Ground-fault protection for construction extension cords
Apply this to your situation
This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.
NOTICE: This is an OSHA Archive Document, and may no longer represent OSHA Policy. It is presented here as historical content, for research and review purposes only.
July 31, 1984
Mr. Peter J. Schram
Chief Electrical Engineer
National Electrical Code
National Fire Protection Association
[Recipient address omitted]
Dear Mr. Schram:
This is in response for an interpretation of cord sets (extension cords) plugged into permanent wiring at construction sites to supply portable electrical hand tools.
Section 305-4(a) of the code requires all 125-volts single-phase, 15 and 20 amperes receptacle outlets which are not a part of the permanent wiring of the building or structure and which are in use by employees shall have ground-fault circuit-interrupter protection for personnel.
I have been advised by my staff that cord sets (extension cords) plugged into permanent wiring at construction sites are temporary wiring and as such require ground-fault protection for personnel on construction sites.
You assistance in this matter will be appreciated.
Sincerely,
John B. Miles, Jr.,
Director
Directorate of Field Operations
What does federal law require in your situation?
Ezel checks current federal labor law against your facts and answers with citations.
Opens in Ezel Pro.
- Checks the law as it stands today, not only this page
- Cites every source it relies on, so you can verify it
- Chat, drafting and research in one workspace