Excel Modular Scaffold & Leasing Company dba Excel Scaffold & Leasing
Skiff violation affirmed, anchorage item vacated
Excel employees erected hanging scaffolds a few inches above Galveston Bay, and one employee drowned after a scaffold component collapsed and pulled him underwater. The company stipulated that it lacked an immediately available lifesaving skiff, and the judge held that the violation was serious…
Midwest Steel, Inc.
Scaffold items affirmed after fatal fall
A Midwest Steel ironworker fell 33 feet from a temporary platform while welding steel columns at a hospital construction project and died. The judge vacated allegations concerning the worker’s synthetic lanyard because OSHA did not prove the cited heat-related hazard under the general duty clause…
Elite Builders, Inc.
Fall and forklift violations partly affirmed
Elite Builders was a residential roofing contractor inspected at two Nebraska worksites where employees worked on elevated roofs without conventional fall protection. At the second site, employees were lifted on an oversized, unguarded personnel platform attached to a rough-terrain forklift…
Mast Climber Manufacturing, Inc., d/b/a American Mast Climbers
Scaffold items split, design violation willful
Mast Climber Manufacturing erected and serviced a mast-climbing work platform on a 21-story construction project. Four contractor employees fell when one side of the platform collapsed, and three died. The judge held that the system was a scaffold, not an aerial lift, because it was not…
International Masonry, Inc.
Scaffold citations produced a mixed result and $4,000 penalty
Three International Masonry employees fell about 37 feet when a scaffold platform supported by a modified corner bracket collapsed. One employee died and another was seriously injured. The Secretary withdrew four items, and the judge vacated allegations involving a damaged bracket, ladder…
Malu Construction Co., and its successors
Jury-rigged scaffold items affirmed for $8,000
Malu called its framing workers independent subcontractors, but it supplied their scaffold and safety equipment, assigned their work, provided training, and retained authority to stop work. Judge Stanley M. Schwartz therefore treated them as Malu employees under the common-law control test. OSHA…
Texas A.C.A., Inc., and its successors
Scaffold citations vacated for foreman misconduct
Texas A.C.A. employees performed stucco work from an incomplete scaffold with missing bracing, incomplete planking, unstable supports, unsafe access, and inadequate fall protection. The foreman knew the crew was assigned to roof work and that the scaffold was unfinished, but moved them onto it…
Connelly Construction Corp.
Scaffold guardrail violation affirmed as willful
Connelly performed masonry work from multi-level scaffolding at a shopping mall construction site. The judge found serious violations for employees without hard hats, inadequate scaffold access, missing overhead screening above a building entrance, and unguarded stairways. The principal…
Thermo Tech, Inc.
Fifty-foot scaffold violation and $400 penalty affirmed
Thermo Tech employees installed insulation from 50-foot-high scaffolds that lacked midrails, toeboards, and wire-mesh screens. The Commission unanimously held that the standard expressly required midrails and toeboards and that a fall to the concrete surface made the violation serious. Commissioner…
Brown and Root, Inc.
Serious items settled and scaffold-screen citation vacated
Brown and Root settled serious allegations involving an inadequately slung boiler pipe that fell about 140 feet, an uncovered floor opening, an unguarded winch platform, and an unguarded runway at the steam-drum level. Those items were affirmed under the settlement with a total $1,000 penalty. The…
Chicago Bridge and Iron Company
Fall-protection and scaffold items affirmed
Two employees worked 19 and 29 feet above ground on penetration tubes and unsecured planks without tying off, with exposed reinforcing steel below. The Commission affirmed the serious personal-protective-equipment violation and an increased $850 penalty because supervisors could have discovered the…
What these documents are
- Commission decisions: Rulings by the Occupational Safety and Health Review Commission itself, the highest level of agency review. These are citable as Commission precedent, though a decision may have been appealed to a U.S. Court of Appeals after issuance.
- ALJ decisions: Rulings by OSHRC Administrative Law Judges after a hearing. When no Commissioner directs review, an ALJ decision becomes a final order under 29 U.S.C. § 661(j): it binds the parties in that case but is not binding precedent in other cases.
- Why finality matters: Every page here says which kind of decision you are reading, so you know whether it is precedent you can cite or a final order that only shows how one judge ruled on one set of facts.
- Where they come from: Every page links the official OSHRC public release, and the full text on the page is that release. The plain-English summaries are written by Ezel.