Replacement servers for state unemployment databases

Summary ETA told state workforce agencies it planned to replace their unemployment database servers, with a projected completion date of March 2015. The letter explains the data transfer and return process and attaches equipment specifications, an upgrade plan and a delivery schedule. ETA now lists the advisory as Canceled.
Document
Federal guidance
Agency
U.S. Department of Labor, Employment and Training Administration (ETA)
Document number
UIPL No. 6-15
Date issued
December 31, 2014
Status
Withdrawn
ETA's advisory listing marks this letter Canceled as of 2026-10-24, although the PDF prints an expiration date of Continuing. Its server replacement schedule was for early 2015.
Status last verified October 24, 2026

Is this still the rule?

This document has been withdrawn. Ezel checks what federal law requires today, under current federal labor law, and answers your situation with citations.

This document has been withdrawn
ETA's advisory listing marks this letter Canceled as of 2026-10-24, although the PDF prints an expiration date of Continuing. Its server replacement schedule was for early 2015. It no longer reflects the agency's current position. Treat this page as historical context, not current guidance, and verify current law before relying on anything here.
About this page: The full text below is the official document from U.S. Department of Labor, Employment and Training Administration (ETA). Ezel adds the plain-English summary and tracks the document's status. The official source linked on this page is authoritative for any reliance.
CLASSIFICATION
   EMPLOYMENT AND TRAINING ADMINISTRATION                  Unemployment Insurance
               ADVISORY SYSTEM                             CORRESPONDENCE SYMBOL
          U.S. DEPARTMENT OF LABOR                         OUI/DPM
             Washington, D.C. 20210                        DATE
                                                           December 31, 2014

ADVISORY:          UNEMPLOYMENT INSURANCE PROGRAM LETTER NO. 6-15

TO:                STATE WORKFORCE AGENCIES

FROM:              PORTIA WU /s/
                   Assistant Secretary

SUBJECT:          Replacement of State-based Information Technology Hardware for the
                  Unemployment Insurance Data Base System

1. Purpose. To provide State Workforce Agencies (SWAs) with advance notice of distribution
   of new Sun Server X4-2 computer systems.

2. References.

   •    Unemployment Insurance Program Letter (UIPL) No. 20-09, Distribution of new Sun
        Server T2000 computer systems; and
  •     UIPL No. 25-04, Purchase of New Sun System to Support State Unemployment Insurance
        Data Base (UIDB) System.

3. Background. The U.S. Department of Labor (Department) purchases, configures, and ships
   to each state a server that stores important program information extracted from state systems
   and from which states electronically transmit data they are required to report to the
   Department. The current Sun Server T2000 server is no longer produced or supported, and
   the Department will be providing each state with a new and upgraded server over the next
   three months.

4. Upgrade Overview.

  Hardware: The Sun Server X4-2 computer will be the replacement server for the SWAs. This
  new system has larger disk drives and faster central processing units (CPUs) and allows for
  future expansion. The new system will be designed and configured to support the current
  web-based applications.

  Software: The Department’s technical support staff will work closely with the state Sun
  System Administrators to transfer all software and data from the current servers to the new
  servers. The transition should be transparent for the current users and system administrators,
  and thus no additional training is anticipated.

 RESCISSIONS                                              EXPIRATION DATE
 None                                                     Continuing

  Technical staff will also be in contact with each state Sun System Administrator to coordinate
  schedules and provide more information on the implementation process. The projected
  completion date for this project is March 2015.

5. Action Required. Please provide the above information to all appropriate state personnel,
   including state Sun System Administrators providing support for the SWA's Sun UNIX
   system.

6. Inquiries. Inquiries should be directed to the appropriate Regional Office.

7. Attachments.

  I. System Configuration
  II. Upgrade Plan
  III. Delivery Timeframe

Attachment I



                            SYSTEM CONFIGURATION

                             X4-2 Server Configuration

   •   Oracle Sun X4-2 Server

           o 4-core 2.5 GHz Intel Xenon Processor

           o 8GB DDR3-1600 memory (8 * 1GB DIMMs)

           o 3 300GB 10000 rpm 2.5-inch SAS-2 hard disk drives

           o 1 DVD drive

           o 1 Oracle System Assistant 4 GB USB stick

           o 2 Poser cords: sun rack 2 jumper, 2 meters, C14RA plug, C13 connector

           o 8 internal port Sun Storage 6 GB SAS PCIe HBAS

           o Solaris 11.2 and Java JBOSS software

           o Solaris 11.2 DVD boot DVD

   •   Quantum DAT 160 tape drive

           o 17 DAT 160 Tapes

The X4-2 integrates with all diverse clients on the network such as Apple Macintosh,
Microsoft Windows 7/8/2000/NT/XP, UNIX and LINUX workstations providing TCP/IP
connectivity over Ethernet LANs through HTTP and SSH.

Software

           •   Oracle Solaris 11.2 Operating System

           •   UIDBMS State Workforce Agency Software Suite

Attachment II


                                       UPGRADE PLAN

The new systems will be shipped, initially, to the National Office and will be installed by
operations staff. After which, the system will be sent to the State Workforce Agency based upon
the schedule listed in Attachment III.
   •   Department of Labor (Department) technical staff will contact the State SUN
       Administrator to schedule the hardware upgrade.

   •   Based on the schedule, the Department’s technical staff will provide the necessary
       assistance required by the State SUN Administrator to install the new systems. Once the
       new system is setup and adequately tested, all existing information on the old system
       including the external drive will be deleted to ensure privacy of State data.

   •   Once the implementation is complete, the State SUN administrator is requested to prepare
       the “return” process for the old system. The old SUN T2000 chassis - must be boxed and
       prepared for pickup. Packing materials provided with the new X4-2 system may be used
       for packing the old system for pickup. Inside the box of the new X4-2 is a packet of
       information for the System Administrators. This packet contains "Action Required-
       Upgrade Return Procedures" and will provide all of the necessary paperwork and
       instructions for returning the old system to Sun Microsystems. A Return Merchandise
       Authorization (RMA) Number and an 800 number will be provided to make
       arrangements for Oracle to pick up the old system.

The Department will keep all System Administrators informed regarding the implementation
process. The projected completion date for this project is March 2015. More detailed
information will follow concerning the installation plans and this effort will be coordinated in
detail with the State SUN System Administrators.

Special Technical Notes:

    1. External Exabyte Model 8700 tape drive will be replaced by the Quantum DAT 160 tape
      drive.

    2. HP 4100 N LaserJet Printers, monitor, cables, mouse and keyboard already in the SWA
      sites are not being replaced and will be used in the new system's configuration.

Attachment III

                                   Estimated Delivery Timeframe

                         System / Equipment Sent from the National Office

        State            Date                                System / Equipment

Training Center         1/8/2015                             X4-2 System / cables
California              1/8/2015                             X4-2 System / cables
Arkansas                1/8/2015                             X4-2 System / cables
Georgia                 1/8/2015                             X4-2 System / cables
Maryland                1/8/2015                             X4-2 System / cables
Wisconsin               1/8/2015                             X4-2 System / cables
District of Columbia    1/8/2015                             X4-2 System / cables
Mississippi            1/22/2015                             X4-2 System / cables
Alaska                 1/22/2015                             X4-2 System / cables
Virgin Islands         1/22/2015                             X4-2 System / cables
Puerto Rico            1/22/2015                             X4-2 System / cables
Washington             1/22/2015                             X4-2 System / cables
Oregon                 1/22/2015                             X4-2 System / cables
Montana                1/23/2015                             X4-2 System / cables
Hawaii                 1/23/2015                             X4-2 System / cables
Arizona                1/23/2015                             X4-2 System / cables
Nevada                 1/23/2015                             X4-2 System / cables
Florida                1/23/2015                             X4-2 System / cables
North Dakota           1/23/2015                             X4-2 System / cables
Texas                  1/23/2015                             X4-2 System / cables
Maine                  1/26/2015                             X4-2 System / cables
Wyoming                1/26/2015                             X4-2 System / cables
Vermont                1/26/2015                             X4-2 System / cables
West Virginia          1/26/2015                             X4-2 System / cables
Kansas                 1/26/2015                             X4-2 System / cables
South Dakota           1/26/2015                             X4-2 System / cables
Colorado               1/27/2015                             X4-2 System / cables
Idaho                  1/27/2015                             X4-2 System / cables
Minnesota              1/27/2015                             X4-2 System / cables
Alabama                1/27/2015                             X4-2 System / cables
Louisiana              1/27/2015                             X4-2 System / cables
New Hampshire          1/27/2015                             X4-2 System / cables
Nebraska               1/28/2015                             X4-2 System / cables
New Mexico             1/28/2015                             X4-2 System / cables

North Carolina              1/28/2015                            X4-2 System / cables
Oklahoma                    1/28/2015                            X4-2 System / cables
Iowa                        1/28/2015                            X4-2 System / cables
Indiana                     1/28/2015                            X4-2 System / cables
Utah                        1/29/2015                            X4-2 System / cables
Tennessee                   1/29/2015                            X4-2 System / cables
South Carolina              1/29/2015                            X4-2 System / cables
Kentucky                    1/29/2015                            X4-2 System / cables
Missouri                    1/29/2015                            X4-2 System / cables
Virginia                    1/29/2015                            X4-2 System / cables
New York                    1/30/2015                            X4-2 System / cables
New Jersey                  1/30/2015                            X4-2 System / cables
Illinois                    1/30/2015                            X4-2 System / cables
Michigan                    1/30/2015                            X4-2 System / cables
Massachusetts               1/30/2015                            X4-2 System / cables
Delaware                    1/30/2015                            X4-2 System / cables
Rhode Island                 2/2/2015                            X4-2 System / cables
Ohio                         2/2/2015                            X4-2 System / cables
Connecticut                  2/2/2015                            X4-2 System / cables
Pennsylvania                 2/2/2015                            X4-2 System / cables

* Equipment ship directly from the vendor to the states will need to be stored until the server, monitor,
keyboard and cables arrive from the National Office. States’ System Administrators will need to email
the hotline that they received the equipment and provide the serial number to the printer.

What does federal law require today?

This guidance has been withdrawn. Ezel checks current federal labor law as it stands now and answers your situation with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace