Secretary of Labor (MSHA), on behalf of Theodore Hazzard v. Cannelton Industries, Inc. (ALJ decision, August 12, 1981)

Cannelton Industries (FMSHRC WEVA 81-392-D): Miner discrimination complaint settled

Decision type
ALJ decision
Docket
WEVA 81-392-D
Decided
August 12, 1981
Presiding judge
Outcome
Settled
Precedential status
Final order, not precedent
Checked against source
2026-10-22

Apply this to your situation

This order from 1981 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current MSHA standards and Commission precedent say, with citations.

Currency note: this decision dates from 1981
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final ALJ decision under the Mine Act's 40-day rule
This administrative law judge decision became a final decision of the Commission because no Commissioner directed review within 40 days, under 30 U.S.C. § 823(d)(1). It binds the parties but is not Commission precedent. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the agency's own release.
Transcribed from a scanned original: FMSHRC released this decision as an image-only file. The full text below is a machine transcription, proofread against the scan. Check the official release before quoting exact language.
Read the official release (fmshrc.gov)

Plain-English summary

The Secretary brought a discrimination complaint on behalf of miner Theodore Hazzard, alleging that Cannelton Industries interfered with his efforts to raise mine safety concerns. The dispute arose amid disagreements over fire drills, escapeways, and methane examinations at the Pocahontas No. 3 and 4 Mine. The judge described a heated exchange between Hazzard and a company superintendent and said the superintendent's remarks exceeded a permissible response. The parties settled, and the judge approved their agreement. He ordered Cannelton to stop statements that interfere with miners' safety rights, pay a $1,500 penalty, and post the decision at the mine for 30 days.

Decision snapshot

  • Cited standards: The decision discusses 30 C.F.R. §§ 75.1704-2(e), 75.1704-1, 75.1707, and 75.305 as context for the dispute.
  • Outcome: Settlement approved; cease and desist order, $1,500 penalty, and 30-day posting requirement.
  • Key point: The order protects miners' ability to report safety concerns without coercive statements from management.

Full text (FMSHRC public release)

FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION OFFICE OF ADMINISTRATIVE LAW JUDGES 2 SKYLINE, 10th FLOOR 5203 LEESBURG PIKE FALLS CHURCH, VIRGINIA 22041

AUG 12 1981

SECRETARY OF LABOR,
: Complaint of Discrimination
MINE SAFETY AND HEALTH
:
ADMINISTRATION (MSHA),
: Docket No. WEVA 81-392-D
ON BEHALF OF THEODORE HAZZARD, :
Complainant : Pocahontas No. 3 & 4 Mine :
v. :
:
CANNELTON INDUSTRIES, INC.,
:
Respondent
:

DECISION AND ORDER

This is a complaint for discrimination that came on for hearing on August 4 and 5, 1981 in Beckley, West Virginia. The gravamen of the charge was that the operator attempted to interfere with a miner's right to seek correction of what were claimed to be unsafe mining practices and conditions in the 4-B and Roadside Mines (Pocohantas No. 3 and 4 Mine). The charge arose in the context of a sharp disagreement between the complainant and MSHA's Subdistrict Office in Princeton, West Virginia over the timing and extent of fire drills prescribed by 30 C.F.R. 75.1704-2(e), and the requirement for the designation, approval and inspection of secondary escapeways, 30 C.F.R. 75.1704-1, -2; 1/ 30 C.F.R. 75.1707.

A third consideration that directly affected the actions of the parties involved two petitions for modification of the requirement of 30 C.F.R. 75.305 for weekly methane examinations of at least one entry

1/ MSHA has interpreted 30 C.F.R. 75.1704-2(e) as requiring the evacuation of all miners from the working face to the loading point every 90 days. With respect to the designation of approved escapeways, Section 317(j)(4) of the Act, 30 C.F.R. 75.1707 provides that belt and track or trolley haulage entries be separated from escapeways by rela- tively airtight stopping materials in order to provide a practically smoke free escapeway in the event fire should occur in the track and/or belt entries. MSHA Underground Inspection Manual 11-619. Despite this, MSHA has permitted the track and belt entries to be designated as escapeways in both the Roadside and 4-B sections. This conflict between the requirements of the law and MSHA's practice has been a source of continuing friction between the Mine Safety Committee and management at this mine. The trial judge recommends that the Chief of MSHA's Safety Division work with the District and Subdistrict Offices to effect a clarification and resolution of what has been a serious source of contention between labor and management at this mine.

1923

of each intake and return airway in its entirety. The first petition involved the left air return in both the 4-B and Roadside Sections. It was granted in September 1979 and permitted the monitoring of the airflow on a daily basis at specified stations instead of traveling the entire entry which was deemed unsafe. The second petition filed in April 1980 requested a waiver of the same requirement on the right return in only the 4-B section. Because of its concern over designation of the track and belt entry as a secondary escapeway, its lack of confidence in air monitoring systems, 2/ and its belief that the right return is or can be made travelable, the Mine Safety Committee and Local 6029 of the UMWA requested the International Union in Washington appeal MSHA's grant of the second petition in November 1980. At the time of the hearing, the complainant and the local union were under the impression that the decision on the second petition had not become final. Neither counsel was aware of its status.

On the merits, the evidence unequivocally established that the manifold misunderstandings and conflicts between complainant and other members of the Mine Safety Committee and with MSHA, management and the State Department of mines over walkaround rights, fire drills, evacuation procedures, and the petitions for modification when coupled with the stresses that stemmed from the explosion and resulting disaster at the Ferrell Mine and numerous grievances generated by a realignment of the labor force at several of the operator's mines led to a tense labor relationship that culminated in a heated verbal exchange between complainant and the operator's general superintendent of mines on December 17, 1980. Fortunately there is no need to detail this event. Suffice it to say that what was said by the management representative went beyond the pale of permissible legal reaction to what he in good faith believed to be an unjustified provocation. Much of the obvious ill feeling that prevailed at the beginning of the hearing was dispelled in the end by the opportunity afforded all concerned to thresh the matter out and to get things off their chest. For their candid cooperation in this inquiry counsel and the parties, especially Mr. Spengler, MSHA's Subdistrict Mgr. are to be commended.

Because the parties agreed to settle this matter on the terms set forth in the consent order entered on the record and adopted and confirmed in this decision, the parties are in a position to make a new beginning and to commence the work of reconciliation of their differences in an atmosphere cleansed of the poisonous suspicions of the past.

For these reasons, I find the settlement agreed upon in accord with the purposes and policy of the Act.

Accordingly, it is ORDERED that:

1. Cannelton Industries, Inc., its directors, officers, agents and employees be, and hereby are, ENJOINED and DIRECTED

2/ This stemmed from the failure of such a system at Westmoreland's Ferrell Mine in November 1980 to prevent a lethal buildup of explosive gas.

1924

TO CEASE AND DESIST from making any and all statements, verbal or written, designed to interfere with, coerce or restrain any miner from freely exercising rights guaranteed by the Mine Safety Law, including the right to make, file or report alleged safety or health violations or dangers to management, MSHA or the appropriate State authorities.

2. Cannelton Industries, Inc. pay a penalty of $1,500 for the violation found OR or before Friday, August 21, 1981.

3. Cannelton Industries, Inc. immediately post on the Mine Bulletin Board or in places where notices to employees are customarily posted at the Pocahontas No. 3 and 4 Mine (Roadside and 4-B Sections), and maintain the same for thirty (30) consecutive days from the date of posting, a copy of this decision and order.

Finally, it is ORDERED that upon payment of the penalty agreed upon and subject to enforcement of this injunction under the contempt powers and procedures of the United States Courts of Appeals, the aforesaid consent order and this confirming decision be deemed a final disposition of this matter.

Joseph B. Kennedy
Administrative Law Judge

Distribution:

William C. Miller, II, Esq., Cannelton Industries, Inc., Box 1226, 1250 One Valley Square, Charleston, WV 25324 (Certified Mail)

James P. Kilcoyne, Esq., U.S. Department of Labor, Office of the Solicitor, 14480 Gateway Bldg., 3535 Market St., Philadelphia, PA 19104 (Certified Mail)

Theodore H. Hazzard, Box 21, Superior, WV 24886 (Certified Mail)

Doug Tolley, Vice President, Cannelton Industries, Cannelton, WV 25936 (Certified Mail)

1925

What applies to your situation today?

This order bound one employer. Ezel checks the current MSHA standards and Commission precedent against your facts, with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace