Box-fan cords and scaffold base plates at construction sites
Apply this to your situation
This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.
July 20, 1998
Donald Kriesel
Safety Engineer
Manhattan Construction
[Recipient address omitted]
RE: 1926.404(a)(2); 1926.404(b)(1)(ii); 1926.405(g); 1926.451(c)(2); scaffold base plates; electrical box fan.
Dear Mr. Kriesel:
This is in response to your letter dated June 27 to the Occupational Safety and Health Administration (OSHA) in which you asked whether an electrical box fan (residential type) could be used on a construction site if equipped with a flat cord. You also questioned the practice of using a scaffold screw jack without a base plate.
Residential type electrical box fans may be used on construction sites if properly maintained and used. OSHA's electrical standard which covers wiring methods, components and equipment for general use has a section that addresses flexible cords and cables, 29 CFR 1926.405(g). This section lists the suitable conditions in which cords and cables can be used; paragraph (g)(1)(i)(C) specifically mentions "appliances." However, please reference paragraph (g)(1)(iii) for a list of prohibited uses. Obviously, the employer should inspect the surrounding area and eliminate any potential accidental contact and tripping hazards that the unit and its installation may have created. In addition, ensure that the box fan has a cord cap that is properly polarized to eliminate reverse polarity, as stated in §1926.404(a)(2), and should the unit be connected to any temporary electrical service, such as an extension cord, then the ground fault circuit interrupter provisions found in §1926.404(b)(1)(ii) would apply.
OSHA's new scaffold standard, which became effective November 29, 1996, contains criteria for supported scaffolds. Section 1926.451(c)(2) specifies that, "[s]upported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation." Placing a scaffold screw jack directly onto a surface, such as a 2 x 10 plank, without a base plate would not sufficiently distribute the weight of the scaffold load and could cause the scaffold to shift and collapse.
If you require further assistance, please do not hesitate to contact us again by writing to: OSHA-Directorate of Construction, Office of Construction Standards and Compliance Assistance, Room N3621, 200 Constitution Avenue, N. W., Washington, D.C. 20210.
Sincerely,
Russell B. Swanson, Director
Directorate of Construction
What does federal law require in your situation?
Ezel checks current federal labor law against your facts and answers with citations.
Opens in Ezel Pro.
- Checks the law as it stands today, not only this page
- Cites every source it relies on, so you can verify it
- Chat, drafting and research in one workspace