Back to Federal guidance

GFCIs and emergency venting for flammable liquids

Summary An insurance representative asked about construction ground-fault protection and flammable-liquid venting. A regional OSHA office described the GFCI or testing-program options and explained how emergency discharge location, alarms, and vent-pipe dimensions applied to the stated tank questions. OSHA archives the letter.
Document
Federal opinion letter
Agency
Occupational Safety and Health Administration (OSHA)
Document number
1977-02-16
Date issued
February 16, 1977
Status
Archived by the agency
OSHA labels this an archive document and warns that it may no longer represent OSHA policy.
Status last verified October 10, 2026

Apply this to your situation

This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.

The current status of this document is unclear
OSHA labels this an archive document and warns that it may no longer represent OSHA policy. It may no longer reflect the agency's current position. Treat this page as historical context, not current guidance, and verify current law before relying on anything here.
About this page: The full text below is the official document from Occupational Safety and Health Administration (OSHA). Ezel adds the plain-English summary and tracks the document's status. The official source linked on this page is authoritative for any reliance.

NOTICE: This is an OSHA Archive Document, and may no longer represent OSHA Policy. It is presented here as historical content, for research and review purposes only.

February 16, 1977
Mr. Charles J. Troell
Senior Field Representative
Loss Control & Engineering Department
The Continental Insurance Companies
[Recipient address omitted]
Dear Mr. Troell:
This is in response to your letter requesting further information on the ground-fault circuit interrupter protection devices and their application.
Somewhat more than a year ago, there was an OSHA requirement for the Construction Industry to provide GFCI in construction operations. This Standard was withdrawn during the year of 1975, and as of December 21, 1976 has been reinstated effective 60 days from that date of the publication of the Federal Register. We are enclosing a copy of the Federal Register article on that particular item. This new regulation on GFCI requires either that a ground fault circuit interrupter system be installed in accordance with the NEC Standard or that a program of ground fault testing be initiated in such manner that any change to outlets, circuits or systems would require testing for grounds or a test shall be made not less than once every three months in the absence of any changes in the system. It should be clearly understood that the requirements for GFCI do not apply to circumstances other than those specified in the National Electrical Code.
In your second paragraph, you ask information about "emergency venting" when applied to stills and reactors. Under 1910.106(b)(2)(v)(e), on page 128 of the January 1976 issue of the Federal Register, you will find a formula for determining emergency relief venting for all types of flammable liquids. The three questions based upon the preceding paragraph would elicite the following responses:

  1. Discharge to a safe location would mean that every consideration has been given to the potential ignition of flammable gases, the potential hazard to employees and the public from inhalation of toxic fumes, dusts, or gas generated by such emission and finally, the requirements of the Environmental Protection Agency (EPA), in relation to air protection.
  2. We have made a thorough search and have been unable to locate any mention of blow-down tanks or other controls of like type.
  3. As to visual and audio warning systems, under 1910.106(h)(6)(iii), Alarm Systems, there is a specific requirement for the notification of fire to those within the plant and to any public fire department.
    In your third paragraph, you request clarification of 1910.106(b)(3)(iv) which provides specific guides for the diameter and length of exhaust pipes. The Standard specifies that if the length of the pipe is under ten feet, and the diameter is greater than two inches ID, the outlet shall be provided with a vacuum or pressure relief device or a flame arrester. Alternately, the pipe must be at least 12 feet long and not less than 1-1/4 inches nominal inside diameter. The vent pipe is also related to the size and maximum flow GPM of the fill line in accordance to Table H 11 in 1910.106. One sentence in Paragraph IV, Vents, specifically states that vent pipes two inches or less in nominal inside diameter shall not be obstructed. Therefore, the proposed length and diameter in your third paragraph of your letter, do not meet the requirements of the Standard 1910.106.
    We hope the preceding provides the information you require. Please feel free to contact us if there are further questions about OSHA.
    Sincerely,
    Alfred Barden
    Regional Administrator
    Occupational Safety and Health Administration

What does federal law require in your situation?

Ezel checks current federal labor law against your facts and answers with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace