Back to Federal guidance

Multiple-load crane hoisting during steel erection

Summary An OSHA regional office told field staff how it would assess cranes lifting several steel loads at once during erection. It said the practice could support a general duty citation if the recognized hazard and worker exposure were well documented. OSHA now archives the memorandum as potentially outdated.
Document
Federal opinion letter
Agency
Occupational Safety and Health Administration (OSHA)
Document number
1988-03-16-0
Date issued
March 16, 1988
Status
Archived by the agency
OSHA archives this regional memorandum and says it may no longer represent OSHA policy.
Status last verified October 10, 2026

Apply this to your situation

This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.

The current status of this document is unclear
OSHA archives this regional memorandum and says it may no longer represent OSHA policy. It may no longer reflect the agency's current position. Treat this page as historical context, not current guidance, and verify current law before relying on anything here.
About this page: The full text below is the official document from Occupational Safety and Health Administration (OSHA). Ezel adds the plain-English summary and tracks the document's status. The official source linked on this page is authoritative for any reliance.

NOTICE: This is an OSHA Archive Document, and may no longer represent OSHA Policy. It is presented here as historical content, for research and review purposes only.

March 16, 1988

MEMORANDUM FOR: AREA DIRECTORS

FROM: JOHN B. MILES, JR
Regional Administrator

SUBJECT: Christmas Treeing, Steel Erection

Enclosed is documentation from the manuals of the Construction Industry Manufacturers Association, FMC Corporation, Construction Safety Association of Ontario and the Structural Manual V, Volume I for Ironworkers. This information was forwarded to this office by the Area Director of the Harrisburg, Pennsylvania office and is currently being used in Region III to support 5(a)(1) citations for the practice of hoisting multiple loads (Christmas Treeing) by cranes.

Effective immediately, Supervisors and CSHOs are advised that the practice of lifting multiple loads with a crane are citable under Section 5(a)(1) of the Act and that the attached information can be used to show that the hazard is recognized in the industry.

Particular attention, however, needs to be taken to thoroughly document the hazards to employees who man tag lines, work under the hoisted loads, methods of rigging the load, weather conditions, etc. so as to support the issuance of a 5(a)(1) citation. Photographs taken of employees under the suspended loads will also help in substantiating violations.

For your future reference, Region III considers Tom Doherty of the Harrisburg Area Office to be an expert in the hazards of multiple load hoisting. Tom has 21 years experience as a crane operator in the construction industry.

What does federal law require in your situation?

Ezel checks current federal labor law against your facts and answers with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace