Back to Federal guidance
Extended ETA 9177 checklist approval for state UI system modernization
Summary ETA advised states that the ETA 9177 preimplementation checklist for modernized unemployment insurance systems had Office of Management and Budget approval through July 31, 2026. States submit the checklist about six months before launching a new benefit or tax system. The letter says the collection requirements did not change; its printed expiration designation is Continuing.
Document
Federal guidance
Agency
U.S. Department of Labor, Employment and Training Administration (ETA)
Document number
UIPL No. 11-18, Change 2
Date issued
February 2, 2024
Status
Active
The letter states that it rescinds nothing and has a Continuing expiration designation. It extends approval of the ETA 9177 report through July 31, 2026; that approval date has passed, so the current approval of the form should be checked separately.
Status last verified October 24, 2026
Apply this to your situation
This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.
About this page: The full text below is the official document from U.S. Department of Labor, Employment and Training Administration (ETA). Ezel adds the plain-English summary and tracks the document's status. The official source linked on this page is authoritative for any reliance.
CLASSIFICATION
EMPLOYMENT AND TRAINING ADMINISTRATION Unemployment Insurance
ADVISORY SYSTEM CORRESPONDENCE SYMBOL
U.S. DEPARTMENT OF LABOR OUI/DPM
Washington, D.C. 20210 DATE
February 2, 2024
ADVISORY: UNEMPLOYMENT INSURANCE PROGRAM LETTER NO. 11-18
CHANGE 2
TO: STATE WORKFORCE AGENCIES
FROM: BRENT PARTON
Principal Deputy Assistant Secretary
SUBJECT: Extension of the Employment and Training Administration (ETA) 9177 Report
(Pre-Implementation Planning Checklist Report Version 1) for State
Unemployment Insurance (UI) Information Technology (IT) Modernization
Projects
1. Purpose. To advise states that in accordance with the Paperwork Reduction Act of 1995, the
Office of Management and Budget (OMB) has approved the extension of the ETA 9177
Report (Pre-Implementation Planning Checklist Report Version 1) through July 31, 2026.
There is no change in the requirements of the approved collection.
2. Action Requested. ETA requests that state administrators provide this guidance, including
the attached ETA 9177 (Pre-Implementation Planning Checklist Report Version 1) and the
accompanying Reporting Instructions to the appropriate staff, including UI Directors and
Chief Information Officers.
3. Summary and Background.
a. Summary – The ETA 9177 Report (Pre-Implementation Planning Checklist Report
Version 1) assists state UI agencies in preparing to launch modernized UI IT systems that
support administration of UI benefits and/or tax systems.
b. Background – ETA issued Unemployment Insurance Program Letter (UIPL) No. 11-18
on August 17, 2018, to announce the availability of the ETA 9177 Report (Pre-
Implementation Planning Checklist Report) and its associated Reporting Instructions.
The ETA 9177 Report is a comprehensive checklist denoting critical functional areas that
states should verify prior to launching a new IT system including, but not limited to,
technical IT functions and UI business processes that interface with new systems. States
are required to submit the completed ETA 9177 Report, with any supporting
documentation, to ETA approximately 180 days (6 months) prior to a state’s projected
implementation date. With this information, ETA will be able to identify any needed
RESCISSIONS EXPIRATION DATE
None Continuing
technical assistance and have an assurance that the state’s implementation will have a
significant likelihood of being successful.
ETA issued UIPL No. 11-18, Change 1, on July 16, 2020, to announce the availability of
the enhanced report - ETA 9177 Report (Pre-Implementation Planning Checklist Report
Version 1) for states to use. This updated version of the ETA 9177 Report improved the
document’s structure; provided additional clarity on the verification steps for the ten
existing project categories; and added a new category to address verification steps for
labor market information (LMI) Federal reporting functions. Additionally, the reporting
instructions were modified to address comments received from state agencies and other
entities.
The list of critical areas identified in the enhanced ETA 9177 Report is comprised of the
following eleven (11) Project Categories:
1. Functionality and Workarounds
2. External Alternate Access Options and Usability Issues Addressed
3. Policies and Procedures
4. Technical Preparation for System Implementation
5. Call Center/Customer Service Operations
6. Business Process
7. Help Desk
8. Management Oversight
9. Vendor Support/Communications
10. Communication Processes and Procedures
11. LMI Federal Reporting Functions
The OMB authorization of the ETA 9177 Report expired on June 30, 2023. Recently,
OMB extended its authorization of the data collection under the ETA 9177 Report
through July 31, 2026.
4. Reporting. The information gathered in the ETA 9177 Report must be used by states to
prepare for the implementation of new UI IT systems and to ensure the availability of
mission critical functions. The ETA 9177 Report is required when a state is modernizing a
major component of a UI IT system or systems. A major component can be a full benefits or
tax system or it can be a significant component subset, such as continued claims certification
or adjudication. States may use a modular approach to modernize a major component.
Any state that is preparing to launch a modernized system must certify that it has reviewed
and accomplished the items detailed in the ETA 9177 Report or has a timely plan for doing
so. If a section of the ETA 9177 Report is not applicable to the modernization project, states
must indicate that it is not applicable. If a section is left blank, then it is deemed missing
during ETA’s review, and the report will be regarded as incomplete. ETA will provide
comments back to the state and will request the state to revise and resubmit the report.
An ETA 9177 Report submission is not necessary when a state is merely upgrading sub-
components of a system, such as enhancing the front-end interface for claims intake. Other
instances where a state is not required to submit an ETA 9177 Report include ongoing
maintenance activities, such as database upgrade, IT server upgrades, replacing any obsolete
hardware/software, etc.
As specified previously in UIPL No. 11-18, the ETA 9177 Report information must include a
cover page; state general information (state name, date of submission, UI IT Modernization
project name, contact information, and a summary of the project); and include the report on
each of the UI IT Modernization Pre-Implementation Planning Checklist Project Categories.
Each Project Category has associated sub-elements. For every sub-element in the ETA 9177,
the state must provide supporting content to demonstrate that it has addressed the specific
sub-element. A Certification is required at the end of the report.
For each sub-element, the state must address issues including, but not limited to, the
following:
• An overall status report;
• A brief report explaining the status of the project as it relates to the particular sub-
element;
• Explanations of any workaround solutions of the processes in the sub -element;
• Explanations if implementation of the new system concerning processes for the sub -
element will be delayed or deferred;
• Explanations for added clarity and/or to support a narrative;
• Mitigation proposals for addressing any problems;
• New project timelines if applicable; and/or
• Any discussion of identified technical assistance needs for the successful completion of
the project.
This report is a narrative, not a statistical submission; therefore, states will use an ETA
provided simple form template (a Microsoft Word 2010 “.doc”) found in Attachment I to
prepare the ETA 9177 Report. Once completed, the ETA 9177 Report must be e-mailed to
the appropriate ETA regional office.
The ETA 9177 Report has been approved by the OMB in accordance with the Paperwork
Reduction Act of 1995. The OMB Control Number is 1205-0527 with an expiration date of
July 31, 2026.
5. Inquiries. Questions should be directed to the appropriate ETA Regional Office.
6. References.
• Section 303(a)(6), Social Security Act, 42 U.S.C. 503(a)(6);
• Section 911(a), Social Security Act, 42 U.S.C. 1111(a);
• 5 CFR 1320.5;
• UIPL No. 11-18, ETA 9177 Report - Pre-Implementation Planning Checklist Report for
State Unemployment Insurance (UI) Information Technology (IT) Modernization
Projects, issued on August 17, 2018,
https://www.dol.gov/agencies/eta/advisories/unemployment-insurance-program-letter-no-
11-18;
• UIPL No. 11-18 Change 1, Employment and Training Administration (ETA) 9177 Report
- Pre-Implementation Planning Checklist Report for State Unemployment Insurance (UI)
Information Technology (IT) Modernization Projects – Additional Updates to the ETA
9177 Report and Reporting Instructions, issued on July 16, 2020,
https://www.dol.gov/agencies/eta/advisories/unemployment-insurance-program-letter-no-
11-18-change-1; and
• Training and Employment Notice (TEN) No. 28-14, Pre-Implementation Planning
Checklist for State Unemployment Insurance (UI) Information Technology (IT)
Modernization Projects, issued on March 27, 2015,
https://www.dol.gov/agencies/eta/advisories/training-and-employment-notice-no-28-14.
7. Attachment(s).
Attachment I: Unemployment Insurance (UI) Information Technology (IT)
Modernization Pre-Implementation Planning Checklist Report Version 1
Attachment II: Unemployment Insurance (UI) Information Technology (IT)
Modernization Pre-Implementation Planning Checklist Report Instructions
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
ATTACHMENT I
Unemployment Insurance (UI) Information Technology (IT)
Modernization Pre-Implementation Planning Checklist
Report
Version 1
U.S. Department of Labor
Employment and Training Administration
Form ETA 9177
Attachment I-1
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
UI IT Modernization Pre-Implementation Planning Checklist Report
State Name: Date of Submission:
Project Name:
Scheduled Go Live Date:
Contact Information:
(Name, Title, Address, Phone Number. Email Address)
Summary of Project:
Attachment I-2
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
Unemployment Insurance (UI) Information Technology (IT) Modernization Pre-
Implementation Planning Checklist – Version 1
1. Functionality and Workarounds
Ensure all functionalities are fully available and operational (preferably with no high or
critical defects). If a functionality is not fully available, an interim workaround should be in
place, with a plan to quickly fix the defects, especially ones that are deemed high or critical.
Workarounds should be minimized, fully tested, and exercised with the staff for any system
functionality that is deferred or necessary to address known system issues.
1.1. All Benefit functions have been fully tested, including all service channels such as web,
mobile, telephone, etc., and are fully operational (unless work around(s) have been
planned for and tested), including, but not limited to:
1.1.1. Claims Filing:
For all supported programs: Regular UI, Unemployment Compensation for Federal
Employees, Unemployment Compensation for Ex-Servicemembers, Combined
Wage Claim, Disaster Unemployment Assistance, Trade Readjustment Allowances,
any extensions, etc.;
1.1.2. Monetary determinations and monetary re-determinations;
1.1.3. Non-monetary determinations:
Separation and non-separation issues, including automated holds, are flagged for
adjudication. The effects across Benefits Year Beginnings, especially involving
converted claims (claims migrated from the legacy to the new system) and Benefit
Charging; non-monetary scheduling of issues, as applicable, have been thoroughly
tested;
1.1.4. Continued Claims processing;
1.1.5. Benefit payment mechanisms; including (as applicable): direct deposit, debit card,
and checks;
1.1.6. Benefit Payment Control functions and other processes associated with prevention,
detection, and recovery of improper and fraudulent payments; and
1.1.7. Claimant account portals and/or maintenance (including password reset
functionality), as applicable;
1.2. All Tax functions have been fully tested (unless work around(s) have been planned for
and tested), including, but not limited to:
1.2.1. Employer Registration:
Attachment I-1
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
• Initial registration; and
• Updates to Employer Registration;
1.2.2. Employer liability determinations, including reimbursable employers and employer
status change;
1.2.3. Employer audit;
1.2.4. Tax rate computation;
1.2.5. Employer delinquency enforcement;
1.2.6. Employer tax and wage report and input processing;
1.2.7. Tax collections;
1.2.8. Tax refunds/overpayments;
1.2.9. New business registration; and
1.2.10. Quarterly tax filing/data entry;
1.3. All Appeals functions, such as automated filing of appeals, hearing notices/hearing
decision correspondence, etc., have been fully tested;
1.4. All Reporting functions have been fully tested (unless work around(s) planned for and
tested) including, but not limited to:
1.4.1. Federal reporting functions, including UI Required Reports, Benefits Accuracy
Measurement, and UI Data Validation; and
1.4.2. UI program management reporting functions, such as tracking of initial and
continued claims by age, management dashboard, and ad hoc and system logging
reports;
1.5. All Interfaces, external and internal, have been fully tested (unless work around(s) have
been planned for and tested) including, but not limited to:
1.5.1. Interfaces with call center operations (e.g., screen pop, Interactive Voice Response
(IVR)). Recovery procedures are established and proven in the event that an interface
is down/fails;
1.5.2. UI Interstate Connection (ICON) network interfaces, including Social Security
Administration cross-match;
1.5.3. Treasury Offset Program interface with the Internal Revenue Service;
Attachment I-2
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
1.5.4. Connectivity with the UI Integrity Center’s Integrity Data Hub;
1.5.5. National Directory of New Hires interface with Department of Health and Human
Services;
1.5.6. State Information Data Exchange System interface with Employers; and
1.5.7. Other external interfaces and extracts, such as those required to retrieve wage record
data and quarterly employment and wages statistics (Quarterly Census of
Employment and Wages (QCEW), Local Area Unemployment Statistics (LAUS),
and Longitudinal Employer-Household Dynamics) microdata, and automatic cross
matches for identity or other integrity purposes;
1.6. All Testing has been completed including, but not limited to:
1.6.1. System generated forms and correspondence have been fully tested, including any
configurability mechanisms and multiple language implementations;
1.6.2. All user roles have been tested, and users with appropriate permissions can easily
change staff role assignments directly in the application;
1.6.3. Printing processes have been fully tested including:
• Verification of printer tap test requirements have been met, including cartridge
nozzle performance and printer internal firmware functionality;
• Verification of a process in place to do manual intervention for letters and
payments; and
• Verification of mailing addresses and proper display of United States Postal
Service barcodes in window envelopes, multiple pages per envelope are possible,
and that printers can handle duplex printing (conservation of resources);
1.6.4. Imaging and scanning, as needed, have been fully tested.
• Sufficient storage capacity has been provisioned;
• All legacy system image files have been successfully migrated, as applicable ;
• Indexing has been tested and validated;
• Optical Character Recognition has been tested and validated as applicable; and
• Imaging system recovery from failure has been tested to ensure critical customer
services are not impacted;
1.6.5. Batch Processes, including execution timelines, have been fully tested as outlined
below:
Attachment I-3
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
• Batch processes have been executed for at least a week to ensure that all links are
pointing to the correct places, all jobs run as expected and produce expected
results;
• Batch processing should be completed within a designated amount of time;
• Batch processing remediation and recovery of failures have been tested and
validated;
• Weekly, monthly, quarterly, and annual batch process have been tested and
validated;
• If possible, a mock execution has been conducted by states for at least a week
with manufactured data to simulate three times the expected load in order to
ensure system readiness;
• Time travel/aging test data has been incorporated as part of system testing and
User Acceptance Testing (UAT);
• If the testing can be done in an enterprise test environment, production like
interaction between systems via interfaces and web services has been simulated
to provide insight into potential bottlenecks or issues before launch; and
• After testing, ensure that any environment configuration file(s) have been
updated for production;
1.6.6. Pilot the process during final testing for reporting system issues;
1.7. Workflows have been verified and adjusted by conducting thorough review of
system-generated issue flags/triggers to ensure they are necessary , and are not
creating false issues. This effort should include:
1.7.1. Monitoring workflow/work items in new system and ensure proper staff
coverage on all queues;
1.7.2. Ensuring the capability to either migrate work items or have a process to
identify unprocessed/semi processed work on the new system; and
1.7.3. Addressing and closing as many work items as possible, across all functions,
before “go-live”;
1.8. System issue handling processes have been established, practiced before “go-live”, and are
in operation in order to:
1.8.1. Ensure processes are in place to identify, track, and address system errors;
1.8.2. Develop procedures to document and communicate any system work-around
or resolution; and
1.8.3. Ensure system error messages are understandable (and have been fully tested before
“go-live”).
Attachment I-4
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
2. External Alternate Access Options and Usability Issues Addressed
2.1. Alternative Access Options are made available in compliance with ETA guidance,
including alternative access options for individuals with barriers to filing by phone or on-
line, such as those with Limited English Proficiency, disabilities, literacy issues (including
computer literacy), and computer access issues;
2.2. Websites and other forms of communications, like brochures and posters, are in place
which clearly identify alternative access points that effectively communicate to the
populations with barriers described in section 2.1;
2.3. All staff have been fully trained on how to assist individuals with access barriers on
using alternative filing options;
2.4. Staff and customer system access to new system has been defined, with outreach to all
customers regarding access changes prior to going live, including processes to migrate
existing credentials and/or establish new credentials;
2.5. New credentials are clearly described to the customer when attempting to first access
the new system. If security questions or knowledge base authentications are used for
self-services, industry best practices should be followed. If email accounts are used as
the UserID for self-services login, the state has provided mechanisms for customers to
easily create an email account if they do not have one; and
2.6. Ensure usability and access including:
2.6.1. Compliance with the Americans with Disabilities Act including meeting 508
compliance standards for hardware, software, websites, and documentation;
2.6.2. Website content has been translated for identified significant population language
groups within the state, including correspondence as applicable;
2.6.3. Relevant state standards and other standards such as Web Content Accessibility
Guidelines have been incorporated;
2.6.4. On-line content is clear, understandable, and at appropriate reading level
(preferably tested by appropriate customer population);
2.6.5. Websites provide information on alternative access for individuals with
barriers; and
2.6.6. IVR phraseology and messages are clear and understandable.
Attachment I-5
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
3. Policies and Procedures
Ensure policies and procedures have been developed, completed, and disseminated,
including:
3.1. Policy and procedural changes coinciding with UI system modernization;
3.2. Policies for data security, including those for handling privacy and confidential
data;
3.3. Policies for data retention and data disposal;
3.4. Staff has been fully trained on new policies and procedures;
3.5. Any updates to organizational structure have been coordinated with human resources
department and disseminated agency-wide;
3.6. Any new or modified roles have been clearly defined, and staff have been appropriately
trained; and
3.7. Disaster Recovery (DR) plan is in place and the Recovery Time Objective and Recovery
Point Objective have been established and disseminated.
Attachment I-6
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
4. Technical Preparation for System Implementation
Ensure the technical preparation for system implementation is completed prior to “go-live”,
including
4.1. Data architectures/data structures have been addressed and documented. Internal and
external data users have been consulted in the development of new data structures;
4.2. Data conversion is complete and successful, including:
4.2.1. State policies and procedures have been followed to inform migration strategy of
data to the new system and backlogs are addressed prior to initiating data migration
process;
4.2.2. Data model diagram (entity relationship model) of the legacy system and the new
system have been completed;
4.2.3. System design document(s), technical design document(s) and related artifacts have
been completed and reviewed for completeness;
4.2.4. New system results checked and reconciled against legacy system results;
4.2.5. Spot checks have been completed for particular areas of interest (such as:
overpayments, certifications, employer charging, ICON Billing (IB6), and
accounting balances);
4.2.6. System blackout period has been benchmarked, if appropriate, with notification and
messaging to customers in advance;
4.2.7. Multiple successful data conversions, including record count verifications, and
Extract, Transform, Load final load benchmarking have been completed and, process
lockdown is in place before going live; and
4.2.8. Financial reporting has been thoroughly tested and validated, as Trust Fund/Financial
staff interactions are critical;
4.3. Independent Verification and Validation has been conducted, as needed;
4.4. Bridging processes/protocols between applications/systems are in place as needed (for
example, new benefits system integrated with legacy tax system or the inverse);
4.5. User roles have been well-defined, configured, and set-up in the system. The use of
excessive amount of roles in the system should be avoided in order to ensure a
coordinated workflow process;
4.6. Comprehensive UAT has been performed including:
Attachment I-7
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
4.6.1. UAT has been conducted with positive results and conducted again following
any additional system changes;
4.6.2. System defects were systematically tracked and remedied;
4.6.3. Defect tracking and remediation processes are in place post “go-live” (in
conjunction with development vendor), along with applicable service level
agreements (SLAs) for response times and fix turnaround times;
4.6.4. System help has been verified (e.g., page level, field level); and
4.6.5. Logging and exception handling have been verified, including any tool used for
mining application logs;
4.7. Capacity has been developed to rapidly identify system flaws and make immediate fixes.
Hot fix procedures are established, exercised, and validated;
4.8. Contingency/Back-up plan is in place if new system fails – particularly if no overlap of
legacy and new system at go live point;
4.9. If a DR site is in place and available, testing and validation of the DR site has been
conducted;
4.10. Incoming phone capacity (lines and staff) have been adjusted for anticipated increases in
call volume, including:
4.10.1. Call Centers, as applicable; and
4.10.2. Any other Agency unit staff that will conduct triage of system issues with customers;
4.11. “Go-live” decision points (show stoppers) have been outlined and continue to be followed;
4.12. System performance has been checked under peak user loads, including complex
transactions, prior to “go-live”;
4.13. System availability testing has been conducted, including:
4.13.1. Demonstrated system availability under heavy loads for sustained period of
times; and
4.13.2. Monitoring of computing resource consumption (processors, memory,
input/output, etc.);
4.14. System operations reporting is available, including management dashboard, ad hoc
reports, and system logging and audit trails, as needed ;
4.15. Production configuration is defined and in place;
Attachment I-8
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
4.16. Automated production build /testing/production environment promotion process is in
place for post-deploy defect fixes and enhancements;
4.17. System security has been tested and validated, including:
4.17.1. Verification and validation of Data and System security;
4.17.2. Verification of other internal system controls in order to ensure security and
confidentiality of data; and
4.17.3. Security Penetration and/or Performance Testing has been conducted;
4.18. Business knowledge has been successfully transferred to appropriate agency/staff to
operate the system, including role management, configuration settings and
management, dashboards, and reporting;
4.19. End user support, problem reporting, and resolution protocols are in place;
4.20. IT knowledge transfer has been completed in order for agency to maintain and support
the system. System performance benchmarks documented during build (and start
early) have been used by IT staff to complete configuration/programming changes to
support performance and system expectations (not just “help” vendor); and
4.21. Transition planning and execution concerning post-warranty or maintenance phase has
been validated with vendor.
Attachment I-9
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
5. Call Center /Customer Service Operations
Ensure Call Center /Customer Service Operations strategies are in place including:
5.1. Call center standard operational procedures adapted, as appropriate ;
5.2. Call center staff and/or customer service representatives (CSRs) have been fully trained,
including:
5.2.1. CSRs/agents have participated in system UAT;
5.2.2. CSRs/agents, supervisors, and managers have been trained in the use of the new
system;
5.2.3. Staff have been cross trained for use/augmentation, particularly to manage inquiries;
5.2.4. Project staff have been assigned/embedded into the customer service operations for
at least the first few weeks in order to help the team transition to the new system
support procedure; and
5.2.5. Call center staff have been included in the triage calls for the first few weeks after
going live;
5.3. Modernization system and operations help desk information have been provided to
all front-line CSR staff;
5.4. Front-line and management staff know triage process when system issues arise, and
issue escalation processes have been clearly defined and understood by staff ; and
5.5. Team meetings are scheduled daily and, as needed, to address:
5.5.1. New system issues;
5.5.2. Customer complaints; and
5.5.3. New operational or procedural issues.
Attachment I-10
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
6. Business Process
Ensure new business processes have been established, staffed, and that staff have been fully
trained on any/all new system operations
6.1. Business processes and standard operating procedures have been developed and made
available to all staff to enable them to understand how the new system has changed their
work processes;
6.2. Roles/responsibilities have been fully defined prior to “go-live”;
6.3. Staff have been trained on new business processes and roles and responsibilities;
6.4. Training materials and tools to support new business processes (desk guides, handbooks,
etc.) have been fully developed and provided to management and staff. A final training
session, where “practice on production” work happens to uncover potential skill gaps
(and also possible conversion issues) has been conducted;
6.5. Service delivery strategies have been clearly identified, made known to staff, and fully
communicated to customers;
6.6. Management and staff have been fully trained on new system features and operations,
broadly as well as in relation to their specific job responsibilities including:
6.6.1. Training that covers refresher information on program knowledge;
6.6.2. Training or refresher training has been scheduled as close to “go-live” as possible;
and
6.6.3. Recognition that people learn at a different pace — if the training material is online
or interactive, ensure the resources are made available to staff for self-learning after
formal classes are complete;
6.7. Additional staffing needs have been identified/secured to address new system
implementation including:
6.7.1. Call center(s) (calls can dramatically increase during a conversion);
6.7.2. Adjudication staff (modernized systems tend to contain more automated flags
that raise issues requiring adjudication);
6.7.3. Appeals staff (the number of appeals may increase following a conversion as a result
of newly automated processes which may impact claimants’ benefits or employers’
liability);
6.7.4. Other support functions such as integrity-related activities; and
Attachment I-11
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
6.7.5. Advance identification and clarification of roles for the members of the
triage team (e.g., Frontline and Management staff, Help Desk staff, Call
Center staff, Vendor, Labor Market Information (LMI) staff, etc.).
Attachment I-12
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
7. Help Desk
Ensure Staff and Help Desk Support is available, including:
7.1. Key staff have been put on alert and made available during critical times of conversion
and deployment;
7.2. Procedures have been established for escalation processes, triage processes for
addressing system technical/functional issues, communication channels, and
coordination with Call Centers, as applicable;
7.3. Dry-runs of procedures with Help Desk staff have been conducted, including:
7.3.1. Project staff have been embedded into the help desk team to help the team transition
to support the new application and answer questions, etc.; and
7.3.2. Help desk staff is included in the triage calls;
7.4. Help Desk is adequately staffed with modernization testers, including:
7.4.1. Subject Matter Experts, Business Analysts, and Project Team members;
7.4.2. Subject Matter Experts have been assigned for every 10-15 people in the
State Agency in order to assist with questions and training; and
7.4.3. Laptops have been distributed to modernization testers (Subject Matter
Experts) to report any findings;
7.5. Contact information has been published and disseminated to appropriate personnel,
including LMI staff;
7.6. Procedures to categorize and track system issues based on help requests are in place
(e.g., credential/access issue, performance, questions needing clarification, etc.); and
7.7. Ensure Help Desk is available to support staff.
Attachment I-13
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
8. Management Oversight
Ensure management oversight is delivered, including:
8.1. Managers have been fully trained on management features and reporting processes in the
system, including those for LMI and Bureau of Labor Statistics (BLS) to ensure that state
unemployment and employment statistics can continue to be provided to the state;
8.2. Managers have been prepared to support staff if system issues arise;
8.3. Additional management meetings are scheduled during transition to identify and resolve
issues; and
8.4. A support group for managers has been established to share information and relearn how
to do their job functions using the new system.
Attachment I-14
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
9. Vendor Support/Communications
Ensure vendor support and communications has been established, including:
9.1. Process for addressing post implementation system fixes with vendor is in place prior
to implementation;
9.2. Process for tracking system and post-implementation system issues is in place;
9.3. Routine, daily meetings with the vendor during transition has been scheduled to
identify and prioritize system issues for as long as needed ;
9.4. Process is in place to track the implementation of deferred functionalities;
9.5. The “hand-off” process for identified incidents/issues/changes/bugs to the vendor is clear
and is understood by all parties;
9.6. Systems are in place to track the post-implementation support criteria and SLAs
defined in the contract; and
9.7. The triage process has active vendor engagement.
Attachment I-15
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
10. Communication Processes and Procedures
Ensure communications processes and procedures have been established, including:
10.1. Staff Communications including:
10.1.1. Both UI and non-UI staff (e.g. LMI staff) have been included in the communications
throughout the project;
10.1.2. Staff have been fully briefed on implementation plan (in addition to being fully
trained); and
10.1.3. Staff have been provided with clear instructions on how to handle system issues if
they arise;
10.2. Claimant and Employer Communications including:
10.2.1. Employer and Claimant outreach regarding roll-out of new system;
10.2.2. System “go-live” date disseminated;
10.2.3. System black-out period, if needed, and methods of conducting business during this
phase has been clearly communicated to staff and customers;
10.2.4. Agency contact information has been widely disseminated;
10.2.5. System “how-to information” has been provided to staff and customers; and
10.2.6. Processes have been made available to support communication with individuals
with limited English proficiency and staff are trained on these processes;
10.3. Public Communications have been issued prior to “go-live” point, as well as periodically
during startup including:
10.3.1. State stakeholders have been notified in advance (i.e. Governor’s office, Legislative
Services, and partner agencies);
10.3.2. System “go-live” date has been disseminated;
10.3.3. System black-out period, if needed, has been communicated;
10.3.4. A plan has been established to address potential issues/ad-hoc inquiries at the time of
launch; and
10.3.5. A plan has been put in place to handle the press/media for a successful launch as
well as for any unforeseen issues causing the launch to not go as planned.
Attachment I-16
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
11. Labor Market Information (LMI) Federal Reporting
Ensure LMI federal reporting functions have followed nationally standardized specifications
(available at https://www.bls.gov/cew/additional-resources/unemployment-insurance-
modernization/home.htm), tested, validated within project timelines, and are fully
operational, including:
11.1. LMI Notification:
11.1.1. LMI has received advance notification of planning timetable for benefits and tax
portions of the system implementation milestones; and
11.1.2. LMI has been notified of “go-live” dates for benefits and tax systems;
11.2. LMI Participation:
11.2.1. Discussions have occurred with LMI regarding any planned changes to UI
numbering schemes, data sources or computations;
11.2.2. Collaboration has occurred with LMI on data uses and definitions to help with the
development specifications:
• Data dictionary mapping of the fields in the legacy UI system to the fields in the
new system has been shared and discussed with LMI; and
• Consultation with LMI on the definitions of employment and wages used in the
new system;
11.2.3. Any changes to the reporting responsibilities of employers’ have been developed in
consultation with LMI and the outreach plan to employers has been shared with
LMI;
11.2.4. Periodic demonstrations of the parts of the system relevant to LMI have occurred, as
the new UI system progresses toward deployment with an opportunity for LMI staff
to provide feedback on screens as they are developed and prior to “go -live”;
11.2.5. Testing schedule has been discussed and agreed upon with LMI staff;
• LMI staff has been allowed to parallel test the new UI systems as it progresses
toward deployment and an opportunity to provide feedback on any identified
issue; and
• Issues identified by LMI during testing have been resolved prior to “go -live”;
11.2.6. LMI has been granted the same level of access to the screens, forms etc. in the new
system as they had in the legacy system;
11.3. Data Exchange:
Attachment I-17
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
11.3.2. Extracts have been tested by LMI staff in order to ensure that it meets LMI
requirements;
11.4. Data Validation:
11.4.1. Ensure LMI has completed data validation to produce LAUS and QCEW; and
11.4.2. Ensure completion of LMI testing and validation of benefit claims data.
Attachment I-18
U.S. Department of Labor OMB Control No. 1205-0527
Employment and Training Administration Expiration Date: 07/31/2026
Form ETA 9177
Certification
Certifying Official:
(Name, Title)
Signature:
Telephone Number: Date:
Email Address:
Attachment I-19
DOL EMPLOYMENT AND TRAINING ADMINISTRATION
OMB Control Number: 1205-0527
Expiration Date: 06/30/2026
ATTACHMENT II
Unemployment Insurance (UI) Information Technology (IT)
Modernization Pre-Implementation Planning Checklist Report
Instructions
Employment and Training Administration
United States Department of Labor
This reporting requirement is approved under the Paperwork Reduction Act of 1995, OMB Control No. 1205-0527, expiring
07/31/2026. Persons are not required to respond to this collection of information unless it displays a currently valid OMB
number. State Workforce Agency reporting burden for this collection of information is estimated to average 20 hours for
planning, and 160 hours for reporting. This includes time for reviewing instructions, searching existing data sources, and
gathering and reviewing the collection of information. This collection of information is for general program oversight,
evaluation, and performance assessment. Responses are required to obtain or retain a Federal benefit. Send comments regarding
this burden estimate or any other aspect of this collection, including suggestions for reducing this burden, to the U. S. Dep artment
of Labor, Employment and Training Administration, Office of Unemployment Insurance, 200 Constitution Avenue, NW, Room
S-4524, Washington, D.C. 20210.
Attachment II-1
DOL EMPLOYMENT AND TRAINING ADMINISTRATION
I. GENERAL INSTRUCTIONS
The unemployment insurance (UI) information technology (IT) Modernization Pre-
implementation Checklist Report is collected to assist state UI agencies in preparing to
launch a modernized UI IT system, which supports administration of UI Benefits and/or UI
Tax operations. Because the launch of an UI IT system is critical to a state’s ability to
administer its UI program, the U.S. Department of Labor’s Employment and Training
Administration (ETA) requires any state that is preparing to launch a new UI IT system to
certify that it has reviewed and accomplished or has developed an appropriate plan
addressing the items detailed in the Pre-Implementation checklist. ETA will use the
checklist to identify any technical assistance needs of the state UI agency prior to an
implementation of a new UI IT system.
The ETA 9177 Report is required when a state is modernizing a major component of a UI
IT system or systems. A major component can be a full benefits or tax system, or it can be
a significant component subset, such as continued claims certification or adjudication.
Modernization can be of a single or multiple UI systems (e.g., Benefits, Tax, Appeals, etc.).
States may decide to do all systems at one time or use an iterative or modular approach to
modernize. Any state that is preparing to launch a modernized system must certify that it
has reviewed and accomplished, or has developed an appropriate plan addressing, the items
detailed in the ETA 9177 Report. If a section of the report is not applicable to the
modernization project, the state must indicate that the section is not applicable. If a section
is left blank, then it is deemed missing during ETA’s review, and the report will be
regarded as incomplete. ETA will provide comments back to the state, and will request the
state to revise and resubmit the report.
An ETA 9177 Report submission is not necessary when a state is upgrading sub-
components of a system, such as enhancing the front-end interface for claims intake. Other
instances where a state is not required to submit an ETA 9177 Report include ongoing
maintenance activities: database upgrade, IT server upgrades, replacing any obsolete
hardware/software, etc.
II. DUE DATES
The UI IT Modernization Pre-Implementation Planning Checklist Report must be
completed and submitted to ETA approximately 180 days (6 months) prior to the state’s
projected implementation date. Please note that testing and training activities may continue
after the submission of the report.
III. SUBMISSION PROCEDURES
The UI IT Modernization Pre-implementation Planning Checklist Report and any
supporting documentation must be submitted by email to the appropriate ETA Regional
Office. The ETA Regional and National Office will work collaboratively in reviewing the
Report and supporting documents. Any clarifications or follow-up will be conducted via
Attachment II-2
DOL EMPLOYMENT AND TRAINING ADMINISTRATION
email and conference calls within 30 days upon receipt of the Report. Any modifications
to the original Report must be submitted by a state through the ETA Regional Office.
Attachment II-3
DOL EMPLOYMENT AND TRAINING ADMINISTRATION
Instructions for Completing the
UI IT Modernization Pre-Implementation Planning Checklist Report
In general, the document contains the following four (4) parts:
1. Cover Page
2. State General Information
3. UI IT Modernization Project Categories
4. Certification
Sections No. 2 (“State General Information”) and No. 3 (“UI IT Modernization Project
Categories”) require fillable content. The instructions below, address how the state is to
complete the report.
State General Information
The State General Information section consists of the following five (5) sub-elements in a
table format.
1. State Name:
Enter the name of the State Workforce Agency (SWA) who is providing the
information (e.g., State of Mississippi).
2. Date of Submission:
Enter the date when the completed report is submitted. Date format must follow
mm/dd/yyyy format (e.g., 06/13/2015).
3. Project Name:
Enter the proper name of the UI IT modernization project (e.g., The ReEmploy USA
Consortium).
4. Contact Information:
Provide the contact information (i.e., Name, Title, Address, Phone Number, Email
Address.) for the person who will serve as the primary point of contact for any
questions or follow up that ETA may have regarding the report. This may be a
different person than the state certifying official. It may be the state official who is
the project lead responsible for the day-to-day operation and implementation of the
UI IT Modernization project.
5. Summary of Project
Provide an executive summary of the UI IT Modernization project. This information
will include the project title and purpose, the project timeline and key milestones, and
a narrative description of the project implementation status.
Attachment II-4
DOL EMPLOYMENT AND TRAINING ADMINISTRATION
UI IT Modernization Project Categories
This comprehensive checklist denotes critical functional areas that a SWA should verify prior
to launching a modernized UI system. This includes, but is not limited to, technical IT
functions and UI business processes that interface with the new system. The list of critical
areas identified in the checklist comprises of the following eleven (11) distinct project
categories with associated sub-elements including:
1. Functionality and Workarounds
2. External Alternate Access Options and Usability Issues Addressed
3. Policies and Procedures
4. Technical Preparation for System Implementation
5. Call Center /Customer Service Operations
6. Business Process
7. Help Desk
8. Management Oversight
9. Vendor Support/Communications
10. Communication Processes and Procedures
11. Labor Market Information (LMI) Federal Reporting
For every sub-element in the ETA 9177, the SWA is to provide supporting content to
demonstrate that the SWA has addressed the specific sub-element. For each sub-element,
ETA expects the SWA to address the issue including, but not limited to, the following:
• An overall status report;
• A brief report explaining the status of the project as it relates to the particular sub -
element;
• Explanations of any workaround solutions of the processes in the sub-element;
• Explanations if implementation of the new system concerning processes for the sub -
element will be delayed or deferred;
• Explanations for added clarity and/or to support a narrative;
• Mitigation proposals for addressing any problems;
• New project timelines if applicable; and/or
• Any discussion of identified technical assistance needs for the successful completion
of the project.
Attachment II-5
DOL EMPLOYMENT AND TRAINING ADMINISTRATION
Certification
The Certification section consists of the following five (5) sub-elements in a table format.
1. Certifying Official:
Provide the name and title of the state official who is certifying the submission of the
report to ETA.
2. Signature:
Provide the signature of the state official who is certifying the submission of the
report to ETA.
3. Telephone Number:
Provide the area code and telephone number of the state official who is certifying the
submission of the report to ETA. The number should be in the following format:
(###) ### - ####
4. Date:
Provide the date when the certifying official signed the Report. Date format must
follow mm/dd/yyyy format (e.g., 06/13/2019).
5. Email Address:
Provide the email address of the state official who is certifying the submission of the
report to ETA.
Attachment II-6
What does federal law require in your situation?
Ezel checks current federal labor law against your facts and answers with citations.
Opens in Ezel Pro.
- Checks the law as it stands today, not only this page
- Cites every source it relies on, so you can verify it
- Chat, drafting and research in one workspace