COMM

Meadows Construction Company, LLC

Citations upheld despite expired inspector credential

OSHA inspected Meadows Construction’s public-school roofing project after receiving a complaint that employees were working without fall protection. The administrative law judge affirmed machine-guarding, ground-fault protection, housekeeping, power-tap, and fall-protection items, assessing $24,400…

February 26, 2018
Citations affirmed
ALJ

North Pac Corporation

Default affirms five safety items

OSHA cited North Pac Corporation for electrical and scaffold violations at a Northern Marianas College construction project. During the Commission case, North Pac repeatedly failed to answer discovery, participate in required conferences, and comply with multiple written orders and extended…

January 3, 2018 ·Covette Rooney
Procedural
ALJ

Summer & Winter Contruction, LLC

Roofing safety violations yield $89,000 in penalties

OSHA inspected Summer & Winter roofing crews at two New Hampshire sites and found extensive fall-protection and related safety violations. At the first site, workers used body belts, shared anchors, worked beneath a raised lift, used a damaged ladder, and accessed a steep roof without compliant…

June 15, 2011 ·Dennis L. Phillips
Citations affirmed
COMM

Altor, Inc., and/or Avcon, Inc.

Eight willful items affirmed with $412,000 penalty

OSHA cited extensive hard-hat, open-edge, and floor-hole hazards during construction of a sixteen-story concrete building. The Commission held that Altor and Avcon operated as a single employer because they shared a worksite, management, ownership, office support, and integrated operations. The…

April 26, 2011
Modified
ALJ

Standard Building Company, Inc., and Standard Systems, Inc.

Three items affirmed against one company and all items vacated against the other

Standard Building managed a restaurant renovation, and Standard Systems was identified as a related stucco contractor. The judge found that a subcontractor owner acted in part as Standard Building's site superintendent but lacked scaffold and powered-industrial-truck safety training. Standard…

December 20, 2007 ·Ken S. Welsch
Mixed result
ALJ

St. Lawrence Food Corp., dba Primo Foods

Most dairy-plant health and safety citations affirmed

OSHA conducted health and safety inspections at Primo Foods, a kosher dairy, and cited hazards involving ammonia refrigeration, respirators, confined spaces, chemical training, noise, machine guarding, electrical work, lockout/tagout, powered industrial trucks, and recordkeeping. The ALJ found that…

October 15, 2007 ·G. Marvin Bober
Mixed result
ALJ

Schimenti Construction Co.

Citations affirmed after contest abandoned

OSHA cited Schimenti Construction after inspecting a Hartsdale, New York worksite. The company did not appear for a telephone prehearing conference or respond to requests from the Secretary or the Commission. The judge found that Schimenti abandoned its contest and affirmed two serious electrical…

December 3, 2003 ·Michael H. Schoenfeld
Citations affirmed
COMM

Cody-Zeigler, Inc.

Consensual inspections and mixed citation rulings affirmed

Cody-Zeigler faced citations arising from five programmed inspections at construction projects in Ohio. Although company representatives consented when OSHA arrived, the contractor later argued that the frequency of inspections showed a lack of administrative probable cause. The Commission held…

May 9, 2001
Mixed result
ALJ

Reliable Roofing, Inc.

Settlement approved on five construction-safety items

Reliable Roofing contested a serious citation issued after OSHA inspected one of its construction worksites. The citation alleged five electrical, ladder, and training violations, and the case was assigned to the Commission's E-Z Trial procedure. The parties reached a written settlement just before…

March 6, 2000 ·Irving Sommer
Settled
ALJ

The Pike Company, Inc.

Edge, scaffold, and ground-fault items affirmed

At a prison construction project, Pike employees worked near a 13-foot unguarded edge, and another employee poured concrete from an unguarded outrigger scaffold about 20 feet high without a proper access ladder. Judge Ann Z. Cook rejected infeasibility because the edge work did not require removal…

June 21, 1999 ·Ann Z. Cook
Modified
ALJ

Christie Constructors, Inc.

Barge safety citations produce $2,750 penalty

Christie Constructors performed bridge construction from two connected barges on the Columbia River. Judge Stanley M. Schwartz held that federal OSHA retained jurisdiction over non-maritime construction on vessels in navigable waters despite Washington's state plan. He affirmed serious violations…

October 26, 1998 ·Stanley M. Schwartz
Mixed result
ALJ

Milo Construction Corporation

Twelve violations affirmed with reduced classifications

Milo Construction Corporation was the prime contractor on a residential construction project in Guam. After Milo failed to comply with discovery orders, the judge deemed admitted the cited conditions, employee exposure, and Milo's ability to control or correct the hazards. The violations covered…

March 20, 1998 ·Benjamin R. Loye
Modified
COMM

Otis Elevator Company

Extension-cord GFCI violation affirmed

Otis Elevator Company was installing an elevator in a building addition and powered tools and a portable lamp through an extension cord connected to the original building's permanent wiring. The Commission held that the cord's receptacle outlet still required ground-fault protection under the…

April 4, 1995
Citations affirmed
ALJ

Franklin E. Skepton

Twelve construction-safety violations affirmed

Franklin E. Skepton was the general contractor for a high-school addition in Pennsylvania. OSHA cited conditions including unguarded floor and wall openings, missing hard hats, unsafe compressed-gas handling, unprotected electrical equipment, unstable and unguarded scaffolds, improper gasoline…

March 13, 1995 ·John H. Frye III
Citations affirmed
ALJ

McCain Foods, Inc.

Willful asbestos violations and $165,000 in penalties affirmed

McCain Foods operated a food-processing plant in Easton, Maine, while a major renovation project removed old piping and other material containing asbestos. The judge found that management knew asbestos was present, misled an OSHA inspector about the work, failed to train or protect employees, and…

June 3, 1994 ·Barbara L. Hassenfeld-Rutberg
Mixed result
COMM

Bielmeier Builders, Inc.

Commission approves a settlement, dropping the electrical item and cutting the guardrail item to other-than-serious

Bielmeier Builders was a custom home builder putting up a two-story house in Clarence, New York. After an April 1991 inspection, OSHA cited the company for two serious violations: running a saw off an extension cord in a damp garage area with no ground-fault protection, and leaving an open-sided…

March 25, 1994
Settled
ALJ

Southern Forming, Inc.

Broad safety violations affirmed at $69,150

Southern Forming, also known as Suncrete Construction, performed concrete formwork at construction sites in Sunny Isles and Delray Beach, Florida. At the Sunny Isles site, an employee fell to his death from a stairway, and OSHA's investigation identified numerous fall-protection, stairway…

February 7, 1994 ·Paul L. Brady
Modified
ALJ

Renewal Arts Contracting Corp.

Electrical grounding violations affirmed

Renewal Arts Contracting was performing construction work in the Bronx, New York. An employee used a drill and extension cord with missing grounding pins, and the company's project manager knew about the defective equipment. The ALJ affirmed a serious violation because the missing continuous ground…

July 19, 1993 ·Irving Sommer
Modified
COMM

Dover Elevator Company, Inc.

GFCI citation vacated based on adequate safety program

Dover Elevator employees were installing an elevator in Ridgeland, Mississippi, when a ground-fault circuit interrupter tripped because of a defective receptacle and extension cord. The supervising mechanic temporarily left an extension cord connected to an operable but unprotected receptacle while…

July 16, 1993
Mixed result
ALJ

Fluidics, Inc.

Mixed construction ruling assesses $13,600

Fluidics performed mechanical-system renovations at a Philadelphia public-housing project with unusually difficult site-security conditions. The judge affirmed serious violations involving unsecured and improperly separated compressed-gas cylinders, missing GFCI protection, exposed energized…

May 10, 1993 ·John H. Frye, III
Mixed result
COMM

Mautz & Oren, Inc.

EAJA fee request denied after citation withdrawal

Mautz & Oren was cited for a repeat electrical violation after OSHA found that its construction site used neither ground-fault circuit interrupters nor an assured equipment grounding conductor program. The Secretary later withdrew the citation during Commission review, making Mautz the prevailing…

March 8, 1993
Procedural
COMM

Otis Elevator Company

Remaining electrical citation withdrawn and case dismissed

Otis Elevator was installing an elevator at a construction site where an employee used a portable drill connected through an extension cord and a metal knockout junction box. The judge vacated the item alleging that the junction box was exposed to physical damage, finding the cited standard did not…

November 18, 1992
Citations vacated
COMM

All Phase Electric & Maintenance, Inc.

Informal-conference request did not contest citations

OSHA cited All Phase Electric for two serious electrical violations and one other-than-serious posting violation, with $240 in proposed penalties. The company received the citations on December 18, 1989, but did not submit a written notice of contest within the 15-working-day period ending January…

October 4, 1991
Procedural
COMM

Mautz & Oren, Inc.

Remaining electrical citation withdrawn and case dismissed

The underlying case concerned a repeat citation alleging that Mautz & Oren failed to use ground-fault circuit interrupters or an assured equipment grounding conductor program at a construction site. The ALJ had affirmed the citation under 29 C.F.R. § 1926.404(b)(1)(i) and assessed a $980 penalty…

April 18, 1991
Citations vacated

What these documents are

  • Commission decisions: Rulings by the Occupational Safety and Health Review Commission itself, the highest level of agency review. These are citable as Commission precedent, though a decision may have been appealed to a U.S. Court of Appeals after issuance.
  • ALJ decisions: Rulings by OSHRC Administrative Law Judges after a hearing. When no Commissioner directs review, an ALJ decision becomes a final order under 29 U.S.C. § 661(j): it binds the parties in that case but is not binding precedent in other cases.
  • Why finality matters: Every page here says which kind of decision you are reading, so you know whether it is precedent you can cite or a final order that only shows how one judge ruled on one set of facts.
  • Where they come from: Every page links the official OSHRC public release, and the full text on the page is that release. The plain-English summaries are written by Ezel.