]
[Classification] [___] $[___] $[___]
[Classification] [___] $[___] $[___]
Labor Subtotal $[___]

MATERIALS:

Item Quantity Unit Cost Amount
[Material] [___] $[___] $[___]
[Material] [___] $[___] $[___]
[Material] [___] $[___] $[___]
Material Subtotal $[___]

EQUIPMENT:

Equipment Duration Rate Amount
[Equipment] [___] $[___] $[___]
Equipment Subtotal $[___]

SUBCONTRACTOR(S):

Subcontractor Trade Amount
[Name] [Trade] $[___]
[Name] [Trade] $[___]
Subcontractor Subtotal $[___]

4.2 Cost Summary

Amount
Direct Labor $[___]
Materials $[___]
Equipment $[___]
Subcontractors $[___]
Other Direct Costs $[___]
Subtotal Direct Costs $[___]
Overhead ([___]%) $[___]
Profit ([___]%) $[___]
Bond Premium (if applicable) $[___]
TOTAL ADDITIONS $[___]

4.3 Credits (If Applicable)

Description Amount
Deleted Labor ($[___])
Deleted Materials ($[___])
Other Credits ($[___])
TOTAL CREDITS ($[___])

4.4 Net Cost Impact

Amount
Total Additions $[___]
Total Credits ($[___])
NET COST OF CHANGE $[___]

5. PROPOSED TIME IMPACT

5.1 Schedule Impact

☐ No impact to project schedule
☐ Adds [___] calendar days to project schedule
☐ Reduces project schedule by [___] calendar days
☐ To be determined

5.2 Impact Analysis

Affected Activities:
- [Activity 1] - Impact: [___] days
- [Activity 2] - Impact: [___] days
- [Activity 3] - Impact: [___] days

Critical Path Impact:
☐ On critical path
☐ Not on critical path
☐ Analysis required

Explanation:
[Explain how and why the change impacts the schedule]

5.3 Mitigation (If Applicable)

[Describe any measures to minimize schedule impact]


6. SUPPORTING DOCUMENTATION

The following documents are attached:

☐ Detailed Cost Estimate
☐ Subcontractor Quote(s)
☐ Material Quote(s)
☐ Labor Hour Calculation
☐ Revised Drawings/Sketches
☐ Photographs
☐ Manufacturer Data
☐ Schedule Analysis/Fragnet
☐ Specification Reference
☐ Other: [___]


7. ALTERNATIVES CONSIDERED

Alternative 1: [Description]

  • Cost: $[___]
  • Time: [___] days
  • Pros: [___]
  • Cons: [___]

Alternative 2: [Description]

  • Cost: $[___]
  • Time: [___] days
  • Pros: [___]
  • Cons: [___]

Recommendation: [Which alternative and why]


8. IMPACT IF NOT APPROVED

[Describe the consequences if this change is not approved, including:
- Impact on project functionality
- Code compliance issues
- Safety concerns
- Schedule delays
- Other impacts]


9. WORK STATUS

☐ Work has NOT started - awaiting approval
☐ Work is in progress under Construction Change Directive
☐ Work has been completed - documentation/approval pending


10. CONTRACTOR'S CERTIFICATION

By submitting this Change Order Request, Contractor certifies that:

  1. The proposed pricing is accurate and based on actual costs
  2. All subcontractor and material costs have been verified
  3. The time impact analysis is based on current project schedule
  4. This request does not include any costs already covered under the Contract
  5. Supporting documentation is accurate and complete

SUBMITTED BY:

Company: [Contractor Name]
By: _________________________________
Name: [Printed Name]
Title: [Title]
Date: _________________________________
Phone: [Phone]
Email: [Email]

11. REVIEW AND DISPOSITION

Architect/Engineer Review

Reviewed By: [Name]
Date: [Date]
☐ Recommend Approval ☐ Recommend Approval with Modifications
☐ Recommend Rejection ☐ Requires Additional Information

Comments:
[___]

Recommended Cost: $[___]
Recommended Time: [___] days

Signature: _________________________________

Owner Disposition

Reviewed By: [Name]
Date: [Date]

APPROVED - Proceed with Change Order preparation
APPROVED WITH MODIFICATIONS - See comments
REJECTED - See comments
PENDING - Additional information required
DEFERRED - Hold for future decision

Approved Amount: $[___]
Approved Time: [___] days

Comments:
[___]

Signature: _________________________________
Date: _________________________________

DISTRIBUTION

☐ Owner
☐ Architect/Engineer
☐ Contractor
☐ Project File
☐ Subcontractor(s): [Names]


COR TRACKING LOG

COR # Date Description Cost Time Status
COR-001 $ days
COR-002 $ days
COR-003 $ days
COR-004 $ days
COR-005 $ days

Status Codes: P = Pending, A = Approved, R = Rejected, D = Deferred, W = Withdrawn


[// GUIDANCE:
1. Submit COR promptly when change is identified
2. Do not proceed with changed work until approved (unless directed)
3. Provide complete supporting documentation
4. Maintain COR log throughout project
5. Track COR through approval process
6. Convert approved CORs to formal Change Orders]

AI Legal Assistant
$49 one-time

Need help customizing this document?

Get 3 days of intelligent editing. Tailor every section to your specific case.

See how AI customizes your document (DEMO)

Change Order Request
All changes saved
Save
Export
Export as DOCX
Export as PDF
Generating PDF...
change_order_request_universal.pdf
Ready to export as PDF or Word
AI is editing...

CHANGE ORDER REQUEST

GENERAL TEMPLATE


Effective Date: [DATE]
Party A: [PARTY A NAME]
Address: [PARTY A ADDRESS]
Party B: [PARTY B NAME]
Address: [PARTY B ADDRESS]
Governing Law: [GOVERNING STATE]

This document is entered into by and between [PARTY A NAME] and [PARTY B NAME], effective as of the date set forth above, subject to the terms and conditions outlined herein and the laws of [GOVERNING STATE].
Chat
Review

Customize this document with Ezel

$49 one-time · No subscription

  • AI-Powered Editing
    Tell the AI what to change and watch it edit your document in real time.
  • 3 Days of Access
    Revise as many times as you need. Download as Word or PDF.
  • State-Specific Law
    AI understands your jurisdiction's legal requirements.
Secure checkout via Stripe
Need to customize this document?

Do more with Ezel

This free template is just the beginning. See how Ezel helps legal teams draft, research, and collaborate faster.

AI Document Editor

AI that drafts while you watch

Tell the AI what you need and watch your document transform in real-time. No more copy-pasting between tools or manually formatting changes.

  • Natural language commands: "Add a force majeure clause"
  • Context-aware suggestions based on document type
  • Real-time streaming shows edits as they happen
  • Milestone tracking and version comparison
Learn more about the Editor
AI Chat for legal research
AI Chat Workspace

Research and draft in one conversation

Ask questions, attach documents, and get answers grounded in case law. Link chats to matters so the AI remembers your context.

  • Pull statutes, case law, and secondary sources
  • Attach and analyze contracts mid-conversation
  • Link chats to matters for automatic context
  • Your data never trains AI models
Learn more about AI Chat
Case law search interface
Case Law Search

Search like you think

Describe your legal question in plain English. Filter by jurisdiction, date, and court level. Read full opinions without leaving Ezel.

  • All 50 states plus federal courts
  • Natural language queries - no boolean syntax
  • Citation analysis and network exploration
  • Copy quotes with automatic citation generation
Learn more about Case Law Search

Ready to transform your legal workflow?

Join legal teams using Ezel to draft documents, research case law, and organize matters — all in one workspace.

Request a Demo