Temporary string lighting at construction sites

Summary A lighting manufacturer asked whether construction string lights fell under a hand-held lamp rule. OSHA said that provision addressed portable hand-held lamps, while general temporary lighting had to follow temporary wiring provisions; the described installation appeared acceptable if other requirements were met. OSHA archives the letter.
Document
Federal opinion letter
Agency
Occupational Safety and Health Administration (OSHA)
Document number
1980-07-17
Date issued
July 17, 1980
Status
Archived by the agency
OSHA labels this an archive document and warns that it may no longer represent OSHA policy.
Status last verified October 10, 2026

Apply this to your situation

This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.

The current status of this document is unclear
OSHA labels this an archive document and warns that it may no longer represent OSHA policy. It may no longer reflect the agency's current position. Treat this page as historical context, not current guidance, and verify current law before relying on anything here.
About this page: The full text below is the official document from Occupational Safety and Health Administration (OSHA). Ezel adds the plain-English summary and tracks the document's status. The official source linked on this page is authoritative for any reliance.

NOTICE: This is an OSHA Archive Document, and may no longer represent OSHA Policy. It is presented here as historical content, for research and review purposes only.

July 17, 1980

Mr. J. E. Ericson
President
Ericson Manufacturing Company
[Recipient address omitted]

Dear Mr. Ericson:

This is in response to your letter regarding another manufacturer's string lights for temporary lighting. Please accept our apology for the delay in response.

In answer to your request in your second paragraph for our opinion, the application intent of 29 CFR 1926.401(j)(2) is, in fact, for portable hand-held type lamps, and not for the general type lighting used during construction. Temporary lighting for construction is to conform to the requirements of the NEC Article 305, Temporary Wiring.

In answer to the points raised in your third and fourth paragraphs, Article 305 of the 1971 NEC allows temporary branch circuits to be run as open wiring. It also allows temporary wiring to be of a class less than permanent wiring. Although Article 320 applies to open wiring, provisions relating to permanent installations obviously cannot strictly apply to temporary ones. For example, the conductors would not be required to be rigidly supported by knobs in a temporary installation; however, they would have to be supported by insulating material (Section 320-5(a)).

If installed as the manufacturer intended, the equipment in the advertisement can meet the intent of Articles 305 and 320. A messenger supports the lamp which in turn supports the conductors by insulating ears. As long as other requirements pertinent to a temporary installation are met, the installation of this type of temporary lighting would appear to be in compliance with the NEC and OSHA's regulations.

Should you have any further questions, please feel free to call or write.

Sincerely,
Bruce Hillenbrand
Acting Director,
Federal Compliance and State Programs

What does federal law require in your situation?

Ezel checks current federal labor law against your facts and answers with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace