Asbestos-containing paint during renovation and demolition

Summary A consultant asked whether asbestos-containing paint had to be removed before interior work or whole-building demolition. OSHA said the standard did not generally require advance removal, but the work still had to meet the applicable asbestos controls and exposure assessment duties. It distinguished Class II work, total demolition, and small maintenance disturbances; OSHA marks the letter as archived and says it may no longer represent agency policy.
Document
Federal opinion letter
Agency
Occupational Safety and Health Administration (OSHA)
Document number
1997-04-25
Date issued
April 25, 1997
Status
Archived by the agency
OSHA labels this an archive document and says it may no longer represent agency policy; the page does not state a withdrawal or replacement.
Status last verified October 9, 2026

Apply this to your situation

This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.

The current status of this document is unclear
OSHA labels this an archive document and says it may no longer represent agency policy; the page does not state a withdrawal or replacement. It may no longer reflect the agency's current position. Treat this page as historical context, not current guidance, and verify current law before relying on anything here.
About this page: The full text below is the official document from Occupational Safety and Health Administration (OSHA). Ezel adds the plain-English summary and tracks the document's status. The official source linked on this page is authoritative for any reliance.

NOTICE: This is an OSHA Archive Document, and may no longer represent OSHA Policy. It is presented here as historical content, for research and review purposes only.

April 25, 1997

Mr. James Prarat
Assistant Director of Environmental Department
Karl R. Rohrer Associates, Inc.
[Recipient address omitted]
Dear Mr. Prarat:

This is in response to your letter dated December 9, 1996, where you have asked for a clarification of the Occupational Safety and Health Administration's (OSHA) Exposure to Asbestos standard for the construction industry, 29 CFR 1926.1101. The specific questions concern asbestos-containing paint and how the standard regulates activities that involve "thin-layered" asbestos-containing paint.

Your questions will be answered in the order they were asked. However, to begin with statements made in the first paragraph of your letter should be discussed to clear up any misunderstanding of the materials covered by the presumptive rule. The standard requires building owners to locate the presence and quantity of presumed asbestos-containing materials (PACM) in buildings built before 1981. The definition of PACM is thermal system insulation (TSI) such as, pipe-wrap or duct insulation and sprayed on and troweled on surfacing material such as, fireproofing material or acoustical material. Asbestos-containing paint is not included in the lists of products required by a building owner to locate and identify under OSHA's presumptive rule. In addition, the terms "intact" and "non-intact" refer to the condition of the asbestos-containing materials not only upon inspection prior to removal, but also throughout the entire removal operation. Intact means that asbestos-containing material (ACM) has not crumbled, been pulverized, or otherwise deteriorated to the point that the fibers are no longer bound to their matrix.

The four questions on "thin layered" asbestos-containing paint (ACP) include the following:

1.

Does OSHA require that intact ACM paint be removed from surfaces prior to those surfaces being damaged in interior demolition work?

No, the OSHA Asbestos standard does not require asbestos paint to be removed prior to interior demolition work. It is assumed that the "demolition" work you refer to is the removal of the wallboards that are covered with asbestos containing paint. The removal (demolition) of ACM that is not thermal system insulation, and therefore is a Class II operation. It appears that the method of removal that you are referring to, i.e. demolition, suggests that the ACM is not removed in a substantially intact state. The standard contains work practices for non-intact Class II removal in paragraphs (g)(7) and (g)(8). Employers shall ensure that a competent person conduct an initial exposure assessment immediately before or at the initiation of the operation to determine the exposures to employees performing the work. The results of the assessment will determine how an employer shall proceed in this work operation, including, but not limited to, monitoring, methods of compliance, respiratory equipment, and personal protective equipment.

2.

Does OSHA require that non-intact ACM paint be removed from surfaces prior to those surfaces being damaged in interior demolition work?

No. The standard does not require non-intact asbestos containing paint be removed prior to work operations but does require the employer to comply with the standard as described in question #1.

It is our understanding from your letter that questions #1 and #2 are referring to interior and exterior work being performed on a building that is not scheduled for total demolition. Questions #3 and #4 pose the same questions concerning prior removal of intact and non-intact asbestos containing paint. However, our understanding is that the building itself is being demolished. OSHA regulations do not require removal of intact or non-intact ACM prior to the total demolition of a building. Total demolition of a building is an "unclassified" asbestos activity. The competent person is required to assess the exposure to employees (for instance, to crane operators and oilers) in the area and ensure there is compliance with the Permissible Exposure Limit (PEL) and the Excursion Limit (EL). Paragraphs (g)(1), (2), and (3) titled Methods of Compliance, contain additional requirements for all asbestos operations, to include the preference for wet removal if feasible, HEPA filtered equipment, and proper disposal methods. OSHA does not require removal of asbestos-containing products prior to the total demolition of a building. However, it would be advisable to check other state or local authorities for regulations that may affect this operation.

The standard does not contain definitions of "textured paint" or "thin-layered paint." The standard defines surfacing material and surfacing ACM, which would include ACP that contains one percent asbestos. The classification of asbestos work is determined not only by the material being removed, but the work being performed. For example, if a small amount of asbestos-containing paint was disturbed during a maintenance job such as changing a light switch on the wall, this would be a Class III operation.

We hope this response is helpful in assisting you and your clients when making decisions on compliance with the asbestos standard. If you have further questions, please feel free to contact Wanda Bissell of the Office of Health Compliance Assistance on (202) 219-8036 ext. 36.

Sincerely,
Stephen Mallinger, Acting Director
Office of Health Compliance Assistance

[Requester letter reproduced on OSHA page; omitted here.]

What does federal law require in your situation?

Ezel checks current federal labor law against your facts and answers with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace