Moving an intact house and the demolition standard
Apply this to your situation
This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.
July 17, 2008
Letter # 20080226-8302
RE: Whether the Demolition standard applies to moving a residential structure. 29 CFR 1926 Subpart T – Demolition.
Question: When moving an entire residential structure, does 29 CFR 1926 Subpart T, the Demolition standard, apply?
Answer: It is our understanding that moving a residential structure typically involves the following process: First, employees complete pre-move tasks such as disconnecting utilities. Then, holes are made in the foundation, and steel I-beams are run through the holes and under the structure. Dunnage piers are built up to support hydraulic jacks. The jacks then lift the entire structure from its foundation. After placement of the beams on dollies, the structure is moved to its new location and laid on the new foundation. Finally, post-move tasks such as connecting to utilities lines are commenced.
The provisions of the demolition standard, 1926 Subpart T (1926.850-1926.860), address hazards associated with demolition. The procedure described above is not a demolition process; in fact, it is in a sense the opposite – a procedure designed to keep the structure intact. Therefore, the demolition standard would not typically apply to such a procedure.
Noah Connell, Acting Director
Directorate of Construction
What does federal law require in your situation?
Ezel checks current federal labor law against your facts and answers with citations.
Opens in Ezel Pro.
- Checks the law as it stands today, not only this page
- Cites every source it relies on, so you can verify it
- Chat, drafting and research in one workspace