December 3, 1991
Mr. B.T. Dempsey
Dempsey Associates, Ltd.
[Recipient address omitted]
Dear Mr. Dempsey:
This is in response to your letter of September 19, 1991, requesting the Occupational Safety and Health Administration (OSHA) to review technical information on the Techam LVL Scaffold Plank, and whether that product meets OSHA's construction standards for scaffolds. I apologize for the delay in responding to your letter.
As Mr. Roy Gurnham of the Office of Construction and Maritime Compliance Assistance advised you at your meeting in early September, OSHA does not approve nor endorse products. The variable working conditions at jobsites and possible alterations, misuse, or misapplication of an otherwise safe product could easily create a hazardous condition beyond the control of the manufacturer. However, we have reviewed the product data enclosed with your letter and it appears that if the planks are properly installed and loaded, they would be acceptable for use as scaffold planking. However, you are cautioned to provide load tables to the users which assure, as a minimum, compliance with the 4 to 1 design factor required by the standard at 29 CFR 1926.451[(a)(1)]
Thank you for your interest in Occupational Safety and Health.
Sincerely,
Patricia K. Clark, Director
Directorate of Compliance Programs
What does federal law require in your situation?
Ezel checks current federal labor law against your facts and answers with citations.
Opens in Ezel Pro.
- Checks the law as it stands today, not only this page
- Cites every source it relies on, so you can verify it
- Chat, drafting and research in one workspace