Federal agency decisions, searchable in plain English.

Workplace-safety cases from the Occupational Safety and Health Review Commission (OSHRC) and mine-safety cases from the Federal Mine Safety and Health Review Commission (FMSHRC), each with a plain-English summary, the standards it cites, and whether it counts as precedent. More agencies are coming.

5,593 decisions and counting · Latest decision July 17, 2026
87 decisions 29 C.F.R. § 1910.95(b)(1)

No decisions match these filters

Try a different search term or clear the filters.

COMM

West Point Pepperell, Inc.

Textile-mill noise and cotton-dust citation vacated

West Point Pepperell employees worked in two textile weave rooms where measured noise levels exceeded the permissible exposure table. The Commission majority held that the Secretary did not prove technologically feasible engineering controls because the proposed loom modifications had not…

April 18, 1977
Citations vacated
COMM

Cyprus Mines Corporation d/b/a Cyprus Wire and Cable Company

Noise citation affirmed with extended abatement

Noise measurements in Cyprus Mines' rod mill ranged from 94 to 116 dBA and exceeded the permissible exposure limits in the cited standard. The judge found that feasible engineering controls could reduce the noise and that the company had not supported its claim of economic infeasibility with…

April 18, 1977
Modified
COMM

Del Monte Corporation

Excessive-noise citation reinstated and remanded

OSHA cited Del Monte’s Tampa canning plant for excessive noise in nine identified production areas and required an engineering compliance program, but proposed no penalty. The judge dismissed the case because the citation and complaint did not specify detailed noise measurements, sources, exposed…

January 28, 1977
Remanded
COMM

Chrysler Corporation

Press-room noise abatement deadline extended

Chrysler sought more time to abate excessive noise in the press room of its Twinsburg, Ohio, plant, which produced vehicle doors and rear underbodies. The underlying violation was final because Chrysler had not contested it. The company documented engineering efforts involving quieter dolly wheels…

January 26, 1977
Modified
COMM

Pabst Brewing Company

Noise case revived and discovery inspection granted

Pabst was cited for allegedly failing to use feasible engineering or administrative controls for excessive brewery noise. The judge granted Pabst summary judgment after the Secretary admitted he could not then prove that available controls would reduce noise to the limits in Table G-16, and the…

January 17, 1977
Remanded
COMM

Anheuser-Busch, Inc.

Brewery noise-control violation affirmed

Anheuser-Busch was cited for failing to implement feasible engineering or administrative controls for excessive noise at brewery packaging equipment. The company challenged a continuance that allowed the Secretary to obtain expert testimony and disputed the judge’s reliance on that acoustical…

January 13, 1977
Citations affirmed
COMM

Owens-Corning Fiberglas Corporation

Noise-abatement deadline extended

Owens-Corning sought to extend two noise-abatement deadlines to December 31, 1976. The judge found that the company had installed operator booths with sound levels below 90 dBA, maintained an audiometric program, supplied hearing protection, and pursued engineering controls for noisy glass…

January 12, 1977
Citations affirmed
COMM

John Hassall, Inc.

Fastener-plant noise citation vacated

John Hassall’s fastener plant exposed machine operators to noise of roughly 95 to 102 decibels. The Secretary proposed enclosing machines with rated plastic curtains, but the judge found that approach unproven and impractical because it would not reduce noise inside the enclosure, would interfere…

January 4, 1977
Citations vacated
COMM

Weyerhaeuser Company

Noise-standard ruling reversed and remanded

Weyerhaeuser's Honolulu corrugated-box plant exposed a single-facer operator to noise above the limits in OSHA's occupational-noise standard. The company required hearing protection and had investigated a range of engineering controls, while the judge vacated the citation after declaring § 1910.95…

September 24, 1976
Remanded
COMM

Continental Can Company

Noise-control citations vacated

Continental Can manufactured metal cans at eight plants where production machinery exposed employees to noise above the limits in OSHA's noise standard. Employees used hearing protection that reduced their exposure below those limits, but OSHA cited the company for not installing engineering…

August 24, 1976
Citations vacated
COMM

Ford Motor Co., Metal Stamping Div.

Noise-abatement period set at two years

A United Auto Workers local challenged the time allowed for Ford's metal-stamping plant to reduce excessive workplace noise through feasible engineering or administrative controls. The Commission held that employees may contest whether an abatement period is reasonable, but may not directly require…

May 25, 1976
Procedural
COMM

The Davies Can Company

Three-plant noise settlement approved

Davies Can admitted that workplace noise at its Tampa, Solon, and Leetsdale plants exceeded the permitted levels. The company agreed to pursue feasible engineering and administrative controls by December 1, 1975, maintain a mandatory hearing-protection program, and file periodic progress reports…

May 19, 1976
Settled
COMM

Love Box Company

First-aid violation affirmed

Love Box manufactured corrugated boxes and employed about 151 workers. The Commission held that the company needed a person trained in first aid on its second shift because the nearest hospital was about nine minutes away, and it assessed a $25 penalty. It vacated an aisle-obstruction item because…

April 7, 1976
Mixed result
COMM

The Singer Company-Furniture Division

Polyester-line noise violations affirmed as nonserious

Singer operated a furniture plant in Toccoa, Georgia, with a polyester fill line added after an earlier plant-wide noise citation. One operator worked about six hours near equipment producing a 94 dBA sound level and was not using hearing protection. The judge found that feasible changes could…

March 5, 1976
Mixed result
COMM

Reynolds Metals Company

Noise-control citation vacated for lack of feasible controls

Reynolds Metals operated a can-manufacturing plant where employees worked near six production lines containing 126 pieces of equipment. OSHA's spot measurements showed noise levels from 92 to 105 dBA, and the Commission found that the excessive noise continued during the employees' exposure…

February 25, 1976
Citations vacated
COMM

Idaho Travertine Corporation

Mine-safety jurisdiction dismissal reversed and case remanded

Idaho Travertine quarried large stone blocks at remote sites and transported them to an Idaho Falls plant for cutting, honing, polishing, and finishing. OSHA issued one serious citation and 12 nonserious citations with $1,290 in proposed penalties, but the judge vacated them because he placed the…

September 30, 1975
Remanded
COMM

Anchor Hocking Corporation

Glass-plant noise-control citation vacated by divided Commission

Anchor Hocking's glass-forming employees worked around noise levels of 98 to 103 dBA and used personal hearing protection. OSHA alleged that the company also had to implement feasible engineering or administrative controls. Evidence showed that enclosed operator booths could reduce exposure during…

July 22, 1975
Citations vacated
COMM

Continental Steel Corporation

Noise penalties modified, four violations affirmed

Continental Steel received four citations involving excessive noise, nonmandatory hearing protection, failure to lock out power during lubrication, and inadequate ventilation around an acid tank. The company stipulated that noise exceeded permitted levels and that some employees did not use hearing…

July 16, 1975
Modified
COMM

Hartwell Excavating Co.

Mixed ruling on blasting, equipment, and noise items

Hartwell Excavating was cited for eight nonserious violations involving explosives, equipment guards and alarms, and occupational noise at an Idaho sewer project. The Secretary moved to withdraw citation items 1 through 4 after the judge's decision. The Commission allowed withdrawal of items 2…

May 13, 1975
Mixed result
COMM

St. Regis Paper Co.

Noise-abatement extension affirmed after employee notice

St. Regis sought additional time to correct employee noise exposures at its Bucksport, Maine, facility. The judge granted an extension from August 6, 1974, to March 1, 1983, following the timetable in the company's hazard profile study. OSHA did not object and stated that the company had made a…

January 22, 1975
Procedural
COMM

Weyerhaeuser Company

Storage item affirmed and noise citation vacated

OSHA cited noise exposure near a corrugator at Weyerhaeuser's Maine fiberboard plant, unstable stacks of corrugated cartons, and allegedly unguarded machine parts. The Commission affirmed vacation of the noise item because a 15-to-20-minute sample ranging from 97 to 102 dBA was not shown to…

August 15, 1974
Mixed result
COMM

Sequoyah Spinning Mills, Inc.

Plant penalties affirmed and noise penalties vacated

Sequoyah Spinning Mills manufactured carpet yarn at a plant with 246 employees. In docket 1012, the company admitted 16 nonserious conditions involving housekeeping, combustible materials, fire protection, chemical protection, machine guarding, compressed air, welding cylinders, and electrical…

July 3, 1974
Mixed result
COMM

Transcon Lines, Inc.

Maintenance-pit and excessive-noise violations affirmed

Transcon Lines operated truck-maintenance facilities with six vehicle pits that were periodically left uncovered and had no guardrails. Employees in a fuel-tank repair area were also exposed for an hour a day to noise measured at 124 and 128 decibels. The company supplied hearing protection but…

May 6, 1974
Citations affirmed
COMM

Owens-Illinois, Inc., Lily Tulip Division

Noise-abatement settlement approved conditionally

Owens-Illinois contested only the abatement period for a noise-control item under 29 C.F.R. § 1910.95(b)(1). The company and the Secretary stipulated to extend the abatement date from May 22, 1974, to May 22, 1976, and the company moved to withdraw its contest. The Commission treated the…

March 11, 1974
Settled
COMM

Southern Indiana Gas & Electric Co.

Noise citation affirmed without a penalty

Southern Indiana Gas & Electric operated a generating station where boiler-room sound readings reached 97 to 103 dBA. The utility had supplied ear protection and was pursuing an engineering solution, but the judge found that it did not consistently require employees to use the protection. The…

March 5, 1974
Mixed result
COMM

American Motors Corporation

Welding-ventilation item vacated and $254 assessed

OSHA cited American Motors for 29 non-serious conditions at its Milwaukee automobile plant. After withdrawals, admissions, and a hearing, the administrative law judge affirmed 17 items, vacated 12, and assessed $279. Commission review focused on a welding station where no mechanical ventilation was…

July 2, 1973
Mixed result
COMM

Detroit Printing Pressmen Local No. 13, International Printing Pressmen & Assistants Union of North America, AFL-CIO

Union's noise-abatement extension request dismissed

OSHA cited the Evening News Association for excessive workplace noise and set deadlines for temporary protection and longer-term controls. Neither the employer nor the union contested the citation, so it became final. The union later asked the Commission to extend the abatement period because the…

November 8, 1972
Procedural

What these documents are

  • Commission decisions: Rulings by the Occupational Safety and Health Review Commission itself, the highest level of agency review. These are citable as Commission precedent, though a decision may have been appealed to a U.S. Court of Appeals after issuance.
  • ALJ decisions: Rulings by OSHRC Administrative Law Judges after a hearing. When no Commissioner directs review, an ALJ decision becomes a final order under 29 U.S.C. § 661(j): it binds the parties in that case but is not binding precedent in other cases.
  • Why finality matters: Every page here says which kind of decision you are reading, so you know whether it is precedent you can cite or a final order that only shows how one judge ruled on one set of facts.
  • Where they come from: Every page links the official OSHRC public release, and the full text on the page is that release. The plain-English summaries are written by Ezel.