Temporary oil-heater safeguards at construction sites

Summary An OSHA regional office asked whether a temporary oil heater met construction standards. OSHA said the model’s integral fuel tank made a separate flame-loss shutoff unnecessary, while users still had to meet the construction heater rule and address placement, maintenance, and carbon-monoxide hazards. The guidance matters to contractors using temporary heaters.
Document
Federal opinion letter
Agency
Occupational Safety and Health Administration (OSHA)
Document number
1988-05-26
Date issued
May 26, 1988
Status
Active
Status last verified October 10, 2026

Apply this to your situation

This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.

About this page: The full text below is the official document from Occupational Safety and Health Administration (OSHA). Ezel adds the plain-English summary and tracks the document's status. The official source linked on this page is authoritative for any reliance.

May 26, 1988


MEMORANDUM FOR: GILBERT T. SAULTER
Regional Administrator
ATTN: JERRY D. BAILEY ARA
Technical Support
FROM: EDWARD BAIER Director
Directorate of Technical Support
SUBJECT: Hi-Lo "Hard Hat" Radiant Oil Heaters


We have reviewed the materials you sent on the subject heater and contacted the manufacturer for additional information. Based on the information available to use the manufacturer has met the ANSI A10.10 and 29 CFR 1926.154 standards. Both ANSI and OSHA standards require the heater to be equipped with an automatic flame-loss device to stop the flow of fuel if the flame is extinguished. The design of the heater, however, is such that the fuel tank is an integral part of the heater and the fuel cannot flow in case of flame-loss. Therefore the requirement for a flame loss device is not applicable to this specific model.

The manufacturer has stated that the "Hard Hat is designed primarily for use at construction sites and for temporary heating applications. The heater is not intended for use as a permanent fixture. The manufacturer's operating instructions advise that the heater be used in accordance with the Federal, State and local codes and regulations governing temporary heating devices.

The user of this heater in a construction site must comply with the 29 CFR 1926.154 standard. The provisions of the source standard, ANSI A10.10 may be used to cite under the General Duty Clause. ANSI A10.10 in addition to the requirements of 1926.154 requires the following:

  1. The heater shall be protected against damage when in use by anchoring or barricading.

  2. When used in enclosed or partially enclosed structures, tests for the presence of carbon monoxide shall be made within and hour after the start of each shift and at least four hours thereafter.

  3. Carbon monoxide concentrations greater than 50 ppm of air volume at worker breathing levels shall require extinguishing of the heater unless additional mechanical ventilation is provided to reduce the carbon monoxide content to acceptable limits.

  4. A qualified employee must be assigned to be responsible for the operation and maintenance of the heater. Instructions on the data plate and all other manufacturer's instructions must be followed.

In general industry, violation of the manufacturer's recommendations, instructions, and warnings may be cited under the General duty Clause after consultation with the Regional Solicitor.

What does federal law require in your situation?

Ezel checks current federal labor law against your facts and answers with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace