Approval of electrical equipment under construction standards
Apply this to your situation
This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.
NOTICE: This is an OSHA Archive Document, and may no longer represent OSHA Policy. It is presented here as historical content, for research and review purposes only.
September 24, 1987
MEMORANDUM FOR: ALL REGIONAL ADMINISTRATORS
FROM: THOMAS J. SHEPICH, Director
Directorate of Compliance Programs
THRU: LEO CAREY, Director
Office of Field Programs
SUBJECT: Clarification of 29 CFR 1926.403(a)
In the revised Subpart K, Electrical Standards for Construction the language of the requirement for approval in 1926.403(a) differs from the wording given in Subpart S, Electrical Standards for General Industry, 1910.303(a). However, while different language was used in Subpart K, no difference in the implementation of the requirement was intended.
In both standards, Subpart K and Subpart S, the definition of "approved" leads to the definition of "acceptable," which provides for acceptance of electric equipment based in testing by a laboratory (among other means of acceptance). The Subpart K requirement for approval is not intended to expand equipment testing beyond what has taken place under Subpart S.
In determining the acceptability of electric equipment that is of a type that has not historically been tested by a "qualified electrical testing laboratory," OSHA compliance staff must consider the decisions of local authorities responsible for enforcing the National Electrical Code.
What does federal law require in your situation?
Ezel checks current federal labor law against your facts and answers with citations.
Opens in Ezel Pro.
- Checks the law as it stands today, not only this page
- Cites every source it relies on, so you can verify it
- Chat, drafting and research in one workspace