FMSHRC ALJ decision Docket WEVA 2000-50 Decided March 6, 2001 Modified Judge Gary Melick

Consolidation Coal Company

Consolidation Coal Company (FMSHRC WEVA 2000-50): Ventilation order modified and penalty assessed

Apply this to your situation

This order from 2001 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current MSHA standards and Commission precedent say, with citations.

Currency note: this decision dates from 2001
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final ALJ decision, not Commission precedent
This decision became final under the 40-day rule in 30 U.S.C. § 823(d)(1) because no later Commission review appears in the official index. It binds the parties but is not Commission precedent. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the agency's own release.
Read the official release (fmshrc.gov)

Plain-English summary

Consolidation Coal admitted that it failed to maintain the approved ventilation-plan air velocity at the Robinson Run No. 95 Mine. The judge found the violation significant and substantial because inadequate ventilation could contribute to respirable-dust exposure and a methane or dust ignition. The judge did not find unwarrantable failure or high negligence because the condition existed briefly, the foreman had recorded compliant readings shortly before the inspection, and prior readings were above the required level. The withdrawal order was modified to a section 104(a) citation, and a $2,500 civil penalty was assessed.

Decision snapshot

  • Cited standard(s): 30 C.F.R. § 75.370(a)(1)
  • Outcome: Order No. 4867384 was modified to a section 104(a) citation, with a $2,500 penalty.
  • Key point: A short-lived ventilation-plan violation may be significant and substantial without constituting unwarrantable failure.

Full text (FMSHRC public release)

FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION

                            OFFICE OF ADMINISTRATIVE LAW JUDGES
                                     2 SKYLINE, Suite 1000
                                     5203 LEESBURG PIKE
                                FALLS CHURCH, VIRGINIA 22041


                                      March 6, 2001

SECRETARY OF LABOR, : CIVIL PENALTY PROCEEDING
MINE SAFETY AND HEALTH :
ADMINISTRATION (MSHA), : Docket No. WEVA 2000-50
Petitioner : A. C. No. 46-01318-04419
v. :
:
CONSOLIDATION COAL COMPANY, :
Respondent : Robinson Run No. 95

                                       DECISION

Appearances: Melonie J. McCall, Esq., Office of the Solicitor, U.S. Department of Labor,
Arlington, Virginia, on behalf of Petitioner;
Robert M. Vukas, Esq., Consolidation Coal Company, Pittsburgh, Pennsylvania,
on behalf of Respondent.

Before: Judge Melick

     This case is before me upon the Petition for Civil Penalty filed by the Secretary of Labor

pursuant to Section 105(d) of the Federal Mine Safety and Health Act of 1977, 30 U.S.C. § 801,
et seq. (1994), “the Act,” charging the Consolidation Coal Company (Consol) with one violation
of the mandatory standard at 30 C.F.R. § 75.370(a)(1) and proposing a civil penalty of $5,000.00
for that violation. At hearings on November 14, 2000, Consol admitted the violation as alleged
and challenged only the Secretary’s “significant and substantial” and “unwarrantable failure”
findings. The general issues before me then are whether the violation was “significant and
substantial,” whether it was the result of the operator’s “unwarrantable failure” and what is the
appropriate civil penalty to be assessed for the violation considering the criteria under Section
110(i) of the Act.

    The order at bar, number 4867384, issued October 6, 1999, pursuant to Section 104(d)(2)

of the Act, charges as follows:1

      1
           Section 104(d) provides as follows:

(1) "If, upon any inspection of a coal or other mine, an authorized representative of the
Secretary finds that there has been a violation of any mandatory health or safety standard, and if
he also finds that, while the conditions created by such violation do not cause imminent danger,
such violation is of such nature as could significantly and substantially contribute to the cause

                                           270

Page 2

           The currently approved mine ventilation plan is not being complied with on
   the 084-0 mmu, 13-0 Longwall section, in that only 435 fpm velocity was
   measured at the No. 10 shield with a properly calibrated anemometer. This is the
   fourth citation that has been issued for inadequate air velocity on this section.
   Citation No. 7142544 was issued on 08/25/1999. Citation No. 4866439 was
   issued on 10/04/1999. A methane/dust face ignition occurred on 09/16/1999.
   Citation No. 7142156 was issued on 09/30/1999 for failure to comply with the
   applicable respirable dust standard.

   The cited standard requires in essence that the operator follow the ventilation plan that has

been approved by the District Manager for the Department of Labor’s Mine Safety and Health
Administration (MSHA). In this case there is no dispute that the relevant ventilation plan
required that the air velocity at the cited location be maintained at 500 feet per minute (Jt. Exh.
No. 1 Para. 10).

    Gregory Fetty is Chief of the Health Section in MSHA District 3. On October 6, 1999, he

was working as an MSHA inspector at the Robinson Run No. 95 Mine for the purpose of abating
a September 30, 1999, excessive dust violation. Fetty took an air velocity reading at the No. 10
shield and found only 440 feet per minute (fpm) where 500 fpm was required by the ventilation

and effect of a coal or other mine safety or health hazard, and if he finds such violation to be
caused by an unwarrantable failure of such operator to comply with such mandatory
health or safety standards, he shall include such finding in any citation given to the operator
under this Act. If, during the same inspection or any subsequent inspection of such mine within
90 days after the issuance of such citation, an authorized representative of the Secretary finds
another violation of any mandatory health or safety standard and finds such violation to be also
caused by an unwarrantable failure of such operator to so comply, he shall forthwith issue an
order requiring the operator to cause all persons in the area affected by such violation, except
those persons referred to in subsection (c) to be withdrawn from, and to be prohibited from
entering, such area until an authorized representative of the Secretary determines that such
violation has been abated."

(2) If a withdrawal order with respect to any area in a coal or other mine has been issued
pursuant to paragraph (1), a withdrawal order shall promptly be issued by an authorized
representative of the Secretary who finds upon any subsequent inspection the existence in such
mine of violations similar to those that resulted in the issuance of the withdrawal order under
paragraph (1) until such time as an inspection of such mine discloses no similar violations.
Following an inspection of such mine which discloses no similar violations, the provisions of
paragraph (1) shall again be applicable to that mine.

                                            271

Page 3

plan.2 The violation was abated by placing a curtain between the No. 1 shield and the headgate
rib and by tightening the gob check curtain in the No. 3 entry (Gov’t Exh. No. 1).

    The Secretary maintains that the violation was “significant and substantial.” A violation is

properly designated as "significant and substantial" if, based on the particular facts surrounding
that violation, there exists a reasonable likelihood that the hazard contributed to will result in an
injury or illness of a reasonably serious nature. Cement Division, National Gypsum Co., 3
FMSHRC 822, 825 (April 1981). In Mathies Coal Co., 6 FMSHRC 1,3-4 (January 1984), the
Commission explained:

           In order to establish that a violation of a mandatory safety standard is
   significant and substantial under National Gypsum the Secretary must prove:
   (1) the underlying violation of a mandatory safety standard, (2) a discrete safety
   hazard -- that is, a measure of danger to safety -- contributed to by the violation,
   (3) a reasonable likelihood that the hazard contributed to will result in an injury,
   and (4) a reasonable likelihood that the injury in question will be of a reasonably
   serious nature.

See also Austin Power Inc. v. Secretary, 861 F.2d 99, 103-04 (5th Cir. 1988), aff'g 9

FMSHRC 2015, 2021 (December 1987) (approving Mathies criteria).

    The third element of the Mathies formula requires that the Secretary establish a reasonable

likelihood that the hazard contributed to will result in an event in which there is an injury (U.S.
Steel Mining Co., 6 FMSHRC 1834, 1836 (August 1984)). The likelihood of such injury must be
evaluated in terms of continued normal mining operations without any assumptions as to
abatement. U.S. Steel Mining Co., Inc., 6 FMSHRC 1573, 1574 (July 1984); See also Halfway,
Inc., 8 FMSHRC 8, 12 (January 1986) and Southern Ohio Coal Co.,
13 FMSHRC 912, 916-17 (June 1991).

     According to Inspector Fetty, several health and safety hazards were presented by the

violation at issue including the inhalation of excessive respirable dust contributing to black lung
disease and the contribution to a fire or explosion resulting from a face ignition because methane
would not be promptly removed from the longwall face. Fetty opined that, in the latter cases,
fatal injuries were reasonably likely. Fetty also noted that the subject mine was under the “Section
103(i)” gassy mine spot inspection program involving mines liberating more than 1,000,000 cubic
feet of methane in a 24-hour period. He also noted that there had been an ignition on September
16, 1999, on the same 13D longwall face. Within this framework of evidence and the reasonable
inferences to be made therefrom, I conclude that indeed, the violation was “significant and
substantial” and of high gravity.

   2
            The parties apparently agree that Inspector Fetty found 440 cfm not the 435 cfm

alleged in the order at bar.

                                            272

Page 4

    In reaching this conclusion I have not disregarded Consol’s argument that, because the

violation was quickly abated, it was short lived and therefore, the hazard, if any, was minimized.
However, under present law, in determining whether a violation is “significant and substantial”
the likelihood of an injury must be evaluated in terms of continued normal mining operations
without any assumptions as to abatement, U.S. Steel Mining Co., Inc., 6 FMSHRC at 1574.
Consol also appears to argue that the Secretary failed to prove that this violation “would
necessarily lead to an explosion, a fire or black lung.” As previously noted, however, the correct
standard of proof requires only that the Secretary establish by direct evidence or by reasonable
inference a reasonable likelihood that the hazard contributed to will result in an event in which
there is an injury or illness. U.S. Steel Mining Co., at 1836. That standard of proof has been met
herein.

    The Secretary also argues that the violation was the result of Consol’s “unwarrantable

failure” and high negligence. In this regard the Secretary argues that prior violations for
inadequate ventilation were issued at the same location on August 25, August 30, 1999, and, on
September 30, 1999 (Gov’t Exhs. No. 3 and 4).3 The Secretary also argues that Inspector Fetty
had discussed with the operator at a closeout conference on October 4, the importance of
compliance with the ventilation requirements. The Secretary also alleged but failed to prove that
the anemometer utilized by the section foreman was not properly calibrated and that he was not
using any correction or error factor in calculating air velocity. Fetty acknowledged however, that
he did not know how the section foreman actually took his air readings for compliance purposes.
Finally, Inspector Fetty testified that he relied in part also upon what he apparently believed was a
serious deficiency in the air velocity, i.e., 440 fpm when 500 fpm was required by the ventilation
plan.

    In defense of the Secretary’s allegations of “unwarrantable failure” and high negligence

Consol presented the reports for the three pre-shift examinations preceding the issuance of the
order at bar performed at the No. 10 shield. The most recent pre-shift examination prior to the
issuance of the order showed a reading of 605 (presumably feet per minute) at the No. 10 shield
measured during the examination between 5:00 a.m. and 7:15 a.m., on October 6, 1999 (Resp.’s
Exh. No. 4). The examination preceding that showed 612 (presumably feet per minute) at the No.
10 shield and the exam preceding that showed 730 (presumably feet per minute) at the No. 10
shield. In addition, the pre-shift examination for the preceding day, October 5, 1999, showed

   3
            At hearing the Secretary sought to amend the citation at bar by also referencing a

charging document issued October 4, 1999, for a similar violation of inadequate air in the cited
section. However, because the Secretary had failed to disclose this information in a timely
manner, the proposed amendment was denied. The admission of that charging document was
also barred for purposes of establishing "unwarrantable failure" because the Secretary’s failure to
disclose her intended use of that document in a timely manner. In any event, even had that prior
charging document been admitted and considered, it would not have been sufficient under all the
circumstances to support a finding of unwarrantability or greater negligence than found herein.

                                            273

Page 5

readings at the No. 10 shield of 700, 600 and 625 (presumably feet per minute). The
uncontradicted and credible record thus shows that for the six pre-shift examinations preceding
the issuance of the order at bar the air measurements at the No. 10 shield were well above the
minimum required by the ventilation plan.

     In further defense of the unwarrantable failure allegations, Consol cites the testimony of

longwall section foreman Gary Graham that he obtained an air reading on October 6, 1999, only
five or ten minutes before 9:00 a.m., and found 535 fpm at the No. 10 shield. Since the order at
bar was issued at 9:05 a.m., it is apparent that Graham’s readings were obtained only 10 to 15
minutes before inspector Fetty found the air reading had dropped to 440 fpm at the No. 10 shield.
Graham also testified that it required only five minutes to tighten the curtains necessary to bring
the air readings up to the requisite level. Graham also observed that the curtains had been tight at
that location when he passed earlier around 9:00 that morning and noted that when he later
returned to that location after the order had been issued he observed that the curtain had been
torn out from the spad. Graham opined that this could have been caused by someone passing
through the curtain in the interim. He noted that the other curtain had been loosened by moving
the shield.

    Longwall section foreman Graham’s testimony is not disputed and his credibility is not

otherwise challenged. Under the circumstances I accord Graham’s testimony significant weight
and conclude that indeed he checked the air velocity at the No. 10 shield only ten or fifteen
minutes before the violative condition was discovered by Fetty. Fetty’s lower and violative air
reading was apparently the result of curtains becoming loosened subsequent to their examination
by Graham, thereby causing the decrease in ventilation. Because of the extremely brief period
during which the violative condition therefore existed, the permissible air reading obtained only
shortly before the violation was discovered and the fact that the six preceding pre-shift reports
showed air readings well above the requisite level, I cannot find that the violation herein was a
result of “unwarrantable failure” or high negligence.

    I do find however, that the violation was the result of moderate negligence based on

Graham’s admission that they had been having trouble keeping air at the face for several weeks
before the order in this case was issued. At the same time I also note that the mine foreman had
instructed Graham to take four to five readings per shift to monitor the problem. Under all the
circumstances the order at bar must be modified to a citation under Section 104(a) of the Act.

Civil Penalty

    Under Section 110(i) of the Act, the Commission and its judges must consider the

following criteria in assessing a civil penalty: the operator’s history of previous violations, the
appropriateness of such penalty to the size of the business of the operator charged, whether the
operator was negligent, the effect on the operator’s ability to continue in business, the gravity of
the violation and the demonstrated good faith of the person charged in attempting to achieve rapid
compliance after notification of a violation.

                                            274

Page 6

    Gravity has been found to have been high and negligence to have been moderate.

Respondent has a significant history of violations as shown by Gov’t Exh. No. 10. It has been
stipulated that Consol is a large mine operator. There is no dispute that Consol demonstrated
good faith in attempting to achieve rapid compliance after notification of the violation. There is
no evidence that the penalty imposed herein would have any effect on the operator’s ability to
continue in business. Within this framework of evidence I find that a civil penalty of $2,500.00, is
appropriate.

                                         ORDER

    Order No. 4867384 is hereby modified to a citation pursuant to Section 104(a) of the Act.

Consolidation Coal Company is hereby directed to pay a civil penalty of $2,500.00, for the
violation charged in Citation 4867384 within 40 days of the date of this decision.

                                           Gary Melick
                                           Administrative Law Judge

Distribution: (Certified Mail)

Melonie J. McCall, Esq., Office of the Solicitor, U.S. Department of Labor, 4015 Wilson Blvd.,
Suite 400, Arlington, VA 22202

Robert M. Vukas, Esq., Consolidation Coal Company, 1800 Washington Road, Pittsburgh, PA
15241

\mca

                                            275

Get today's answer for your situation

You just read what one judge decided for one employer in 2001, and it binds only those parties. Ezel checks the current MSHA standards and Commission precedent and answers your specific situation, with citations.

Opens in Ezel Pro. Every answer cites the authority it relies on.