2010 funding for unemployment IT security and contingency plans

Summary ETA offered states fiscal year 2010 supplemental funds to develop or update unemployment IT contingency plans and improve system security. The letter gives request instructions; its attachments include planning templates, an assessment form and an audit extract. ETA now lists the letter as Canceled.
Document
Federal guidance
Agency
U.S. Department of Labor, Employment and Training Administration (ETA)
Document number
UIPL No. 19-10
Date issued
March 29, 2010
Status
Withdrawn
ETA lists this letter Canceled as of 2026-10-24; the PDF prints an expiration date of March 29, 2011.
Status last verified October 24, 2026

Is this still the rule?

This document has been withdrawn. Ezel checks what federal law requires today, under current federal labor law, and answers your situation with citations.

This document has been withdrawn
ETA lists this letter Canceled as of 2026-10-24; the PDF prints an expiration date of March 29, 2011. It no longer reflects the agency's current position. Treat this page as historical context, not current guidance, and verify current law before relying on anything here.
About this page: The full text below is the official document from U.S. Department of Labor, Employment and Training Administration (ETA). Ezel adds the plain-English summary and tracks the document's status. The official source linked on this page is authoritative for any reliance.
UIPL19-10acc.pdf (https://www.dol.gov/sites/dolgov/files/ETA/advisories/UIPL/2010/UIPL19-10acc.pdf)

                                                                   CLASSIFICATION
      EMPLOYMENT AND TRAINING ADMINISTRATION                       UI
                  ADVISORY SYSTEM                                  CORRESPONDENCE SYMBOL
             U.S. DEPARTMENT OF LABOR
                                                                   OUI/DPM
                Washington, D.C. 20210
                                                                   DATE
                                                                   March 29, 2010



ADVISORY:               UNEMPLOYMENT INSURANCE PROGRAM LETTER NO. 19-10

TO:                     STATE WORKFORCE AGENCIES

FROM:                   JANE OATES /s/
                        Assistant Secretary

SUBJECT:                Unemployment Insurance (UI) Fiscal Year (FY) 2010 Supplemental
                        Funding Opportunities to Improve UI Information Technology (IT)
                        Contingency Plans and UI IT Security


1. Purpose. To notify State Workforce Agencies (SWAs) of the availability of FY 2010 UI
   funds to 1) develop or update UI IT Contingency Plans, including obtaining an Independent
   Verification and Validation (IV&V) and 2) improve UI IT Security.

2. References. ET Handbook No. 336, 18th Edition, the Unemployment Insurance State Quality
   Service Planning and Reporting Guidelines, Chapter 1, Section VI, C. Supplemental Budget
   Request (SBR) and Chapter 1, Section VII, H. Assurance of Contingency Planning;
   Unemployment Insurance Program Letter (UIPL) 24-04 Change 3, Unemployment Insurance
   Information Technology Security – Additional Information; Office of Inspector General
   (OIG) Report No. 23-08-004-03-315 1 and OIG Report No. 23-09-002-03-315 2 .

3. Background. As SWAs operate their UI programs, there is a continual need to:

       a. Monitor and improve the security of their IT systems;
       b. Address the findings of internal security assessments; and
       c. Address the findings of external audits by third-party entities.




       1 The link to this report is http://www.oig.dol.gov/public/reports/oa/2008/23-08-004-03-315.pdf

       2 The link to this report is http://www.oig.dol.gov/public/reports/oa/2009/23-09-002-03-315.pdf

 RESCISSIONS                                                       EXPIRATION DATE
 None                                                              March 29, 2011

                                               -2-
   Periodically, the Employment and Training Administration (ETA) provides up-to-date
   security guidance to assist SWAs in monitoring and improving their UI IT Security, and
   encourages SWAs to conduct UI IT security self-assessments to identify areas of weakness.

   In FY 2008, the OIG conducted two audits of the SWAs’ UI IT contingency plans to
   determine if SWAs were prepared to minimize the impact of a disaster or other situations that
   may disrupt normal UI program operations. The OIG utilized National Institute of Standards
   and Technology (NIST) standards in evaluating the plans. The summary of findings
   contained in the OIG audits (OIG Report No. 23-08-004-03-315 issued on September 29,
   2008; OIG Report No. 23-09-001-03-315 issued on March 31, 2009) stated that:

       a. SWAs lack IT Contingency Plans that would ensure adequate disaster-response
          capability as identified in the NIST Special Publication (SP) 800-34, Contingency
          Planning for Information Technology Systems;

       b. ETA has not adequately fulfilled its leadership responsibilities in providing oversight
          and targeted guidance to the SWAs regarding ETA's expectations of an IT disaster-
          recovery capability; and

       c. ETA should conduct an annual verification of SWAs’ UI IT contingency plans for
          existence and reliability.

4. Fiscal Year 2010 Funding. ETA will award selected SWAs funding to improve their UI IT
   Contingency Plans and UI IT Security. The priority will be to fund UI IT Contingency Plan
   SBRs first, and then use any remaining funds to fund UI IT Security SBRs.

   a. UI IT Contingency Plan: SWAs may submit a SBR to develop or update their UI IT
      Contingency Plan utilizing the guidelines provided in NIST SP 800-34. Attachment I
      provides the NIST SP 800-34 template for an IT Contingency Plan. SWAs can use this
      template as a guideline to develop a plan or update an existing plan. Upon completion of
      the plan, SWAs must have an IV&V conducted of their UI IT Contingency Plan based on
      guidelines provided in the NIST SP 800-34. SWAs must submit a copy of the IV&V
      certification report to their respective Regional Office (RO).

       A UI IT Contingency Plan SBR must address all the key elements deemed as missing in
       the SWA UI IT Contingency Plan by the OIG Audit and describe the proposed
       corrections/solutions. See Attachment III, extracted from the OIG Audit Report:
       Presence of 17 IT Contingency Plan Elements in UI Systems’ Plans, for a complete
       listing. Each SWA may submit one UI IT Contingency Plan SBR, which includes
       proposed improvement to their UI Contingency Plan, as well as an IV&V of the UI
       Contingency Plan. The SBR must include the total cost of the project; however, Federal
       funding for each SBR will not exceed $150,000. By submitting the proposal, the SWA
       agrees to provide any additional funds needed to complete the project.

                                              -3-

   b. UI IT Security: SWAs may submit SBRs to address the UI IT security weaknesses that
      have been identified by recent IT security audits (performed within the last 3 years from
      the date of this UIPL) or by a SWA’s UI IT security self-assessment that complies with
      the NIST IT security guidelines found in NIST SP 800-53, Recommended Security
      Controls for Federal Information Systems and NIST SP 800-53A, Guide for Assessing
      the Security Controls in Federal Information Systems. Attachment II provides a Sample
      Security Assessment Reporting Form from NIST SP 800-53A, which may be used to
      perform an IT security assessment of the SWA's UI IT system or associated UI IT
      segments (e.g. Web site, Tax System, Benefits System, etc.).

       The UI IT Security SBR must also address the proposed remediation for each security
       weakness identified. Each SWA may submit multiple UI IT Security SBRs. Each SBR
       must include the total cost to remediate the weakness described; however, Federal
       funding for each SBR will not exceed $100,000. By submitting the proposal, the SWA
       agrees to provide any additional funds needed to complete the project.

5. Information Required. The following information is required to request for the SBRs:

   •   Specific to a UI IT Contingency Plan SBR, provide a list of the UI IT contingency
       planning key elements missing in the current plan according to the OIG, including a
       description of how the proposed remediation addresses these weaknesses. Also, submit a
       proposal from an independent entity to perform a UI IT Contingency Plan IV&V based
       on guidelines provided in the NIST SP 800-34;
   •   Specific to any UI IT Security SBR, submit a copy of the complete audit report or
       security assessment (performed within the last 3 years from the date of this UIPL), which
       outlines the finding(s) related to the UI IT Security weakness being addressed, including
       a description of how the proposed remediation addresses this weakness.

   All SBR submissions must include the following:
   • A projected cost breakout (including any additional costs to be covered by the SWA);
   • A detailed cost proposal, product description and specifications for any equipment,
       hardware, software, etc., to be purchased to address a security weakness;
   • If contract staff is requested, the position description, estimated contract staff hours,
       anticipated costs per hour, and total staffing cost;
   • If a SWA staff position is backfilled, the position description, estimated staff hours,
       anticipated costs per hour, and total staffing cost for the backfilled position;
   • An estimated timeline for the project, i.e. the number of days, weeks or months, or the
       estimated start and end dates of each identified phase of the project; and
   • The name, address, telephone number, and e-mail address of a SWA contact person.

6. Confidentiality of Information. Under the provisions of the Freedom of Information Act
   (FOIA), records received by a Federal agency can be requested by the public. ETA
   recognizes the SWAs’ concern related to disclosure of information about UI IT contingency
   planning weaknesses that are submitted to support their SBRs. ETA will protect the SWAs’

                                              -4-
   data to the greatest extent permitted by law by invoking one or more of the nine FOIA
   exemptions that protect sensitive data. SWAs should specifically request that security
   weakness information provided to support an SBR be kept strictly confidential. Documents
   submitted in which the SWA requests confidentiality should be clearly marked as
   "confidential."

   Should ETA receive a FOIA request related to the security material submitted as part of this
   SBR, it will notify the relevant SWA, seek its views on any potential disclosure, and act in
   consultation with the affected SWA.

7. Evaluation Criteria. Proposals will be evaluated based on the following criteria for each
   category:

   •   UI IT Contingency Plan:

       ƒ   SWAs must address all the missing key elements in their UI IT Contingency Plan as
           reported by the OIG in Attachment III;
       ƒ   SWAs must utilize the guidelines provided in NIST SP 800-34 to develop the UI IT
           Contingency Plan;
       ƒ   The UI IT Contingency Plan IV&V must use the guidelines provided in the NIST SP
           800-34 to evaluate and certify the UI IT Contingency Plan; and
       ƒ   SWAs must submit a copy of the IV&V certification report to their respective RO
           upon completion.

   •   UI IT Security:

       Priority will be given to proposals that address the following:
       ƒ The specific security weaknesses documented in a recently-conducted security audit
           or security assessment report;
       ƒ Findings with the greatest risk;
       ƒ Provide assurance that future audits or security assessments will show that the
           weaknesses have been resolved or mitigated; and
       ƒ Audit findings of UI IT security that comply with the standards established by the
           Office of Management and Budget Circular A-130, Appendix III, The Federal
           Information System Controls Audit Manual and the NIST computer security and
           information processing publications.

8. SBR Award Timeline. The SBR award timeline is as follows:

   •   SBRs must be submitted electronically, via email to [email protected] no later than May
       14, 2010;
   •   Award notifications will be made by July 16, 2010;
   •   Grants will be executed to selected SWAs by July 30, 2010.

                                               -5-

9. SBR Funds Expenditure. FY 2010 automation funds must be obligated no later than
   September 30, 2012, and liquidated within 90 days of the obligation deadline. There are no
   provisions for extending the deadline for obligation of these funds, and any funds not
   obligated must be returned to the Federal government. States performance in completing
   funded projects within the applicable timeframe will be considered in awarding future SBRs.

10. Action Requested. SWA Administrators are requested to distribute this advisory to
   appropriate staff. SBRs that meet the above criteria must be sent electronically via email to
   [email protected] no later than May 14, 2010. The SWA should ensure that the following
   are provided:

   •   SBR proposal with supporting documentation.
   •   Completed forms SF 424 (OMB Approval No. 4040-0004) and SF 424a (OMB Approval
       No. 4040-0006) as required in ET Handbook 336, 18th Edition.

11. Inquiries. Direct questions to Jagruti Patel at 202-693-3059 or [email protected] or
   Paul Bankes at 202-693-3053 or [email protected].

12. Attachments.

    I. Sample IT Contingency Plan Format
   II. Sample Security Assessment Reporting Form
  III. Extract from the OIG Audit Report: Presence of 17 IT Contingency Plan Elements in UI
       Systems’ Plans

UIPL19-10a1.pdf (https://www.dol.gov/sites/dolgov/files/ETA/advisories/UIPL/2010/UIPL19-10a1.pdf)

Attachment I




         SAMPLE IT CONTINGENCY PLAN FORMAT
This sample format provides a template for preparing an information technology (IT)
contingency plan. The template is intended to be used as a guide, and the Contingency Planning
Coordinator should modify the format as necessary to meet the system’s contingency
requirements and comply with internal policies. Where practical, the guide provides instructions
for completing specific sections. Text is added in certain sections; however, this information is
intended only to suggest the type of information that may be found in that section. The text is
not comprehensive and should be modified to meet specific agency and system considerations.
The IT contingency plan should be marked with the appropriate security label, such as Official
Use Only.





Attachment I


                            IT CONTINGENCY PLAN

1. INTRODUCTION

1.1 PURPOSE

This {system name} Contingency Plan establishes procedures to recover the {system name}
following a disruption. The following objectives have been established for this plan:

•   Maximize the effectiveness of contingency operations through an established plan that
    consists of the following phases:
    ƒ Notification/Activation phase to detect and assess damage and to activate the plan
    ƒ Recovery phase to restore temporary IT operations and recover damage done to the
        original system
    ƒ Reconstitution phase to restore IT system-processing capabilities to normal operations.
•   Identify the activities, resources, and procedures needed to carry out {system name}
    processing requirements during prolonged interruptions to normal operations.
•   Assign responsibilities to designated {Organization name} personnel and provide guidance
    for recovering {system name} during prolonged periods of interruption to normal operations.
•   Ensure coordination with other {Organization name} staff who will participate in the
    contingency planning strategies. Ensure coordination with external points of contact and
    vendors who will participate in the contingency planning strategies.

1.2 APPLICABILITY

The {system name} Contingency Plan applies to the functions, operations, and resources
necessary to restore and resume {Organization name}’s {system name} operations as it is
installed at primary location name, City, State. The {system name} Contingency Plan applies to
{Organization name} and all other persons associated with {system name} as identified under
Section 2.3, Responsibilities.
The {system name} Contingency Plan is supported by plan name, which provides the purpose of
plan. Procedures outlined in this plan are coordinated with and support the plan name, which
provides purpose of plan.

1.3 SCOPE

1.3.1 Planning Principles

Various scenarios were considered to form a basis for the plan, and multiple assumptions were
made. The applicability of the plan is predicated on two key principles:

•   The {Organization name}’s facility in City, State, is inaccessible; therefore, {Organization
    name} is unable to perform {system name} processing for the Department.
•   A valid contract exists with the alternate site that designates that site in City, State, as the
    {Organization name}’s alternate operating facility.



Attachment I

    ƒ   {Organization name} will use the alternate site building and IT resources to recover
        {system name} functionality during an emergency that prevents access to the original
        facility.
    ƒ   The designated computer system at the alternate site has been configured to begin
        processing {system name} information.
    ƒ   The alternate site will be used to continue {system name} recovery and processing
        throughout the period of disruption, until the return to normal operations.

1.3.2 Assumptions

Based on these principles, the following assumptions were used when developing the IT
Contingency Plan:

•   The {system name} is inoperable at the {Organization name} computer center and cannot be
    recovered within 48 hours.
•   Key {system name} personnel have been identified and trained in their emergency response
    and recovery roles; they are available to activate the {system name} Contingency Plan.
•   Preventive controls (e.g., generators, environmental controls, waterproof tarps, sprinkler
    systems, fire extinguishers, and fire department assistance) are operational at the time of the
    disaster.
•   Computer center equipment, including components supporting {system name}, are connected
    to an uninterruptible power supply (UPS) that provides 45 minutes to 1 hour of electricity
    during a power failure.
•   {system name} hardware and software at the {Organization name} original site are
    unavailable for at least 48 hours.
•   Current backups of the application software and data are intact and available at the offsite
    storage facility.
•   The equipment, connections, and capabilities required to operate {system name} are
    available at the alternate site in City, State.
•   Service agreements are maintained with {system name} hardware, software, and
    communications providers to support the emergency system recovery.

The {system name} Contingency Plan does not apply to the following situations:

•   Overall recovery and continuity of business operations. The Business Resumption Plan
    (BRP) and Continuity of Operations Plan (COOP) are appended to the plan.
•   Emergency evacuation of personnel. The Occupant Evacuation Plan (OEP) is appended to
    the plan.
•   Any additional constraints should be added to this list.

1.4 REFERENCES/REQUIREMENTS

This {system name} Contingency Plan complies with the {Organization name}’s IT contingency
planning policy as follows:
    The organization shall develop a contingency planning capability to meet the needs of
    critical supporting operations in the event of a disruption extending beyond 72 hours. The



Attachment I


    procedures for execution of such a capability shall be documented in a formal contingency
    plan and shall be reviewed at least annually and updated as necessary. Personnel
    responsible for target systems shall be trained to execute contingency procedures. The plan,
    recovery capabilities, and personnel shall be tested to identify weaknesses of the capability at
    least annually.

The {system name} Contingency Plan also complies with the following federal and departmental
policies:

•   The Computer Security Act of 1987
•   OMB Circular A-130, Management of Federal Information Resources, Appendix III,
    November 2000
•   Federal Preparedness Circular (FPC) 65, Federal Executive Branch Continuity of Operations,
    July 1999
•   Presidential Decision Directive (PDD) 67, Enduring Constitutional Government and
    Continuity of Government Operations, October 1998
•   PDD 63, Critical Infrastructure Protection, May 1998
•   Federal Emergency Management Agency (FEMA), The Federal Response Plan (FRP), April
    1999
•   Defense Authorization Act (Public Law 106-398), Title X, Subtitle G, “Government
    Information Security Reform,” October 30, 2000
•   Any other applicable federal policies should be added
•   Any other applicable departmental policies should be added.

1.5 RECORD OF CHANGES

Modifications made to this plan since the last printing are as follows:

                                 Record of Changes
    Page No.              Change Comment                  Date of Change        Signature




2. CONCEPT OF OPERATIONS
2.1 SYSTEM DESCRIPTION AND ARCHITECTURE

Provide a general description of system architecture and functionality. Indicate the operating
environment, physical location, general location of users, and partnerships with external
organizations/systems. Include information regarding any other technical considerations that
are important for recovery purposes, such as backup procedures. Provide a diagram of the
architecture, including security controls and telecommunications connections.




Attachment I



2.2 LINE OF SUCCESSION

The {organization name} sets forth an order of succession, in coordination with the order set
forth by the department to ensure that decision-making authority for the {system name}
Contingency Plan is uninterrupted. The Chief Information Officer (CIO), {organization name}
is responsible for ensuring the safety of personnel and the execution of procedures documented
within this {system name} Contingency Plan. If the CIO is unable to function as the overall
authority or chooses to delegate this responsibility to a successor, the Deputy CIO shall function
as that authority. Continue description of succession as applicable.

2.3 RESPONSIBILITIES

The following teams have been developed and trained to respond to a contingency event
affecting the IT system.

The Contingency Plan establishes several teams assigned to participate in recovering {system
name} operations. The {team name} is responsible for recovery of the {system name} computer
environment and all applications. Members of the team name include personnel who are also
responsible for the daily operations and maintenance of {system name}. The team leader title
directs the {team name}.

Continue to describe each team, their responsibilities, leadership, and coordination with other
applicable teams during a recovery operation.

The relationships of the team leaders involved in system recovery and their member teams are
illustrated in Figure XX below.

   (Insert hierarchical diagram of recovery teams. Show team names and leaders; do not
   include actual names of personnel.)

Describe each team separately, highlighting overall recovery goals and specific responsibilities.
Do not detail the procedures that will be used to execute these responsibilities. These
procedures will be itemized in the appropriate phase sections.

3. NOTIFICATION AND ACTIVATION PHASE

This phase addresses the initial actions taken to detect and assess damage inflicted by a
disruption to {system name}. Based on the assessment of the event, the plan may be activated by
the Contingency Planning Coordinator.

       In an emergency, the {Organization name}’s top priority is to preserve
       the health and safety of its staff before proceeding to the Notification
       and Activation procedures.





Attachment I

Contact information for key personnel is located in Personnel Contact list appendix. The
notification sequence is listed below:

•   The first responder is to notify the Contingency Planning Coordinator. All known
    information must be relayed to the Contingency Planning Coordinator.
•   The systems manager is to contact the Damage Assessment Team Leader and inform them of
    the event. The Contingency Planning Coordinator is to instruct the Team Leader to begin
    assessment procedures.
•   The Damage Assessment Team Leader is to notify team members and direct them to
    complete the assessment procedures outlined below to determine the extent of damage and
    estimated recovery time. If damage assessment cannot be performed locally because of
    unsafe conditions, the Damage Assessment Team is to follow the outline below.

    Damage Assessment Procedures:
      (Detailed procedures should be outlined to include activities to determine the cause of
      the disruption; potential for additional disruption or damage; affected physical area and
      status of physical infrastructure; status of IT equipment functionality and inventory,
      including items that will need to be replaced; and estimated time to repair services to
      normal operations.)
      ƒ Upon notification from the Contingency Planning Coordinator, the Damage
          Assessment Team Leader is to …
      ƒ The Damage Assessment Team is to ….

    Alternate Assessment Procedures:

    ƒ   Upon notification from the Contingency Planning Coordinator, the Damage Assessment
        Team Leader is to …
    ƒ   The Damage Assessment Team is to ….
        − When damage assessment has been completed, the Damage Assessment Team Leader
           is to notify the Contingency Planning Coordinator of the results.
        − The Contingency Planning Coordinator is to evaluate the results and determine
           whether the contingency plan is to be activated and if relocation is required.
        − Based on assessment results, the Contingency Planning Coordinator is to notify
           assessment results to civil emergency personnel (e.g., police, fire) as appropriate.

The Contingency Plan is to be activated if one or more of the following criteria are met:

    1. {System name} will be unavailable for more than 48 hours
    2. Facility is damaged and will be unavailable for more than 24 hours
    3. Other criteria, as appropriate.

•   If the plan is to be activated, the Contingency Planning Coordinator is to notify all Team
    Leaders and inform them of the details of the event and if relocation is required.
•   Upon notification from the Contingency Planning Coordinator, Team Leaders are to notify
    their respective teams. Team members are to be informed of all applicable information and
    prepared to respond and relocate if necessary.




Attachment I


•   The Contingency Planning Coordinator is to notify the off-site storage facility that a
    contingency event has been declared and to ship the necessary materials (as determined by
    damage assessment) to the alternate site.
•   The Contingency Planning Coordinator is to notify the Alternate site that a contingency
    event has been declared and to prepare the facility for the Organization’s arrival.
•   The Contingency Planning Coordinator is to notify remaining personnel (via notification
    procedures) on the general status of the incident.

4. RECOVERY OPERATIONS

This section provides procedures for recovering the application at the alternate site, whereas
other efforts are directed to repair damage to the original system and capabilities.
The following procedures are for recovering the {system name} at the alternate site. Procedures
are outlined per team required. Each procedure should be executed in the sequence it is
presented to maintain efficient operations.

    Recovery Goal. State the first recovery objective as determined by the Business Impact
    Assessment (BIA). For each team responsible for executing a function to meet this objective,
    state the team names and list their respective procedures.

    •   {team name}
        − Team Recovery Procedures
    •   {team name}
        − Team Recovery Procedures
    •   {team name}
        − Team Recovery Procedures

    Recovery Goal. State the second recovery objective as determined by the BIA. For each
    team responsible for executing a function to meet this objective, state the team names and list
    their respective procedures.

    •   {team name}
        − Team Recovery Procedures
    •   {team name}
        − Team Recovery Procedures
    •   {team name}
        − Team Recovery Procedures

    Recovery Goal. State the remaining recovery objectives (as determined by the BIA). For
    each team responsible for executing a function to meet this objective, state the team names
    and list their respective procedures.

5. RETURN TO NORMAL OPERATIONS

This section discusses activities necessary for restoring {system name} operations at the
{Organization name}’s original or new site. When the computer center at the original or new



Attachment I

site has been restored, {system name} operations at the alternate site must be transitioned back.
The goal is to provide a seamless transition of operations from the alternate site to the computer
center.

   Original or New Site Restoration

   Procedures should be outlined, per necessary team, to restore or replace the original site so
   that normal operations may be transferred. IT equipment and telecommunications
   connections should be tested.

   •   {team name}
       − Team Resumption Procedures
   •   {team name}
       − Team Resumption Procedures

5.1 CONCURRENT PROCESSING

Procedures should be outlined, per necessary team, to operate the system in coordination with
the system at the original or new site. These procedures should include testing the original or
new system until it is functioning properly and the contingency system is shut down gracefully.

   •   {team name}
       − Team Resumption Procedures
   •   {team name}
       − Team Resumption Procedures

5.2 PLAN DEACTIVATION

Procedures should be outlined, per necessary team, to clean the alternate site of any equipment
or other materials belonging to the organization, with a focus on handling sensitive information.
Materials, equipment, and backup media should be properly packaged, labeled, and shipped to
the appropriate location(s). Team members should be instructed to return to the original or new
site.
    • {team name}
       − Team Testing Procedures
    • {team name}
       − Team Testing Procedures

6. PLAN APPENDICES

The appendices included should be based on system and plan requirements.
• Personnel Contact List
• Vendor Contact List
• Equipment and Specifications
• Service Level Agreements and Memorandums of Understanding



Attachment I


•   IT Standard Operating Procedures
•   Business Impact Analysis
•   Related Contingency Plans
•   Emergency Management Plan
•   Occupant Evacuation Plan
•   Continuity of Operations Plan.

UIPL19-10a2.pdf (https://www.dol.gov/sites/dolgov/files/ETA/advisories/UIPL/2010/UIPL19-10a2.pdf)

Attachment 2




       Sample Security Assessment Reporting Form




                          -1-

Attachment 2

Sample Security Assessment Reporting Form

To help organizations collect, organize, and report the findings of individual security control
assessments for the information system, a sample reporting form is provided below. This sample
reporting form is illustrative and is intended to be used for each security control and control
enhancement included in the security control assessment. The form is not intended to limit the
flexibility of organizations in determining the most appropriate presentation of assessment
findings for the purposes of a given security control assessment.


                             SAMPLE SECURITY ASSESSMENT REPORTING FORM

 SECTION I: INFORMATION SYSTEM AND ASSESSMENT INFORMATION

 Information System Name                                                                              Impact Level
                                                                                                      Low, Moderate, High


 Site(s) Assessed                                                                                     Assessment Date(s)


 Information System Components Where Security Control Employed (e.g., firewall, router, workstation, server, laptop,
 PDA)



 SECTION II: SECURITY CONTROL INFORMATION

 Security Control or Control Enhancement
 Insert text from security control or control enhancement being assessed as stated in, or as referenced by the approved
 system security plan.




 Supplemental Guidance Associated with Security Control or Control Enhancement
 Insert text from the supplemental guidance from the security control or control enhancement being assessed as stated in, or
 as referenced by the approved system security plan.




 SECTION III: ASSESSMENT FINDINGS

 Assessment Objective
 Identify assessment objective (e.g., CP-1.1, associated with the security control or control enhancement described above).

 Determination Statements                                                                                     Finding
 See determination statements below which restate the determinations from the assessment                       (S/O)
 objective, as tailored for this security control assessment (e.g., including organization-specific
 information, where appropriate).

 Determination Statement


 Determination Statement


 Determination Statement




                                                            -2-

Attachment 2




                          SAMPLE SECURITY ASSESSMENT REPORTING FORM

Assessment Methods and Objects
Identify assessment methods and assessment objects as tailored for this assessment (e.g., the specific version of a
specification examined and the nature of the examination performed).




SECTION IV: ASSESSOR COMMENTS AND RECOMMENDATIONS

Assessor Comments
Explanation of weaknesses or deficiencies noted for each finding of other than satisfied. Comments may also be included
in this section regarding evidence used to support findings of satisfied.




Assessor Recommendations
Recommendations for remediation, corrective actions, or improvements in security control implementation or operation.




                                                        -3-

UIPL19-10a3.pdf (https://www.dol.gov/sites/dolgov/files/ETA/advisories/UIPL/2010/UIPL19-10a3.pdf)

          Attachment III


                                                  Presence of 17 IT Contingency Plan Elements in UI Systems’ Plans 1

                                                                                                 State Workforce Authorities
                Elements                     AL     AK   AZ   AR   CA   CO   CT   DE   FL   GA   HI   ID   IL   IN   IA   KS   KY   LA   ME   MD   MA   MI   MN   MS     MO   MT
Purpose                                                                                X                   X                             X    X    X              X      X
Applicability                                                                          X                   X                             X    X    X              X      X
Scope                                                                                  X                   X                             X    X    X              X      X
Record of Changes                                                                                                                                  X              X
System Description                                                                                         X              X                        X              X      X    X
Line of Succession                                                 X    X                                            X                             X                     X
Responsibilities                                                   X    X              X                   X         X              X         X    X              X      X
Activation Criteria                                                X                   X                   X         X                        X    X
Documented Notification Procedures                   X             X    X              X                   X                        X         X    X              X
Damage Assessment Procedures                                       X    X              X                             X              X              X              X
Detailed Recovery Procedures                         X                                 X                   X                                       X
Reconstitution Phase Procedures                                                                                                                    X
Contact information of CP teams              X                                                             X         X                             X              X      X
Vendor contact information                   X                          X              X                   X                                                             X
Checklists for system recovery               X                                                                                                                           X
Equip/System requirements lists              X                     X                   X                   X         X                                                   X
Description/Direction to alternative sites           X                                                               X              X         X




          1
           An X mark in the chart indicates the element was present in the SWA’s planning documents. For purposes of this analysis, a plan that contained parts or the
          element, i.e. received “partial” in the analysis, was not given an X for present, as the element was found deficient in some manner.



         Attachment III


                                     Presence of 17 IT Contingency Plan Elements in UI Systems’ Plans (continued) 2

                                                                                                 State Workforce Authorities
                Elements                     NE   NV   NJ   NM   NC   ND   OH   OK   OR     PA     RI   SC   SD    TN    TX    UT   VT   VA   WA   WV   WI   WY   VI    DC   PR
Purpose                                      X    X         X    X              X           X                 X          X               X    X
Applicability                                X    X              X              X           X                            X                    X    X
Scope                                        X    X              X                          X                 X                          X    X
Record of Changes                                 X                                                           X
System Description                                X                             X                                              X
Line of Succession                                X                                         X                                            X    X
Responsibilities                                  X         X    X              X                             X          X
Activation Criteria                               X              X                          X                 X          X     X         X    X    X
Documented Notification Procedures                X              X              X           X                 X          X     X                   X
Damage Assessment Procedures                      X              X              X                             X
Detailed Recovery Procedures                      X              X              X                             X                          X         X
Reconstitution Phase Procedures                                  X                                            X
Contact information of CP teams                   X                             X                             X                                    X
Vendor contact information                        X              X              X                                              X                   X
Checklists for system recovery                    X              X                                                       X                              X
Equip/System requirements lists                   X              X              X                  X                                               X
Description/Direction to alternative sites                       X              X                  X                                                    X




         2
          An X mark in the chart indicates the element was present in the SWA’s planning documents. For purposes of this analysis, a plan that contained parts or the
         element, i.e. received “partial” in the analysis, was not given an X for present, as the element was found deficient in some manner.

What does federal law require today?

This guidance has been withdrawn. Ezel checks current federal labor law as it stands now and answers your situation with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace