Changes to UI Performs unemployment insurance measures

Summary ETA revised the UI Performs system for measuring state unemployment insurance administration. It reduced the measures with performance targets to a smaller group of core measures, kept other data for management use, and changed state planning and corrective action requirements. Its attachments compare old and new measures and reproduce agency responses to comments. ETA currently lists the letter as Active, but its printed expiration date was February 18, 2007 and later changes revised several measures, so its current applicability is unclear.
Document
Federal guidance
Agency
U.S. Department of Labor, Employment and Training Administration (ETA)
Document number
UIPL No. 14-05
Date issued
February 18, 2005
Status
Unknown
ETA lists the letter Active as of October 25, 2026, but its printed expiration date was February 18, 2007. Changes 1, 2, and 3 later revised or clarified several measures; current applicability of the original letter is unclear.
Status last verified October 25, 2026

Apply this to your situation

This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.

The current status of this document is unclear
ETA lists the letter Active as of October 25, 2026, but its printed expiration date was February 18, 2007. Changes 1, 2, and 3 later revised or clarified several measures; current applicability of the original letter is unclear. It may no longer reflect the agency's current position. Treat this page as historical context, not current guidance, and verify current law before relying on anything here.
About this page: The full text below is the official document from U.S. Department of Labor, Employment and Training Administration (ETA). Ezel adds the plain-English summary and tracks the document's status. The official source linked on this page is authoritative for any reliance.

EMPLOYMENT AND TRAINING ADMINISTRATION ADVISORY SYSTEM
U.S. DEPARTMENT OF LABOR
Washington, D.C. 20210
Classification: UI Performs
Correspondence symbol: OWS/DPM
Date: February 18, 2005
Rescissions: None
Expiration date: February 18, 2007

ADVISORY: UNEMPLOYMENT INSURANCE PROGRAM LETTER NO. 14-05

TO: STATE WORKFORCE AGENCIES

FROM: CHERYL ATKINSON /s/
Administrator
Office of Workforce Security

SUBJECT: Changes to UI Performs


1. Purpose. To inform State Workforce Agencies (SWAs) of changes made to the
unemployment insurance (UI) performance management system “UI Performs” as a
result of a five-year review; to convey a summary of the comments received in response
to the Federal Register Notice (FRN) containing Unemployment Insurance Program
Letter (UIPL) 21-04 “Proposed Changes to UI Performs”; and to provide effective dates
for implementing changes.

2. References. Federal Unemployment Tax Act; Title III of the Social Security Act; 20
Code of Federal Regulations (CFR) parts 640 (Standard for Benefit Payment Promptness)
and 650 (Standard for Appeals Promptness); 69 Fed. Reg. 33669 (2004); Employment
and Training (ET) Handbook No. 336, 17th Edition, “Unemployment Insurance State
Quality Service Plan Planning and Reporting Guidelines” (June 18, 2002); ET Handbook
No. 401, 3rd Edition, “Unemployment Insurance Reports Handbook” and subsequent
changes; Unemployment Insurance Program Letter (UIPL) 41-95, “Draft Narrative
Describing the System for Enhancing Unemployment Insurance (UI) Performance: The
‘UI Performs’ System” (August 24, 1995); UIPL 37-99, “UI Performs Tier I and Tier II
Performance Measures, and Minimum Performance Criteria for Tier I Measures” (July
31, 1999); UIPL 06-03, “Review of UI Performs” (November 25, 2002); UIPL No. 21-
04, “Proposed Changes to UI Performs” (May 18, 2004); and UIPL 29-04, “Study of the
Measure of Nonmonetary Determination Quality” (July 20, 2004).

3. Background. In December 2002, the Employment and Training Administration
(ETA) of the U.S. Department of Labor (DOL) began a review of UI Performs, the
performance management system for the UI program. The review addressed: (a) the
performance measures; (b) the criteria used to gauge success against the measures; and
(c) the administration of UI Performs. The review included substantial consultation
directly with SWAs and indirectly through the National Association of State Workforce
Agencies’ (NASWA) Subcommittee for UI Performs. Mathematica Policy Research,
Inc., provided data analyses.

Two overarching themes emerged during the review: (1) the large number of measures to
which the SWAs are held accountable diffuses management attention and (2) the
administration of UI Performs is too complex and burdensome on the SWAs. The review
resulted in a DOL proposal to streamline UI Performs in three ways:

   a) Reduce the number of measures for which performance goals are set to a few
      “core” measures.
   b) Recognize remaining measures as management information for which no
      performance goals will be set.
   c) Streamline the State Quality Service Plan (SQSP) narrative.

The proposed changes were issued for state comment in UIPL No. 21-04, “Proposed
Changes to UI Performs,” and in 69 Fed. Reg. 33669 (2004), which published the UIPL
for public comment.

4. Highlights of Comments. The American Federation of Labor - Congress of
Industrial Organizations (AFL-CIO), the National Employment Law Project (NELP) and
34 SWAs responded to DOL’s request for comments to the proposed changes to UI
Performs. Both the AFL-CIO and NELP expressed general concern that the proposed
changes would adversely affect unemployed workers and provided comments on specific
changes. Although comments from all commentators about specific areas of the
proposed changes were mixed, SWA comments were generally favorable to the overall
proposed streamlining efforts.

The proposed changes that generated the most comments are discussed briefly below
along with DOL’s responses to them. See Attachment D, Parts 1 and 2, for specific
comments and DOL’s responses. All comments were taken into account in making the
final changes to UI Performs.

Number of Measures. Comments from SWAs were very favorable regarding the
proposal to reduce the number of measures to which they would be held accountable.
NELP and the AFL-CIO, on the other hand, expressed concern that the changes would
erode the “safety net” that UI provides to unemployed workers.

DOL Response: DOL believes that reducing the number of measures to Core Measures
will promote the SWAs’ focus on the most critical program areas. All performance
measures not designated as “core” will be available to State and Federal partners as
management information and will continue to be monitored as a means to alert both
Federal and State staff of potential problems.

Administration of Measures.
Compliance. In its comments, NELP expressed concern that the changes in the
timeliness measures will not help resolve the problem of noncompliance that has been
demonstrated by some SWAs. NELP points out that regulations at 20 CFR Section 640.8
outline a number of steps that can be taken by DOL to address performance issues.

DOL Response: DOL follows these steps as appropriate and constantly monitors SWAs’
performance.

Effective Dates. Several SWAs asked that the changes not be put into effect when their
performance year is already underway because they felt that could reduce their ability to
perform to new standards. The SQSP for the 2005 fiscal year has been submitted, and the
performance year for 2005-2006 has already begun.

DOL Response: DOL agrees that the cycle of the UI Performs management system
requires planning ahead, and the implementation of the changes in the measures should
be done in a systematic way so that the state partners know in advance what will be
expected of them. Therefore, although the data used in the first payment aggregate
measure and the new tax quality measure are currently available, SWAs will not be
expected to prepare Corrective Action Plans (CAPs) in the fiscal year (FY) 2006 SQSP
for failure to meet the Acceptable Levels of Performance (ALPs). Rather, SWAs must
assure DOL that they acknowledge the need to meet the ALPs during the next SQSP
period. See Section 8 of this UIPL for effective dates for implementing changes.

Tax Measures. The Tax Performance System (TPS) has been operating as a series of 13
sample measures performed annually, and combining the sample reviews into a single
Core Measure is a new concept. All of the TPS measures except two, New Employer
Status Determinations Timeliness and Quality, have been operating as “Tier II”
measures. Consequently, comments were mixed—about half of the comments were
supportive and the others expressed varying concerns. Several of the comments centered
on concerns about the stringency of the measure.

DOL Response: DOL considers the new measure a good indicator of overall tax quality.
There was a strong feeling among some of the NASWA Subcommittee members that the
Tier 1 measure of new employer status determination alone was not a sufficient measure
of overall tax quality. As a result, a workgroup of NASWA UI Performs Subcommittee
members and DOL staff recommended the new tax quality measure, which consists of the
combined results of all the TPS sample reviews. To meet the acceptable level of
performance for tax quality, a state can have no more than 3 failures out of the 13 tax
functions reviewed under TPS in a year nor any single tax function failing the TPS
review for three consecutive years. This level of stringency, as one state pointed out,
equates to about a 75% passing rate. SWAs that do not meet this minimum level of
performance will be expected to submit CAPs for improvement. The criterion for New
Employer Status Determinations Timeliness will be raised from 60% to 70% completed
within 90 days of the quarter ending date.

SWAs that do not meet the ALP in calendar year 2004 will acknowledge the need for
improvement in the 2006 SQSP narrative.


Benefits Measures.
First Payment Timeliness. Comments from SWAs were generally supportive of the
aggregate first payment timeliness measure; however, a few SWAs commented that the
time required for processing interstate and federal military and civilian claims will cause
them to have difficulty meeting the criterion. NELP and the AFL-CIO viewed the
change as a weakening of the first payment standard because the SWAs would no longer
be held accountable for performance at multiple intervals.

DOL Response: The Core Measure, which was formerly a Tier 1 measure, is a
comprehensive measure that includes intrastate and interstate UI as well as UCFE and
UCX for both full and partial weeks. Only Workshare programs, episodic claims such as
Disaster Unemployment Assistance (DUA), Extended Benefits (EB), Trade Readjustment
Allowances (TRA), and retroactive payments for a compensable waiting period are
excluded from the measure.

The Core Measure for first payment criterion of 87% applies to the aggregate of all first
payments including interstate, UCFE and UCX claims; the criterion of 87% for the
current standard applies only to intrastate claims for regular UI. Even with the added
claims types, advances in automation and much quicker access to wage data make it
likely that SWAs will be able to meet or exceed the criterion.

DOL plans to issue a notice of proposed rulemaking that would amend the current
regulations in 20 CFR part 640 to reflect the Core Measure; however, the current
regulatory measures and criteria will remain in effect unless and until regulations are
amended.

Nonmonetary Determinations Timeliness. Most SWAs and NELP expressed concerns
about the proposed change to the nonmonetary determinations time lapse parameters
from the issue detection date to the week-ending date of the first week affected by the
determination. Most of the SWA comments indicated that issue detection date is the
better date because it marks the time at which the SWA has control of disposal of the
issue. Comments also expressed concern that using the “first week affected” date could
seemingly penalize SWAs that have liberal claims backdating policies.

DOL Response: DOL proposed changing the starting date of the measure to the week-
ending date of the first week affected because SWAs have consistently been unable to
accurately report the issue detection date. Validation of both data points, accomplished
through reviews of sampled nonmonetary determinations, indicate that SWAs generally
have better success in reporting the “first week affected,” also a pertinent date from the
customer (UI claimants and employers) perspective. However, DOL agrees that issue
detection date is a good measurement parameter from an administrative perspective and
will defer the decision to change the reporting parameters until an analysis can be
conducted to determine whether reporting of issue detection date can be substantially
improved. DOL expects to conduct the analysis over the course of the next performance

year, which begins April 1, 2005, and ends March 31, 2006. Until then, the existing
measure remains in place.

Nonmonetary Determinations Quality. A number of SWAs commented about
nonmonetary determination quality, particularly expressing concerns about the scoring
system.

DOL Response: As part of the UI Performs five-year review, DOL convened a
federal/state workgroup of nonmonetary determination experts to study and recommend
changes to the Benefits Timeliness and Quality (BTQ) Nonmonetary Determinations
Quality Review. The workgroup reviewed the data collection instrument and the
instructions used in the quality review of nonmonetary determinations, operational
guidance that DOL gives the SWAs regarding claim determination requirements, and
other matters concerning the adjudication process. Particular effort went toward
exploring ways to refine the measurement instrument, how determinations are scored,
and instructions to the reviewers to ensure consistent and accurate review results. The
workgroup’s recommendations were issued for comment in UIPL No. 29-04, “Study of
the Measure of Nonmonetary Determination Quality.” Comments about the scoring
method received in response to UIPL No. 21-04 will be considered along with comments
received in response to UIPL No. 29-04 in making decisions for changes to the BTQ
Nonmonetary Determination Quality Review.

Overpayment Detection Measure. The AFL-CIO, NELP and SWAs commented on the
proposed overpayment detection measure. The AFL-CIO and NELP generally think the
focus on UI overpayments should be balanced with attention to UI underpayments and
unpaid/underpaid employer taxes. SWA comments were mixed.

DOL Response: DOL believes that overpayment prevention and detection are central to
good UI administration and has made reducing overpayments a priority. DOL is
currently scrutinizing the measurement data - and, in some cases, methods used to create
the data - to assure data quality. Because this is a new measure, DOL will assess the data
for a year and explore possible adjustments to the measure before setting a performance
level.

DOL agrees that payment accuracy is essential and tracks UI underpayments and denied
payments through its Benefits Accuracy Measurement (BAM) quality control program.
In addition, the integrity of wage reporting and proper tax payments is of great concern to
DOL. Consequently, SWA employer audits are subject to review through TPS.

Appeals Measures. The proposal of a new timeliness Core Measure for Lower and
Higher Authority Appeals was met with mixed reactions from SWAs; some commented
that the proposed new measure would provide a better incentive for deciding appeals
promptly and others saw no benefit to the change in measurement. Some SWAs, NELP,
and the AFL-CIO were concerned that the current timeliness measures would no longer
be available for use in making operational decisions.

DOL Response: The new Core Measure would be a different approach to timeliness
measurement; however, it is one which NELP agreed would provide information relevant

to the question of how many unresolved cases are pending in the state. Under the new
measure, SWAs would review all of their unresolved appeals, adding up the number of
days each has been pending. Then the total number of days would be divided by the
number of unresolved cases, to yield an average case age. For example, if a state had 500
cases unresolved on the last day of this month, and 150 were five days old, 200 were 20
days old, 50 were 35 days old, and 100 were 210 days old, the sum of the number of days
pending would be 750 + 4000 + 1750 + 21,000 for a total of 27,500 days. 27,500/500 =
55 days “average age.”

The current timeliness measures (20 CFR part 650) lack such a simple way to evaluate
the real condition of the pending cases in a state because as cases age, they simply fall off
the end of the measurement scale (at, for example, “greater than 360 days”) and are no
longer seen in the performance measurement. Under this type of measure, a state can
meet all standards of timeliness even though some appeals remain pending for an
inordinately long period. Under the average age measure, it is to the advantage of a state
to hear appeals as quickly as possible. The current timeliness measures will continue to
be reported as management information. The new appeals timeliness measures are
contingent upon Office of Management and Budget (OMB) approval to collect the data.

Reemployment Measure. SWAs generally commented that UI beneficiaries’
reemployment is not a function of the UI program and is beyond the control of the UI
system. The AFL-CIO and NELP expressed concerns that beneficiaries would be
compelled to accept work that would be unsuitable.

DOL Response: The new measure is intended to establish the effectiveness of the UI
program to facilitate the reemployment of UI beneficiaries. State UI agencies perform
many functions designed to help beneficiaries become reemployed, including referral to
employment services, benefits rights interviews that help beneficiaries understand their
responsibilities in making job search contacts, and reviews of job search activities for
appropriateness and methods being used. DOL feels that as a result of these activities,
beneficiaries become reemployed more quickly than they would without such assistance.
Further, because benefits rights are preserved in law, this measure will in no way
diminish those rights by compelling beneficiaries to accept unsuitable work.

Acceptable performance levels will be deferred until data have been collected from all
SWAs for four quarters. The measure is contingent upon OMB approval to collect the
data, which includes a solicitation for public comment in the Federal Register. The
comments received in response to UIPL No. 21-04 will be combined with the comments
received in response to the Federal Register solicitation. All comments will be
considered.

5. Revised UI Performs Measures and Criteria.

Measures.
The streamlined UI Performs will include two measurement categories: 1) Core
Measures and 2) Management Information Measures. The Tier I and Tier II
nomenclature will no longer be used.

•   Core Measures are the 11 measures that replace the 19 Tier I measures. These
    measures are indicators of how well SWAs perform critical activities. Core Measures
    are comparable among SWAs and will be assigned ALP criteria. SWAs are expected
    to submit CAPs when their performance falls below acceptable levels. The Core
    Measures and performance criteria are:
     Tax Measures                          Acceptable Levels of Performance
     ¾ New Employer Status                 70 percent within 90 days of quarter ending
       Determinations Timeliness           (Q/E) date.

     ¾ Measure of Tax Quality              No more than three failures out of the 13 tax
                                           functions reviewed under TPS in a year nor
                                           any single function failing the TPS review
                                           for three consecutive years.

     Benefits Measures                     Acceptable Levels of Performance
     ¾   First Payment Promptness          87 percent of all first payments made within
                                           14/21 days (14 days if a waiting week is
                                           required and 21 days if no waiting week is
                                           required) after the compensable week.

     ¾   Nonmonetary Determination        Issue detection date will continue to be the
         Time Lapse                       beginning parameter for timeliness for the
                                          next year while DOL evaluates the causes of
                                          errors in detection date reporting. If
                                          detection date reporting can be improved to
                                          pass measures of data validity, it will be
                                          retained.

     ¾   Nonmonetary Determination         75 percent of nonseparation determinations
         Quality: Nonseparation            sampled will meet quality standards.
         Issues

     ¾   Nonmonetary Determination         75 percent of separation determinations
         Quality: Separation Issues        sampled will meet quality standards.

     ¾   Detection of Overpayments         Percent of detectable/recoverable
                                           overpayments established for recovery.
                                           ALP will be set after a review of the data
                                           over one year.

     Appeals Measures                      Acceptable Levels of Performance
     ¾   Average Age of Pending            ALP deferred until state performance using
         Lower Authority Appeals           the new parameters has been recorded for
         (Contingent upon OMB              four quarters.
         approval to collect the data)

¾   Average Age of Pending
                                            ALP deferred until state performance using
         Higher Authority Appeals
                                            the new parameters has been recorded for
         (Contingent upon OMB
                                            four quarters.
         approval to collect the data)

     ¾   Lower Authority Appeals            80 percent of lower authority appeals have
         Quality                            quality scores of at least 85 percent of
                                            potential points.

     Reemployment Measure                   Acceptable Levels of Performance

     ¾   Facilitate Reemployment            Percent of UI claimants who are
         (Contingent upon OMB               reemployed within the quarter following
         approval to collect the data)      their first UI payment. ALP deferred until
                                            data have been collected from all SWAs for
                                            four quarters.


•   Management Information Measures consist of currently collected performance data
    that provide additional insight into UI program operations. Some Management
    Information Measures are subsets or components of data included in Core Measures,
    such as timeliness of UCX benefit payments, those claiming benefits on an interstate
    basis, or the individual TPS components of the tax quality measure. These data alert
    state and Federal managers to performance issues that could result in lower
    performance on Core Measure goals and are useful for performance analysis. DOL
    will continue to collect all of the Management Information with the exception of the
    TPS “turnover ratio” measure, which will be discontinued because the information is
    being captured in another report.

    No performance criteria are assigned to Management Information Measures.
    However, several measures’ criteria are currently in regulation and will remain in
    effect until the regulation is replaced. Descriptions of the Management Information
    Measures can be reviewed in Handbook 401, 3rd Edition, Change 9. The
    Management Information Measures are listed in Attachment B.

Regulations. Secretary’s Standards for benefit payment promptness and lower authority
appeals promptness are found in 20 CFR Parts 640 and 650, respectively. Changes to the
regulations will be proposed to reflect the measures and criteria noted above for first
payment promptness and average age of pending appeals. Until the regulations are
changed, the current measures and criteria will remain in force. Failure to meet criteria
established in regulation will require corrective action.

Program Reviews and Reporting Requirements. SWAs perform a variety of reviews
and submit required reports as part of the overall performance management system. For
example, SWAs conduct tripartite reviews for nonmonetary determination quality and

reviews of lower authority appeals quality. They also conduct Benefits Accuracy
Measurement (BAM) investigations and meet the requirements for reviews under the
Data Validation program and TPS. They administer Benefit Payment Control programs
and Internal Security programs. SWAs will address failure to administer these programs
in the SQSP narrative rather than in CAPs.

6. Administering UI Performs. The SQSP, which each state negotiates annually with
the Federal partner, will continue to be central to the administration of UI Performs. The
SQSP will include narratives and CAPs.

   • Narratives. Unlike the current SQSP format that requires a “Summary” narrative
     and “Focus” narratives, SWAs will describe in a single narrative:
         ¾ State performance in comparison to the Government Performance Results
            Act (GPRA) goals;
         ¾ Results of customer satisfaction surveys (optional);
         ¾ Actions planned to correct deficiencies regarding program reviews and
            reporting requirements described in Section 5.

       SWAs will no longer be required to address environmental factors, such as
       economic conditions, political climate, labor/business relationships, or state
       legislative issues in the SQSP. They may continue to provide this information to
       the degree they consider it important to explain performance and CAPs.

   •   CAPs. SWAs will be expected to submit CAPs as a part of the SQSP when their
       annual performance on Core Measures does not meet the ALPs. No CAPs will be
       required based on Management Information Measures. However, if a state’s
       performance in one or more Management Information Measures is so
       conspicuously poor that a state’s compliance with Federal law requirements is in
       question, DOL would require corrective action. SWAs will provide quarterly
       updates for each CAP. DOL will strive to attain uniform administration of CAP
       requirements among the SWAs and regions.

    • Continuous Improvement Plans (CIPs). Under the current UI Performs
      structure, SWAs prepare CIPS to improve Tier II performance or Tier I
      performance that is above the established criteria. However, CIPs proved to be
      administratively burdensome without demonstrating improved performance.
      Therefore, SWAs will no longer be asked to develop CIPs under UI Performs.

7. Publishing Data. Three categories of performance data will be published each year:
   • The GPRA goals and national aggregate data;
   • Core Measures with state-specific data;
   • Management Information will be published in a format that does not compare
      SWAs’ performance.

8. Effective Dates for Implementing Changes. DOL will begin implementing the
changes in UI Performs with the SQSP for FY 2006 that SWAs will prepare during the
summer of 2005. UI Performs will use data from the Performance Year that extends
from April 1, 2004, to March 31, 2005, for the FY 2006 SQSP with the exception of TPS,

which will use data from the calendar year ending December 31, 2004. As previously
mentioned, for the FY 2006 SQSP, CAPs will not be required for failure to meet the
ALPs for the first payment aggregate measure and the Tax Quality measure. CAPs will
be expected for failure to meet the ALPs for these measures in subsequent years.
Implementation of the measures for which data are not currently available will be phased
in upon approval from OMB to collect the data, the measures are finalized and the
requisite programming is completed.

9. Action. Distribute this document to all appropriate SWA staff.

10. Inquiries. Direct inquiries to your regional office.

11. Attachments. Attachment A: Comparison of Previous Tier 1 to Core Measures
                 Attachment B: Management Information Measures
                 Attachment C: Core Measures
                 Attachment D: Comments on FRN: Proposed Changes to UI
                 Performs Part 1 (Benefits) and Part 2 (Tax)

Attachment A (official PDF): https://www.dol.gov/sites/dolgov/files/ETA/advisories/UIPL/2005/UIPL14-05_AttachA.pdf

Attachment A
                            Comparison of Previous Tier I to Core Measures

               Previous Tier I Measures                                                Core Measures
New Employer Status Determinations: % of new status                 New Employer Status Determinations: % of new status
determinations within 90/180 days of Q/E date.                      determinations within 90 days of Q/E date.
     ¾ 60% within 90 days of Q/E date                                    ¾ 70% within 90 days of Q/E date

      ¾ 80% within 180 days of Q/E date

Acceptance Sample for Accuracy: 60 New Status                       Tax Quality: New measure using data currently
Determinations--Pass with no more than 6 Failed Cases               collected under TPS as sample scores for the tax
                                                                    functions.
                                                                         ¾ No more than 3 failures out of the 13 tax
                                                                            functions reviewed under TPS in a year nor
                                                                            any single function failing the TPS review for
                                                                            3 consecutive years.
Timeliness of Transfer to the UTF:
Ratio of the monthly average daily loanable balance to
the average daily transfer to the Trust Fund divided by
the number of days in the month. (No criterion set)
Timeliness of deposit into state’s clearing account:                (Included in the Tax Quality Core Measure above.)
    ¾ % of employer contributions deposited into the                    ¾ 90% of employer contributions deposited into
         state’s clearing account within three days of                     the state’s clearing account within 3 days.
         receipt. (Criterion not set)
First Payment Timeliness: Number of days elapsed from               First Payment Timeliness: Number of days elapsed
week-ending date of the first compensable week in                   from week-ending date of the first compensable week
benefit year to date payment is made in person, mailed,             in benefit year to date payment is made in person,
or offset/intercept is applied on the claim.                        mailed, or offset/intercept is applied on the claim.
      ¾
          87% of first payments within 14/211 days:                       ¾ 87% of all first payments including Intra +
          Intrastate UI, full weeks 2                                       Interstate UI, UCFE, UCX, full & partial
                                                                            weeks, made within 14/211 days. Excludes
                                                                            Workshare, episodic claims such as DUA, and
                                                                            retroactive payments for a compensable
                                                                            waiting period.
      ¾ 93% of 1st Payments within 35 days: Intrastate
        UI, full weeks 2

      ¾ 70% of 1st Payments within 14/211 days:
        Interstate UI, full weeks 2

      ¾ 78% of 1st Payments within 35 days: Interstate
        UI, full weeks 2

     “14/21” days: SWAs requiring a waiting week before the payment of a week of benefits must make the first payment within
  14 days of the week-ending date of the first compensable week claimed. SWAs with no waiting week requirement must make
  the first payment within 21 days of the week-ending date of the first compensable week claimed.

  2   Current measurement for Secretary’s Standards.

¾ 90% of all first payments, including Intra +
      Interstate UI, UCFE, UCX, full & partial weeks,
      within 14/21 days

    ¾ 95% of all first payments, including Intra +
      Interstate UI, UCFE, UCX, full & partial weeks,
      within 35 days

Nonmonetary Determinations Timeliness: Number of               Nonmonetary Determinations Timeliness: Number of
days elapsed from date of detection by the state of any        days elapsed from date of detection by the state of any
nonmonetary issue that had the potential to affect the         nonmonetary issue that had the potential to affect the
claimant’s past, present or future benefit rights to the       claimant’s past, present or future benefit rights to the
date on the determination.                                     date on the determination: a study of errors in reporting
                                                               will be done this performance year to find whether
    ¾ 80% of Separation Determinations within 21               SWAs can report detection date correctly within
      days of Detection Date: Intra + Interstate UI,           standards of validity.
      UCFE, UCX Programs, full + partial weeks

     ¾ 80% of Nonseparation Determinations within 14               ¾ 80% of All Determinations within 21 days of
         days of Detection Date: Intra + Interstate UI,                 Detection Date: Intra + Interstate UI, UCFE,
         UCFE, UCX Programs, full + partial weeks                       UCX Programs, full + partial weeks
Nonmonetary Determinations Quality: Evaluation                 Nonmonetary Determinations Quality: Evaluation
results of quarterly samples of nonmonetary                    results of quarterly samples of nonmonetary
determinations selected from the universe of                   determinations selected from the universe of
nonmonetary determinations reported by the 9052 report.        nonmonetary determinations reported on the 9052
Intra + Interstate UI, UCFE, UCX.                              report. Intra + Interstate UI, UCFE, UCX.

    ¾ 75% of Separation and Nonseparation                      Separation and nonseparation samples must each meet
      Determinations with Quality Scores >80 points:           the threshold criteria for case material found and issue
      Score weighted by universe population size.              validity without reference to the validity of the other.
                                                               Results will be reported separately for separation and
                                                               nonseparation issues. Scores weighted by universe
                                                               population size for annual report only.

                                                                    ¾ 75% of separations scoring >80 points.

                                                                    ¾ 75% of nonseparations scoring >80 points.
                                                               Detection of Overpayments: Overpayments (dollars)
                                                               established for recovery as a percent of the overpaid
                                                               amount estimated through BAM that the state can
                                                               detect and recover. (Categories of overpayments that
                                                               vary greatly from state to state or may be “technical”
                                                               overpayments – failure to meet work search
                                                               requirements and be registered with ES – are excluded
                                                               from the measure.)

                                                                   ¾ % of all detectable/recoverable overpayments
                                                                     established for recovery: ALP will be set after
                                                                     a 1-year review of the data.

Lower Authority Appeals Timeliness: Number of days             Average Age of Pending Lower Authority Appeals: a
elapsed from the date the request for a lower authority        count of all pending Lower Authority Appeals divided
appeals hearing is filed to the date of the decision.          into the sum of their age in days. (Contingent upon
                                                               OMB approval to collect the data.)
    ¾ 60% of Lower Authority Appeals Decided
      within 30 days of filing: Intra + Interstate UI,             ¾ Performance goal deferred until state
      UCFE, UCX 2                                                    performance using the new parameters has
                                                                     been recorded for four quarters.
    ¾ 80% of Lower Authority Appeals Decided
      within 45 days of filing: Intra + Interstate UI,
      UCFE, UCX 2

     ¾ 95% of Lower Authority Appeals Decided
         within 90 days of filing: Intra + Interstate UI,
         UCFE, UCX (no criterion set)
Higher Authority Appeals Timeliness: Number of days            Average Age of Pending Higher Authority Appeals: a
elapsed from the date a higher authority appeal is filed to    count of all pending Higher Authority Appeals divided
date of the decision.                                          into the sum of their age in days. (Contingent upon
                                                               OMB approval to collect the data.)
     ¾ 50% of Higher Authority Appeals Decided
       within 45 Days of filing: Intra + Interstate UI,            ¾ Performance goal deferred until state
       UCFE, UCX                                                     performance using the new parameters has
                                                                     been recorded for four quarters.
     ¾ 80% of Higher Authority Appeals Decided
       within 75 Days of filing: Intra + Interstate UI,
       UCFE, UCX
     ¾ 95% of Higher Authority Appeals Decided
       within 150 Days of filing: Intra + Interstate UI,
       UCFE, UCX

Lower Authority Appeals Quality: Evaluation results of         Lower Authority Appeals Quality: Evaluation results
quarterly samples of lower authority benefit appeals           of quarterly samples of lower authority benefit appeals
hearings selected and evaluated as instructed in ET            hearings selected and evaluated as instructed in ET
Handbook #382 (2nd edition). Intra + Interstate UI,            Handbook #382 (2nd edition). Intra + Interstate UI,
UCFE, UCX.                                                     UCFE, UCX. (No change from Tier I measure.)

     ¾ 80% of Lower Authority Appeals with quality                 ¾ 80% of Lower Authority Appeals with quality
       scores at least 85% of potential points.                      scores at least 85% of potential points.

                                                               Facilitate Reemployment: The percent of UI claimants
                                                               who become reemployed within the quarter following
                                                               their first UI payment. (Contingent upon OMB
                                                               approval to collect the data.)

                                                                   ¾ Performance goal deferred until data have been
                                                                     collected from all SWAs for four quarters.

Attachment B (official PDF): https://www.dol.gov/sites/dolgov/files/ETA/advisories/UIPL/2005/UIPL14-05_AttachB.pdf

Attachment B
                           Management Information Measures
A. Secretary’s Standards

        1. First Payments Intrastate full weeks, within 14/21 days
        2. First Payments Intrastate full weeks, within 35 days
        3. First Payments Interstate full weeks, within 14/21 days
        4. First Payments Interstate full weeks, within 35 days
        5. Lower Authority Appeals Timeliness – 30 Days
        6. Lower Authority Appeals Timeliness – 45 Days

B. Tax Measures

        1. New Status Determination Timeliness (within 180 days of Quarter Ending Date)
        2. Successor Status Determination Timeliness (within 90 days of Quarter Ending Date)
        3. Successor Status Determination Timeliness (within 180 days of Quarter Ending Date)
        4. Contributory Employer Report Filing Timeliness
        5. Reimbursing Employer Report Filing Timeliness
        6. Secured Delinquent Contributory Reports Timeliness
        7. Secured Delinquent Reimbursing Reports Timeliness
        8. Resolved Delinquent Contributory Reports Timeliness
        9. Resolved Delinquent Reimbursing Reports Timeliness
        10. Contributory Employer Payments Timeliness
        11. Reimbursing Employer Payments Timeliness
        12. Percent of Contributory Employer Tax Due Declared Uncollectible
        13. Percent of Reimbursing Employer Receivables Due Declared Uncollectible
        14. Percent of Contributory Employer Accounts Receivable At End of Report Period to Tax Due
        15. Percent of Reimbursing Employer Accounts Receivable At End of Report Period to Tax Due
        16. Percent of Change in Total Wages Resulting from Audit
        17. Percent of Contributory Employers Audited
        18. Percent of Total Wages Audited (Annualized)
        19. Accuracy of New Status Determination
        20. Accuracy of Successor Determination
        21. Accuracy of Status Inactivations
        22. Timeliness of Cashiering
        23. Accurate Identification and Resolution of Report Delinquency
        24. Accurate Identification and Resolution of Accounts Receivable
        25. Audits to Meet ESM Requirements
        26. Accuracy of Contribution Report Processing
        27. Accuracy of Debits and Billings of Contributory Employers
        28. Accuracy of Debits and Billings of Reimbursing Employers
        29. Accuracy of Credits and Refunds
        30. Accuracy of Benefit Charging
        31. Accuracy of Experience Rating

C. Cash Management Measures

        1. Average Days on Deposit
        2. Timeliness of transfer from clearing account to Trust Fund

D. Benefits Measures
Timeliness of Payments and Nonmonetary Determinations

        1. First Payments Intrastate full weeks
        2. First Payments Interstate full weeks
        3. First Payments Intrastate, all weeks
        4. First Payments Interstate, all weeks
        5. First Payments, partial weeks
        6. First Payments, UCFE
        7. First Payments, UCX
        8. First Payments, workshare
        9. Continued Weeks Payment, all weeks
        10. Continued Weeks Payment, partial weeks
        11. Continued Weeks Payments, workshare
        12. Intrastate Separation Determinations
        13. Intrastate Nonseparation Determinations
        14. Interstate Separation Determinations
        15. Interstate Nonseparation Determinations

Combined Wage Claims Timeliness Measures

    1. Combined Wage Claim Wage Transfer
    2. Combined Wage Claim Billing
    3. Combined Wage Claim Reimbursements

Benefits Accuracy Measures

        1. Paid Claim Accuracy
        2. Denied Claim Accuracy
        3. Operational Overpayment Rates

Benefit Payment Control Measures

        1. Fraud Overpayment Recovery Rate
        2. Nonfraud Overpayment Recovery Rate

E. Appeals Measures
Appeals Timeliness Measures and Case Aging Measures

        1. Lower Authority Appeals Timeliness
        2. Higher Authority Appeals Timeliness
        3. Lower Authority Appeals, Case Aging
        4. Higher Authority Appeals, Case Aging

Appeals Quality Measure
      Lower Authority Appeals Quality - Due Process

F. Macroeconomic Stabilization Measures

1. Recipiency Rates
2. Exhaustion Rates

Attachment C (official PDF): https://www.dol.gov/sites/dolgov/files/ETA/advisories/UIPL/2005/UIPL14-05_AttachC.pdf

Attachment C
                           Core Measures

1. New Employer Status Determinations


Measure:           Percentage of employer status determinations made within 90
                   days from the last day of the quarter in which the business first
                   became liable (for newly established employers) or re-established
                   liability (for previously terminated accounts) or was reactivated
                   (for previously inactivated accounts).

Change:            Criterion
.
Data Source:       Quarterly ETA 581 Contributions Operations Report.


Computation        The sum of Item 15 (number of determinations made within the
and                90 day period) from the ETA 581 for four consecutive report
Criterion:         quarters divided by the sum of all new status determinations
                   (Item 14) made during the same four quarters. The result is
                   multiplied by 100 to convert the decimal to a percentage.

                   Criterion goes up from 60% to 70%.

Reporting
Frequency:         Quarterly.

2. Tax Quality

Measure:          Assessment of the accuracy and completeness of the tax program.

Change:           This is a new measure.

Data Source:      The annual TPS Review report including Acceptance Sample
                  scores for the following tax functions:
                     • Status Determinations Accuracy
                            o New Status Determinations
                            o Successor Status Determinations
                            o Inactivations/Terminations
                     • Cashiering
                     • Report Delinquency
                     • Collections
                     • Field Audit
                     • Contribution Report Processing
                     • Debits/Billings
                            o Contributory Employers
                            o Reimbursing Employers
                     • Credits/Refunds
                     • Benefit Charging
                     • Tax Rates (usually sampled once every four years unless the
                         previous year’s sample of Tax Rates, Contribution Report
                         Processing or Benefit Charging failed review or there have
                         been changes to the state’s tax rating system that could
                         impact tax rate accuracy)

Computation and   Each of the 13 Acceptance Samples is scored as pass/fail. For
Criterion:        each of the samples (with the exception of Cashiering) 3 or more
                  case failures will cause the sample to fail the TPS review.

                  For tax quality, if 4 or more of the 13 samples fail the annual TPS
                  review, a CAP will be required.

                  Additionally, if any Acceptance Sample fails for three (3)
                  consecutive years, a CAP will be required regardless of whether
                  the state passes the Tax Quality measure.

Reporting         Results for each of the Acceptance Samples will be reported: the
Categories:       format for the data entry screen will be programmed for the state
                  SUN systems, and a table in UIDB will be designed to capture the
                  reports.
Reporting
Frequency:        Annually.

3. First Payment Time Lapse

Measure:           The number of days from the week ending date of the first
                   compensable week in the benefit year to the date the
                   payment is mailed, transferred electronically, or offset or
                   intercept is applied on a claim. States determine “mail
                   date” and provide DOL with the procedure used to derive
                   it. When multiple weeks are paid at the same time, the
                   earliest week should be reported as the first payment.

                   ¾ Includes intrastate and interstate total weeks,
                     partial/part-total weeks and transitional payments.
                   ¾ Includes UCFE and UCX claims.
                   ¾ Includes Combined Wage Claim payments reported in
                     the appropriate category determined by the nature of
                     the base period wages.
                   ¾ Includes offsets and intercepts.

                   ¾ Excludes episodic claims such as EB, DUA and TRA.
                   ¾ Excludes workshare claims.
                   ¾ Excludes retroactive payment for compensable waiting
                     period.

Change:            The Core Measure of First Payment Time Lapse differs
                   from the Secretary’s Standard in that it is all inclusive with
                   the exceptions listed above. The Secretary’s Standard for
                   First Payment Time Lapse applies to intrastate total
                   weeks only. The Tier I measure definition is unchanged.

Data Source:       Universe of first payments currently reported on ETA
                   9050.

Computation and    Start date: week ending date of first compensable week.
Criterion:         End date: date check was mailed or electronic transfer
                   made or offset or intercept applied.

                   The criterion will be set at 87% of first payments made
                   within 14 days for states requiring a waiting week and 21
                   days for states not requiring a waiting week.

Reporting
Frequency:         Monthly.

4. Nonmonetary Determinations Time Lapse

Measure:           Number of days elapsed from date of detection by the
                   state of any nonmonetary issue that had the potential to
                   affect the claimant’s past, present or future benefit rights
                   to the date on the determination which resolves the issue.

                   ¾ Includes the universe of nonmonetary determinations
                     made during the month.
                   ¾ Includes BAM and BPC-generated nonmonetary
                     determinations.

                   ¾ Excludes episodic claims such as EB, DUA and TRA.
                   ¾ Excludes BPC crossmatch and overpayment
                     (monetary) notices.

Change:            The criterion for both separations and nonseparations will
                   be 80% within 21 days.
                   Confidence in reporting of issue detection date will be
                   studied for four quarters to determine causes of error.

Data Source:       Universe of nonmonetary determinations.

                   Note: The population identified for this measure must be
                   identical with the population from which the samples for
                   nonmonetary determinations quality are drawn.

Computation and    Start date: the date on which the agency detected an
Criterion:         issue on a claim which could affect past, present, or future
                   benefit rights.
                   End date: the date on the determination which resolves
                   the issue.

                   Percent of separation and nonseparation nonmonetary
                   determinations completed in 21 days.

Reporting
Categories:        Report Management Information separately for:
                   ¾ Intrastate UI, UCFE, UCX – Seps and Nonseps.
                   ¾ Interstate UI, UCFE, UCX – Seps and Nonseps.

Reporting
Frequency:         Monthly

5. Nonmonetary Determinations Quality: Separation Issues

Measure:            Assessment of the quality of nonmonetary determinations
                    dealing with separation issues.

Change:             Separation issue samples must meet the threshold criteria
                    for “case material found” and issue validity to be
                    considered valid. The separation issue sample must be
                    able to pass the criteria on its own, without reference to
                    the validity of the nonseparation issue sample, and the
                    score will be reported separately.

Data Source:        Universe of nonmonetary determinations completed on
                    separation issues within the calendar quarter being
                    reviewed.

Computation and     Quarterly random sample of 30 or 50 separation
Criterion:          determinations drawn from the universe. Sample size is
                    determined by the number of nonmonetary determinations
                    completed in the previous calendar year.

                    75% of the cases must score more than 80 points.
                    Invalid cases, those out of scope of the review, and those
                    for which no documentation is found are not scored, and
                    must not exceed set thresholds for scores to be
                    considered representative of the quality of the state’s
                    nonmonetary determinations.

Reporting:          Scoring uses a data collection instrument; the elements
                    are entered into the ETA 9056 report for each scored
                    case. The ETA 9056 transmission report will
                    automatically apply the sample validity tests and produce
                    the unweighted quality score when the state transmits the
                    sample results to the National Office. Annually, the
                    National Office will report a quality score weighted by the
                    numbers of separation and nonseparation determinations
                    in the sample universe for each state.

Reporting
Categories:         None.


Reporting
Frequency:          Quarterly

6. Nonmonetary Determinations Quality: Nonseparation Issues

Measure:            Assessment of the quality of nonmonetary determinations
                    dealing with nonseparation issues.

Change:             Nonseparation issue samples must meet the threshold
                    criteria for “case material found” and issue validity to be
                    considered valid samples. The nonseparation issue
                    sample must be able to pass the criteria on its own,
                    without reference to the validity of the separation issue
                    sample, and the score will be reported separately.

Data Source:        Universe of nonmonetary determinations completed on
                    nonseparation issues within the calendar quarter being
                    reviewed.

Computation and     Quarterly random sample of 30 or 50 determinations
Criterion:          drawn from the universe. Sample size is determined by
                    the number of nonmonetary determinations completed in
                    the previous calendar year.

                    75% of the cases must score more than 80 points.
                    Invalid cases, those out of scope of the review, and those
                    for which no documentation is found are not scored, and
                    must not exceed set thresholds for scores to be
                    considered representative of the quality of the state’s
                    nonmonetary determinations.

Reporting:          Scoring uses a data collection instrument; the elements
                    are entered into the ETA 9056 report for each scored
                    case. The ETA 9056 transmission report will
                    automatically apply the sample validity tests and produce
                    the unweighted quality score when the state transmits the
                    sample results to the National Office. Annually, the
                    National Office will report a quality score weighted by the
                    numbers of separation and nonseparation determinations
                    in the sample universe for each state.
Reporting
Categories:         None.

Reporting
Frequency:          Quarterly.

7. Detection of Overpayments

Measure:            Percent of estimated detectable, recoverable
                    overpayments (dollars) established for recovery.

Change:             This measure is new in UI Performs.

Data Source:        BAM and BPC reports.

Computation and     BAM reports of recoverable overpayments (dollars)
Criterion:          divided by BPC reports of overpayments established for
                    recovery. An interactive report will be available on the
                    OWS web site for SWA and Regional Offices to use to
                    find SWA performance.

                    The criterion will be a percentage (to be determined after
                    a year of data collection) of estimated detectable,
                    recoverable overpayments (dollars) established for
                    recovery.

Reporting
Categories:         None.

Reporting
Frequency:          Quarterly.

8. Average Age of Pending Lower Authority Appeals

Measure:           A count of all pending Lower Authority Appeals divided
                   into the sum of their actual age in days to produce an
                   average age.

Change:            This measure is new in UI Performs. It takes the age of
                   all pending appeals into account and allows prediction of
                   and planning for future performance.

                   The measure is contingent upon OMB approval for the
                   data collection.

Data Source:       Universe of pending Lower Authority Appeals.

Computation and    At the close of business on the last day of each month,
Criterion:         access the universe of pending Lower Authority Appeals.

                   Determine actual age of each pending Appeal by counting
                   days elapsed from the date of filing to the date of count.

                   Sum actual age in days of all pending Lower Authority
                   Appeals and divide by the total number of pending Lower
                   Authority Appeals to arrive at the average age.

                   The criterion will be determined when twelve months of
                   data have been recorded.

Reporting:         Report the dividend, divisor, and average age as
                   determined by the computation.

Reporting
Categories:        None.

Reporting
Frequency:         Monthly

9. Average Age of Pending Higher Authority Appeals.

Measure:            A count of all pending Higher Authority Appeals divided
                    into the sum of their actual age in days to produce an
                    average age.

Change:             This measure is new in UI Performs. It takes the age of
                    all pending appeals into account and allows prediction of
                    and planning for future performance.

                    The measure is contingent upon OMB approval for the
                    data collection.

Data Source:        Universe of Higher Authority Appeals.

Computation and     At the close of business on the last day of each month,
Criterion:          access the universe of pending Higher Authority Appeals.

                    Determine actual age of each pending Appeal by counting
                    days elapsed from the date of filing to the date of count.

                    Sum actual age in days of all pending Higher Authority
                    Appeals and divide by the total number of pending Higher
                    Authority Appeals to arrive at the average age.

                    The criterion will be determined when twelve months of
                    data have been recorded.

Reporting:          Report the dividend, divisor, and average age as
                    determined by the computation.

Reporting
Categories:         None.

Reporting
Frequency:          Monthly

10. Lower Authority Appeals Quality

Measure:            Assessment of the quality of Lower Authority Appeals by
                    scoring a random sample of Lower Authority Appeals
                    decisions completed in the calendar quarter being
                    reviewed.

Change:             None.

Data Source:        Universe of Lower Authority Appeals.

Computation and     Scores recorded on the data collection instrument for
Criterion:          each case will be entered into the UI data base using the
                    ETA 9057.

                    The criterion is 80% of cases scoring 85% or more.

Reporting
Intervals:          None.

Reporting
Categories:         None.

Reporting
Frequency:          Quarterly.

11. Facilitate Reemployment

Measure:            Percent of UI claimants who become reemployed within
                    the quarter following their first UI payment.

Change:             This is a new measure in UI Performs.

                    The measure is contingent upon OMB approval for the
                    data collection.

Data Source:        ETA 5159 and state UI wage records.

Computation and     State UI wage records will be accessed and a cross-
Criterion:          match run against claimant benefits records for the
                    previous calendar quarter to determine the percent of
                    claimants who have been reemployed.

                    A performance goal will be deferred until data have been
                    collected from all states for four quarters.

Reporting
Intervals:          None.

Reporting
Categories:         None.

Reporting
Frequency:          Quarterly.

Attachment D, Part 1 (official PDF): https://www.dol.gov/sites/dolgov/files/ETA/advisories/UIPL/2005/UIPL14-05_AttachD_Part1.pdf

Attachment D, Part 1
       Comments on FRN: Proposed Changes to UI Performs



#          Issue                  Comment                           DOL Response

1   Result of Changes   15 states commented on
                        expected results of the 5-year
                        review of performance
                        measures, as did NELP &
                        AFL/CIO.

    Increased Focus     11 states approved of increased
                        focus on critical measures.

    Management          5 states were glad to see that
    Information         Management Information would
                        be collected for their use,
                        although 1 suggested evaluating
                        these reports to reduce their
                        number.
                        1 state mentioned favoring
                        consolidation of benefits
                        payment time lapse.
                        1 state mentioned its approval of
                        the 21 day time lapse for all
                        nonmonetary determinations.

                        Both NELP & AFL/CIO
                        commented in opposition to the
                        changes as detrimental to the
                        jobless, and called attention to
                        reductions in funding of state
                        employment service operations
                        since 2001.
                        2 states agreed that further
                        reviews such as this one should
                        be planned for the future.

    Regarding GPRA      2 states said that the GPRA
                        goals should not become
                        performance measures for            Core (formerly “Tier I”) measures
                        individual states, and another      are assigned a criterion that is
                        state questioned the logic of       intended to be a floor below which
                        differing standards for Tier I      performance must not fall, while
                        versus GPRA.                        GPRA measures set performance
                                                            goals every state should try to
    SQSP                7 states favored the streamlining   achieve.
                        of the SQSP narrative; 4 states
                        specifically stated that they       DOL hopes to see the narratives in
                        disliked being required to          the SQSP as concentrated
                        describe prevailing economic or     commentary on performance
                        political conditions as a part of   issues; however, states can
                        the SQSP.                           choose to include information on
                                                            other factors if they are contributing
    CAPs                5 states and NELP addressed         to performance problems.
                        the subject of CAPs:

#        Issue                  Comment                            DOL Response

                                                           CAPs are Corrective Action Plans
                      1 state commented that the           – they should be written to produce
                      cycle of UI Performs evaluation      effective and appropriate actions.
                      does not allow sufficient time for   DOL encourages states to do long-
                      corrective action plans to work      range (multi-year) planning and to
                      before they are changed or           include requests for technical
                      dropped;                             assistance or analysis of
                                                           operations in order to boost
                      1 state asked “What efforts will     performance. Milestones can be
                      USDOL make to enforce the            redesigned annually to reflect
                      correction of deficiencies           changing performance. In many
                      regarding ALPs that are              cases, a one-year cycle is not long
                      habitually covered in the SQSP       enough for results to become
                      narratives & by CAPs but remain      apparent as either successful or
                      below the required thresholds?”      unsatisfactory.

                      2 states were comfortable with       The proposed changes in
                      the plan as outlined; 1 state        performance measures are in no
                      suggested that other approaches      way a lowering or lessening of
                      to corrective action (including      standards, and in no way will be
                      doing nothing) could be              detrimental to jobless workers. To
                      considered besides CAPs.             the contrary, the changes will allow
                                                           states to better focus on the most
                      NELP is concerned that DOL           critical program areas that will
                      “only requires a ‘corrective         promote better customer service.
                      action plan’ after the state has
                      failed to meet the criteria and      DOL consistently monitors state
                      workers have lost out on benefits    performance and works
                      for a substantial period. . . DOL    cooperatively with the state
                      must do much more to fulfill its     agencies to help improve
                      role in ensuring that workers        performance. DOL takes all the
                      receive benefits when due . . .”     steps outlined in 20 CFR Section
                                                           640.8 as needed, and will continue
                                                           to do so.
2   Nonmonetary       23 states commented on the           DOL agrees that calculating time
    Determinations    proposed change to the               lapse from the date an issue is
    Timeliness        measure, as did NELP.                detected is the most valid measure
                                                           of state operational efficiency. (For
    Issue Detection   16 states agreed that the            claimants and employers, the
    Date              beginning parameter of detection     week-ending date of the first
                      date makes a better measure of       affected week is arguably more
                      nonmonetary determinations           pertinent.)
                      timeliness than the week-ending      States have been reporting time
                      date of the first affected week,     lapse from issue detection date to
                      largely because issue detection      determination date since January
                      date marks the time at which the     1997, but errors in reporting the
                      state has control of the disposal    issue detection date remain
                      of the issue.                        unacceptably high, as verified
                      SWAs also feel timeliness [using     through data validation carried out
                      w/e date] would be adversely         during the nonmonetary quality
                      affected by backdating of claims     reviews.
                      and other issues.

#        Issue                     Comment                            DOL Response

    Week-ending Date    10 states felt the change to w/e
    of First Affected   date of the first affected week       Because commenting states
    Week                would penalize states for not         clearly prefer to retain the
                        detecting issues over which they      timeliness measure using detection
                        had no control.                       date, DOL will extend the use of
                        4 states felt they would need to      this measure for a period of one
                        know the new criterion before         performance year.
                        judging the measure.
                        3 states support combining time       During that year DOL will examine
                        lapse measures; 1 wishes to           the causes of the inaccurate
                        retain separate measures.             reporting and determine whether
                        2 states felt that w/e date could     reporting can be improved to an
                        prove a disincentive to detecting     acceptable level.
                        potential issues.
                        2 states cited concerns over          If issue detection date reporting
                        Java.                                 accuracy cannot be improved, DOL
                        1 state said the proposed             will revisit the issue.
                        measure would be an
                        improvement but would like
                        “uncontrollably” undetected
                        issues tracked separately under
                        a different standard.
                        1 state said it would be
                        negatively impacted due to
                        liberal backdating of claims.
                        1 stated that, since w/e date
                        requires programming changes
                        and training, it would be costly to
                        implement.*                           *States currently report the week-
                        NELP said that, in view of the        ending date of the first affected
                        many states failing the current       week on the ETA 9053.
                        benchmark, the current
                        standards should remain in
                        place, and more demanding
                        benchmarks should be adopted
                        to ensure timely determinations
                        of eligibility for benefits.
3   Nonmonetary
    Determinations
    Quality

    On scoring          3 states concur with the proposal     Scoring the samples separately
    separate samples    of scoring the samples                and requiring that both samples
    for separations &   separately.                           independently pass validity tests
    nonseparations:     2 states say the change will          will result in a clearer picture of the
                        have no effect on them.               quality of nonmonetary
                        2 states would prefer to continue     determinations and help pinpoint
                        using a single weighted score.        areas that require additional
                        1 state said the measure should       attention.
                        match the time lapse measure,
                        either combined or separate.

#         Issue                    Comment                            DOL Response

                         10 states feel that change is
    On quality scoring   needed in the scoring method;        As part of the UI Performs review,
    method:              most of these states make the        a state/federal nonmonetary
                         point that the current pass/fail     determinations workgroup studied
                         system causes too many states        the quality review system, including
                         to fail the quality measure          the scoring system. The
                         because of over-emphasis on          workgroup’s recommendations
                         detail.                              were issued for comment in UIPL
                         1 state submitted a proposal for     29-04. Changes to the review and
                         a revised scoring method, which      scoring systems will be issued
                         DOL is reviewing.                    separately.
                         1 state felt that the Handbook on
                         Nonmonetary Quality [HB 301]         All comments received related to
                         should be revised and that           the quality review and scoring
                         written clarifications should be     systems will be considered.
                         provided to questions brought up
                         during tripartite reviews.

    On cross-regional    1 state does not see any need
    reviews:             for cross-regional reviews to
                         overcome localized bias;
                         1 state favors cross-regional
                         reviews to develop national
                         consistency in scoring.

    On ALPs:             1 state proposed that the ALP
                         for nonmonetary determination
                         quality be adjusted annually to
                         reflect funding levels.

    On automation:       1 state proposed increased
                         levels of automation in
                         nonmonetary determinations.
4   Lower & Higher       20 states and NELP commented         The proposed measure of average
    Authority Appeals    on the proposed measure.             age of pending appeals provides a
    Timeliness                                                more comprehensive view of
                         9 states commented that the          states’ appeals programs. The
    Average age:         new measure provides better          current time lapse measure
                         incentive for deciding all appeals   provides information only on
                         promptly, but 1 suggested the        decisions that have been made but
                         use of the median age rather         no information about the number of
                         than average, and 3 requested        remaining appeals nor how old
                         that multi-claimant appeals be       those cases may be.
                         removed from the time lapse
                         universe.                            The measure of average age of
                                                              pending cases would create a
    Need for change:     7 states felt there was no need      single measure for promptness
                         for a change in the measure or       performance and the age of the
                         felt the reasons for the change      inventory of pending cases. While
                         were not convincing.                 it is important to know the percent
                         1 state did not wish to comment      of cases decided within certain
                         without knowing the new              time intervals, in the interest of

#         Issue                    Comment                             DOL Response

                        standard.                              good customer service it is more
                        1 state felt that either the current   important to know how long
                        or the new measure would be            individuals must wait to be served.
                        acceptable.
                        AFL/CIO said that current              The new measure is contingent
                        standards that apply to appeals        upon OMB approval to collect the
                        timeliness should be                   data.
                        strengthened.
                        NELP commented that using the          DOL will continue to collect and
                        age of pending decisions will          monitor appeals time lapse data
                        provide information that is more       currently collected.
                        relevant to the question of the
                        volume of undecided cases.
5   Detection of        14 comments on the proposed            DOL will be examining the data for
    Overpayments        overpayment detection measure          the next year to determine whether
                        were received from states and          the proposed measure can be
                        from the AFL/CIO and NELP.             refined. Due to anomalies found in
                                                               current data, careful scrutiny will be
    Variation:          5 states commented that there is       maintained to assure the
                        too much variation among states        correctness of BAM data.
                        in the BAM & BPC programs for
                        the measure to be comparable;          Also being considered is the
                        1 felt that the difference in          possibility of applying this measure
                        measurement periods for the two        to a rolling three-year performance
                        programs will make it impractical      period, to bring BAM and BPC data
                        to implement.                          into focus for the same time frame.

    Need for testing:   6 states suggested that the
                        measure needs extensive testing
                        and much more information
                        before it is implemented.
                        2 states were opposed to the
                        measure because of the
                        unknown degree of confidence
                        in reporting and an unpredictable
                        range of error in calculating
                        results                                .

                        2 states said they approve the
                        measure, and 1 other would
                        approve if it were expanded to
                        include underpayments and
                        wrongful denials

                        2 states would attempt to apply
                        the measure if they were given
                        adequate budgetary allotments
                        to do so.

                        1 state withheld comment
                        because the measurement
                        criterion is unknown.

#        Issue                   Comment                            DOL Response

                       1 state is uncertain what
                       corrective action could be taken
                       should their performance be
                       judged inadequate.

                       1 state feels it should be allowed
                       to use collection agencies to        The proposed measure is the
                       pursue overpayments.                 detection, not the collection, of
                       1 state suggests that the            overpayments. The first step
                       emphasis should be much more         toward prevention is detection.
                       on prevention of overpayments.

                       1 state recommends that the          DOL is in the process of making
                       measure not be enacted until         performance data available on the
                       software is available to track       ETA Web site.
                       performance in a timely manner.

    Employer audit:    AFL/CIO feels DOL has not            Employer integrity is of great
                       focused sufficiently on employer     concern to DOL.
                       fraud as a cause of OP and that      Employers are subject to audit
                       DOL should do more to establish      through the Tax Performance
                       standards related to                 System; approximately 110,000
                       underpayments due to                 misclassified employees are
                       improperly denied benefits.          discovered and corrected through
                       NELP feels that the “Proposed        the states’ audit program annually.
                       Program Integrity Standards Are
                       Unbalanced Against Workers. . .      BAM currently tracks and reports
                       DOL [should] require states to       underpayments and also samples
                       do a better job reducing the         denied claims for correctness.
                       hundreds of millions of dollars in
                       benefits that are underpaid
                       today’s worker, and more
                       aggressively address the
                       problem of program integrity as
                       applied to employers who fail to
                       pay their fair share of
                       unemployment taxes. . . “

6   Facilitate         25 states commented, plus
    Reemployment       NELP & AFL/CIO.
                       1 state was in favor of the
                       proposed measure.
                       24 states, NELP and AFL/CIO
                       were against the proposed
                       measure.

    Role of economy,   13 states commented                  In addition to providing benefits to
    seasonality        extensively regarding the large      unemployed workers, the UI
                       role of the economy and of           system has a responsibility to
                       seasonality adjustments with         facilitate worker reemployment.
                       respect to the proposed              This is evidenced in states’ “able
                       measure, saying that even ES         and available” requirements that UI

#         Issue                    Comment                          DOL Response

                         can’t get claimants reemployed     beneficiaries be both able to work
                         when there are no jobs             and available to work; the worker
                         available.                         profiling requirement; and the
                                                            requirement in the Social Security
    A new focus for UI   10 states responded that the UI    Act that UI benefits be paid
                         role is to pay benefits when due   through public employment offices.
                         and to collect employer            The UI system is uniquely situated
                         contributions; that the monies     to facilitate reemployment by
                         funding UI are expressly devoted   conducting eligibility reviews and
                         to those purposes and cannot be    enforcing state requirements that
                         legally used to fund ES            UI beneficiaries seek and accept
                         functions.                         suitable work.

    ES registration      9 states felt that claimants       DOL plans to continue to seek
                         should be registered with ES       required approvals to collect
                         and that there are measures of     reemployment data.
                         reemployment funded there.

    Outside UI           8 states expressed the opinion
    Control              that reemployment is an activity
                         which is totally outside UI
                         control.

    How to measure       4 states inquired about what UI    The reemployment measure will
                         function or action would be        take into account economic
                         measured with reference to         conditions when setting criteria.
                         claimants’ reemployment.
                         4 states added that if
                         reemployment is to be measured
                         with respect to UI, it should at
                         most be a Management
                         Information measure.
                         3 states asked what research
                         information was used in the
                         development of the proposed
                         measurement.
                         1 state suggested that the
                         measure should use the
                         unemployment rate as a
                         measure.

    Effect on            NELP expressed concern that        DOL disagrees that the measure
    claimants            claimants will be forced to        will force claimants to accept
                         accept unsuitable work because     unsuitable work. The measure in
                         of the new measure; longer         no way lessens claimants’ benefits
                         unemployment is a product of       rights which protect claimants from
                         the labor market and not the       losing benefits for not accepting
                         fault of the jobless.              unsuitable employment.
                         AFL/CIO commented similarly,
                         that claimants would be forced
                         into unsuitable work in a weak
                         economy and that providing

#         Issue                    Comment                            DOL Response

                         temporary replacement income
                         is the core purpose of UI.
7   First Payment        13 states and NELP commented         DOL acknowledges that conditions
    Promptness           on the measure.                      exist which make some first
                                                              payments take longer than others;
                         13 states support the proposed       that is why the criterion is set at
                         measure,                             less than 100%.
    Interstate causes    5 with the caveat that interstate
    problems             and intrastate should be
                         measured separately due to
                         problems with CWC and IB
                         claims.
    Multi-claimant       2 states feel that Labor Disputes
    issues               and other multi-claimant issues
                         cause negative effects on first
                         payments and should be
                         excluded from the measure.
                         1 state explained that high levels
                         of UCFE & UCX claims as well
                         as interstate negatively affect
                         time lapse.

                         NELP commented that claimants        The proposed measure does not
                         often have need for immediate        reduce incentives to pay claims
                         wage replacement or they may         quickly – it broadens the scope of
                         face extreme hardship, and the       the existing first payment
                         first payment timeliness             timeliness measure to include
                         requirement forces SWAs to pay       every type of claim but workshare.
                         quickly.
8   Effective Date for   2 states asked that                  The first SQSP affected will be for
    Implementing         implementation of the proposed       FY 2006 that states will complete
    Changes              measures not begin until all         during the summer of 2005.
                         states are reporting with
                         knowledge of the proposed
                         standards.

Attachment D, Part 2 (official PDF): https://www.dol.gov/sites/dolgov/files/ETA/advisories/UIPL/2005/UIPL14-05_AttachD_Part2.pdf

Attachment D, Part 2
                Comments on FRN: Proposed Changes to UI Performs


     Issue                              Comment                                     DOL Response

Tax                 A total of 34 states provided comments regarding
Performance         proposed changes to UI Performs. Of those, 24
Measures            had comments relating to tax performance
                    measures: 9 were supportive of the tax
                    performance measures; 2 were supportive but
                    questioned the Tax Performance Systems’ Posting
                    sections (which have been removed); 1 requested
                    more information; and 12 had varying concerns
                    which are listed below.


Overarching         4 states supported the new measure of tax quality,       Agree. These measures of tax
Comments            overall. 1 said, “We believe that these standards        quality are the product of
                    are reasonable measures of the timeliness and due        extensive state and Federal
                    processes of the program’s employer accounts             interaction.
                    function.”


General             1 state urged DOL to “sync up the program                A decision was made to continue
Concerns re:        performance timeframes of UI Performs to TPS. A          measuring TPS by CY (January
Implementation      similar measure with differing timelines would be        through December) due to the
                    inefficient.” Another state added: “We would like to     program’s structure and sampling
                    see that UI Performs and TPS operate on the same         frames. The SQSP measurement
                    performance year…calendar years are easiest, but         period must remain on an April
                    a consistent period would be better…”                    through March timeframe due to
                                                                             its relationship to the Federal
                                                                             funding process.

                    2 other states raised concerns that measurement          The decision was made to have
                    should only begin “after sufficient time has been        states address failures in the
                    provided to implement the changes…until after the        narrative for the FY ’06 SQSP.
                    beginning of the next measurement period.” The
                    other state said, “We request that the date of
                    implementation be pushed back to FY 2007.”


                    1 state was in general agreement with the new tax
TPS Sample:         measure but strongly objected if three or more           There is little subjectivity in
Stringency of       failures out of a total of 60 cases cause failure of     deciding whether a status
pass/fail (3 or +   that tax function. It wanted to allow up to 5 failures   determination or tax rate is
fails out of 60     before the tax function fails because it saw TPS as      accurate or not. In addition, TPS
cases = failure)    subjective, open to interpretation. Another state        accuracy levels were set by state
                    said that a stringency level of 3 failures combined      Tax Administrators, in the early
                    with having to focus on all samples would be unduly      90’s, who wanted to be made
                    burdensome.                                              aware whenever any major tax
                                                                             outputs were processed
                                                                             inaccurately. The emphasis was
                                                                             on identifying problems before
                                                                             they became too large.

Issue                               Comment                                        DOL Response
                    3 respondents were concerned that non-substantive
TPS Sample:         posting errors such as misspellings could cause           Agree. These sections have
Accuracy in         failure. 1 asked that posting sections of New Status,     been removed from TPS. Only a
posting non-        Successorship and Inactivation be removed from            few, material posting questions
substantive         Tier I. “Either allow 4 or 5 samples to fail or make it   remain. All non substantive
data.               less restrictive.”                                        questions have been removed
                                                                              and will not be used in UI
                                                                              Performs measures.

                    3 states agreed with stringency level of no more
Tax Accuracy        than 3 failures out of 13 tax functions/ samples.         Agree.
Measure:            One said this “…calculates to be approx. a 25%
Stringency of       level of failure, which would equate to a 75%
allowing 3          passing rate…in alignment with other UI Performs
failures out of     quality standards such as BTQ.”
13 samples
                    However, 1 state said it was too rigid because there
                    are a “maximum of 16 different samples reviewed.”         Only 13 samples are reviewed,
                    Another state said that the number of samples             and one, (Experience Rate) is
                    allowed to fail should be raised from two to four in      only sampled once every 4
                    “consideration of the high number of sampling             years. The number of sampling
                    categories…”                                              categories should have little
                                                                              bearing on the level of accuracy
                                                                              expected.
                    Another respondent noted that with the Cashiering
                    tax function blended in as one of the 13 samples,         This is true unless or until the
                    the states could pass the tax quality measure while       Cashiering function failed three
                    failing to meet Cashiering timeliness requirement,        consecutive years.
                    as long as less than three tax functions out of 13
                    passed TPS review.


                    2 states agreed with this standard. However,
                    another state said that only if two or more tax           A state will have two years to
                    functions failed for three consecutive years should a     correct a process problem that
                    CAP apply.                                                caused the particular tax sample
                                                                              to fail in both years. Therefore, it
                                                                              seems reasonable to expect a
                                                                              Corrective Action Plan if the
                                                                              sample fails for 3 consecutive
                                                                              years.
                    2 states said that not all 13 tax functions should be
Tax Accuracy        considered Tier I. 1 state said that only 4 of the 13     The 13 samples represent the 13
Measure:            samples were important enough to warrant Tier I           major UI tax functions. They are
Stringency of       status (Status, New and Successor, Report                 interrelated and operate together
not allowing a      Processing, and Cashiering) and that the rest             as a fully functioning UI tax
sample to fail      should be Management Information (MI). Another            system. Attempts have been
for 3               noted that tax functions previously identified as MI      made, but no particular tax
consecutive         or Core measure should remain as such and not be          function/s could be extracted as
years               lumped together. One state recommended the 70%            being more significant than the
                    timeliness measure and Status accuracy measure            others (and consistently so,
                    as the only Core measures.                                between states). The proposal is
                                                                              to compute one single measure

Issue                              Comment                                      DOL Response
                                                                             of Tax Accuracy from these 13
                                                                             tax functions. They will still be
                                                                             used as Management
                                                                             Information on an individual
                                                                             basis.

                  3 states supported the combining of all 13 TPS tax
Tax Accuracy      functions into one measure of Tax performance:             Agree. Data on all 13 tax
Measure:          “This measure is an improvement over the current           functions is already being
Which Tax         measure. It raises the overall quality measure to a        gathered. For purposes of UI
Functions to      Tier I measure without increasing the number of            Performs, only ONE number will
Include as Core   measures & reporting burden” and it “…agrees with          represent the Tax Accuracy
Measures          the consideration of quality measures and not just         Measure, not 13.
                  timeliness values…Incorporating TPS into the mix
                  is a good idea.”

                  However, 1 respondent thought that the same
                  measures will be applied to Core measures and to           The measures will still be used
                  MI measures, “Either measure Tax Quality                   as Management Information but
                  collectively as a Core Measure…or use the                  will also be combined into one
                  acceptance sample results as a Management                  Core measure of Tax Accuracy.
                  Information Measure. They should not be used for
                  both.”


                  Another state indicated that it is too stringent, “while
Tax Accuracy      being substantially broadened from 1 to 11 tax             All major tax functions are
Measure:          functions…the proposed measure will subject the            currently subject to a yearly
Number of         ALP to 11 areas of the TPS review…” 2 other                review. It is proposed that they
Measures          states said that the net effect will be to increase the    are now each 1/13th of one total
                  number of Core Measures - in contradiction to the          score that represents the
                  goal of reducing the number of performance                 Accuracy side of a state’s Tax
                  measures. Another had concerns about having to             Performance, and as a “Core”
                  write a separate CAP for each failed sample since          measure, more important. The 3
                  one all-encompassing CAP “is unrealistic.” It              fails allowed out of 13 samples is
                  suggested that CAPs only be required for samples           very permissive; CAPs should be
                  that fail 3 years in a row.                                expected if a state can’t meet a
                                                                             75% passing rate.

                  Finally, 1 state, while agreeing with combining 13
                  tax functions into one measure, had concerns that a        Oversight of UI tax is vital, no
                  separate department of state government controlled         matter what entity is responsible
                  data entry and that the tax unit had no control over       for the actual process.
                  their rate of error.

Cashiering        2 states agreed with the 90% deposited within three        This measures the time it takes
Measure           days criterion. A state reminded that, at one time,        to deposit received funds into the
                  there was support for compensating balances and            state clearing account. It has
                  that these arrangements have become attractive to          been in place for many years and
                  states.                                                    the vast majority of states have
                                                                             little difficulty in passing the
                                                                             Cashiering measure.

Issue                           Comment                                    DOL Response

                 1 state noted that the next two measures               The Trust Fund measures are in
                 (transferred into the Trust Fund and drawdown from     place but are not Core measures.
                 the TF), were important and now appear to be           If DOL found that a state was
                 missing.                                               failing to meet the requirements
                                                                        for transfer to the Trust Fund,
                                                                        DOL would work with the state to
                                                                        remedy the problem.

Tax Timeliness   4 states agreed with the 70% level. 1 added that “by   This measure was carefully
Measure:         focusing on just the 90 day level, states may tend     reviewed, and it was found that
Timeliness of    not to place emphasis on those that are beyond the     the national average has held
Status           90 days…continue to monitor the 70% level to see       steady from 1998 (78%) to 2002
Determinations   if the rating was set high enough…” Another state      (81%). It appears that a vast
                 thought that a focus on timeliness and reduction of    majority of states would have
                 status determination accuracy to 1/13 its value        little difficulty passing this
                 would drive down the accuracy levels. A different      measure at a criterion of 70%.
                 state said, “Leave the percentage at 60%!”             Zero (0) states scored below
                                                                        60% in 2002 and only seven (7)
                                                                        scored below 70% in that year.
                                                                        In addition, the 60% benchmark
                                                                        was 20% less than the GPRA
                                                                        goal. It now remains 10% below
                                                                        the GPRA goal. Regarding
                                                                        determinations made beyond 90
                                                                        days – this data is still captured
                                                                        as part of the MI system.


                 Another state added that the time should begin from    This could discourage states
                 the date notice is filed by an employer and from the   from being proactive in searching
                 date the agency detects employer liability.            out and identifying new
                                                                        employers.

What does federal law require in your situation?

Ezel checks current federal labor law against your facts and answers with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace