Back to Federal guidance
YouthBuild match and construction cost guidance
Summary ETA clarified when YouthBuild grantees can charge construction materials and related costs to grants or count them toward their required match. It explains the 25-percent matching requirement and conditions for construction and other capital-asset costs. The attachment gives examples of allowable and unallowable costs.
Document
Federal guidance
Agency
U.S. Department of Labor, Employment and Training Administration (ETA)
Document number
TEGL No. 5-10, Change 1
Date issued
July 16, 2018
Status
Active
ETA lists this change Active as of 2026-10-24; its PDF prints Rescissions: None and Expiration Date: Continuing.
Status last verified October 24, 2026
Apply this to your situation
This page explains the general guidance. Ask about your specific situation and see what current federal labor law says, with citations.
About this page: The full text below is the official document from U.S. Department of Labor, Employment and Training Administration (ETA). Ezel adds the plain-English summary and tracks the document's status. The official source linked on this page is authoritative for any reliance.
CLASSIFICATION
EMPLOYMENT AND TRAINING ADMINISTRATION Allowable Costs
ADVISORY SYSTEM CORRESPONDENCE SYMBOL
U.S. DEPARTMENT OF LABOR OFAM/TMG
Washington, D.C. 20210 DATE
July 16, 2018
ADVISORY: TRAINING AND EMPLOYMENT GUIDANCE LETTER NO. 5-10,
Change 1
TO: STATE WORKFORCE AGENCIES
STATE WORKFORCE LIAISONS
STATE WORKFORCE ADMINISTRATORS
STATE AND LOCAL WORKFORCE DEVELOPMENT BOARDS
ALL YOUTHBUILD GRANTEES
FROM: ROSEMARY LAHASKY /s/
Deputy Assistant Secretary
SUBJECT: Updated Guidance on Match and Allowable Construction and Other
Capital Asset Costs for the YouthBuild Program
1. Purpose. To provide further clarification on match requirements and allowable
construction costs under the YouthBuild Program.
2. References.
Workforce Innovation and Opportunity Act (WIOA), Pub. L. 113-128
(https://www.gpo.gov/fdsys/pkg/PLAW-113publ128/pdf/PLAW-113publ128.pdf);
WIOA regulations at 20 CFR 688.530 and 20 CFR 688.550
(https://www.gpo.gov/fdsys/pkg/FR-2016-08-19/pdf/2016-15975.pdf); and
2 CFR 200 and 2 CFR 2900, Uniform Administrative Requirements Cost Principles,
and Audit Requirements for Federal Awards (https://www.gpo.gov/fdsys/granule/CFR-
2014-title2-vol1/CFR-2014-title2-vol1-part200/content-detail.html and
https://www.gpo.gov/fdsys/granule/CFR-2016-title2-vol1/CFR-2016-title2-vol1-
part2900)
3. Background. An objective of the YouthBuild program is to expand the supply of
permanent affordable housing for homeless individuals and low-income families while
providing youth with training in the construction and rehabilitation of residential,
community, or public facilities. Although construction costs are not normally permitted
in Employment and Training Administration (ETA)-funded grants, and are specifically
prohibited in the WIOA regulations at 20 CFR 683.235, the nature of the YouthBuild
programs requires that certain construction costs essential to the mission of the program
be allowable. Therefore, this TEGL provides the conditions under which these types of
costs will be allowable.
Furthermore, YouthBuild grants are required to provide cash or in-kind resources equivalent
to 25 percent of the grant award amount as matching funds. Funds are considered matching
RESCISSIONS EXPIRATION DATE
None Continuing
funds only if the non-grant matching funds are used to pay for activities allowable under the
grant. YouthBuild grantees have asked questions on what constitutes an allowable match,
and the allowable construction costs that can be charged to the grant and counted as
allowable match. This guidance provides clarification on these questions. Note that the
allowable construction costs under the grant are those costs that also can qualify as
allowable match costs, though the same cost cannot be attributed to both the grant funding
and match.
4. Allowable Construction Costs for YouthBuild Activities. Construction costs are
generally not allowable costs to ETA-funded grants because these types of costs are
defined as capital expenditures, as they contribute to the increased value or useful life of
a capital asset. However, because the YouthBuild program is designed to provide
training to eligible participants in the construction or rehabilitation of affordable housing
for homeless individuals and low-income families, the costs of construction-related
materials and supplies are necessary to fulfill the goals of approved YouthBuild projects.
The necessity of these costs to the program makes them allowable. Therefore, the
purchase of construction supplies and materials used as part of the direct training for
YouthBuild participants that are directly related to the construction or rehabilitation of
residential, community, or other public facilities are allowable costs.
Examples of allowable construction costs are the tools used to construct or rehabilitate
residential, community, or other public facilities, such as hammers, safety gear, and
protective clothing; the machinery used to construct or rehabilitate property, loaders, lift
trucks, tractors, and mixers; and the materials needed to construct or rehabilitate property
such as lumber, dry wall, and like items.
Some of the costs associated with securing the location, land, and property are allowable
costs to the grant while others are not. The purchase cost of buildings used solely for training
purposes is allowable. For buildings used for training and other purposes, the allowable
amount is determined based on the proportionate share of the purchase cost related to direct
training. However, acquisition, inspection, title, and broker fees are not allowable costs.
Architectural fees, or a proportionate share thereof, are allowable when such fees can be
related to items such as architectural plans or blueprints on which participants will be trained.
When making the distinction between allowable and unallowable costs, grantees need to
consider whether the activity and associated costs are directly related to participant training.
If the incurred costs are not directly related to participant training, then they are not allowable
costs to the grant.
As prescribed in Department of Labor exceptions at 2 CFR 2900.8, match is reported in the
grant recipient’s accounting system when expended. This includes in-kind contributions that
must be spent or used for training of a participant or for a YouthBuild activity before it can
be accounted for as match. For example, property enhancements such as landscaping are
not allowable costs to the grant unless performed by participants as part of a training
activity. Similarly, the costs associated with plumbing and electrical work are unallowable
unless participant training is taking place on those specific activities. Another example
would be termite inspection services. Although termite inspection services may be a
non-construction cost that is incurred when constructing or rehabilitating a house for sale, it
is not directly related to participant training and is an unallowable cost of the YouthBuild
grant program.
The attachment to this TEGL identifies a list of selected cost items that are allowable,
unallowable, or allowable with conditions as they relate to the YouthBuild program
construction activities. Please note that the conditions under which some costs are allowable
may include getting Grant Officer approval prior to incurring the costs.
5. Allowable Matching Funds under the YouthBuild Program. Under 2 CFR 200.306,
matching requirements may be met by costs incurred by the direct grant recipient,
subrecipient, or cost-type contractor that could have been paid with grant funds, but were
instead paid with non-grant resources. Federal funds may not be used to meet a match
requirement unless specifically authorized by the statute. A number of questions have
been raised as to whether or not certain costs not chargeable to the grant, but incurred as
a result of activities used for training participants, could be used to fulfill the 25 percent
match requirement.
Costs that are not allowable charges to the grant cannot be used to fulfill a match
requirement. Like Federal costs, match must meet all seven factors for allowable grant costs
under 2 CFR 200.403(a-g). For example, grant funds cannot be used to purchase land. As
described in Section 4 above, a portion of grant funds may be used to purchase a building to
be renovated through training, but only the portion of the building directly related to training.
Therefore, under the requirement that only allowable costs may be used as matching funds,
the cost of the land on which the home resides cannot be used to qualify towards meeting the
match requirement. Other related costs that may be essential to the acquisition of a property
used for training purposes but that are not chargeable to the grant, and therefore cannot be
used as match, are appraisal fees, inspection fees, and other acquisition fees.
Examples of allowable match for the YouthBuild program are the cost of construction
supplies and materials used in the approved training activities. The costs of such materials
for approved YouthBuild projects are allowable and therefore, may fulfill the match
requirement if paid with non-Federal funds.
Other examples of allowable match for the YouthBuild program are salaries of construction
site managers paid with non-grant funds; construction tools, materials, equipment, and
supplies purchased with non-grant funds used by participants for training activities;
supportive services paid with non-grant funds to enable participation in the program; and
other allowable activities that contribute to the direct training of eligible participants
enrolled in the YouthBuild program. As discussed above, to be allowable as part of match, a
cost must be an allowable charge for Federal grant funds. If the cost is not allowable with
grant funds, it is also not acceptable in fulfilling the 25 percent match requirement.
Matching funds must be expended during the grant period of performance and must be
reported quarterly, when the costs are incurred, on the ETA 9130 financial form.
6. Match - Use of ETA Funds and Other Federal Funds. For ETA programs, 2 CFR
200.306(b) states that for all Federal awards, all matching funds must be accepted as part
of the award recipient’s matching funds when the funds meet all of the criteria listed at 2
CFR 200.306(b)(1-7). The criterion at (b)(5) states that matching funds cannot be funds
paid by the Federal government under another Federal award, except for where the
Federal statute authorizing the program “specifically provides” that the program’s funds
can be applied to matching requirements of other Federal programs. WIOA,
YouthBuild’s authorizing statute, does not provide for YouthBuild funds to be applied to
matching requirements of other Federal programs. For these programs which are not
administered through ETA, it is the responsibility of the grant recipient to consult with
that Federal agency and obtain the necessary documentation to support the recipient’s use
of funds towards meeting a match requirement for the YouthBuild program. ETA is
unable to provide guidance or technical assistance on other Federal agencies’ programs or
the use of their funds.
YouthBuild grantees may also have Corporation for National and Community Service (CNCS)
AmeriCorps grants. AmeriCorps grants have a match requirement. Even though CNCS’
authorizing statute states that CNCS programs may provide for their match “through . . . other
Federal sources,” ETA’s YouthBuild grantees cannot use ETA grant funds as match for the
CNCS matching requirements. This is because 2 CFR 200.306(b)(5) only allows for Federal
funds to be used as match where the “Federal statute authorizing a program specifically
provides that Federal funds made available for such program can be applied to matching or
cost sharing requirements of other Federal programs.” Because YouthBuild’s Federal statute
does not make such a provision for YouthBuild funds, the exception to the rule against using
Federal program funds as match for another Federal program provided in 2 CFR 200.306(b)(5)
does not apply. Please refer to the YouthBuild program’s statute, regulations, and grant
agreement for further information.
7. Action Requested. All ETA YouthBuild grantees should distribute this information to
all appropriate staff.
8. Inquiries. Questions regarding this guidance should be directed to the appropriate ETA
regional office.
9. Attachments. YouthBuild Selected Cost Items
Attachment (official PDF: https://www.dol.gov/sites/dolgov/files/ETA/advisories/TEGL/2018/TEGL_5-10_Change_1_Attachment_Acc.pdf)
Attachment
YouthBuild Selected Cost Items
NOTE: The selected cost items listed below are related to the construction component of the
YouthBuild program and not necessarily reflective of costs incurred to operate the grant.
These costs are strictly for the purpose of implementing an authorized YouthBuild program.
A: Allowable
Citation
Item U: Unallowable
AC: Allowable with
Conditions*
20 CFR
Real Property
Acquisition of authorized buildings AC 688.550(b)
Acquisition of land U 688.550(e)(1)
Construction of authorized buildings A 688.550(a)(2)
Construction/rehabilitation of community/other public facilities (up
to 15% of total grant award) A 688.550(a)(3)
Rehabilitation of existing authorized structures A 688.550(a)(1)
Relocation of buildings AC 688.550(c)(4)
Pre-Purchase Phase
Acquisition fees U 688.550
Brokerage fees U 688.550(e)(2)
Home appraisal U 688.550
Home inspection U 688.550
Termite inspection U 688.550
Title fee U 688.550
Pre-Construction/Construction/Rehab Phase
Architectural fees AC 688.550(d)
Building permits U 688.550
Construction company services (provide the heavy equipment
(crawler loaders, bobcats, dozers, mixers, operators, etc.) A 688.550(c)(3)
Equipment rental costs AC 688.550
Property insurance (not homeowners Insurance) AC 688.550
Supervisors and training (up to 15% of the total grant award) A 688.520(b)
Work on grantee-owned facility/property U 688.550
Construction/Rehab Training Phase (TEGL 05-10)
Appliances U 688.550
Brick/cement A 688.550(c)(1)
Clearance and demolition A 688.550(c)(5)
Doors A 688.550(c)(1)
Door locks AC 688.550(c)(1)
Drywall A 688.550(c)(1)
Electrical supplies (fuse box, wiring, outlets/covers, etc.) A 688.550(c)(1)
Flooring materials AC 688.550(c)(1)
Furnace A 688.550(c)(1)
Stationary (not portable) AC unit A 688.550(c)(1)
Heat pump AC 688.550(c)(1)
Hot water tanks A 688.550(c)(1)
Insulation materials A 688.550(c)(1)
Kitchen and bath cabinets AC 688.550(c)(1)
Landscaping AC 688.550(c)(1)
Lighting fixtures AC 688.550(c)(1)
Lumber A 688.550(c)(1)
Nails A 688.550(c)(1)
Paint AC 688.550(c)(1)
Plumbing supplies (tubs, sinks, commodes, faucets, etc.) AC 688.550(c)(1)
Plumbing pipes A 688.550(c)(1)
Safety gear A 688.550(c)(1)
Roofing materials A 688.550(c)(1)
Tools (hammers, screw drivers, etc.) A 688.550(c)(1)
Windows A 688.550(c)(1)
Property Disposition Phase
House advertising costs AC 688.550
Legal fees associated with acquisition and disposition U 688.550
Real estate fees U 688.550
* Costs marked as “A” are allowable, provided they are part of the YouthBuild training
activities, while costs marked as “AC” may be allowable with Grant Officer approval, and
those marked as “U” are always unallowable.
What does federal law require in your situation?
Ezel checks current federal labor law against your facts and answers with citations.
Opens in Ezel Pro.
- Checks the law as it stands today, not only this page
- Cites every source it relies on, so you can verify it
- Chat, drafting and research in one workspace