Federal Agency Decisions

Federal workers' compensation appeals from the Department of Labor's Employees' Compensation Appeals Board (ECAB), federal-sector labor-relations cases from the Federal Labor Relations Authority (FLRA), mine-safety cases from the Federal Mine Safety and Health Review Commission (FMSHRC), workplace-safety cases from the Occupational Safety and Health Review Commission (OSHRC), Longshore Act and Black Lung Benefits Act appeals from the Department of Labor's Benefits Review Board (BRB), precedent decisions of the Board of Immigration Appeals (BIA), environmental permit and penalty appeals from the EPA's Environmental Appeals Board (EAB), and whistleblower and other labor appeals from the Department of Labor's Administrative Review Board (ARB), each with a plain-English summary, the law it cites, and whether it counts as precedent. More agencies are coming.

60,101 decisions and counting · Latest decision October 28, 2026
60,101 decisions

No decisions match these filters

Try fewer or different words, check the spelling, or clear the filters to browse everything.

COMM

Air Force, Randolph Air Force Base and AFGE Local 1840

Randolph Air Force Base and AFGE Local 1840 (FLRA DA-CA-00630): Newsletter-distribution restriction violated employee rights

Randolph Air Force Base disapproved distribution of a union newsletter to nonappropriated-fund employees during non-work time in non-work areas. The Authority adopted the judge's finding that the restriction violated employees' statutory rights to distribute union literature. The agency did not…

August 30, 2002 ·FLRA
Upheld
COMM

Donald Clevenger v. Mary Helen Coal Company and American Business and Mercantile Insurance Mutual, Incorporated

Clevenger v. Mary Helen Coal (BRB 01-0884): Withdrawal reversed after benefits denial

Donald Clevenger's black lung claim was denied, and later requests to change that result had also failed. During another modification proceeding, he asked to withdraw the original claim so he could pursue a new claim under amended regulations. The judge allowed withdrawal, but the Board held that…

August 30, 2002 ·BRB
Remanded
ALJ

Hensel Phelps Construction Co., and its successors

Roof-edge citation vacated for lack of employee exposure

An OSHA compliance officer photographed workers on the second floor of a hotel structure where only one top rail protected an edge nearly 10 feet above the ground. OSHA attributed one photographed worker to Hensel Phelps because the worker appeared to be a woman and Hensel Phelps had one female…

August 30, 2002 ·Benjamin R. Loye ·OSHRC
Citations vacated
ALJ

C. E. Wylie Construction Co., and its successors

Roof-edge violation reduced to de minimis

A Wylie Construction employee installed a safety cable on a hangar roof without conventional fall protection. He briefly approached and leaned over a two-foot parapet above a 15-foot drop to answer a question. The judge found technical noncompliance because the employee was exposed without a…

August 30, 2002 ·Benjamin R. Loye ·OSHRC
Modified
COMM

Air Force Seymour Johnson AFB and NAGE Local R5-188

Seymour Johnson AFB and NAGE Local R5-188 (FLRA 0-AR-3425): Reconsideration denied

The union sought reconsideration of the Authority's earlier arbitration decision. It argued that the Authority had erred in describing the union as advancing a claim by the first arbitrator. The Authority found that the assertion merely disagreed with its conclusions and did not establish…

August 30, 2002 ·FLRA
Procedural
COMM

Avon Custom Mixing Services, Inc.

In re Avon Custom Mixing Services, Inc. (EAB NPDES Appeal No. 02-03): monitoring requirements upheld

Avon Custom Mixing Services operated a rubber-products manufacturing facility in Massachusetts with wastewater and stormwater discharges to Trout Brook. Avon challenged new testing and monitoring requirements in its renewed NPDES permit, arguing that they were excessive and burdensome. The…

August 27, 2002 ·EPA EAB
Affirmed
COMM

Immigration and Naturalization Service and AFGE Local 511

INS and AFGE Local 511 (FLRA WA-RP-00085): Review granted on personnel-work exclusions

The union challenged the exclusion of 21 attorney positions from its INS bargaining unit. The Authority denied review of the exclusion of four employees whose security work included regular use of or access to classified information. It granted review of the exclusion of 17 employees who provided…

August 26, 2002 ·FLRA
Procedural
ALJ

Thompson Electric, Inc.

Eye-protection and recordkeeping items affirmed

A Thompson Electric crew worked inside a vault near energized 4,160-volt cable terminations, and no crew member wore eye protection. The crew supervisor received a fatal electric shock when his elbow contacted a tiny exposed spot in insulating tape on an adjacent energized lug. The judge affirmed a…

August 26, 2002 ·Covette Rooney ·OSHRC
Mixed result
ALJ

Cannelton Industries, Incorporated

Contractor training and truck-condition citations affirmed

Cannelton Industries operated the Lady Dunn Preparation Plant and used a contractor to haul coal when a haulage accident resulted in a miner's death. Judge David F. Barbour found that the contractor's employees had not received required experienced-miner and task training, and that a haul truck had…

August 23, 2002 ·David F. Barbour ·FMSHRC
Citations affirmed
ALJ

Kennecott Utah Copper Corp.

Discrimination complaint dismissed

Richard M. Bundy, a repair gang machinist at Kennecott's Bingham Canyon open-pit copper mine, alleged that the company terminated him because he raised a safety concern about working overtime while fatigued. Judge Richard W. Manning found that Bundy's initial concern about fatigue was reasonable…

August 22, 2002 ·Richard W. Manning ·FMSHRC
Other
ALJ

Black Beauty Coal Company

Motion to lift stay denied during criminal investigation

Black Beauty Coal asked Judge T. Todd Hodgdon to end a stay in its civil penalty proceeding after more than 120 days had passed. The Secretary opposed the request because the matter had been referred to the U.S. Attorney for a criminal investigation involving overlapping evidence. The judge applied…

August 22, 2002 ·T. Todd Hodgdon ·FMSHRC
Procedural
ALJ

Evelyn D. Komes d/b/a Economy Roofing and Sheet Metal, and its successors

Roof fall violation affirmed with $5,000 penalty

Economy Roofing employees worked on a 30-foot-high flat roof without guardrails, warning lines, a safety monitor, or personal fall arrest equipment. OSHA observed one employee kneeling within three feet of the edge. Economy did not appear at the hearing, and the Secretary established a prima facie…

August 22, 2002 ·James H. Barkley ·OSHRC
Citations affirmed
COMM

BHP Copper, Inc., Pinto Valley Operations

In re BHP Copper, Inc., Pinto Valley Operations (EAB NPDES Appeal No. 02-05): voluntary dismissal granted

BHP Copper, Inc., Pinto Valley Operations challenged two conditions in an EPA Region IX NPDES permit for its Pinto Valley operation. The conditions concerned a new outfall at a natural seep and the designation of other seeps and springs as process-related. During the appeal, Region IX withdrew both…

August 21, 2002 ·EPA EAB
Procedural
ALJ

Darwin Stratton & Son, Inc.

Mine-inspection refusal affirmed with $1,000 penalty

Darwin Stratton & Son operated the Rattlesnake Pit and refused to allow an MSHA inspector onto the property, arguing that the pit was closed and outside MSHA jurisdiction. Judge Richard W. Manning found that the site was a coal or other mine subject to the Mine Act, and that an operator cannot…

August 15, 2002 ·Richard W. Manning ·FMSHRC
Citations affirmed
COMM

Ray and Jeanette Veldhuis

In re Ray and Jeanette Veldhuis (EAB CWA Appeal No. 02-05): premature appeal dismissed without prejudice

Ray and Jeanette Veldhuis appealed an initial decision assessing an $87,930 civil penalty for Clean Water Act violations. They had already filed a motion to reopen the hearing with the ALJ, and that motion automatically stayed the time for the initial decision to become final and for an appeal to…

August 15, 2002 ·EPA EAB
Procedural
ALJ

Powell Mountain Coal Company, Inc.

Motion to dismiss discrimination complaint denied

Powell Mountain Coal moved to dismiss Jerry Polly's discrimination complaint, arguing that he filed it after the 30-day deadline following MSHA's determination. Judge David F. Barbour found that the Commission received Polly's complaint on May 13, 2002, before the deadline, even though service on…

August 13, 2002 ·David F. Barbour ·FMSHRC
Procedural
COMM

AFGE National VA Council 53 and VA Vista Clinic

VA Vista Clinic and AFGE Council 53 (FLRA 0-NG-2624): Mandatory interview observers outside duty to bargain

The union proposed having an observer at performance-based interviews for bargaining-unit positions, even over a candidate's objection. The Authority held that the proposal affected management's right to select because interviews gather information and evaluate candidates as part of the selection…

August 12, 2002 ·FLRA
Upheld
ALJ

Sunshine Precious Metals, Incorporated

Discrimination complaint dismissed

John R. Peterson alleged that Sunshine Precious Metals discharged him after a dispute about correcting a ventilation problem at the Sunshine Mine. He had already been reinstated through arbitration and received back wages after the discharge. Judge August F. Cetti found no persuasive evidence that…

August 9, 2002 ·August F. Cetti ·FMSHRC
Procedural
COMM

Army North Central Civilian Personnel Operation Center and AFGE Local 15

Army Rock Island and AFGE Local 15 (FLRA CH-RP-01-0033): Review granted on cross-unit personnel work

The Army challenged a regional director's inclusion of staffing and classification employees in a proposed bargaining unit. Those employees performed personnel work for Army employees outside the proposed unit. The Authority found that existing precedent did not adequately explain whether the…

August 9, 2002 ·FLRA
Procedural
COMM

Sun Pipe Line Company

In re Sun Pipe Line Company (EAB UIC Appeal Nos. 02-01 and 02-02): reconsideration motion denied as untimely

Sun Pipe Line Company was involved in UIC Appeals 02-01 and 02-02, and Sandra K. Yerman asked the Environmental Appeals Board to reconsider its July 11, 2002 final decision. The Board explained that a reconsideration motion had to be filed within 10 days after service, with three additional days…

August 8, 2002 ·EPA EAB
Procedural
COMM

Reilly Industries, Inc.

In re Reilly Industries, Inc. (EAB RCRA Appeal No. 02-01): petition withdrawn after permit modification

Reilly Industries, Inc. petitioned for review of Region V's denial of its request for a Class II modification to its Boilers and Industrial Furnaces permit. The parties agreed that the Region would submit a revised modification for public comment, and Reilly later reported that the Region had…

August 8, 2002 ·EPA EAB
Settled
ALJ

Rowland, Inc.

Settlement approved with $1,600 penalty

After the Secretary presented her case at the hearing, Rowland and the Secretary resolved all pending issues. Rowland withdrew its notice of contest and represented that it had complied with posting and service requirements. The judge approved and incorporated the settlement, disposed of the…

August 8, 2002 ·Stephen J. Simko, Jr. ·OSHRC
Settled
ALJ

Lodestar Energy Incorporated

Five citations affirmed and one vacated

Lodestar Energy Incorporated faced consolidated civil penalty proceedings involving its coal mines. Five citations alleged that air near mine seals contained less than the required 19.5% oxygen, and one citation alleged that a tail roller guard was not secured. Judge Gary Melick affirmed the five…

August 7, 2002 ·Gary Melick ·FMSHRC
Mixed result
COMM

Bureau of Engraving and Printing and NTEU

Procurement employees remain in bargaining unit

The Bureau of Engraving and Printing challenged a unit clarification including 18 employees in four procurement-related positions. The regional director found that they were not professional employees under the labor-relations statute, despite revised OPM educational requirements for their…

August 5, 2002 ·FLRA
Upheld
COMM

AFGE Local 2401 and VA Northern Arizona Health Care System

Northern Arizona VA and AFGE Local 2401 (FLRA 0-AR-3523): One challenge late, other award upheld

The union challenged two arbitration awards involving the Northern Arizona VA health care system. Its exceptions to the February 1 award were late because timeliness ran from service rather than receipt. The March 18 postmark made the same filing timely for the February 8 award. On that award, the…

August 2, 2002 ·FLRA
Upheld
COMM

Carroll Oil Company

In re Carroll Oil Company (EAB RCRA (9006) Appeal No. 01-02): penalty increased and compliance order reinstated

Carroll Oil Company operated an inactive gas station in Wyoming whose underground storage tanks had not been permanently closed as required. EPA proposed a $19,500 penalty, and the Administrative Law Judge assessed $3,500 while declining to order compliance because the company was defunct and…

July 31, 2002 ·EPA EAB
Modified
COMM

Hillman Power Company, L.L.C.

In re Hillman Power Company, L.L.C. (EAB PSD Appeal Nos. 02-04, 02-05, and 02-06): permit review denied

Hillman Power Company operated a wood-waste and tire-derived-fuel electric generating facility in Michigan. A modified PSD permit allowed Hillman Power to increase tire-derived fuel from about six percent to about nine percent of the fuel burned. Petitioners challenged the dioxin analysis, the BACT…

July 31, 2002 ·EPA EAB
Affirmed
ALJ

Dacotah Cement

Task-training petition dismissed

Dacotah Cement operated a portland cement plant where two maintenance employees were injured while replacing a high-pressure hydraulic hose on a mill. The Secretary alleged that the employees had not received the task training required by 30 C.F.R. § 46.7. Judge Irwin Schroeder found that the…

July 31, 2002 ·Irwin Schroeder ·FMSHRC
Other
COMM

AFGE Local 4056 and Social Security Administration, Brunswick

SSA Brunswick and AFGE Local 4056 (FLRA 0-AR-3533): Nonfact challenge denied

The union challenged an arbitration award involving SSA's Brunswick office on the ground that it relied on a nonfact. The Authority found no defect under the governing standard for a clearly erroneous central fact that would have changed the result. It denied the union's exception. The Authority…

July 31, 2002 ·FLRA
Upheld
COMM

Robert W. Dodd v. Crown Central Petroleum Corporation

Dodd v. Crown Central Petroleum (BRB 01-840 and 00-578): partial benefits and suspension dates returned

Robert Dodd injured his knee while working as a pumper and dock standby at Crown Central Petroleum. The Board affirmed his total disability award beginning January 17, 1996, and upheld the finding that his refusal to attend a psychiatric examination justified suspending compensation. It held…

July 29, 2002 ·BRB
Remanded
ALJ

Duro-Last, Inc.

First-aid-room eating violation affirmed

OSHA cited three conditions at Duro-Last's roofing-material plant. The judge vacated the eyewash item because employees merely connected forklift batteries for charging and the Secretary did not prove exposure to corrosive electrolyte. He also vacated the machine-shaft guarding item because…

July 29, 2002 ·Ken S. Welsch ·OSHRC
Mixed result
ALJ

D.R.B. Boring and Drilling Construction Co., Inc.

Four excavation violations affirmed

D.R.B. Boring and Drilling used an excavation approximately 10 feet wide, 32 feet long, and nearly 10 feet deep. The judge found that the ladder and loose-earth ramp did not provide safe access, water had accumulated without adequate precautions, employees lacked protection from falling or rolling…

July 29, 2002 ·Michael H. Schoenfeld ·OSHRC
Citations affirmed
ALJ

Marianas Garment Manufacturing, and its successors

Late contest dismissed with no penalty

Marianas Garment Manufacturing admitted that its notice of contest was late but sought relief under Rule 60(b). It argued that the citation was void because OSHA lacked jurisdiction over conditions in residential dormitories. The judge held that the argument concerned statutory coverage, not the…

July 29, 2002 ·Benjamin R. Loye ·OSHRC
Procedural
ALJ

Keystone Structural Concrete Ltd., and its successors

Settlement withdrew both electrical items

The judge had vacated Keystone Structural Concrete's notice of contest after its attorney failed to timely execute a settlement and respond to an order to show cause. On reconsideration, the judge restored the contest because settlement is encouraged and the client should not bear the attorney's…

July 29, 2002 ·James H. Barkley ·OSHRC
Settled
ALJ

FPM Group, Ltd.

EAJA fee application denied after citation withdrawal

OSHA withdrew a serious compressed-gas citation against FPM Group before the case was set for hearing. FPM then sought fees and expenses under the Equal Access to Justice Act for work performed by its president and an administrative assistant. The judge held that a self-represented party is not…

July 29, 2002 ·Irving Sommer ·OSHRC
Procedural
ALJ

C. I. Thornburg Co., Inc.

Settlement approved with $25,250 penalty

OSHA cited C. I. Thornburg after inspecting pipe work at a West Virginia water-treatment plant. The parties settled before litigating the citation merits. Three citation groupings remained serious with penalties of $1,750 each, while the alleged willful item was amended to unclassified with a…

July 29, 2002 ·Covette Rooney ·OSHRC
Settled
ALJ

Parisi Construction, Inc.

Safety penalties reduced to $3,000

Parisi Construction did not dispute five citation items involving high-visibility clothing and several silica and respiratory-protection requirements. The only issue was the amount of the proposed penalties, which totaled $9,000. The judge considered that the road workers had partial protection…

July 29, 2002 ·Sidney J. Goldstein ·OSHRC
Modified
COMM

IRS New Carrollton and NTEU Chapter 65

Accommodation claim and remedies remanded

An arbitrator found that the IRS improperly denied an employee work at home and awarded leave restoration, backpay, medical costs, and other damages. In this 2002 decision, the Authority held that an employee merely regarded as disabled was not entitled to reasonable accommodation on that basis…

July 29, 2002 ·FLRA
Remanded
COMM

Nathan B. Harvey v. Mingo Logan Coal Company

Request to reopen discrimination case denied

Nathan B. Harvey asked the Commission to reopen his discrimination case against Mingo Logan Coal Company based on statements from eight coworkers that he said conflicted with hearing testimony. The majority denied the request because the statements concerned his work attitude and did not undermine…

July 26, 2002 ·FMSHRC
Procedural
ALJ

Morrill Asphalt Paving

Telephone testimony motion denied

Morrill Asphalt Paving asked to present Roger Harting's testimony by telephone because he no longer worked for the company, lived in another state, and was unavailable on the scheduled hearing date. The complainant objected. Judge Richard W. Manning denied the motion because Harting was a critical…

July 26, 2002 ·Richard W. Manning ·FMSHRC
Procedural
ALJ

Summit Anthracite, Inc.

Multiple citations affirmed, vacated, and modified

Summit Anthracite operated an underground anthracite coal mine where a July 1998 explosion or similar event killed one miner and severely injured another. After a 22-violation case, Judge Michael E. Zielinski found twelve violations and imposed $16,330 in civil penalties, while other citations were…

July 25, 2002 ·Michael E. Zielinski ·FMSHRC
Mixed result
COMM

Lodestar Energy, Inc.

Weekly air-course inspection ruling remanded for notice findings

Lodestar operated an underground coal mine where two longwall entries were separated by stoppings and coal pillars for about 6,615 feet. MSHA cited the company for failing to inspect the No. 1 intake entry weekly for hazardous conditions, as required by 30 C.F.R. § 75.364(b)(1). The Commission…

July 25, 2002 ·FMSHRC
Remanded
COMM

C&C Erecting, Inc.

Settlement resolved steel-erection citations with no penalty

The case involved fall-protection training, aerial-lift, roof-opening, and steel-erection allegations at a Wisconsin construction site. While the matter was under Commission review, the parties settled all outstanding issues. One training instance, two aerial-lift items, and the alleged willful…

July 25, 2002 ·OSHRC
Settled
ALJ

Gray Quarries Incorporated

Discrimination complaint dismissed

Gray Quarries Incorporated discharged quarry worker Willie Ray Shaffer after a dispute about assignments that included cleaning a catwalk beneath operating scalper screens where falling rocks could pose a hazard. Shaffer claimed he told management that he would contact the right people about the…

July 24, 2002 ·Gary Melick ·FMSHRC
Other
COMM

Highlands Mining & Processing Company, Inc.

Default judgment relief request remanded

Highlands Mining & Processing failed to answer a civil penalty petition and a later show-cause order, so the Chief Administrative Law Judge entered a default judgment for $1,871. Highlands later asked to reopen the penalty assessment, citing only its inability to pay. The Commission remanded for…

July 24, 2002 ·FMSHRC
Remanded
COMM

ACT Wichita Air Capitol Chapter and Kansas National Guard

Kansas National Guard and ACT Wichita (FLRA 0-NG-2618): Civilian-address proposal outside duty to bargain

The technicians' union proposed requiring management to use civilian titles rather than military rank in specified labor-relations communications. The Authority held that the wording directly imposed a job requirement on management officials and therefore determined their conditions of employment…

July 24, 2002 ·FLRA
Upheld
COMM

Watkins Engineers & Constructors

Cement plant jurisdiction and three safety violations affirmed

A Watkins employee fell about 70 feet while moving from a man-lift into a breezeway at a cement plant and suffered serious injuries, including the amputation of one leg. The Commission held that the cement plant was within MSHA's jurisdiction because its crushing, grinding, sizing, calcining, and…

July 23, 2002 ·FMSHRC
Citations affirmed
COMM

Secretary of Labor v. Phelps Dodge Sierrita, Inc.

Penalty assessment reopened after mistaken payment

Phelps Dodge Sierrita intended to contest a $55 penalty for a citation but mistakenly paid it with fourteen other assessments. The company had separately filed a notice of contest for the citation and supported its explanation with an affidavit from its safety and health manager. The Commission…

July 23, 2002 ·FMSHRC
Remanded
COMM

Secretary of Labor v. John Richards Construction

Late review request allowed limited opportunity to provide evidence

John Richards Construction asked for relief after missing the 30-day deadline to seek Commission review of an administrative law judge's decision. The mine owner said he received the decision late because it was sent to an Arizona apartment complex where someone else signed for it, but the record…

July 23, 2002 ·FMSHRC
Procedural
COMM

Secretary of Labor v. J.P. Donmoyer, Inc.

Two penalty assessments reopened after processing mistake

J.P. Donmoyer received several proposed penalties, but its safety director returned the green card for only one assessment because he mistakenly believed that action contested all pending citations. The company supported its explanation with an affidavit from its controller. The Commission…

July 23, 2002 ·FMSHRC
Remanded
COMM

Douglas R. Rushford Trucking

Fatality penalty increased to $15,000

A Rushford employee was fatally injured while inflating a truck tire without a stand-off device. The Commission had sent the penalty back twice because the administrative law judge did not follow instructions about the statutory penalty factors and improperly treated the operator's ignorance of the…

July 22, 2002 ·FMSHRC
Modified
COMM

Secretary of Labor v. Cranesville Aggregates Company, Inc.

Reopening request sent to a judge for fact finding

Cranesville Aggregates did not file a timely request to contest a proposed penalty assessment because its safety director believed conversations with MSHA officials had extended the deadline while an investigation was pending. The company said it wanted to contest two issues but did not identify…

July 22, 2002 ·FMSHRC
Remanded
COMM

Larry Richner, Nancy Sheepbouwer & Richway Farms

In re Larry Richner, Nancy Sheepbouwer & Richway Farms (EAB CWA Appeal No. 01-01): liability reversed and penalty remanded

Larry Richner operated a dairy farm in Washington with creeks that flowed through or near manure areas and connected through a railroad culvert to waters leading to the Nooksack River. EPA alleged that the farm discharged dairy waste without a Clean Water Act permit and sought an $11,000 civil…

July 22, 2002 ·EPA EAB
Remanded
COMM

Kansas National Guard and ACT Wichita Air Capitol Chapter, Local 74

Kansas National Guard and ACT Local 74 (FLRA 0-AR-3443): Contractual bargaining over holiday changes upheld

An arbitrator found that the Kansas National Guard violated its agreement by refusing to bargain over the impact and implementation of holiday schedule changes. The Authority upheld the award requiring bargaining on request over future changes. It found that the case concerned a contractual…

July 19, 2002 ·FLRA
Upheld
ALJ

Felix Maurice Sykes v. Har-Lee Coal Company

Discrimination complaint dismissed after complainant missed hearing

Felix Maurice Sykes, a miner and roof bolter operator, alleged that Har-Lee Coal Company discriminated against him for raising safety concerns. Sykes did not appear at the scheduled hearing, did not request a continuance, and did not explain his absence. Based on the respondent's uncontested offer…

July 17, 2002 ·Irwin Schroeder ·FMSHRC
Other
COMM

AFGE Local 4046 and Minot Air Force Base

Minot Air Force Base and AFGE Local 4046 (FLRA 0-AR-3538): Arbitration challenges denied

The union challenged an arbitration award involving Minot Air Force Base. The Authority found that the union had raised recognized grounds for challenging an award, despite the agency's argument for dismissal. It nevertheless rejected the claims of arbitrator bias, excess of authority, an unfair…

July 12, 2002 ·FLRA
Upheld
COMM

Sun Pipe Line Company

In re Sun Pipe Line Company (EAB UIC Appeal Nos. 02-01 and 02-02): permit petitions denied

Sun Pipe Line Company sought a permit for a Class I non-hazardous liquid waste injection well beneath its Michigan pipeline terminal. Sandra K. Yerman and Jim Rarey challenged different aspects of the permit, including the location and effects of nearby injection wells, project segmentation…

July 11, 2002 ·EPA EAB
Other
COMM

Hecla Mining Company, Grouse Creek Unit

In re Hecla Mining Company, Grouse Creek Unit (EAB NPDES Appeal No. 02-02): dilution-ratio permit challenge denied

Hecla Mining Company operates the Grouse Creek gold mine and mill in Idaho, which was undergoing closure when it challenged a renewed NPDES permit. The permit used an 8:1 dilution ratio to set concentration-based effluent limits for discharges to Jordan Creek. Hecla argued that drought and low…

July 11, 2002 ·EPA EAB
Other
ALJ

Cannelton Industries, Inc.

Preshift exception applied, weekly examination violation affirmed

Cannelton Industries operated the Shadrick underground coal mine in West Virginia while the mine was idle and certified personnel entered to keep its pumps running. The judge held that the regulation's pumpers' exception allowed a certified pumper to examine the areas where the pumper worked or…

July 10, 2002 ·T. Todd Hodgdon ·FMSHRC
Mixed result
COMM

Secretary of Labor v. CDG Materials, Inc.

Reopening request remanded to resolve mailing dispute

CDG Materials said it timely mailed a hearing request but that postal delays caused by current events may have delayed delivery. The Secretary responded that CDG received the proposed assessment on November 29, 2001, but did not mail its request until January 4, 2002, after the 30-day deadline…

July 10, 2002 ·FMSHRC
Remanded

What these documents are

  • The agencies: Federal workers' compensation appeals from the Department of Labor's Employees' Compensation Appeals Board (ECAB), federal-sector labor-relations cases from the Federal Labor Relations Authority (FLRA), mine-safety cases from the Federal Mine Safety and Health Review Commission (FMSHRC), workplace-safety cases from the Occupational Safety and Health Review Commission (OSHRC), Longshore Act and Black Lung Benefits Act appeals from the Department of Labor's Benefits Review Board (BRB), precedent decisions of the Board of Immigration Appeals (BIA), environmental permit and penalty appeals from the EPA's Environmental Appeals Board (EAB), and whistleblower and other labor appeals from the Department of Labor's Administrative Review Board (ARB). Each decision page names its agency.
  • Commission, Board and Authority decisions: Rulings by the agency's highest review level (the Commission at OSHRC and FMSHRC, the Authority at FLRA, the Board of Immigration Appeals, the Administrative Review Board at Labor, and the Environmental Appeals Board at EPA). These are citable as precedent, though a decision may have been appealed to a U.S. Court of Appeals after issuance.
  • ALJ decisions: Rulings by the agency's Administrative Law Judges after a hearing. When no Commissioner directs review, an ALJ decision becomes a final order that binds the parties in that case but is not binding precedent: under 29 U.S.C. § 661(j) at OSHRC, and after the 40-day window of 30 U.S.C. § 823(d)(1) at FMSHRC.
  • Why finality matters: Every page here says which kind of decision you are reading, so you know whether it is precedent you can cite or a final order that only shows how one judge ruled on one set of facts.
  • Where they come from: Every page links the official public release from the deciding agency, and the full text on the page is that release. The plain-English summaries are written by Ezel.