Ground-fault protection on permanent construction wiring
Apply this to your situation
This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.
January 12, 1979
MEMORANDUM FOR: CURTIS A. FOSTER
REGIONAL ADMINISTRATOR - DENVER
THRU: DONALD E. MACKENZIE Field Coordinator
FROM: IRVING WEISBLATT, Acting Director,
Directorate of Federal Compliance and State Programs
SUBJECT: Clarification of 1910.309(c)(2) and 1926.400(1)(2):
Ground Fault Protection
In the specific instance on a construction site, where the permanent wiring is in place and in use, and an employee plugs an extension cord into a permanent 120 volt, single-phase receptacle outlet, and then plugs a portable electric tool into the extension cord, a GFCI may be used but is not required. However, if the GFCI is not used under these conditions then and assured equipment grounding conductor program is required covering all cord sets, receptacles which are not a part of the permanent wiring of the building or structure, and equipment connected by cord and plug.
What does federal law require in your situation?
Ezel checks current federal labor law against your facts and answers with citations.
Opens in Ezel Pro.
- Checks the law as it stands today, not only this page
- Cites every source it relies on, so you can verify it
- Chat, drafting and research in one workspace