When did a pre-November 7, 1989 construction contract qualify for the temporary old-rate protection?

Short answer Specified materials needed fixed unit prices that included or stated the old 7% rate. Estimates were insufficient, and an unconditional termination right defeated relief.
State
CA
Ruling
Annotation 190.2837
Tax type
Sales and Use Tax
Issued
1990-03-09
Issued by
California State Board of Equalization
Requested by
A construction contractor asking about California's 1989 quarter-point tax increase

Apply this to your situation

This page answers the general question as of 1990. Ask about yours and see what current California tax law says, with citations.

Currency note: this ruling is from 1990
Subsequent statutory amendments, regulation changes, court decisions, or later rulings may have changed the analysis. Treat this page as historical context, not current tax advice. Verify current law before relying on any specific rule, rate, or position mentioned here.
Disclaimer: This March 9, 1990 opinion interprets temporary section 6376 relief tied to a quarter-point rate increase and a December 1, 1989 through December 31, 1990 statutory window. The January 22 request is quoted only in part, while the local-office discussion, supplier quotations, proposal, and actual construction contract are not reproduced in the official PDF. The Board therefore could not give a definite result. This is historical transition guidance, not a current rate rule. Contract date, fixed pricing, stated rate, termination rights, job-site rate, later law, and current facts control.
About this page: The plain-English summary, reader guidance, and Q&A below were written by Ezel based on the official state tax ruling. The original ruling (linked on this page as a PDF) is the authoritative source for any reliance.
View original ruling (PDF)

Plain-English summary

A construction contract could qualify for the temporary old-rate protection when it required the contractor to furnish and install specified materials at fixed unit prices for each item. Those unit prices had to include tax or separately state the old 7% rate, assuming the job site was in a county where that had been the combined rate.

An estimate of miscellaneous material prices was not enough. The opinion also says section 6376 relief failed if either the contractor or owner could unconditionally terminate the contract, because the property was not treated as obligated during a terminable period.

On qualifying facts, required materials could be purchased at the former 7% rate instead of the new 7.25% rate. The legal staff did not decide the requester's contract because the letter supplied too few details and no contract copy.

Common questions

Did a pre-November 7, 1989 contract automatically qualify?

No. It also needed qualifying fixed pricing and binding obligations.

Were estimated material amounts fixed prices?

No.

Did a right to cancel matter?

Yes. An unconditional termination right defeated the relief.

Is this a current California rate rule?

No. The cited statute covered a temporary 1989–1990 transition.

Citations and references

  • California Revenue and Taxation Code section 6376(a) and (c) — temporary construction-contract transition relief and termination rule
  • Senate Bill 33, 1989 California Statutes, First Extraordinary Session, chapter 14 — quarter-point state tax increase and section 6376 enactment
  • Requester's January 22, 1990 letter — estimated-material, proposal, and prior-contract facts quoted in part; the separate letter is not reproduced in the official PDF
  • Local-office representative discussion — requester's account of advice concerning lump-sum supplier quotations; no separate record is reproduced in the official PDF
  • Supplier quotations, proposal, and construction contract — identified as the underlying transaction materials, but none is reproduced in the official PDF

Source

Original ruling text

190.2837

STATE OF CALIFORNIA

STATE BOARD OF EQUALIZATION
1020 N STREET, SACRAMENTO, CALIFORNIA
(P.O. BOX 942879, SACRAMENTO, CALIFORNIA 94279-0001)
(916) 445-6493

March 9, 1990

--- --- ----- --- ----- --- --State sales tax increase – fixed price construction contract Dear Mr. ---: In your January 22, 1990 letter to the Board’s legal staff, you request our advice on the following situation: “I have been trying to obtain a decision regarding the new sales tax of 7-1/4%. It is my understanding that if I entered into a contract prior to November 7, 1989, that the sales tax on materials purchased for that contract would be taxed at the then existing rate of 7%. “According to one of your representatives at the local office, this reduction is only for materials that were quoted by our suppliers as a lump sum for the project. However, they were not sure of the miscellaneous material items that were to be supplied at any time during the project, but that were estimated by our firm and then the 7% sales tax was included in our proposal.” Opinion The 1/4% state sales tax increase was enacted by Senate Bill 33, Chapter 14, Statutes 1989, First Extraordinary Session. As part of that legislation, Revenue and Taxation Code Section 6376 was also adopted. Subdivisions (a) and (c) of that section provide: “(a) From December 1, 1989 to December 31, 1990, there are exempted from 5 percent of the taxes imposed by this part, the gross receipts from the sale of and the storage, use, or other consumption in this state of material, fixtures, and supplies if the sale, storage, use or other consumption in this state of the material, fixtures, or supplies are obligated pursuant to an engineering construction project contract or a building construction contract entered into for a fixed price prior to the effective date of this section.

Mr. ---

-2-

March 9, 1990
190.2837


“(c) For the purposes of this section, the sale or lease of tangible personal property shall be deemed not to be obligated pursuant to a contract or lease for any period of time for which any party to the contract or lease has the right to terminate the contract or lease upon notice, whether or not that right is exercised.” We cannot tell from the facts related in your letter whether your construction contract would qualify as a fixed-price construction contract within the meaning of Section 6376. If your contract with the owner of the real property requires you to furnish and install specified materials at fixed unit prices for each item of material, and the fixed unit prices are either tax-included prices or separately state the tax rate of 7% (assuming your job site is in a county in which the total combined sales and use tax rate was 7%), then you would be entitled to purchase from your suppliers the materials required for your construction contract at the 7% rate, not at the 7-1/4% rate. However, if your construction contract merely estimated the prices of materials to be furnished by you pursuant to the contract, that contract would not be a fixed price construction contract which qualifies for the exemption under Section 6376. In addition, your contract will not qualify for the exemption from the tax increase if either you or the owner may unconditionally terminate the contract. If you wish to have a definite opinion on this issue, please write again with additional details or include a copy of the contract. Sincerely,

John Abbott
Senior Tax Counsel

JA:jb

What does the law say today, for your facts?

This ruling is from 1990. Ezel checks current California tax law against your situation and cites the authority it relies on.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace