Secretary of Labor v. Justice Energy Company, Inc.
Secretary of Labor v. Justice Energy Company (FMSHRC WEVA 2023-0148): Truck-safety settlement approved
Apply this to your situation
This order from 2023 bound only the parties to this case; it isn't precedent. Ezel answers your situation under the current MSHA standards and Commission precedent, with citations.
Plain-English summary
The settlement covered five citations, including unsafe-condition and inadequate pre-operational-inspection violations involving two mine trucks. One truck had seven listed defects, and another had nineteen, while the related inspection records omitted most or all of those conditions. The parties agreed to downgrade the expected injury for four citations from fatal to lost workdays or restricted duty and reduce each related penalty by 26 percent. The judge questioned the factual support for the reductions but concluded that Commission precedent limited settlement review and required approval on the submitted record. Justice Energy was ordered to pay $3,061 instead of the $4,081 originally proposed.
Decision snapshot
- Cited standards: 30 C.F.R. §§ 77.404(a) and 77.1606(a)
- Outcome: Settlement of five citations was approved for a total penalty of $3,061.
- Key point: The settlement was approved under Commission rules despite the judge's concerns about the support for reducing four truck-safety penalties.
Full text (FMSHRC public release)
FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION
OFFICE OF THE CHIEF ADMINISTRATIVE LAW JUDGE
1331 PENNSYLVANIA AVE., N.W., SUITE 520N
WASHINGTON, DC 20004-1710
TELEPHONE: 202-434-9933 FAX: 202-434-9949
|
SECRETARY OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION (MSHA), Petitioner
v.
JUSTICE ENERGY COMPANY, INC., Respondent |
|
|
CIVIL PENALTY PROCEEDING
Docket No. WEVA 2023-0148 A.C. No. 46-03404-569444
Mine: No. 32
|
DECISION
APPROVING SETTLEMENT
Before: Judge William B. Moran
This case is before the Court upon a petition for assessment of a civil penalty under section 105(d) of the Federal Mine Safety and Health Act of 1977. The Conference and Litigation Representative, (“CLR”), has filed a Motion to Approve Settlement. The originally assessed amount for the citations at issue was $4,081.00 and the proposed settlement amount is $3,061.00. The proposed settlement terms are reflected in the following table:
**Analysis **
Although the overall penalty reductions are moderate for this docket, several disconcerting aspects stand out. For each of the citations in this docket, save the one citation assessed at the minimum penalty, the basis for the reductions is that the injury would not result in more than lost workdays or restricted duty. Motion at 3-4. However, examining the four citations, the now-admitted violations represent serious and extensive conditions, all as found by the issuing MSHA Inspector, Aaron D. Cline, who diligently recorded the conditions and practices he discovered.
As reflected here, citing 30 C.F.R. § 77.404(a),[1] the
text of Inspector Cline’s demonstrates the significant hazards he found:
Citation No. 9569727[provides
the following unchallenged facts of the unsafe truck:]
The CAT 785C rock truck #521 is not being maintained in safe operating condition. When checked, the following deficiencies exist:
-
door seal is damaged
-
cab filter is missing
3.
handrail in front of cab broke
4.
off-side step top rung bent and steps bent into bumper
causing no toe clearance
5.
oil hose on off-side front brake leaking
- oil leak inside offside rear wheel
7.
emergency steering does not work
The operator removed the truck from service until all repairs are made.
Petition for civil penalty at 9.
Seven defects constitute a large number and items 3 through 5 and 7 are particularly worrisome.
Citation No. 9569728
This admitted violation has the effect, in
context, of making the serious defects identified in Citation No. 9569727 much
worse. Th issuing MSHA Inspector, to his great credit, performed due diligence in
citing the operator, per 30 C.F.R. § 77.1606 (a),[2] with a failure to perform a
legitimate pre-operational check for the truck cited in Citation No. 9569727,
above, noting:
The CAT 785C rock truck #521 has not been provided an adequate
pre-operational
check on either shift. When checked, citation 9569727 was issued with
numerous deficiencies and no defects were listed on the pre-ops except the
cab filter.
Petition for civil penalty at 10 (emphasis added).
In
settlement motions, the Court has seen a rise as a defense in such
motions that there was no citation for failure to perform a pre-check for
equipment defects. To address such claims, the Court has stated that inspectors
should evaluate whether there has been genuine pre-check for defects affecting
safety, something Inspector Cline, to his credit, evaluated here, finding an
abnegation by the operator of its duties to comply with the pre-shift exam
requirement.
**As described below, those two, inextricably related,
citations were not the end of the matter. **
Citation No. 9569731
Essentially the twin violations problems presented themselves again within the same inspection; that is to say, the inspector found multiple unsafe conditions on yet another truck and these hazards were also coupled with inadequate pre-operational checks.
This was a gross deficiency, far exceeding the 7
deficiencies found for Citation No. 9569727, as Citation, Citation No. 9569731
was considerably worse. Citing the same standard violated in Citation No.
9569727, this time Inspector Cline found 19 (nineteen) defects presenting
unsafe conditions. The citation provided the following unchallenged facts
of the unsafe truck:
The Maroon Mack Lube truck #0009 is not being maintained in safe operating condition. When checked, the following deficiencies exist:
-
Door seal driver side damaged
-
Door seal passenger side damaged
3.
inside door handles don't work inside cab both doors
4.
no passenger seat, wooden box is in place of seat, no buckle
for seat belt
5.
hood latch broke
6.
hood handle gone
-
oil leak on motor
-
ball stud has excessive slack on off side tie rod end
-
air dryer not working and leaking
-
green antifreeze tank ratchet strapped not bolted down
11.
no valve to shut air line off that must be changed from
antifreeze to grease tanks, blows air out on operator
-
- jake brake is weak
-
- shock missing on off side front
-
- oil covering walkway in bed
-
- oil covering hose bay
-
- 2 lights out on rear
-
- ladder to top of truck no toe clearance
18.
18. no handrail on top of tank and no antiskid material
19.
All 6 brakes are out of adjustment.
The operator removed the truck from service until all repairs are made. Standard 77.404(a) was cited 12 times in two years at mine 4603404 (12 to the operator, 0 to a contractor).
Petition for a civil penalty at 12-13 (emphasis added).
Here too, in the diligent performance of his inspection responsibilities, Inspector Cline issued Citation No. 9569732, with his unchallenged statement that:
The maroon mack lube
truck #0009 has not been provided an adequate pre-operational check on either
shift. When checked, ** no deficiencies were listed** on the pre
ops and citation 9569731 was issued listing 17
Standard 77.1606(a) was cited 2 times in two years at mine 4603404 (2 to the operator, 0 to a contractor).
Petition for Civil Penalty at 14. (emphasis added).
In the Court’s view, the motion is appalling, both because of the large number of hazards found on the two trucks and the dereliction of duties by the operator in not performing a legitimate precheck. The Respondent provides the same, empty, rationale to support the across-the-board 26% reductions for each of these four conceded violations.
The Respondent offers the same empty language
for each of four admitted violations:
In the unlikely event of a mine
accident, the listed conditions would not result in more than a lost workdays
or restricted duty injury.
Motion at 3-4. (emphasis added).
There is no substance to back up the bald claim; only the assertion is made.
The Secretary, acting through Conference and
Litigation Representative David Trent, in like fashion, has an equally hollow
response for each, stating:
The Secretary recognizes that
the ALJ may find merit in the facts and arguments presented by the
Respondent and in light of the contested evidence and given the uncertainties
of litigation,
Id. (emphasis added).
Despite its statutory role to protect miners, the Secretary does not inform if he/she consulted with the issuing inspector, who saw the admitted violations, for his take on the ‘lost workday, restricted duty’ claims. Further, for the Secretary to make no distinction between the numerous defects and the arguably more serious violation of not performing an honest pre-operational check, weakens the importance of the latter, and is a disservice to miners. Such a response is inimical to the Secretary’s safety and health duties.
Reasonable Inquiry by the Court is not Permitted
It is obvious that for egregious violations such
as these, the Court would have questions aplenty. However, [Reasonable Inquiry about the contentions advanced in
settlement motions is not Permitted]
This is because, under the Commission’s
interpretation of section 110(k) of the Mine Act, Congress only intended that
the three elements as laid out in The American Coal Co., 40 FMSHRC 983
(Aug. 2018) and Rockwell Mining, LLC, 40 FMSHRC 994 (Aug. 2018), need be
considered under the Commission’s standard for review of settlement
submissions. The settlement motion does not require more information from the
Secretary. Accordingly, per the Commission’s decisions on the scope of a
judge’s review authority of settlements, the “information” presented in this
settlement motion is sufficient for approval.
The Commission has stated that the administrative law judges have “front line oversight” of the settlement process and as such that it is an adjudicative function that “necessarily involves wide discretion.” Despite those muscular words, the Commission has clearly set forth that the Secretary is not required to offer any comment at all as to the merits of the Respondent’s arguments.
Per the Commission’s decisions in AmCoal and Rockwell
Mining, to approve a settlement motion there are three requirements.
Meeting the first two requirements is automatic and perfunctory.
(1) The motion must state the penalty proposed by the Secretary.
This requirement is met in every civil penalty petition, as the petition contains the proposed penalty. The amount is rarely, if ever, an issue, and if in issue, it is resolved before the penalty petition is filed.
(2) The amount of the penalty agreed to in settlement.
This requirement is also automatic; there could not be a settlement motion without the parties stating the penalty amount to which they have agreed.
(3) “Facts,” as the Commission has employed that term, in support of the penalty agreed to by the parties.
In the context of settlement motions, “facts”
have an atypical meaning.[4] In
discussing what constitute “facts” for settlements, the Commission stated
“there is no requirement that facts supporting a proposed settlement must
necessarily be submitted by the Secretary. Facts supporting a penalty reduction
in a settlement motion may be provided by any party individually or by parties
collectively.” AmCoal at 990. The only associated requirement with such “facts”
is that “there is a certification by the filing party that any non-filing party
has consented to the granting of the settlement motion.” Id. (emphasis added).
Accordingly, the Commission rejected the view
that a respondent’s assertions of fact need to “present legitimate questions of
fact,” and further that the Secretary need not comment yea or nay to the facts
asserted by a respondent. Instead, the Commission announced that “[f]acts
alleged in a proposed settlement need not demonstrate a ‘legitimate’
disagreement that can only be resolved by a hearing.” Instead, the Commission
allows that parties may submit facts that reflect a mutual position that the
parties have agreed is acceptable to them . . .” Id.
It should not come as a surprise that, under the Commission’s AmCoal test for review of settlements, all such motions are approved. In the rare instances where a judge has denied a settlement motion, post-AmCoal, those decisions have met with reversals by the Commission. Hopedale Mining, 42 FMSHRC 589 (Aug. 2020), American Aggregates, 42 FMSHRC 570 (Aug. 2020) (Chairman Traynor and Commissioner Jordan, dissenting).
The Court has
considered the Secretary’s Motion and approves it solely on the basis
of the Commission’s decisions inThe American Coal Co., 40 FMSHRC
983 (Aug. 2018) and Rockwell Mining, LLC, 40 FMSHRC 994 (Aug. 2018) for
the standard to be applied by Commission administrative law judges when
reviewing such settlement motions under the Commission’s interpretation of
section 110(k) of the Mine Act. Per the Commission’s decisions on the scope of
a judge’s review authority of settlements, the “information” presented in this
settlement motion is sufficient for approval.
** WHEREFORE, the
motion for approval of settlement is GRANTED. With significant
misgivings, the penalties are reduced, per the summary table above, and those
four reduced penalties are modified to provide that the injury or illness
reasonably to be expected is downgraded from ‘fatal’ for each to ‘lost workdays
or restricted duty.’ The Respondent is ORDERED* to pay*
a penalty of $3,061.00** within 30 days of this order.
/s/
William B. Moran
William B. Moran
Administrative Law Judge
Distribution:
David C. Trent, Conference & Litigation Representative, U.S. Department of Labor, MSHA
4499 Appalachian Highway, Pineville WV 24874 [email protected]
Scott Wickline, Esq., Hardy Pence, PLLC, 10 Hale Street, 4th
Floor
P.O. Box 2548, Charleston, WV 25329 [email protected]
[1] 30 C.F.R. § 77.404 Machinery and equipment; operation and
maintenance. (a) Mobile and
stationary machinery and equipment shall be maintained in safe operating
condition and machinery or equipment in unsafe condition shall be removed from
service immediately.
[2]30 C.F.R.
§ § 77.1606 Loading and haulage equipment; inspection and maintenance.
(a) Mobile
loading and haulage equipment shall be inspected by a competent person before
such equipment is placed in operation. Equipment defects affecting safety shall
be recorded and reported to the mine operator.
[3] The reference to
17 deficiencies appears to be a typographical error, as Inspector Cline listed
19, not 17, separate safety deficiencies in Citation No. 9569731.
[4]
In
settlements, “facts” do not mean things that are
known or proved to be true, nor does the term mean something that has actual
existence or a piece of information presented as having objective reality.
[5][Penalties may be paid electronically at Pay.Gov, a service
of the U.S. Department of the Treasury, at]https://www.pay.gov/public/form/start/67564508.
Alternatively, send payment (check or money order) to: U.S. Department of
Treasury, Mine Safety and Health Administration, P.O. Box 790390, St. Louis, MO
63179-0390. It is vital to include
Docket and A.C. Numbers when remitting payments.
| Citation No. | Originally Proposed Assessment | Settlement Amount | Modification |
|---|---|---|---|
| Docket No. WEVA 2023-0148 | |||
| 9569727 | $987.00 | $732.00 | 26% Penalty Reduction |
| 9569728 | $987.00 | $732.00 | 26% Penalty Reduction |
| 9569730 | $133.00 | $133.00 | Sustained as Issued; minimum penalty assessed |
| 9569731 | $987.00 | $732.00 | 26% Penalty Reduction |
| 9569732 | $987.00 | $732.00 | 26% Penalty Reduction |
| TOTAL | $4,081.00 | $3,061.00 | Overall: 25% reduction in total penalty under regular assessment formula |
Get today's answer for your situation
You just read what one judge decided for one employer in 2023, and it binds only those parties. Ezel checks the current MSHA standards and Commission precedent and answers your specific situation, with citations.
Opens in Ezel Pro. Every answer cites the authority it relies on.