FMSHRC ALJ decision Docket WEST 2014-0117 Decided November 19, 2014 Mixed result Judge David P. Simonton

Secretary of Labor v. Delta Concrete Products, Inc.

Secretary of Labor v. Delta Concrete Products, Inc. (FMSHRC WEST 2014-0117): Eight violations upheld and scale-road citation vacated

Apply this to your situation

This order from 2014 bound only the parties to this case; it isn't precedent. Ezel answers your situation under the current MSHA standards and Commission precedent, with citations.

Currency note: this decision dates from 2014
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final ALJ decision, not Commission precedent
This decision became final under the 40-day rule in 30 U.S.C. § 823(d)(1) because no later Commission review appears in the official index. It binds the parties but is not Commission precedent. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the Commission's own document.
Read the official release (fmshrc.gov)

Plain-English summary

MSHA contested nine conditions at Delta Concrete Products' small Alaska gravel operation, including electrical wiring and grounding, a damaged handrail, an unstable ramp wall, and missed workplace examinations. Judge David P. Simonton upheld eight violations, including all five electrical citations and the workplace-examination citation. He reduced high negligence to moderate for two improper electrical splices because Delta had relied on statements during earlier MSHA inspections that led it to believe the methods were acceptable. The Judge vacated the remaining citation because the unguarded vehicle scale sat on a separate access area and was not part of a roadway covered by the cited berm standard. Delta's total penalty was reduced from the proposed $4,721 to $3,807.

Decision snapshot

  • Cited standards: 30 C.F.R. §§ 56.11027, 56.12004, 56.12008, 56.12013, 56.12028, 56.18002(a), 56.9300(a), and 56.9303
  • Outcome: Eight violations were affirmed, two negligence findings were reduced, one scale-road citation was vacated, and the total penalty was set at $3,807.
  • Key point: Prior agency acceptance may mitigate negligence without eliminating a violation, while a roadway-specific berm rule does not cover a scale area that vehicles enter only to be weighed.

Full text (FMSHRC public release)

FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION

Federal  Mine 
Safety  and  Health  Review  Commission

Office  of  Administrative 
Law  Judges

721  19th  St., 
Suite  443

Denver,  CO    80202-2500

Office:    (303)  844-5266/Fax:   
(303)  844-5268

November  19,  2014

SECRETARY  OF  LABOR, 

:

CIVIL  PENALTY  PROCEEDINGS

MINE  SAFETY  AND  HEALTH

:

ADMINISTRATION,  (MSHA),

Petitioner,

v.

:

:

:

:

:

Docket  No.  WEST  2014-117

A.C.  No.  50-01783-336602

DELTA  CONCRETE  PRODUCTS,  INC.,   

:

Mine  ID:    50-01783

Respondent.

:

Mine:    Willow  Lake  Portal

DECISION

Appearances:                           Sean 
J.  Allen,  Office  of  the  Solicitor,  U.S.  Department  of  Labor,  1244  Speer 
Blvd.,  Suite  216,  Denver,  CO  80202  for  Petitioner

Robert 
B.  Groseclose,  Cook,  Schuhmann  &  Groseclose,  714  Fourth  Ave.,  Suite 
200,  Fairbanks,  AK  99707-0810  for  Respondent

Before:                                                Judge  Simonton

I. INTRODUCTION

This  case  is  before  me  on  a  petition 
for  assessment  of  civil  penalty  filed  by  the  Secretary  of  Labor,  acting 
through  the  Mine  Safety  and  Health  Administration,  against  Delta  Concrete 
Products,  Inc.  at  its  Delta  Junction  mine,  pursuant  to  sections  105  and 
110  of  the  Federal  Mine  Safety  and  Health  Act  of  1977,  30  U.S.C.  §§ 
815  and  820  (the  “Mine  Act”  or  “Act”).    The  case  includes  nine  contested 
violations  with  a  total  proposed  penalty  of  $4,721.00.    The  parties 
presented  testimony  and  documentary  evidence  at  a  hearing  held  in  Fairbanks, 
Alaska  on  August  12  and  13,  2014.    For  the  reasons  that  follow,  eight 
of  the  nine  contested  citations  and  orders  are  AFFIRMED  with  two 
reductions  in  the  negligence  level  and  one  citation  is  VACATED.   
Respondent  will  be  ordered  to  pay  $3,807.00  in  penalties.

II. BACKGROUND

Delta  Concrete  Products, 
Inc.,  (Respondent)  crushes  and  screens  gravel  at  their  mile  267.5  Delta 
Junction  surface  pit  mine  (the  “mine”)  in  Delta  Junction,  Alaska.    The 
mine  is  subject  to  regular  inspections  by  the  Mine  Safety  and  Health 
Administration 

(“MSHA”)  pursuant  to  section  103(a)  of  the  Act.   
30  U.S.C.  §  813(a).    The  parties  stipulated  as  follows:

A.    Respondent  was, 
at  all  relevant  times,  the  operator  at  the  Delta  Concrete  Products  Pit, 
Mine  ID:  50-01783.

B.     The  mine 
listed  above  is  a  mine,  as  defined  in  the  Mine  Act.

C.     Respondent 
is  engaged  in  mining  operations  in  the  United  States  and  its  mining 
operations  affect  interstate  commerce.

D.    Respondent  is  subject 
to  the  jurisdiction  of  the  Federal  Mine  Safety  and  Health  Act  of  1977, 
30  U.S.C.  §§  801-965.

E.     The  Federal 
Mine  Safety  and  Health  Review  Commission  has  jurisdiction  of  this  matter 
under  the  Mine  Act.

F.      The 
citations  at  issue  in  this  matter  were  issued  on  the  date  indicated.

G.    The  inspector  whose 
signature  appears  in  block  22  of  the  citations  at  issue  was  acting  in 
his  official  capacity  as  an  authorized  representative  of  the  United  States 
Secretary  of  Labor. 

H.    The  Secretary’s 
proposed  penalties  for  each  citation  are  listed  on  Exhibit  A  of  the 
penalty  assessment  filed  in  this  matter  and  those  amounts  incorporated 
are  incorporated  by  reference  herein.

I.       The 
exhibits  to  be  offered  by  the  parties  are  stipulated  to  be  authentic 
but  no  stipulation  is  made  as  to  their  relevance  or  as  to  the  truth 
of  the  matters  asserted  therein.   

Secy’s  Prehearing  Report.

At  hearing,  the  Secretary  presented 
testimony  from  MSHA  Inspector  Garrett  Frey.    Inspector  Frey  has  worked 
as  an  inspector  for  MSHA  for  two  years.    Tr.  30.    He  has  conducted 
regular  MSHA  E01  inspections  of  approximately  one  hundred  sand  and  gravel 
operations  and  spends  ninety  five  percent  of  his  work  time  doing  so.   
Tr.  30-34.    Inspector  Frey  received  classroom  and  field  training  at  the 
MSHA  Mine  Academy  in  West  Virginia.    Id.    He  has  also  participated 
in  informal  weekly  training  at  staff  meetings  and  journeyman  training 
which  covered  basic  electricity  and  three-phase  electricity  systems.    Id.   
Frey  earned  a  Bachelor’s  degree  in  engineering  which  included  courses 
on  basic  electricity  and  three  phase  electricity.    Tr.  31.   

Respondent  presented  testimony 
from  its  President  and  General  Manager,  Matthew  Walker  and  electrician 
Christopher  Morley.    Mr.  Walker  has  co-owned  Delta  Concrete  Products  since 
2002,  previously  worked  for  a  general  contractor  and  prior  to  that,  for 
approximately  18  years,  worked  for  a  logging  company  performing  various 
functions  from  running  the  shop,  working  on  equipment  as  a  field  mechanic, 
operating  equipment  and  cutting  down  trees.    Tr.  298-299.    Mr.  Morley 
has  owned  Morley  Electric  in  Delta,  since  2004.  Tr.  389.    He  has  been 
a  journeyman  electrician  since  1998  and  an  electrical  administrator  administrating 
electrical  installations  ensuring  they  meet  code  and  job  requirements  since 
2004.    Tr.  390.    Morley  is  licensed  as  a  journeyman  electrician  and 
electrical  administrator  with  the  Alaska  Division  of  Occupational  Licensing 
and  a  member  of  the  International  Brotherhood  of  Electrical  Workers  1547.   
Id.   

I  have  organized  my  findings 
by  individual  docket  and  detailed  my  final  ruling  for  each  citation  within 
its  respective  subsection.    The  Secretary  designated  the  majority  of  these 
contested  citations  as  “Significant  &  Substantial”  (S  &  S)  violations.   
At  hearing,  Respondent  contested  the  factual  representations  of  the  testifying 
MSHA  inspector,  the  underlying  legal  basis  of  the  citations  as  well  as 
the  Secretary’s  gravity  and  negligence  designations. 

As  such,  I  have  prepared 
a  Statement  of  Law  outlining  the  Commission’s  instructions  regarding:  1) 
Burden  of  Proof;  2)  Significant  and  Substantial  violations;  3)  Negligence 
and  4)  Penalty  Assessments.    I  have  followed  these  guidelines  for  each 
of  the  nine  contested  violations. 

The  hearing  for  these 
nine  citations  lasted  two  days  and  produced  a  517  page  transcript  with 
numerous  exhibits.    The  parties  also  submitted  post-hearing  briefs  articulating 
their  respective  positions  on  the  evidence  presented  at  hearing.    I  have 
reviewed  all  of  this  evidence  at  length.    In  the  interest  of  brevity, 
I  have  not  included  a  general  overview  summary  of  the  testimony  presented, 
but  rather  have  cited  to  the  testimony,  exhibits,  and  arguments  I  found 
critical  to  my  ultimate  ruling  within  my  analysis. 

III. STATEMENT  OF  LAW

A. Burden  of  Proof

The  Commission  has  long  held, 
“In  an  enforcement  action  before  the  Commission,  the  Secretary  bears  the 
burden  of  proving  any  alleged  violation.”    Jim  Walter  Resources,  Inc.,  9  FMSHRC 
903,  907  (May  1987);  Wyoming  Fuel  Co.,  14  FMSHRC  1282,  1294  (August  1992).   
The  Commission  has  described  the  Secretary’s  burden  as:

The 
burden  of  showing  something  by  a  “preponderance  of  the  evidence,”  the 
most  common  standard  in  the  civil  law,  simply  requires  the  trier  of 
fact  “to  believe  that  the  existence  of  a  fact  is  more  probable  than 
its  nonexistence.”

RAG  Cumberland  Res. 
Corp.,  22  FMSHRC  1066,  1070  (Sept.  2000);  Garden  Creek  Pocahontas 
Co.,  11  FMSHRC  2148,  2152  (Nov.  1989).

The  Secretary 
may  establish  a  violation  by  inference  in  certain 
situations.    Garden  Creek  Pocahontas  Co.,  11  FMSHRC  2153.    Any  such  inference,  however,  must  be  inherently  reasonable, 
and  there  must  be  a  rational  connection  between  the  evidentiary  facts 
and  the  ultimate  fact  inferred.    Mid-Continent  Resources,  6  FMSHRC 
1132,  1138.  (May  1984).

If  the  Secretary  has  established  facts  supporting  the 
citation,  the  burden  shifts  to  the  Respondent  to  rebut  the  Secretary’s 
prima  facie  case.    Construction  Materials,  23  FMSHRC  321,  327  (March 
2001)  (ALJ  Feldman).

B.
Significant  and  Substantial

A  violation  is  Significant  &  Substantial  (S&S), 
“if  based  upon  the  particular  facts  surrounding  the  violation  there  exists 
a  reasonable  likelihood  that  the  hazard  contributed  to  will  result  in 
an  injury  or  illness  of  a  reasonably  serious  nature.”    Cement  Division, 
National  Gypsum  Co.,  3  FMSHRC  822,  825  (Apr.  1981).

In 
order  to  uphold  a  citation  as  S&S,  the  Commission  has  held  that 
the  Secretary  of  Labor  must  prove:  1)  the  underlying  violation  of  a 
mandatory  safety  standard;  (2)  a  discrete  safety  hazard—that  is,  a  measure 
of  danger  to  safety—contributed  to  by  the  violation;  (3)  a  reasonable 
likelihood  that  the  hazard  contributed  to  will  result  in  an  injury;  and 
(4)  a  reasonable  likelihood  that  the  injury  in  question  will  be  of  a 
reasonably  serious  nature.    Mathies  Coal  Co.,  6  FMSHRC  1,  3-4 
(Jan.  1984).

An 
S&S  designation  must  be  based  upon  the  particular  facts  surrounding 
the  violation  and  must  be  made  in  the  context  of  continued  normal  mining 
operations.    Texasgulf,  Inc.,  10  FMSHRC  498,  500  (Apr.  1988);  U.S. 
Steel  Mining  Co.,  Inc.,  6  FMSHRC  1573,  1574  (July  1984).    The  Secretary 
does  not  necessarily  have  to  “prove  a  reasonable  likelihood  that  the 
violation  itself  will  cause  injury.”    Cumberland  Coal  Resources,  LP, 
33  FMSHRC  2357,  2365  (Oct.  2011)  (holding  that  failure  to  maintain  emergency 
equipment  was  S&S  despite  low  likelihood  of  emergency  occurring);  See 
also  Musser  Engineering,  Inc.  and  PBS  Coals  32  FMSHRC 
1257,  1280-81  (Oct  2010)  (PBS). 

However, 
the  Commission  has  recently  reiterated  that  “it  is  the  contribution  of 
a  violation  to  the  cause  and  effect  of  a  hazard  that  must  be  significant 
and  substantial.”    Black  Beauty  Coal,  34  FMSHRC  1733,    1740  (August 
2012)  (upholding  Judge’s  S&S  determination  that  a  ¼  mile  wide  gap 
in  a  protective  berm  created  a  safety  hazard  of  trucks  driving  over 
a  steep  embankment)  (quoting  U.S.  Steel  Mining  Co.,  6  FMSHRC 
1834,  1836)(Aug  1984). 

C. Negligence

Negligence  “is 
conduct,  either  by  commission  or  omission,  which  falls  below  a  standard 
of  care  established  under  the  Mine  Act  to  protect  miners  against  the 
risks  of  harm.”    30  C.F.R.  §  100.3(d).    “A  mine  operator  is  required 
to  be  on  the  alert  for  conditions  and  practices  in  the  mine  that  affect 
the  safety  and  health  of  miners  and  to  take  steps  necessary  to  correct 
or  prevent  hazardous  conditions  or  practices.”    Id.    Low  negligence 
exists  when  “[t]he  operator  knew  or  should  have  known  of  the  violative 
condition  or  practice,  but  there  are  considerable  mitigating  circumstances.”   
Id.    Moderate  negligence  is  when  “[t]he  operator  knew  or  should 
have  known  of  the  violative  condition  or  practice,  but  there  are  mitigating 
circumstances.”    Id.    High  negligence  exists  when  [t]he  operator 
knew  or  should  have  known  of  the  violation,  condition  or  practice  and 
there  are  no  mitigating  circumstances.    Id.    See  also  Brody  Mining, 
LLC,  2011  WL  2745785  (2011)  (ALJ).    Finally,  the  operator  is  guilty 
of  reckless  disregard  where  it  “displayed  conduct  which  exhibits  the  absence 
of  the  slightest  degree  of  care.”    Id.    MSHA  considers  mitigating 
circumstances  which  may  include,  but  are  not  limited  to,  actions  taken 
by  the  operator  to  prevent  or  correct  hazardous  conditions  or  practices.   
Id. 

D. Penalty  Assessment

It 
is  well  established  that  Commission  administrative  law  judges  have  the 
authority  to  assess  civil  penalties  de  novo  for  violations  of  the  Mine 
Act.    Sellersburg  Stone  Company,  5  FMSHRC  287,  291  (March  1983).   
The  Act  requires  that  in  assessing  civil  monetary  penalties,  the  Commission 
ALJ  shall  consider  six  statutory  penalty  criteria:

(1)  the  operator’s 
history  of  previous  violations,  (2)  the  appropriateness  of  such  penalty 
to  the  size  of  the  business  of  the  operator  charged,  (3)  whether  the 
operator  was  negligent,  (4)  the  effect  on  the  operator’s  ability  to  continue 
in  business,  (5)  the  gravity  of  the  violation,  and  (6)  the  demonstrated 
good  faith  of  the  person  charged  in  attempting  to  achieve  rapid  compliance 
after  notification  of  a  violation.

30  U.S.C.  820  (I).

Although  I  assess  monetary  penalties 
de  novo,  the  Secretary  has  submitted  proposed  penalty  amounts  for  each 
citation  contested  at  hearing.    Following  30  CFR  §100.3,  the  Secretary 
submitted  regularly  assessed  penalty  amounts  based  upon  point  values  corresponding 
to  the  six  statutory  criteria  for  all  citations. 

For  all  penalty  assessments, 
the  Secretary  bears  the  burden  of  establishing  the  proposed  penalty  is 
appropriate  based  upon  the  statutory  criteria  of  Section  110(i)  of  the 
Act.    In  re:  Contest  of  Respirable  Dust  Sample  Alteration  Citations, 
14  FMSHRC  239,  241  (ALJ  Broderick)  (January  1992)  (Order).   

In  this  matter,  there  appears  to 
be  no  dispute  that  Respondent  is  a  small  family  owned  business.    Tr. 

301.    Respondent  has  not  argued  or  presented  any  evidence  indicating 
that  any  of  the  proposed  penalties  would  affect  its  ability  to  continue 
business  operations.    I  have  discussed  the  violation  history,  negligence, 
gravity,  and  abatement  efforts  pertaining  to  each  alleged  violation  within 
my  findings  for  each  citation. 

IV. FINDINGS  OF  FACT  AND  CONCLUSIONS  OF  LAW

ELECTRICAL  VIOLATIONS

Five  of  the  nine  citations  adjudicated 
in  this  case,  8693966,  8693967,  8693968,  8693970  and  8693978  involve  electrical 
violations.    For  clarity  these  citations  will  be  addressed  together.   
It  is  undisputed  that  the  number  of  people  affected  by  each  violation 
is  one.   

Respondent  crushes,  screens,  washes 
and  conveys  gravel  at  their  Delta  Junction  mine  facility.    The  crushing 
operation  is  referred  to  as  the  “dry  side”  and  the  screening/washing 
and  conveying  process  occurs  on  the  “wet  side”.    Resp.  Prehearing  Brief.   
It  is  undisputed  that  at  the  time  of  the  inspection  the  dry  side  was 
“red  tagged”  and  had  been  out  of  service  since  2012.    Id.    All 
of  the  electrical  citations  in  this  case  were  issued  for  the  wet  side.   
At  issue  is  whether  the  wet  side  was  operational  at  the  time  the  citations 
were  issued.

A. MSHA’s 
Authority  to  Inspect  the  Wet  Plant  Portion  of  Delta  Junction  Mine 

Respondent  argued  that  the  wet 
side  of  the  mine  should  not  have  been  subject  to  the  issuance  of  citations 
because  it  was  locked  and  tagged  out  and  therefore,  removed  from  service.   
Respondent’s  president  and  co-owner,  Matthew  Walker  testified  it  was  his 
understanding  that  if  a  piece  of  mining  equipment  was  locked  and  tagged 
out  it  could  be  subject  to  inspection  but  not  cited.    Tr.  366-367.   
However,  Inspector  Garrett  Frey  testified  that  he  appropriately  inspected 
the  wet  plant  portion  of  the  mine  according  to  MSHA’s  Metal  and  Nonmetal 
General  Inspection  Handbook  procedures.    Tr.  283-297.    The  Metal  and 
Nonmetal  General  Inspection  Handbook  states, 

[a]t  times,  inspectors  attempt 
to  conduct  regular  inspections  of  mines  or  mills  and  find,  on  arrival, 
that  it  is  not  operating  or  not  operating  at  full  capacity  and  some 
equipment  or  machinery  is  not  in  operation.    In  these  cases,  regardless 
of  whether  the  mill  or  mine  is  operating  or  only  operating  with  limited 
capacity,  inspectors  shall  conduct  a  regular  inspection…of  the  non-producing 
or  non-active  section  of  the  mine  or  mill  to  assure  that  potential  hazards 
or  risks  to  miners  do  not  exist.   

Tr.  284-286,  Sec’y  Ex.  P-17,  Page  35.   

Inspector  Frey  testified  that  Respondent 
was  continuing  to  produce  material  based  upon  the  mine  producing  material 
two  weeks  prior  to  the  inspection.    Tr.  286.    The  inspector  observed 
that  Respondent  could  continue  to  produce  material  from  the  wet  side 
of  the  mine  because  the  wet  plant  distribution  box  was  locked  out  and 
tagged  out  only  for  the  purpose  of  a  screen  change.    Tr.  36-38;  286-287.   
Frey  confirmed  that  the  mine  had  not  produced  material  for  two  weeks 
prior  to  the  inspection  based  on  his  conversation  with  Walker  and  later 
verified  by  production  reports.    Tr.  36-38.    However,  the  inspector  believed 
that  the  wet  plant  could  easily  be  placed  back  into  service.    Tr.  36-38.   
During  the  hearing,  Inspector  Frey  testified  to  observing  many  electrical 
and  non-electrical  violations  on  the  wet  side  of  the  mine  that  he  believed 
would  continue  to  exist  during  continued  mining  operations.    Tr.  286-287.   

The  operator,  Matt  Walker  testified  that  the 
wet  side  of  the  mine  was  “removed  from  service”  because  the  intention 
of  the  lock  and  tag  was  to  permanently  disable  that  part  of  the  mine.   
Tr.  370-371.    However,  MSHA’s  Citation  and  Order  Writing  Handbook  for 
Coal  Miners  and  Metal  and  Nonmetal  Mines  states, 

[t]he  term  ‘removed  from  service’ 
does  not  mean  that  the  mine  operator  stopped  using  and  parked  a  piece 
of  equipment  (e.g.,  front-end  loader,  truck)  or  a  mining  unit  (e.g., 
portable  crusher,  screening  unit)  when  it  could  or  can  be  restarted  and 
easily  placed  back  into  service  in  the  same  condition  which  caused  issuance 
of  the  original  citation(s)  or  order(s).    Rather,  “removed  from  service” 
refers  to  the  action(s)  taken  by  the  mine  operator  or  contractor  to 
permanently  incapacitate  or  render  inoperable  the  equipment  and  eliminate 
the  violation.     

Inspector  Frey  testified  that  the 
wet  plant  was  not  removed  from  service  because  it  was  locked  and  tagged 
out  only  for  the  purpose  of  a  screen  change  as  noted  on  the  distribution 
box  tag.    Tr.  36-38.    He  further  testified  that  the  wet  side  was  not 
permanently  incapacitated  or  rendered  inoperable  because  the  wet  plant 
could  easily  be  placed  back  into  service  in  the  same  condition  after 
the  screens  were  changed  for  production  purposes.    Tr.  288-290;  Sec’y 
Ex.  P-2,  Photo  4.    The  inspector  explained  that  the  wet  plant  could 
be  returned  to  service  by  unlocking  the  distribution  box  and  energizing 
the  wet  plant.    Id.

Similarly,  Respondent  argues  that 
at  a  minimum  the  cited  electrical  violations  would  have  been  corrected 
during  off  season  maintenance.    Resp.  Post  Hearing  Brief,  p.  8.    However, 
this  argument  presupposes  that  the  wet  side  of  the  plant  was  indeed 
shut  down  for  the  season  and  was  removed  from  service.    A  fact  contrary 
to  the  evidence  relied  upon  by  the  inspector  noted  above  that  the  wet 
side  was  locked  and  tagged  out  only  for  a  screen  change;  thus,  indicating 
intent  or  ability  to  reactivate  the  wet  side  as  needed  for  further  operation.   
Nor  was  there  evidence  presented  by  Respondent  that,  had  no  citations 
been  issued,  a  competent  individual  would  have  conducted  an  inspection 
and  tagged  the  electrical  issues  for  repair  given  Respondent’s  admission 
that  had  the  citations  not  been  issued  the  electrical  issues  would  have 
continued  on  during  normal  mining  operations.    Tr.  487.

I  find  that  it  was  appropriate 
and  necessary  for  Inspector  Frey  to  inspect  the  wet  plant  for  safety 
hazards  because  (1)  MSHA’s  Inspection  handbook  allows  inspectors  to  conduct 
inspections  at  mines  that  are  not  operating  at  full  capacity,  and  (2) 
the  wet  side  of  the  Delta  Junction  mine  was  not  permanently  incapacitated 
because  the  lock  and  tag  on  the  distribution  box  was  marked  only  for 
a  screen  change  and  material  had  been  run  on  the  wet  side  of  the  mine 
two  weeks  prior  to  the  inspection  based  on  production  reports.

B. Citation 
No.  8693966   

Inspector  Frey  issued  Citation  No.  8693966 
on  August  19,  2013  for  an  alleged  violation  of  30  CRF  56.12013.    Tr. 
39;  Sec’y  Ex.  P-2.    The  inspector  alleged  within  the  citation  that: 

A  mechanically  strong,  insulated 
and  sealed  splice  was  not  used  in  connecting  a  P-136-29-MSHA  6AWG  SOOW 
power  cable  coming  from  the  wet  plant  distribution  box  in  the  operator’s 
tower.    The  wet  plant  has  operated  using  this  480  volt  three  phase 
electrical  connection  of  only  wire  nuts  and  minimal  electrical  tape  approximately 
16  inches  off  the  ground  immediately  in  front  of  the  wet  plant  distribution 
box.    A  miner  coming  into  contact  with  energized  3  phase  electrical 
circuits  could  experience  severe  shocks,  burns,  or  other  fatal  electrical 
injuries  and  complications.

Sec’y  Ex.  2. 

Inspector  Frey  determined  that  the 
violation  was  reasonably  likely  to  cause  an  injury,  the  resulting  injury 
would  be  fatal,  the  violation  was  S&S,  affected  one  person,  and  was 
the  result  of  Respondent’s  high  negligence.    Sec’y  Ex.  P-2.    The  Secretary 
proposed  a  penalty  of  $807.00.   

  1. Findings

Inspector  Frey  issued  Citation  No.  8693966, 
because  he  determined  that  a  splice  connected  to  a  wet  plant  distribution 
box  was  in  violation  of  30  CFR  §  56.  12013  which  mandates  that:

Permanent  splices  and  repairs  made 
in  power  cables,  including  the  ground  conductor  where  provided,  shall 
be: 

(a)               
Mechanically 
strong  with  electrical  conductivity  as  near  as  possible  to  that  of  the 
original; 

(b)              
Insulated 
to  a  degree  at  least  equal  to  that  of  the  original,  and  sealed  to 
exclude  moisture;  and 

(c)               
Provided 
with  damage  protection  as  near  as  possible  to  that  of  the  original, 
including  good  bonding  to  the  outer  jacket. 

Frey  testified  that  Respondent  used 
wire  nuts  with  electrical  tape  wrapped  around  them  to  connect  a  480-volt 
power  cable  coming  from  the  wet  plant  distribution  box  in  the  operator’s 
tower.    Tr.  44.    The  inspector’s  notes  designate  that  the  splice  was 
16  inches  off  the  floor  below  the  wet  side  distribution  box  and  was 
located  in  the  travel  way  of  the  operator’s  tower.    Sec’y  Ex.  P-2.   
Frey  stated  that  the  splice  violated  the  standard  because  wire  nuts  are 
not  mechanically  strong  with  electrical  conductivity  as  near  as  possible 
to  that  of  the  original.    Tr.  43-46.    The  inspector  also  testified 
that  the  electrical  tape  used  to  wrap  around  the  wire  nuts  was  not 
bonded  in  a  way  to  prevent  moisture  from  infiltrating  the  splice.    Tr. 

46.    He  stated  that  he  observed  the  black,  green,  red,  and  yellow  inner 
conductors  on  the  splice  which  demonstrated  that  the  conductors  were  not 
sealed  from  moisture  or  adequately  bonded  to  the  outer  jacket.    Tr. 
45-47.    He  also  noted  that  the  filler  material  sticking  out  of  the 
cables  exposed  the  splice  to  moisture  that  could  potentially  wick  down 
the  length  of  the  cable  and  create  a  potential  shock  hazard  to  miners.   
Id.   

Christopher  Morley,  Respondent’s 
electrical  witness,  testified  that  the  splice  was  mechanically  strong  because 
the  power  cords  were  secure  and  would  not  come  apart  when  pulled.   
Tr.  419-421.    Morley  believed  that  the  wire  nuts  wrapped  in  electrical 
tape  were  sealed  to  exclude  moisture.    Id.    However,  he  acknowledged 
the  splice  was  not  protected  from  damage  as  near  as  possible  to  the 
original  because  it  was  missing  the  outer  jacket.    Tr.  421.    The  inspector 
provided  very  detailed,  specific  and  compelling  testimony  regarding  the 
likelihood  of  moisture  wicking  down  the  cables  given  the  location  of 
the  splice  in  the  Conex  structure  close  to  an  open  door  with  evidence 
of  rusting  and  water  tracks  on  the  structure  walls.    Tr.  44-49.    Accordingly, 
I  defer  to  his  reasonable  determination  and  credit  his  testimony  over 
that  of  Respondent’s  electrical  witness.   

As  such,  I  find  that  Respondent 
violated  30  CRF  56.12013  by  failing  to  connect  a  480-volt  power  cable 
with  use  of  a  splice  that  was  mechanically  strong  and  insulated  and 
bonded  to  a  degree  that  would  exclude  moisture.    Accordingly,  Citation 
No.  8693966  is  AFFIRMED.    However,  for  reasons  explained  below 
the  negligence  level  will  be  modified  from  high  to  moderate.

a. Prior  Non-Enforcement  of  Standards  at  Delta 
Junction  Mine

Matthew  Walker,  the  operator  of 
Delta  Concrete,  testified  that  previous  MSHA  inspectors  had  instructed 
him  that  there  were  better  ways  to  splice,  but  the  way  Respondent  chose 
to  connect  power  cables  was  adequate.    Tr.  349.    Walker  testified  that 
previous  MSHA  inspector’s  did  not  inform  him  to  make  any  changes  to 
the  existing  electrical  splices  that  were  cited  by  Inspector  Frey.    Tr. 

350.    He  argued  that  because  they  had  not  previously  been  cited  for 
any  electrical  splice  connections,  the  Secretary  should  be  estopped  from 
enforcement  of  citations  dealing  with  hazardous  electrical  splices.    Tr. 
351.   

Although  such  evidence  may  be  weighed 
when  determining  the  appropriate  penalty,  the  Commission  has  generally 
rejected  the  prior  non-enforcement  defense  to  enforcement  of  a  future 
citation.    In  Secretary  v.  King  Knob  Coal  Company,  Inc.,  3  FMSHRC 
1417  (1981),  the  Commission  generally  rejected  the  doctrine  of  equitable 
estoppel.    However,  it  also  viewed  the  erroneous  action  of  the  Secretary 
(mistaken  interpretation  of  the  law  leading  to  prior  non-enforcement)  as 
a  factor  which  can  be  considered  in  mitigation  of  penalty.    The  Supreme 
Court  has  held  that  equitable  estoppel  generally  does  not  apply  against 
the  federal  government.    Federal  Crop  Insurance  Corp.  v.  Merrill, 
332  U.S.  380,  383-386  (1947);  Utah  Power  and  Light  Co.  v.  United 
States,  243  U.S.  389,  408-411  (1917).    The  Court  has  not  expressly 
overruled  these  opinions,  although  in  recent  years  lower  federal  courts 
have  undermined  the  Merrill/Utah  Power  doctrine  by  permitting  estoppel 
against  the  government  in  some  circumstances.    See  United  States 
v.  Georgia-Pacific  Co.,  521  F.2d  92,  95-103  (9th  Circ.  1970).    Absent 
the  Supreme  Court's  expressed  approval  of  that  decisional  trend,  we  think 
that  fidelity  to  precedent  requires  us  to  deal  conservatively  with  this 
area  of  the  law.    This  restrained  approach  is  buttressed  by  the  consideration 
that  approving  an  estoppel  defense  would  be  inconsistent  with  the  liability 
without  fault  structure  of  the  1977  Mine  Act.    See  El  Paso  Rock 
Quarries,  Inc.,  3  FMSHRC  35,  38-39  (1981).    Such  a  defense  is  really 
a  claim  that  although  a  violation  occurred,  the  operator  was  not  to 
blame  for  it.    Furthermore,  under  the  1977  Mine  Act,  an  equitable  consideration, 
such  as  the  confusion  engendered  by  conflicting  MSHA  pronouncements,  can 
be  appropriately  weighed  in  determining  the  appropriate  penalty. 

Accordingly,  the  doctrine  of  equitable 
estoppel  will  not  be  applied  to  the  enforcement  actions  of  the  Secretary 
here.    However,  the  Respondent's  evidence  in  this  connection  will  be 
considered  in  mitigation  of  penalty.    Citing  Sec'y  of  Labor,  Mine 
Safety  &  Health  Admin.  (MSHA),  Petitioner,  15  FMSHRC  2549  (Dec. 
17,  1993). 

  1. Gravity

Inspector  Frey  designated  Citation 
No.  8693966  as  an  S&S  violation.    The  first  element  of  the  Mathies 
test  requires  a  violation  of  a  mandatory  safety  standard,  and  I  have 
already  found  that  the  failure  to  connect  a  480-volt  power  cable  with 
use  of  a  mechanically  strong  and  insulated  splice  was  a  violation  of 
30  CFR  §  56.  12013.    The  second  Mathies  element  is  a  contribution 
to  a  discrete  safety  hazard.    By  failing  to  remedy  the  deficient  splice 
that  potentially  existed  since  fall  of  2011,  Respondent  exposed  miners 
to  possible  severe  shocks  or  burns.    Tr.  57,  484.   

The  third  Mathies  element 
requires  showing  a  reasonable  likelihood  that  the  hazard  contributed  to 
will  result  in  an  injury.    The  inspector  noted  that  no  documentation 
of  workplace  exams  identified  the  defective  splice.    Tr.  57.    Walker 
testified  that  the  splice  probably  existed  from  the  fall  of  2011  to 
August  of  2013.    Tr.  484.    Inspector  Frey  believed  that  the  hazard 
existed  when  the  wet  plant  was  last  run  and  would  likely  continue  to 
exist  during  mining  operations  because  multiple  deficient  splices  were 
noted  over  the  course  of  the  initial  inspection  of  Delta  Concrete.   
Tr.  57.    Further,  Walker  acknowledged  that  had  Inspector  Frey  not  cited 
the  condition  it  would  have  continued  to  exist  into  the  indefinite  future.   
Tr.  487.   

The  Inspector  contends  that  a  fatal 
electrocution  injury  was  reasonably  likely  to  occur  through  one  of  several 
different  ways.    Tr.  49.    The  inspector  testified  that  a  miner  could 
contact  the  splice  by  (1)  reaching  down  to  open  the  door  to  the  tower, 
(2)  brushing  against  the  splice  while  turning  on  or  off  the  distribution 
box,  (3)  grabbing  items  from  the  storage  hooks  next  to  the  splice,  or 
(4)  slipping  and  falling  into  the  splice  because  the  electrical  tower 
did  not  exclude  moisture.    Tr.  49-51.    Because  the  splice  was  located 
in  the  travel  way  of  the  operator’s  tower,  the  potential  for  an  electrocution 
to  a  miner  was  more  likely.    Tr.  49.    I  credit  the  inspector’s  testimony 
that  the  deficient  splice  was  obvious  and  could  be  seen  immediately  when 
entering  the  operator’s  tower.    Tr.  63.    Inspector  Frey  testified  that 
the  wet  plant  distribution  box  was  located  next  to  a  door  where  you 
could  see  daylight  which  likely  exposed  the  splice  to  weather  conditions.   
Tr.  49.    Also,  Inspector  Frey  testified  no  current  continuity  and  resistance 
test  had  been  performed  since  March  of  2012,  which  increased  the  risk 
of  electrical  potential  taking  the  path  of  least  resistance.    Tr.  56.   

Respondent  argues  that  the  violation 
was  not  reasonably  likely  to  lead  to  a  significant  injury  because  according 
to  electrician  Morley,  the  splice  was  sufficiently  protected  against  electrical 
shock  Tr.  457.    Morley  testified  that  the  wire  nuts  coupled  with  the 
electrical  tape  provided  protection  from  moisture.    Tr.  405.    The  operator, 
Walker,  also  testified  that  he  has  never  had  a  problem  with  moisture 
in  the  operator’s  tower  and  thus  there  was  no  increased  risk  of  weather 
exposure  to  the  splice.    Tr.  346.    After  considering  both  parties  testimony, 
I  find  that  the  state  of  the  splice  without  adequate  protection  from 
the  elements  and  adjacent  to  a  travel  way  without  a  protective  outer 
jacket  created  a  reasonable  likelihood  of  contributing  to  a  potentially 
fatal  electrical  shock.    The  lack  of  a  continuity  and  resistance  test 
and  the  splice’s  exposure  to  weather  conditions  increased  the  risk  of 
a  serious  injury  or  death  to  a  miner  working  in  the  travel  way  of 
the  operator’s  tower.    Tr.  56,  49.   

The  fourth  Mathies  element 
requires  showing  a  reasonable  likelihood  that  the  hazard  contributed  to 
will  result  in  an  injury.    Inspector  Frey  testified  that  under  the  right 
circumstances  a  miner  coming  into  contact  with  the  splice  would  potentially 
be  fatal  because  the  power  cord  was  energized  up  to  480  volts.    Tr. 

59.    The  inspector  also  testified  to  five  separate  fatalgrams,  each  showing 
that  a  480-volt  shock  can  be  fatal.    Tr.  60.    The  inspector  stated 
that  the  fatalgrams  demonstrate  that  480-volt  electrical  systems  are  dangerous 
and  need  to  be  installed  and  maintained  in  order  to  prevent  exposure 
to  fatal  amounts  of  electricity.    Tr.  61.    Although  Respondent  argued 
that  the  splice  was  secure  and  safe  to  grab  while  energized,  I  find 
that  the  testimony  of  the  inspector  substantiates  that  the  splice  was 
a  danger  to  miners  working  in  the  travel  way  of  the  operator’s  tower.   
Inspector  Frey  testified  that  the  splice  was  in  close  proximity  to  the 
door  of  the  operator’s  tower.    Tr.  49.    Frey  noted  that  there  was 
evidence  of  water  infiltration  in  the  operator’s  tower  and  that  moisture 
increases  the  risk  a  miner  operating  the  wet  plant  distribution  box  will 
be  shocked.    Tr.  51.    The  inspector  also  testified  that  there  had  not 
been  a  continuity  and  resistance  test  done  that  year  which  increased 
the  undetected  risk  electricity  would  take  the  path  of  least  resistance.   
Tr.  56.  Therefore,  after  considering  the  above  testimony,  I  find  a  reasonable 
likelihood  that  an  electrical  shock  coming  from  the  480-volt  splice  would 
cause  serious  injury  or  death  to  a  miner.   

As  the  evidence  produced  at  hearing 
supports  all  four  elements  of  the  Mathies  formula,  I  find  that 
the  Secretary  has  established  that  Citation  No.  8693966  was  an  S&S 
violation. 

  1. Negligence 

Inspector  Frey  credibly  and  without 
equivocation  in  a  straight  forward,  compelling  manner  testified  and  noted 
in  his  citations  that  throughout  the  mine  there  were  similar  deficient 
splices.    Tr.  57.    The  inspector  believed  that  the  splices  were  made 
this  way  intentionally  and  that  it  was  common  practice  at  Delta  Concrete 
to  splice  using  wire  nuts  and  electric  tape.    Tr.  57.    Accordingly, 
he  assigned  a  high  negligence  level  to  the  violation  at  issue. 

I  find  that  Respondent  was  aware 
or  should  have  been  aware  of  the  violation,  but  there  are  some  mitigating 
circumstances  that  must  be  considered.    I  credit  the  inspector’s  testimony 
that  there  was  no  documentation  identifying  any  electrical  hazards  and 
that  he  believed  the  hazards  would  continue  to  exist  during  continued 
mining  operations.    Tr.  57.    He  also  noted  that  the  deficient  splice 
was  obvious  upon  entering  the  travel  way  of  the  control  tower.    Tr. 

64.    Operator  Walker  acknowledged  that  the  deficient  splice  would  have 
continued  to  exist  at  the  mine  had  Respondent  not  been  cited.    Tr. 
487.   

When  determining  who  was  responsible 
for  creating  the  splices  there  appeared  to  be  a  fundamental  miscommunication 
or  misunderstanding  between  Inspector  Frey  and  Operator  Walker.    I  credit 
Walker’s  testimony  that  his  son,  Ryan  Walker  was  likely  the  foreman  at 
the  time  the  splice  was  made  and  was,  in  fact,  the  person  that  made 
the  splice.    Tr.  335.    The  inspector  testified  that  based  on  his  conversations 
with  Walker,  the  foreman  was  not  competent  to  perform  electrical  maintenance 
at  the  mine.    Tr.  64.    Frey  testified  that  he  considered  this  statement 
when  determining  the  severity  of  the  negligence.    Tr.  65.    Walker  denied 
telling  Frey  that  the  foreman  at  the  time  the  splice  was  made 
was  not  competent  to  perform  electrical  maintenance.    Tr.  483.    He  went 
on  to  explain  that  his  son,  Ryan  started  doing  electrical  work  at  the 
mine  in  2002  and  that  he  worked  with  a  local  electrician,  Ted  Hamilton 
at  the  mine  until  he  had  the  requisite  experience  to  do  the  electrical 
work  himself.    Tr.  336.    When  his  son  finished  working  at  the  mine 
in  approximately  2011  he  went  on  to  work  with  an  electrical  contractor 
at  Fort  Greely  for  a  couple  of  years.    Tr.  339.    Although  there  is 
no  testimony  to  suggest  whether  the  electrician,  Hamilton  knew  or  had 
training  in  MSHA  electrical  regulations,  I  credit  Walker’s  testimony  that 
he  reasonably  believed  his  son,  Ryan,  was  a  competent  person  to  perform 
the  electrical  work.    I  find  that  the  operator  reasonably  and  in  good 
faith  believed  a  competent  person  was  performing  the  electrical  maintenance, 
and  credit  his  testimony  based  on  his  personal  observations  of  Ryan’s 
work  with  electrician  Hamilton. 

For  all  these  reasons,  I  find 
that  Citation  No.  8693966  was  the  result  of  moderate  rather  than  high 
negligence  on  the  part  of  Delta  Concrete,  as  they  should  have  been  aware 
of  the  violation,  but  I  credit  the  operator’s  testimony  that  he  maintained 
a  good  faith  belief  he  designated  a  competent  person  to  perform  electrical 
maintenance  at  the  Delta  Junction  mine. 

  1. Penalty 
    Assessment

The  Secretary  has  proposed  a  regularly 
assessed  penalty  of  $807.00  for  this  citation.    Respondent’s  past  history 
of  previous  violations  revealed  that  the  mine  has  a  total  of  seven  past 
violations  and  no  repeated  violations  of  56.  12013.    P-1.    Walker  testified 
that  Respondent  is  a  small  mom  and  pop  operation.    They  had  15  current 
employees  at  the  time  the  citation  was  issued.    Tr.  301.    Respondent 
has  not  argued  or  presented  any  evidence  indicating  that  the  proposed 
penalty  would  affect  its  ability  to  continue  business  operations.    I 
found  a  moderate  level  of  negligence  because  the  operator  maintained  a 
good  faith  belief  in  his  son,  who  had  previously  performed  the  electrical 
maintenance,  to  be  a  competent  person  to  conduct  repairs.    Respondent 
was  negligent  because  the  deficient  splice  was  open  and  obvious,  intentionally 
made,  undocumented,  and  by  Walker’s  own  admission  would  have  continued 
to  exist  at  the  mine  had  the  inspector  not  issued  a  citation.    Tr. 
57,  64,  487.    I  also  found  the  potential  for  an  electrocution  to  a 
miner  was  more  likely  and  thus  S  &  S  because  the  defective  splice 
was  located  in  the  travel  way  of  the  operator’s  tower  subject  to  the 
risk  of  exposure  to  the  elements  as  well  as  the  fact  that  the  spice 
had  existed  since  at  least  late  2011.    Tr.  49.    Although  the  citation 
was  terminated  based  upon  a  seasonal  closure  and  shutdown  of  the  mine, 
Respondent’s  electrical  witness,  Christopher  Morley  testified  to  repairing 
most  of  the  electrical  hazards  cited  by  Inspector  Frey.    Tr.  389-396.   

After  considering  all  six  penalty 
criteria  as  well  as  the  Respondent’s  reliance  on  MSHA  pronouncements  from 
prior  inspections,  I  am  modifying  the  Secretary’s  proposed  penalty  of 
$807.00  and  assess  Respondent  a  civil  monetary  penalty  of  $400.00  for 
Citation  No.  8693966. 

C. Citation  No.  8693967

Inspector  Frey  issued  Citation  No. 
8693967  on  August  19,  2013  for  an  alleged  violation  of  30  CRF  56.12008.   
Tr.  83.    He  alleged  within  the  citation  that:

An  energized  120-volt  electrical 
cord  passing  through  a  cutout  in  the  metal  back  wall  of  the  operator’s 
station  tower  is  not  bushed  allowing  wear  and  damage  to  the  outer  jacket, 
insulation,  and  eventually  inner  conductors.    A  miner  in  contact  with 
the  metal  tower  could  become  a  path  to  ground  in  the  event  of  a  fault 
leading  to  shock  and  burn  type  injuries. 

Sec’y  Ex.  4. 

Frey  determined  that  the  violation  was  reasonably 
likely  to  cause  an  injury,  the  resulting  injury  would  be  lost  workdays 
or  restricted  duty,  the  violation  was  S&S,  affected  one  person,  and 
was  the  result  of  Respondent’s  moderate  negligence.    Sec’y  Ex.  4.  The 
Secretary  has  proposed  a  penalty  of  $100.00.   

  1. Findings

Inspector  Frey  issued  Citation  No.  8693967, 
because  he  determined  that  a  120-volt  electrical  cord  passing  through 
a  cutout  in  the  operator’s  tower  was  not  bushed.    This  was  in  violation 
of  30  CFR  §  56.12008  which  mandates  that: 

Power  wires  and  cables  shall  be  insulated 
adequately  where  they  pass  into  or  out  of  electrical  compartments.    Cables 
shall  enter  metal  frames  of  motors,  splice  boxes,  and  electrical  compartments 
only  through  proper  fittings.    When  insulated  wires,  other  than  cables, 
pass  through  metal  frames,  the  holes  shall  be  substantially  bushed  with 
insulated  bushings.

The 
inspector  testified  that  he  observed  a  blue  120-volt  electrical  cord  without 
a  bushing  passing  through  a  cutout  of  the  metal  back  wall  of  the  operator’s 
tower.    Tr.  85.    Frey  stated  that  the  cutout  allowed  for  wear  and 
damage  to  the  cord’s  insulation  and  outer  jacket.    Tr.  85.    He  also 
testified  that  there  were  multiple  cords  coming  out  of  the  operator’s 
tower  and  that  the  blue  power  cord  hung  straight  down.    Tr.  86.    I 
credit  the  inspector’s  testimony  where  he  testified  that  the  power  cord 
had  some  weight  on  it  and  that  the  weather  conditions  had  the  ability 
to  degrade  the  power  cord  rapidly.    Tr.  86.    Also,  Frey  noted 
that  the  cited  power  cord  was  still  energized  at  the  time  the  citation 
was  issued.    Tr.  88.   

Inspector  Frey  explained  the  standard 
was  violated  because  the  power  cord  entered  a  cutout  of  the  operator’s 
tower  that  was  not  protected.    Tr.  88.    The  inspector  credibly  testified 
that  the  cutout  was  not  protected  because  it  had  burrs  and  sharp  edges 
on  the  side  that  would  eventually  cut  through  the  power  cords  insulators 
and  contact  the  inner  conductors.    Tr.  88.    Morley,  Respondent’s  electrical 
witness  acknowledged  that  the  power  cord  should  have  been  bushed.    Tr. 

422.    As  such,  I  find  that  Respondent  violated  30  CRF  56.12008  by  failing 
to  install  a  bushing  for  a  blue  120-volt  electrical  cord  where  it  passed 
through  a  cutout  in  the  operator’s  tower.    Citation  No.  8693967  is  AFFIRMED.

  1. Gravity 

Inspector  Frey  designated  Citation 
No.  8693967  as  an  S&S  violation.    The  first  element  of  the  Mathies 
test  requires  a  violation  of  a  mandatory  safety  standard,  and  I  have 
already  found  that  the  failure  to  install  a  bushing  for  the  blue  120-volt 
electrical  cord  entering  a  cutout  in  the  operator’s  tower  was  a  violation 
of  30  CFR  §  56.  12008.    The  second  Mathies  element  is  a  contribution 
to  a  discrete  safety  hazard.    By  failing  to  provide  a  bushing  for  the 
cutout  in  the  operator’s  tower,  Respondent  exposed  miners  to  potential 
shock  and  burn  injuries.    Tr.  95.   

The  third  Mathies  element 
requires  showing  a  reasonable  likelihood  that  the  hazard  contributed  to 
will  result  in  an  injury.    The  inspector  testified  that  the  blue  120-volt 
power  cord  was  damaged  where  it  was  going  in  and  out  of  the  metal 
cutout.    Tr.  94.    Frey  testified  that  at  the  time  the  citation  was 
issued,  there  was  no  exposure  to  the  insulation  and  inner  conductor  but 
with  continued  use  the  power  cord  would  be  damaged.    Tr.  94.    With 
continued  use,  the  power  cord  would  continue  to  degrade  and  eventually 
the  conductors  would  make  contact  with  the  metal  frame  of  the  operator’s 
tower.    Tr.  90.    If  the  inner  conductor  made  contact  with  the  metal 
frame  while  energized,  the  power  cord  would  either  trip  the  breaker  or 
potentially  bleed  electric  potential  to  the  area  without  drawing  enough 
current  to  trip  the  breaker.    Id.    Also,  the  inspector  stated 
that  the  weather  exposure  of  the  cutout  increased  the  risk  a  miner  would 
be  exposed  to  electrical  shock.    Tr.  91.     

Respondent  argued  that  the  violation 
was  not  reasonably  likely  to  lead  to  a  significant  injury  because  there 
was  a  breaker  system  connected  with  the  power  cord  which  would  allow 
the  cord  to  short.    Tr.  408-419.    Morley,  Respondent’s  electrical  witness, 
testified  that  because  the  operator’s  tower  is  grounded,  the  power  cord 
would  trip  the  breaker  if  there  were  a  cut  in  the  jacket.    Tr.  409.   
After  considering  both  parties’  testimony,  I  defer  to  and  credit  the 
inspector’s  testimony  that  there  is  always  the  potential  that  the  power 
source  will  not  break  and  that  weather  exposure  increases  the  risk  of 
shock  to  miners  working  in  the  operator’s  tower.    Tr.  408-411.    As 
such,  I  find  that  the  lack  of  a  bushing  to  protect  the  power  cord 
entering  the  cutout  made  it  reasonably  likely  that  a  significant  injury 
would  occur.   

The  fourth  Mathies  element 
requires  a  reasonable  likelihood  that  a  resulting  injury  will  be  reasonably 
serious.    Inspector  Frey  testified  that  it  is  unlikely  that  a  shock 
from  a  120-volt  power  cord  would  be  fatal,  but  there  was  the  potential 
for  miners  to  be  shocked  or  burned.    Tr.  94.    Frey  believed  that  a 
potential  injury  from  touching  the  power  cord  while  it  was  energized 
would  likely  lead  to  lost  workdays  or  restricted  duty  depending  on  severity.   
Tr.  95.    He  also  noted  that  the  cutout  allowed  the  power  cord  to  be 
exposed  to  weather,  so  there  was  the  potential  for  moisture  to  wick 
up  the  cord.    Tr.  92.    Wicking  allows  electricity  to  carry  up  a  cord 
while  it  is  wet,  which  could  cause  a  serious  shock  or  burn  injury.   
Tr.  92.    Therefore,  considering  the  above  evidence,  there  is  a  reasonable 
likelihood  that  an  electrical  shock  coming  from  120-volt  power  cord  could 
cause  serious  injury  to  a  miner.   

As  the  evidence  produced  at  hearing 
supports  all  four  elements  of  the  Mathies  formula,  I  find  that 
the  Secretary  has  established  that  Citation  No.  8693967  was  an  S&S 
violation. 

  1. Negligence

Inspector  Frey 
testified  that  it  was  likely  that  the  operator  or  miner  had  observed 
the  hazard  based  on  similar  cords  having  bushings  to  protect  them.   
Tr.  96.    Frey  also  acknowledged  that  at  one  point  the  power  cord  could 
have  had  a  bushing  and  worked  its  way  out.    Tr.  97.    I  credit  the 
inspector’s  testimony  that  the  120-volt  power  cord  was  not  terribly  easy 
to  see  because  the  cutout  was  located  in  the  back  of  the  operator’s 
tower  which  is  elevated  from  the  ground.    Tr.  97.    He  also  acknowledged 
that  the  violation  was  not  an  obvious  hazard  and  not  terribly  easy  to 
see.    Id.

Frey  noted  that 
the  ability  for  the  120-volt  power  cord  to  move  affected  the  way  he 
designated  negligence.    Tr.  97.    He  testified  that  the  cord  had  probably 
been  there  for  a  while  because  it  exhibited  some  damage.    Tr.  91.   
The  inspector  believed  that  because  the  power  cord  could  freely  move 
and  was  exposed  to  weather  conditions,  the  cord  would  likely  degrade 
down  to  the  insulation  and  inner  conductors.    Tr.  97.    Also,  the  inspector 
testified  that  because  this  power  cord  was  plugged  into  the  wall  there 
was  the  potential  for  water  to  infiltrate  the  area  and  potentially  wick 
up  the  cord.    Tr.  98.    I  credit  Frey’s  testimony  that  the  risk  of 
an  electrical  shock  was  increased  because  the  operator’s  tower  is  frequently 
visited  by  miners.    Tr.  49.               

For  all  these  reasons,  I  find 
that  Citation  No.  8693967  was  the  result  of  moderate  negligence  on  the 
part  of  Respondent,  as  they  should  have  been  aware  of  the  violation, 
but  I  credit  the  inspector’s  testimony  in  that  the  hazard  was  not  obvious.   
Tr.  98.    Therefore,  the  negligence  designation  for  Order  No.  8693967 
is  upheld  as  moderate.     

  1. Penalty 
    Assessment 

The  Secretary  has  proposed  a  regularly 
assessed  penalty  of  $100.00.    Respondent’s  past  history  of  previous  violations 
revealed  that  the  mine  has  a  total  of  seven  past  violations  and  no 
repeated  violations  of  56.12008.    P-1.    After  considering  all  six  penalty 
criteria  analyzed  earlier  in  this  decision,  I  uphold  the  Secretary’s  proposed 
penalty  and  assess  Respondent  a  civil  monetary  penalty  of  $100.00  for 
Citation  No.  8693967. 

D. Citation 
No.  8693968   

Inspector  Frey  issued  Citation  No. 
8693968  on  August  19,  2013  for  an  alleged  violation  of  30  CRF  56.12004.   
Tr.  107.    The  inspector  alleged  within  the  citation  that: 

The  480-volt  3  phase  power  cable  energizing  the  sand 
stacker  belt  drive  motor  has  multiple  areas  exposed  to  mechanical  damage 
that  have  not  been  protected.    The  power  cable  may  have  been  smashed 
and  is  deformed  near  the  tail,  has  a  slice  that  removed  approximately 
1/2”  of  the  outer  jacket  exposing  the  cable  to  water  damage/hazards, 
and  a  1”  gash  where  inner  wires  are  visible  and  exposed.    Inner  conductors 
may  be  damaged.  The  damage  is  at  eye  level  along  a  travelway.    A  miner 
traveling  adjacent  the  sand  stacker  performing  maintenance  or  production 
duties  and  contacting  a  damaged  conductor  could  suffer  shock,  burn,  and 
other  fatal  electrical  type  injuries  and  complications. 

Sec’y  Ex.  5. 

Frey  determined  that  the  violation  was  reasonably 
likely  to  cause  an  injury,  the  resulting  injury  would  be  fatal,  the 
violation  was  S&S,  affected  one  person,  and  was  the  result  of  Delta 
Concrete’s  high  negligence.    Sec’y  Ex.  5.    The  Secretary  has  proposed 
a  penalty  of  $807.00.   

  1. Findings 

Inspector  Frey  issued 
Citation  No.  8693968,  because  he  determined  that  a  480-volt  3  phase  power 
cable  had  multiple  exposed  areas  of  unprotected  damage.    This  was  a 
violation  of  30  CFR  §  56.  12004  which  mandates  that: 

Electrical  conductors  shall  be  of  a  sufficient 
size  and  current-carrying  capacity  to  ensure  that  a  rise  in  temperature 
resulting  from  normal  operations  will  not  damage  the  insulating  materials. 
  Electrical  conductors  exposed  to  mechanical  damage  shall  be  protected.

Frey 
testified  that  he  observed  multiple  areas  of  mechanical  damage  on  a  480-volt 
power  cable  that  energized  a  sand  stacker  belt  drive.    Tr.  109.    The 
power  cord  was  feeding  the  drive  motor  on  the  sand  stacker  and  Frey 
observed  multiple  areas  where  the  cord  was  cut,  gashed,  and  smashed.   
Tr.  109-113,  Sec’y  Ex.  P-5,  Photos  1-5.    In  one  location  the  inspector 
observed  a  half-inch  gash  where  the  inner  wires  were  visible  and  exposed.   
Tr.  109.    The  inspector  believed  that  with  continued  mining  operation 
the  damaged  areas  would  wear  down  to  the  inner  conductors  and  expose 
miners  to  electrical  shock.    Tr.  111.    Both  Mr.  Walker  and  Mr.  Morley 
acknowledged  that  the  cited  cable  was  damaged  in  the  locations  cited 
by  Inspector  Frey.    Tr.  423-426.  487-489.     

According  to  the  testimony  of  the 
inspector,  the  standard  was  violated  because  the  power  cord  was  not  protected 
against  mechanical  damage  in  multiple  places.    Tr.  110.    I  credit  the 
inspector’s  testimony  where  he  stated  he  observed  multiple  areas  of  a 
480-volt  3  phase  power  cable  that  was  cut,  gashed,  and  smashed.    Tr. 

110.    As  such,  I  find  that  Delta  Concrete  violated  30  CRF  56.12004 
by  failing  to  repair  a  480-volt  3  phase  power  cable  which  had  multiple 
areas  that  were  exposed  to  mechanical  damage.    Citation  No.  8693968  is 
AFFIRMED.

  1. Gravity 

Inspector  Frey  designated  Citation 
No.  8693968  as  an  S&S  violation.    The  first  element  of  the  Mathies 
test  requires  a  violation  of  a  mandatory  safety  standard,  and  I  have 
already  found  that  the  failure  to  repair  a  480-volt  3  phase  power  cable 
that  was  exposed  to  mechanical  damage  was  a  violation  of  30  CFR  §  56. 
12004.    The  second  Mathies  element  is  a  contribution  to  a  discrete 
safety  hazard.    By  failing  to  repair  multiple  areas  of  a  power  cable, 
Respondent  exposed  miners  to  potentially  fatal  shock  and  burn  injuries.   
Tr.  111.   

The  third  Mathies 
element  requires  showing  a  reasonable  likelihood  that  the  hazard  contributed 
to  will  result  in  an  injury.    Inspector  Frey  testified  that  he  observed 
multiple  areas  where  a  480-volt  power  cord  had  cuts,  gashes,  and  smash 
marks.    Tr.  109.    In  one  area  of  the  power  cord,  he  observed  a  one-inch 
gash  where  the  inner  wires  were  visible  and  exposed.    Tr.  109.    The 
inspector  also  testified  that  areas  where  gash  marks  were  observed  also 
contained  moisture,  dirt,  and  sections  where  the  entire  outer  jacket  was 
missing.    Tr.  110-111.    Frey  noted  that  he  observed  a  part  of  the 
power  cord  that  was  mashed  and  deformed.    Tr.  109.    He  also  believed 
that  the  damage  to  the  480-volt  power  cord  occurred  over  multiple  instances 
and  not  just  one.    Tr.  110-111.    The  inspector  testified  that  the  damage 
to  the  power  cord  likely  occurred  over  the  course  of  time  and  if  the 
hazards  were  recognized  they  were  not  fixed  or  documented.    Tr.  112.   
He  believed  that  the  dirt  and  moisture  trapped  in  the  gashed  areas  of 
the  power  cord  would,  over  time,  degrade  the  insulation  and  further  expose 
the  inner  conductors.    Tr.  113.    The  expose  to  moisture  and  dirt  increased 
the  likelihood  a  miner  would  be  exposed  to  an  electrical  injury.    Tr. 

114.    Also,  Frey  noted  that  the  power  cable  travels  along  the  side 
of  the  sand  stacker  at  eye  level  and  was  immediately  adjacent  to  a 
travelway.    Tr.  117.    He  concluded  that  a  miner  performing  maintenance, 
repair,  or  workplace  exams  could  potentially  be  exposed  to  the  different 
hazards  of  mechanical  damage.    Tr.  117. 

Respondent  argued  that  the  violation  was  not 
reasonably  likely  to  lead  to  a  significant  injury  because  the  wet  side 
of  the  Delta  Junction  mine  was  locked  and  tagged  out  and  no  energy 
could  get  to  the  cable.    Tr.  361.    Walker,  the  operator  of  the  mine, 
testified  that  no  bare  wires  were  exposed  on  the  480-volt  3  phase  power 
cable.    Tr.  362.    He  testified  that  the  gashed  parts  of  the  power 
cord  did  not  show  bare  wire,  but  actually  a  fiber-type  filler  that  was 
between  the  outer  jacket  and  the  conductors.    Tr.  363.    Thus,  the  operator 
believed  that  the  damage  to  the  outer  jacket  of  the  480-volt  power  cable 
would  not  cause  a  miner  to  be  electrocuted.    Tr.  364.    Respondent  also 
argued  that  maintenance,  like  greasing,  occurs  only  when  the  wet  side 
is  non-operational  and  therefore  the  exposure  to  an  energized  power  cord 
is  decreased.    Tr.  125.    After  considering  both  parties  testimony,  I 
find  that  the  cuts,  gashes,  and  smash  marks  in  the  480-volt  3  phase 
power  cord  made  it  reasonably  likely  that  a  significant  injury  would 
occur  to  a  miner.    I  defer  to  and  credit  the  inspector’s  straight  forward 
and  detailed  testimony  that  an  injury  was  reasonably  likely  to  occur 
because  the  power  cord  was  next  to  a  travelway  where  maintenance  is 
performed  by  miners.    Tr.  106,  122-123.

The  fourth  Mathies  element  requires  a 
reasonable  likelihood  that  a  resulting  injury  will  be  reasonably  serious.   
Respondent  argued  that  a  miner  exposed  to  the  damaged  part  of  the  power 
cord  would  not  be  fatal  because  the  primary  insulation  was  still  present 
and  that  part  of  the  wet  plant  was  locked  and  tagged  out.    Tr.  361.   
The  inspector  testified  that  the  multiple  hazards  in  the  480-volt  power 
cord  made  it  reasonably  likely  a  miner  traveling  in  the  area  could  be 
fatally  electrocuted  if  they  were  to  brush  up  against  the  exposed  hazards.   
Tr.  113-114,117.    Inspector  Frey  stated  that  the  fatalgrams  referenced 
in  Citation  No.  8693966  also  would  apply  for  this  citation  as  well  because 
a  miner  coming  into  contact  with  a  480-volt  power  cord  would  cause  serious 
injury  or  death.    Tr.  121

As  the  evidence  produced  at  hearing 
supports  all  four  elements  of  the  Mathies  formula,  I  find  that 
the  Secretary  has  established  that  Citation  No.  8693968  was  an  S&S 
violation. 

  1. Negligence   

Inspector  Frey  testified  that  the 
multiple  hazards  he  observed  on  a  480-volt  power  cable  were  obvious  when 
he  walked  along  the  travelway.    Tr.  122-123.    The  inspector  believed 
that  the  operator  should  have  known  about  the  multiple  hazards  because 
it  was  an  area  where  adequate  workplace  examinations  should  have  been 
taking  place  and  a  frequent  area  where  miners  travel.    Tr.  122-125.   
Frey  also  noted  that  the  mine  had  no  documentation  that  recognized  the 
electrical  hazards  and  there  was  no  evidence  of  repair  to  the  480-volt 
power  cord.  Tr.  122. 

According  to  the  inspector,  an 
adequate  workplace  examination  did  not  occur  based  on  the  number  of  hazards 
identified  on  the  480-volt  power  cable.    Tr.  123.    I  credit  the  inspector’s 
testimony  that  he  believed  the  electrical  damage  existed  since  the  last 
workplace  examination  of  the  travelway.    Tr.  123.    Inspector  Frey  also 
stated  that  Respondent  had  been  operational  two  weeks  prior  to  the  issuance 
of  the  citation  and  in  his  view  there  were  no  mitigating  circumstances.   
Tr.  114-115,  123.   

Finally,  the  inspector  factored 
into  account  that  the  operator  told  him  that  the  foreman  performing  workplace 
exams  or  electrical  maintenance  was  not  competent.    Tr.  122.    Walker 
testified  to  the  contrary,  and  avowed  that  he  never  told  the  inspector 
the  foreman  was  not  competent  and  clarified  that  the  foreman  in  question 
was  actually  his  son  Ryan  Walker  who  was  the  last  one  that  had  performed 
electrical  work  at  the  mine  prior  to  the  inspection.    Tr.  335.    It 
is  important  to  note  Ryan  Walker  left  Respondent’s  employment  at  the 
mine  in  late  2011  or  early  2012,  no  less  than  a  year  prior  to  the 
inspection  at  issue.    While  I  found  Operator  Walker’s  reliance  on  his 
son’s  competence  in  performing  electrical  work  a  mitigating  factor  in 
Citation  8693966  above  no  such  mitigating  factor  exists  here  because  the 
damage  to  the  480-volt  power  cable  was  open  and  obvious  to  anyone  that 
would  be  travelling  along  the  pathway.    Respondent  should  have  noticed 
the  damage  and  taken  immediate  action  to  have  the  cable  repaired.    The 
fact  that  they  failed  to  do  so  leads  me  to  conclude  that  the  inspector’s 
high  negligence  level  designation  is  appropriate. 

For  all  these  reasons,  I  find 
that  Citation  No.  8693968  was  the  result  of  high  negligence.    Although 
the  inspector  relied  partially  on  his  conversation  with  the  operator  about 
the  foreman’s  competency  when  determining  negligence,  I  find  that  this 
testimony  is  a  non-factor  for  the  high  negligence  designation.    I  credit 
the  inspector’s  testimony  that  the  hazard  was  obvious  because  it  was 
in  a  travelway  where  miners  frequently  pass.    And,  adequate  workplace 
inspections  would  have  allowed  the  electrical  hazards  to  be  observed, 
noted,  and  repaired.    Therefore,  the  negligence  designation  for  Citation 
No.  8693968  is  upheld  at  high. 

  1. Penalty 
    Assessment 

The  Secretary  has  proposed  a  regularly 
assessed  penalty  of  $807.00.    Respondent’s  past  history  of  previous  violations 
revealed  that  the  mine  has  a  total  of  seven  past  violations  and  no 
repeated  violations  of  56.  12004.    Sec’y  Ex.  P-1.    I  upheld  the  high 
negligence  designation  for  this  citation  because  the  inspector  testified 
that  he  observed  multiple  electrical  hazards  along  a  480-volt  power  cable 
that  was  immediately  adjacent  to  a  travel  way  where  miners  travel  and 
perform  maintenance.    Tr.  122-125.    Although  the  operator,  in  good  faith, 
believed  a  competent  person  was  performing  the  electrical  maintenance, 
the  multiple  electrical  hazards  on  the  480-volt  power  cable  demonstrates 
that  adequate  workplace  inspections  were  not  conducted.    Even  though  the 
citation  was  terminated  based  upon  a  seasonal  closure  and  shutdown  of 
the  mine,  Christopher  Morley  testified  to  repairing  most  of  the  electrical 
hazards  cited  by  Inspector  Frey  in  this  docket.    Tr.  389-396.   

After  considering  all  six  penalty 
criteria  analyzed  earlier  in  this  decision,  I  uphold  the  Secretary’s  proposed 
penalty  and  assess  Respondent  a  civil  monetary  penalty  of  $807.00  for 
Citation  No.  8693968. 

E. Citation 
No.  8693970   

Inspector  Frey  issued  Citation  No.  8693970 
on  August  19,  2013  for  an  alleged  violation  of  30  CRF  56.  12013.   
Tr.  155.    The  inspector  alleged  within  the  citation  that: 

A  mechanically  strong,  insulated  and  sealed  splice  was 
not  used  in  connecting  the  480-volt  3  phase  well  pump  to  cable  that 
powers  it.    Additionally  the  ground  wire  was  not  connected  and  hanging 
in  the  open.    A  miner  coming  into  contact  with  energized  3  phase  electrical 
circuits  could  experience  severe  shocks,  burns,  or  other  fatal  electrical 
injuries  and  complications. 

Standard  56.  12013  was  cited  1  time  in  two  years  at 
mine  5001783  (1  to  the  operator,  0  to  a  contractor).   

Sec’y  Ex.  8. 

Frey  determined  that  the  violation  was  reasonably 
likely  to  cause  an  injury,  the  resulting  injury  would  be  fatal,  the 
violation  was  S&S,  affected  one  person,  and  was  the  result  of  Respondent’s 
high  negligence.  Sec’y  Ex.  8.    The  Secretary  has  proposed  a  penalty 
of  $807.00.   

  1. Findings 

Inspector  Frey  issued  Citation  No.  8693970, 
because  he  determined  that  a  splice  connected  to  a  480-volt  3  phase 
well  pump  was  in  violation  of  30  CFR  §  56.  12013  which  mandates  that: 

Permanent  splices  and  repairs  made 
in  power  cables,  including  the  ground  conductor  where  provided,  shall 
be: 

(a)               
Mechanically  strong  with  electrical  conductivity  as  near  as  possible 
to  that  of  the  original; 

(b)              
Insulated  to  a  degree  at  least  equal  to  that  of  the  original, 
and  sealed  to  exclude  moisture;  and 

(c)               
Provided  with  damage  protection  as  near  as  possible  to  that  of 
the  original,  including  good  bonding  to  the  outer  jacket. 

Frey  testified  that  Respondent  used 
a  splice  to  connect  a  480-volt  3  phase  well  pump  to  a  power  cord.   
Tr.  156.    The  inspector  stated  that  the  splice  connected  the  two  cords 
with  the  use  of  wire  nuts  and  electric  tape.    Tr.  156-157.    Frey  testified 
that  the  green  grounding  wire  was  not  connected  to  anything  and  should 
have  been  connected  to  a  grounding  system.    Tr.  157.    The  inspector 
testified  that  the  black,  green,  red,  and  yellow  inner  conductors  wrapped 
around  the  well  pump  were  exposed  to  mechanical  damage.    Tr.  158.   
The  inner  conductors  were  not  protected  by  housing  and  there  was  no 
outer  jacket  sheath.    Tr.  157.    The  inspector  stated  that  the  splice 
violated  the  standard  because  wire  nuts  are  not  mechanically  strong  with 
electrical  conductivity  as  near  as  possible  to  that  of  the  original.   
Tr.  156,  158.    Also,  the  inspector  testified  that  the  splice  was  not 
bonded  in  a  way  to  prevent  moisture  from  infiltrating  the  inner  conductors.   
Tr.  160.   

Frey  believed  that  moisture  could 
infiltrate  the  splice  because  it  was  not  encased  in  an  outer  jacket, 
outdoor  rated  housing,  or  other  conduit.    Tr.  159-160.      I  defer  to 
and  credit  the  inspector’s  testimony  that  the  grounding  wire  was  not 
properly  grounded  and  that  the  splice  was  exposed  to  mechanical  damage.   
Respondent  attempted  to  address  this  violation  through  testimony  from  electrical 
witness  Morley.    However,  I  found  his  testimony  confusing  and  focused 
primarily  on  the  grounding  issue  stating  that  the  pump  was  grounded  at 
other  points  while  acknowledging  that  the  green  grounding  wire  was  not 
connected.    Tr.  397.    Furthermore,  Morley  acknowledged  there  was  no  outer 
jacket  to  which  the  splice  could  be  bonded.    Tr.  427.    As  such,  I 
find  that  Respondent  violated  30  CRF  56.12013  by  failing  to  connect  a 
480-volt  power  cable  that  was  mechanically  strong  and  insulated  to  a 
degree  that  would  exclude  moisture.    Citation  No.  8693970  is  AFFIRMED.   
However,  for  reasons  explained  below  the  negligence  level  will  be  modified 
from  high  to  moderate.

  1. Gravity 

Inspector  Frey  designated  Citation 
No.  8693970  as  an  S&S  violation.    The  first  element  of  the  Mathies 
test  requires  a  violation  of  a  mandatory  safety  standard,  and  I  have 
already  found  that  the  failure  to  connect  a  480-volt  3  phase  well  pump 
to  a  power  cable  with  use  of  a  mechanically  strong  and  insulated  splice 
was  a  violation  of  30  CFR  §  56.  12013.    The  second  Mathies  element 
is  a  contribution  to  a  discrete  safety  hazard.    By  failing  to  remedy 
the  deficient  splice  that  potentially  existed  since  the  fall  of  2011, 
Respondent  exposed  miners  to  possible  severe  shocks,  burns,  or  other  fatal 
electrical  injuries.    Tr.  57,  353.   

The  third  Mathies  element 
requires  showing  a  reasonable  likelihood  that  the  hazard  contributed  to 
will  result  in  an  injury.    Inspector  Frey  testified  that  the  wire  nuts 
and  electric  tape  used  to  splice  the  well  pump  were  not  mechanically 
strong  and  not  bonded  or  sealed  to  exclude  moisture.    Tr.  156.    Also, 
the  inspector  stated  that  the  splice  was  not  insulted  equal  to  its  original 
condition  and  was  not  bonded  to  the  cable  outer  jacket  to  prevent  moisture.   
Tr.  156-157.    Frey  testified  that  water  can  easily  infiltrate  the  splice 
through  the  wire  nuts  where  there  are  exposed  conductors.    Tr.  160.   
Furthermore,  Frey  noted  that  the  green  grounding  wire  was  not  attached, 
and  that  a  continuity  and  resistance  test  had  not  been  performed  during 
the  year  the  citation  was  issued.    Tr.  157.    The  inspector  believed 
that  the  lack  of  a  grounded  wire  with  no  continuity  and  resistance  test 
made  it  more  likely  that  if  a  miner  touched  the  splice  they  would  be 
the  least  resistance  to  ground  where  electrocution  could  be  fatal.    Tr. 
156-160.    Additionally,  the  inspector  testified  that  the  splice  was  an 
obvious  hazard  that  was  in  plain  sight  when  he  approached  the  water 
pump.    Tr.  158.    Frey  stated  that  the  splice  was  adjacent  to  a  travelway 
and  surge  tunnel  used  by  miners.    Tr.  162-163.    Thus,  miners  were  regularly 
exposed  to  the  deficient  splice.    Id.    Inspector  Frey  believed 
that  the  hazard  existed  when  the  wet  plant  was  last  run  and  would  likely 
continue  to  exist  during  mining  operations  because  multiple  deficient  splices 
were  noted  over  the  course  of  the  initial  inspection  of  the  mine.   
Tr.  57.    The  operator  acknowledged  that  the  splice  had  existed  in  its 
cited  condition  since  Ryan  Walker  installed  the  splice  more  than  a  year 
before  the  citation  was  issued.    Tr.  483-484.    Finally,  Inspector  Frey 
testified  that  no  work  place  examinations  noted  the  inadequate  splices 
throughout  the  mine.    Tr.  168.

Respondent  argues  that  the  violation 
was  not  reasonably  likely  to  lead  to  a  significant  injury  because  according 
to  Morley,  the  splice  was  sufficiently  protected  against  electrical  shock 
Tr.  457.    He  testified  that  the  wire  nuts  coupled  with  the  electrical 
tape  provided  a  moisture  resistant  connection.    Tr.  405.    Also,  Morley 
stated  that  although  the  green  wire  was  not  grounded,  there  was  a  ground 
bar  on  the  water  pipe.    Tr.  397.    He  believed  that  the  generator  that 
powers  the  480-volt  3  phase  well  pump  would  trip  if  the  splice’s  inner 
conductors  were  exposed  to  moisture.    Tr.  400.    Morley  also  acknowledged 
that  the  splice  was  not  protected  from  damage  as  near  as  possible  to 
the  original  and  that  he  would  have  enclosed  the  splice  in  a  raceway 
or  enclosure.    Tr.  426-427.    I  defer  to  and  credit  the  inspector’s 
straight  forward,  detailed  testimony  that  it  was  reasonably  likely  a  significant 
injury  would  occur  because  the  deficient  splice  was  an  electrical  hazard 
and  was  in  a  location  frequently  traveled  by  miners. 

The  fourth  Mathies  element 
requires  a  reasonable  likelihood  that  a  resulting  injury  will  be  reasonably 
serious.    Inspector  Frey  testified  that  under  the  right  circumstances 
a  miner  coming  into  contact  with  the  splice  would  be  potentially  fatal 
because  the  power  cord  was  480  volts.    Tr.  59.    The  inspector  also 
testified  to  five  separate  fatalgrams,  each  showing  that  a  480-volt  shock 
can  be  fatal.    Tr.  60.    The  inspector  stated  that  the  fatalgrams  indicate 
that  480-volt  electrical  systems  are  dangerous  and  need  to  be  installed 
and  maintained  in  order  to  prevent  exposure  to  fatal  amounts  of  electricity.   
Tr.  61.    Morley,  Respondent’s  electrical  witness  acknowledged  that  contact 
with  a  480-volt  power  cord  could  be  fatal.    Tr.  421.    Therefore,  considering 
the  above  evidence  there  is  a  reasonable  likelihood  that  an  electrical 
shock  coming  from  the  splice  would  cause  serious  injury  or  death  to 
a  miner.   

As  the  evidence  produced  at  hearing 
supports  all  four  elements  of  the  Mathies  formula,  I  find  that 
the  Secretary  has  established  that  Citation  No.  8693970  was  an  S&S 
violation. 

  1. Negligence

Inspector  Frey  testified  that  the 
splice  connecting  a  480-volt  3  phase  well  pump  to  a  power  cord  was 
immediately  obvious  when  walking  past  the  well  pump.    Tr.  167-168.   
Frey  credibly  testified  and  noted  that  there  were  multiple  deficient  splices 
throughout  the  mine  that  were  similar  to  the  cited  splice.    Tr.  57.   
He  believed  that  the  splices  were  made  this  way  intentionally  and  that 
it  was  common  practice  at  the  Delta  Junction  mine  to  splice  using  wire 
nuts  and  electric  tape.    Tr.  57.    I  find  that  Respondent  was  aware 
or  should  have  been  aware  of  the  violation  based  on  the  number  of  deficient 
splices  noted  by  inspector  Frey.    Tr.  57.    I  credit  the  inspector’s 
testimony  when  he  testified  that  there  was  no  documentation  identifying 
any  electrical  hazards  and  that  he  believed  the  hazard  would  continue 
to  exist  during  continued  mining  operations.    Tr.  164-168.    When  Walker, 
the  operator,  was  asked  whether  the  deficient  splices  would  have  continued 
to  exist  at  the  mine  had  the  operator  not  been  cited,  he  acknowledged 
that  they  would  have  continued  to  exist.    Tr.  487. 

As  I  noted  above  in  reference 
to  Citation  8693966  I  credit  the  operator’s  testimony  that  his  son,  Ryan 
Walker,  was  likely  the  foreman  at  the  time  when  the  splices  were  made.   
Tr.  335.    The  inspector  believed  that  based  on  his  conversations  with 
the  operator,  the  foreman  was  not  competent  to  perform  electrical  maintenance 
at  the  mine.    Tr.  64.    The  analysis  for  this  citation  mirrors  that 
of  Citation  893966.    As  such,  I  find  that  the  operator  reasonably  and 
in  good  faith  believed  a  competent  person  was  performing  the  electrical 
maintenance,  and  credit  his  testimony  based  on  his  personal  observations 
of  Ryan’s  work  with  electrician  Hamilton.    Walker’s  reasonable  belief 
is  a  mitigating  factor.

For  all  these  reasons,  I  find 
that  Citation  No.  8693970  was  the  result  of  moderate  negligence  on  the 
part  of  Respondent,  as  they  should  have  been  aware  of  the  violation, 
but  I  credited  the  operator’s  testimony  that  he  made  a  good  faith  effort 
to  assign  a  competent  person  to  perform  electrical  maintenance  at  the 
mine  which  constitutes  a  mitigating  circumstance. 

  1. Penalty 
    Assessment

The  Secretary  has  proposed  a  regularly 
assessed  penalty  of  $807.00.    Respondent’s  past  history  of  previous  violations 
revealed  that  the  mine  has  a  total  of  seven  past  violations  and  no 
repeated  violations  of  56.  12004.    P-1.    Walker,  the  operator  testified 
that  Respondent  was  a  small  mom  and  pop  operation  with  15  current  employees 
at  the  time  the  citation  was  issued.    Tr.  301.    Respondent  has  not 
argued  or  presented  any  evidence  indicating  that  the  proposed  penalty 
would  affect  its  ability  to  continue  business  operations.   

Although  the  inspector  designated 
the  citation  as  high  negligence,  I  found  that  the  mine  was  moderately 
negligent  because  the  operator,  in  good  faith,  believed  a  competent  person 
was  performing  the  electrical  maintenance.    Respondent  was  negligent  because 
the  inspector  testified  that  the  deficient  splice  located  on  the  water 
pump  was  obvious,  not  documented,  and  would  have  likely  continued  to 
exist  at  the  mine  based  on  the  number  of  electrical  hazards  cited  as 
well  as  Walker’s  admission  that  the  violation  would  have  continued  to 
exist  had  the  inspector  not  issued  a  citation.    Tr.  57,  64,  164-168, 

487.    Much  like  the  other  electrical  citations,  there  was  a  reasonable 
likelihood  that  a  resulting  injury  would  be  reasonably  serious  because 
a  miner  coming  into  contact  with  the  splice  could  have  easily  been  killed 
because  the  power  cord  was  480  volts.    Tr.  59.    Although  the  citation 
was  terminated  based  upon  a  seasonal  closure  and  shutdown  of  the  mine, 
Christopher  Morley  testified  to  repairing  most  of  the  electrical  hazards 
cited  by  Inspector  Frey.    Tr.  389-396.   

After  considering  all  six  penalty 
criteria  as  analyzed  earlier  in  this  decision  as  well  as  Respondent’s 
reliance  on  MSHA’s  pronouncements  from  prior  inspections,  I  am  modifying 
the  Secretary’s  proposed  penalty  of  $807.00  and  assess  Respondent  a  civil 
monetary  penalty  of  $400.00  for  Citation  No.  8693970.

F. Citation 
No.  8693978   

Inspector  Frey  issued  Citation  No.  8693978 
on  August  23,  2013  for  an  alleged  violation  of  30  CRF  56.12028.    Tr. 

255.    The  inspector  alleged  within  the  citation  that: 

Records  of  ground  continuity  testing 
for  Delta  Concrete  were  unable  to  be  reviewed  upon  request  and  could 
not  be  verified.    Grounding  systems  are  in  place  and  have  been  tested 
in  the  past.    The  last  inspector  noted  that  ground  testing  had  been 
performed  in  March  of  2012.    Ground  system  testing  would  have  identified 
that  the  well  pump  ground  wire  was  not  connected  as  noted  during  this 
inspection.    A  miner  that  became  a  path  to  ground  for  a  three  phase 
480-volt  electrical  system  as  is  used  at  this  mine  could  suffer  shocks, 
burns,  and  other  fatal  electrical  injuries  and  complications.     

Sec’y  Ex.  P-12.

Frey  determined  that  the  violation  was  reasonably 
likely  to  cause  an  injury,  the  resulting  injury  would  be  fatal,  the 
violation  was  S&S,  affected  one  person,  and  was  the  result  of  Respondent’s 
high  negligence.    Sec’y  Ex.  12.    The  Secretary  has  proposed  a  penalty 
of  $807.00.   

  1. Findings 

Inspector  Frey  issued  Citation  No. 
8693978,  because  he  determined  that  Respondent  had  not  performed  a  ground 
continuity  test  annually  and  the  operator  was  unable  to  provide  test 
records  upon  request  in  violation  of  30  CFR  §  56.12028  which  mandates 
that: 

Continuity  and  resistance 
of  grounding  systems  shall  be  tested  immediately  after  installation,  repair, 
and  modification;  and  annually  thereafter.    A  record  of  the  resistance 
measured  during  the  most  recent  tests  shall  be  made  available  on  a  request 
by  the  Secretary  or  his  duly  authorized  representative.

Frey  testified  that 
he  issued  Citation  No.  8693978  because  Respondent  failed  to  produce  a 
record  of  a  ground  continuity  test  upon  request.    Tr.  256.    The  inspector 
testified  that  he  was  able  to  determine  that  the  last  ground  continuity 
test  was  done  in  March  of  2012  by  referencing  a  previous  inspector's 
notes.    The  citation  was  issued  on  August  23,  2013,  which  indicates 
that  a  ground  continuity  test  had  not  been  performed  annually.    Tr. 

271.    Frey  stated  that  he  did  not  personally  observe  any  records  of 
testing.    Tr.  260.    Additionally,  the  electrical  hazards  found  at  Delta 
Concrete  provided  further  evidence  that  a  ground  continuity  test  had  not 
been  performed  annually.    The  inspector  believed  this  to  be  the  case 
because  the  well  pump  ground  wire  was  not  attached  to  anything  and  a 
ground  continuity  test  would  have  recognized  this  hazard.    Tr.  260.   
Frey  also  stated  that  the  other  electrical  hazards  cited  at  Delta  Concrete 
gave  him  reason  to  believe  that  a  ground  continuity  test  had  not  been 
performed  at  all  within  the  last  year.    Tr.  264.   

I  credit  the  inspector’s  testimony 
that  Respondent  failed  to  produce  a  record  of  a  ground  continuity  test 
upon  request.    Also,  I  credit  Frey’s  testimony  that  a  continuity  and 
resistance  test  was  last  conducted  March  of  2012,  which  is  more  than 
one  year  before  the  citation  was  issued  on  August  23,  2013.    As  such, 
I  find  that  Respondent  violated  30  CRF  56.12028  because  Respondent  failed 
to  produce  any  records  indicating  a  continuity  and  resistance  test  had 
been  performed  and  that  a  test  had  not  taken  place  annually  since  March 
of  2012.    Citation  No.  8693978  is  AFFIRMED.

  1. Gravity

Inspector  Frey  designated  Citation 
No.  8693978  as  an  S&S  violation.    The  first  element  of  the  Mathies 
test  requires  a  violation  of  a  mandatory  safety  standard,  and  I  have 
already  found  that  the  failure  to  provide  prior  records  of  a  continuity 
and  resistance  test  and  not  performing  a  test  annually  since  March  of 
2012  was  in  violation  of  30  CFR  §  56.12028.    The  second  Mathies 
element  is  a  contribution  to  a  discrete  safety  hazard.    By  failing  to 
conduct  a  continuity  and  resistance  test  it  is  reasonably  likely  that 
a  miner  coming  into  contact  with  the  energized  wire  or  exposed  moisture 
will  become  the  lowest  resistance  to  ground  and  be  electrocuted.  Tr. 
59-61.   

The  third  Mathies  element 
requires  showing  a  reasonable  likelihood  that  the  hazard  contributed  to 
will  result  in  an  injury.    Inspector  Frey  testified  that  he  had  no 
reason  to  believe  that  a  ground  continuity  and  resistance  test  had  been 
performed  based  on  the  electrical  hazards  found  at  Delta  Concrete.    Tr. 

261.    Frey  stated  that  he  was  particularly  concerned  about  the  non-grounded 
well  pump  splice  that  would  not  provide  a  low-resistance  path  to  ground.   
Tr.  262.    Had  a  continuity  and  resistance  test  been  performed  it  would 
have  detected  the  electrical  hazards  present  at  Delta  Concrete.    Tr. 
263.    Also,  he  stated  that  most  of  the  hazards  cited  were  open  and 
obvious.    Tr.  264-265.    Frey  testified  that  it  is  likely  the  operator 
would  have  continued  to  operate  the  wet  plant  without  a  continuity  and 
resistance  test  being  performed  and  the  various  electrical  hazards  would 
continue  to  exist.    Tr.  267.   

The  fourth  Mathies  element 
requires  a  reasonable  likelihood  that  a  resulting  injury  will  be  reasonably 
serious.    Inspector  Frey  testified  that  under  the  right  circumstances 
a  miner  coming  into  contact  with  a  defective  splice  or  power  cord  would 
be  potentially  fatal  because  most  of  the  defective  hazards  had  electrical 
capacity  up  to  480  volts.    Tr.  59.    The  inspector  also  testified  to 
five  separate  fatalgrams,  each  showing  that  a  480-volt  shock  can  be  fatal.   
Tr.  60.    The  operator,  Walker,  testified  that  he  believed  the  lack  of 
a  continuity  and  resistance  test  would  not  be  fatal  because  the  mine 
was  not  in  production.    Tr.  461.    I  have  already  addressed  Respondent’s 
argument  regarding  Respondent’s  operational  defense  earlier  in  this  decision.   
Accordingly,  I  credit  the  inspector’s  testimony  that  it  is  reasonably 
likely  that  contact  with  480  volts  would  be  fatal.    Tr.  265,  P-3. 

As  the  evidence  produced  at  hearing 
supports  all  four  elements  of  the  Mathies  formula,  I  find  that 
the  Secretary  has  established  that  Citation  No.  8693978  was  an  S&S 
violation. 

  1. Negligence 

The  inspector  testified  that  the 
operator  conducted  continuity  resistance  tests  in  the  past  and  knew  the 
tests  had  to  be  completed  annually.    Tr.  266.    Frey  also  testified 
that  the  operator  did  not  meet  the  standard  in  providing  records  of 
past  or  present  continuity  and  resistance  tests.    Tr.  266.    The  inspector 
stated  that  the  numerous  hazards  present  during  the  inspection  gave  him 
reason  to  believe  that  a  test  had  not  been  performed  within  the  last 
year.    Tr.  266.    Walker,  the  operator,  also  acknowledged  that  he  did 
not  conduct  a  continuity  and  resistance  test  because  he  was  waiting  a 
couple  months  so  he  could  have  more  time  to  conduct  the  subsequent  annual 
test  at  a  later  date.    Tr.  459-461.   

For  all  these  reasons,  I  find 
that  Citation  No.  8693978  was  the  result  of  high  negligence  on  the  part 
of  Delta  Concrete,  as  they  should  have  been  aware  of  the  violation  because 
the  operator  knew  a  continuity  and  resistance  test  had  to  be  performed 
annually  and  that  documentation  of  previous  tests  must  be  available  at 
MSHA’s  request.    I  credit  the  inspector’s  testimony  that  no  continuity 
and  resistance  test  had  been  performed  since  March  2012  and  that  no 
documentation  of  previous  tests  was  provided  to  Inspector  Frey.    Tr. 
260-267.    Therefore,  the  negligence  designation  for  Citation  No.  8693978 
is  upheld  as  high. 

  1. Penalty 
    Assessment

The  Secretary  has  proposed  a  regularly 
assessed  penalty  of  $807.00.    Respondent’s  past  history  of  previous  violations 
revealed  that  the  mine  has  a  total  of  seven  past  violations  and  no 
repeated  violations  of  56.  12028.    Sec’y  Ex.  P-1.    After  considering 
all  six  penalty  criteria  as  explained  more  fully  earlier  in  this  decision, 
I  uphold  the  Secretary’s  proposed  penalty  and  assess  Respondent  a  civil 
monetary  penalty  of  $807.00  for  Citation  No.  8693978.   

V. FINDINGS  OF  FACT  AND  CONCLUSIONS  OF  LAW

OTHER  VIOLATIONS

A. Citation 
No.  8693969

Inspector  Frey  issued  Citation  No. 
8693969  on  August  19,  2013  for  an  alleged  violation  of  30  CRF  56.11027.   
Tr.  134.    The  inspector  alleged  within  the  citation  that: 

The  handrail  on  the  washplant 
operator’s  station  has  not  been  maintained.    The  corner  post  on  the 
right  side  of  the  ladder  landing  has  popped  welds  and  flaps.    This 
corner  serves  both  as  a  fixed  point  for  the  swing  gate  atop  the  landing 
and  as  the  hand  hold  extending  above  the  working  platform  when  climbing 
the  ladder  for  access.    The  working  platform  is  6  feet  from  the  washplant 
deck  and  a  fall  to  the  ground  would  be  20  feet.    This  area  is  subject 
to  weather  and  operational  conditions  that  can  make  it  wet  and  slippery.   
A  miner  falling  from  this  height  while  accessing  or  atop  the  working 
platform  could  suffer  fatal  injuries  and  complications. 

Sec’y  Ex.  6. 

Frey  determined  that  the  violation  was  reasonably 
likely  to  cause  an  injury,  the  resulting  injury  would  be  fatal,  the 
violation  was  S&S,  affected  one  person,  and  was  the  result  of  Respondent’s 
moderate  negligence.    Sec’y  Ex.  5.    The  Secretary  has  proposed  a  specially 
assessed  penalty  of  $243.00.   

  1. Findings 

Inspector  Frey  issued  Citation  No.  8693969, 
because  he  determined  that  the  southwest  handrail  on  the  washplant  operator’s 
station  had  not  been  maintained  in  good  condition  and  was  in  violation 
of  30  CFR  §  56.11027  which  mandates  that: 

Scaffolds  and  working 
platforms  shall  be  of  substantial  construction  and  provided  with  handrails 
and  maintained  in  good  condition.    Floor  boards  shall  be  laid  properly 
and  the  scaffolds  and  working  platforms  shall  not  be  overloaded.    Working 
platforms  shall  be  provided  with  toeboards  when  necessary.

Frey  testified  that 
the  cited  handrail  was  located  on  the  southwest  side  of  the  washplant 
operator’s  station.    Tr.  136,  149.    He  observed  a  broken  bottom  corner 
post  weld  that  caused  the  handrail  to  freely  move.    Tr.  136.    The 
loose  handrail  was  next  to  the  access  ladder,  so  the  handrail  would 
be  a  point  of  contact  for  a  miner  climbing  up  the  ladder  to  the  operator’s 
station.    Tr.  137.    The  operator’s  station  was  six  feet  down  from  the 
wash  plant  deck  and  20  feet  from  the  ground.    Tr.  136.    Also,  the 
inspector  testified  that  the  weld  appeared  to  have  popped  due  to  continued 
vibration.    Tr.  136.    Walker,  the  operator,  acknowledged  that  the  handrail 
had  a  broken  bottom  corner  weld.    Tr.  497-498.   

According  to  the  testimony  of  the 
inspector,  the  standard  was  violated  because  the  handrail  was  not  maintained 
in  good  condition.    Tr.  137.    I  credit  the  inspector’s  testimony  where 
he  testified  that  the  broken  right  corner  weld  allowed  the  vertical  bar 
to  move  up  and  down  and  was  no  longer  connected  to  anything.    Tr. 

137.    He  also  observed  marks  on  the  metal  where  it  was 
rubbing  at  the  bottom  of  the  railing.    Tr.  136.      Frey  stated 
that  the  vertical  end  piece  was  hanging  below  the  angle  iron  where  it 
used  to  be  welded.    Tr.  137.    As  such,  I  find  that  Respondent  violated 
30  CRF  56.11027  by  failing  to  maintain  a  working  platform  in  good  condition.   
Citation  No.  8693969  is  AFFIRMED.

  1. Gravity 

Inspector  Frey  designated  Citation 
No.  8693969  as  an  S&S  violation.    The  first  element  of  the  Mathies 
test  requires  a  violation  of  a  mandatory  safety  standard,  and  I  have 
already  found  that  the  failure  to  maintain  a  working  platform  was  a 
violation  of  30  CFR  §  56.  11027.    The  second  Mathies  element 
is  a  contribution  to  a  discrete  safety  hazard.    By  failing  to  repair 
the  handrail  on  the  wash  plant  operator’s  station, 
Respondent  exposed  miners  to  a  potential  fall  hazard.    Tr.  138.   

The  third  Mathies 
element  requires  showing  a  reasonable  likelihood  that  the  hazard  contributed 
to  will  result  in  an  injury.    Both  parties  testified  that  the  wash 
plant  operator’s  station  is  a  working  platform  for  miners  to  operate 
the  wet  side  screen  deck.    Tr.  140,  498.    The  inspector  noted  that 
the  markings  from  the  vertical  bar  hitting  the  angle  iron  indicated  that 
the  wet  side  screen  deck  had  been  operational  without  the  hazard  being 
corrected.    Tr.  141.    According  to  the  inspector,  this  indicated  that 
the  plant  was  running  at  some  point  after  it  was  broken.    Tr.  141.   
The  inspector  believed  because  the  handrail  was  able  to  freely  move, 
a  miner  could  not  safely  use  it  for  support  while  climbing  up  the  ladder 
or  as  point  of  contact  without  the  potential  of  falling.    Tr.  137-138, 

143.    Walker,  the  operator  testified  that  a  miner  must  go  up  onto  the 
operator’s  tower  to  operate  the  wet  plant.    Tr.  498.    The  inspector 
believed  the  broken  handrail  would  continue  to  exist  during  continued 
mining  operations  because  the  defective  handrail  should  have  been  noted 
in  a  workplace  examination  but  was  never  documented.    Tr.  141.    Frey 
also  testified  that  the  washplant  operator’s  station 
was  exposed  to  weather  conditions  which  increased  the  likelihood  of  a 
miner  falling.  Tr.  154.   

The  fourth  Mathies  element 
requires  a  reasonable  likelihood  that  a  resulting  injury  will  be  reasonably 
serious.    Inspector  Frey  testified  that  if  a  miner  were  to  fall  from 
the  top  of  the  wash  plant  operator’s  station,  the  fall  would  either 
be  six  feet  down  to  the  washplant  deck  or  20  feet  down 
to  the  ground.    Tr.  136.    The  inspector  believed  that  either  fall  would 
be  potentially  fatal.    Tr.  153-154.    Respondent  argued  that  it  would 
be  very  unlikely  that  a  miner  could  fall  past  the  wash  plant  deck  to 
the  ground  and  that  a  fall  to  the  wash  plant  deck  would  not  be  fatal.   
Tr.  466.    The  inspector  testified  that  if  a  miner  were  climbing  the 
ladder  it  would  be  more  likely  that  a  miner  would  miss  the  wash  plant 
deck  and  fall  to  the  ground.    Tr.  138,  153-154.    Inspector  Frey  also 
testified  about  two  fatalgrams,  which  showed  that  miners  can  be  fatally 
injured  from  falls  of  nine  feet  and  sixteen  feet.    Tr.  144-145.    I 
defer  to  and  credit  Frey’s  straight  forward  and  detailed  testimony  that 
there  is  a  reasonable  likelihood  a  resulting  injury  would  be  reasonably 
serious  if  a  miner  were  to  fall  from  the  wash  plant  operator’s  station 
to  the  ground  or  wash  plant  deck.         

As  the  evidence  produced  at  hearing 
supports  all  four  elements  of  the  Mathies  formula,  I  find  that 
the  Secretary  has  established  that  Citation  No.  8693969  was  an  S&S 
violation. 

  1. Negligence   

Frey  believed  that  the  defective 
handrail  was  readily  apparent  because  a  miner  doing  a  workplace  inspection 
or  climbing  up  to  the  wash  plant  operator’s  station  should 
have  noticed  the  hazard.    Tr.  147.    The  inspector  testified  that  the 
marks  where  the  vertical  bar  was  rubbing  against  the  platform  indicated 
that  the  wet  side  screen  deck  had  been  operational  without  the  hazard 
being  corrected.    Tr.  141.    Also,  inspector  Frey  noted  that  the  broken 
handrail  was  not  noted  in  a  workplace  examination  and  no  safeguards  were 
put  in  place  to  indicate  it  had  been  identified.    Tr.  143,147.    Accordingly, 
he  acknowledged  that  the  weld  could  have  broken  when  the  plant  was  last 
in  operation  and  considered  this  a  mitigating  factor  thus  assessing  the 
negligence  level  as  moderate.    Sec’y  Ex.  P-6,  p.  1. 

Respondent  argued  that  a  drop  down 
bar  connects  the  southwest  railing  once  a  miner  reaches  the  top  of  the 
operator’s  station  and  manually  swings  it  down.    Tr.  152.    Inspector 
Frey  testified  that  because  the  southwestern  bottom  corner  weld  was  broken, 
the  drop  down  bar  would  not  function  as  intended  and  would  not  help 
a  miner  climbing  up  the  ladder.    Tr.  152.    Additionally,  the  inspector 
testified  that  the  swing  gate  for  the  working  platform  did  not  work 
properly  and  made  the  cited  condition  more  obvious.    Tr.  143.    Again, 
I  find  Frey’s  testimony  straight  forward,  detailed,  articulate  and  persuasive 
meriting  credit  and  deference  over  that  of  Respondent’s  arguments.     

For  all  these  reasons,  I  find 
that  Order  No.  8693969  was  the  result  of  moderate  negligence  on  the 
part  of  Respondent,  as  they  should  have  been  aware  of  the  violation 
because  the  handrail  was  not  maintained  and  the  operator’s  station  is 
frequently  used  by  miners  to  operate  the  wet  side  screen  deck.    Tr. 

143.    Therefore,  the  negligence  designation  for  Order  No.  8693969  is 
upheld  at  a  moderate  level.

  1. Penalty 
    Assessment

The  Secretary  has  proposed  a  regularly 
assessed  penalty  of  $243.00.    Respondent’s  history  of  previous  violations 
revealed  that  the  mine  has  a  total  of  seven  past  violations  and  no 
repeated  violations  of  56.  11027.    P-1.    Walker,  the  operator,  testified 
that  Respondent  is  a  small  mom  and  pop  operation  with  15  current  employees 
at  the  time  the  citation  was  issued.    Tr.  301.    Respondent  has  not 
argued  or  presented  any  evidence  indicating  that  the  proposed  penalty 
would  affect  its  ability  to  continue  business  operations.    I  upheld  the 
moderate  negligence  designation  for  this  citation  because  the  defective 
handrail  was  able  to  freely  move  and  a  miner  could  not  safely  use  it 
for  support  while  climbing  up  the  ladder  without  the  potential  of  falling.   
Tr.  137-138,  143.    The  defective  handrail  created  a  reasonable  likelihood 
of  injury  because  a  miner  must  go  up  the  ladder  onto  the  operator’s 
tower  to  operate  the  wet  plant.    Tr.  498.      According  to  the  record, 
the  citation  was  terminated  based  upon  a  seasonal  closure  and  shutdown 
of  the  mine.   

After  considering  all  six  penalty 
criteria  and  relying  on  my  penalty  analysis  earlier  in  this  decision, 
I  uphold  the  Secretary’s  proposed  penalty  and  assess  Respondent  a  civil 
monetary  penalty  of  $243.00  for  Citation  No.  8693969. 

B.  Citation  No.  8693974   

Inspector  Frey  issued  Citation  No.  8693974 
on  August  19,  2013  for  an  alleged  violation  of  30  CRF  56.9303.    Tr. 

180.    The  inspector  alleged  within  the  citation  that: 

The  grizzly  ramp  wall  adjacent 
to  the  plant  feed  conveyors  is  unstable  and  has  multiple  concrete  clocks 
in  the  process  of  toppling  as  ramp  material  thrusts  them  outward.  Miners 
travel  below  the  wall  to  maintain  and  grease  the  conveyors  and  as  an 
access  to  the  Surge  tunnel.  If  the  wall  were  to  fail,  a  miner  in  the 
adjacent  travelway  could  be  fatally  crushed. 

Sec’y  Ex.  9. 

Inspector  Frey  determined  that  the 
violation  was  reasonably  likely  to  cause  an  injury,  the  resulting  injury 
would  be  fatal,  the  violation  was  S&S,  affected  one  person,  and  was 
the  result  of  Respondent’s  moderate  negligence.    Sec’y  Ex.  P-9.    The 
Secretary  has  proposed  a  penalty  of  $243.00.   

  1. Findings 

Inspector  Frey  issued  Citation  No.  8693974, 
because  he  determined  that  a  grizzly  ramp  wall  adjacent  to  the  plant 
feed  conveyors  was  unstable  where  he  observed  multiple  concrete  blocks 
that  were  in  the  process  of  toppling.    He  found  this  condition  to  be 
a  violation  of  30  CFR  §  56.9303  which  mandates  that: 

Ramps  and  dumping 
facilities  shall  be  designed  and  constructed  of  materials  capable  of  supporting 
the  loads  to  which  they  will  be  subjected.    The  ramps  and  dumping  facilities 
shall  provide  width,  clearance,  and  headroom  to  safely  accommodate  the 
mobile  equipment  using  the  facilities.

The  Respondent  constructed 
a  ramp  to  a  grizzly  storage  bin  where  large  vehicles  dump  gravel  into 
a  grizzly  that  funnels  the  gravel  onto  a  feed  conveyor  located  in  a 
surge  tunnel  under  the  ramp.    Tr.  183.    Frey  testified  that  the  grizzly 
ramp  wall  was  not  capable  of  supporting  the  weight  of  the  materials 
above  the  ramp.    Tr.  182.    The  inspector  observed  that  material  was 
sloughing  into  the  roadway  past  a  stack  of  ecology  blocks  which  were 
in  the  process  of  toppling  and  being  thrust  forward  by  the  material 
that  was  falling  down  the  grizzly  ramp.    Id.,  Sec’y  Ex.  P-9.   
Also,  Frey  stated  that  the  retaining  wall  under  the  ramp  was  cracked 
and  leaning  outward.      Tr.  185.    The  inspector  also  noted  that  at 
the  top  of  the  grizzly  ramp  there  was  a  k-rail  highway  style  divider 
that  was  sloughing  down  the  side  of  the  ramp.    Tr.  180-185.    Frey 
testified  that  the  ecology  blocks  and  k-rail  created  a  hazard  to  miners 
because  the  material  falling  down  the  ramp  could  cause  them  to  topple 
down  into  the  walkway.    Tr.  182.    Respondent  denied  that  the  blocks 
were  in  the  process  of  toppling  and  asserted  that  the  blocks  were  purposefully 
installed  in  a  toppled  fashion  to  hold  the  bank  down  from  erosion.   
Tr.  439,  441-442,  Sec’y  Ex.  P-9.

According  to  the  inspector,  the 
standard  was  violated  because  the  grizzly  ramp  wall  was  unstable  and 
multiple  concrete  blocks  were  in  the  process  of  toppling  as  ramp  material 
thrust  them  outward.    Tr.  182-189.    I  defer  to  and  credit  the  inspector’s 
testimony  that  the  grizzly  ramp  was  not  capable  of  supporting  the  loads 
to  which  it  was  subject  because  the  falling  material  was  thrusting  hazards 
outward.      The  inspector  believed  that  eventually  the  material  would 
thrust  the  multiple  hazards  outward  and  into  the  travelway.    Tr.  186.   
The  photos  taken  by  the  inspector  show  the  toppled  ecology  blocks  with 
k-rails  that  appear  to  have  been  displaced  due  to  sloughing  of  ground 
material.    Sec’y  Ex.  9.    I  concur  with  his  belief  based  on  his  direct 
observation  and  photos  of  the  condition.    As  such,  I  find  that  Respondent 
violated  30  CRF  56.9303  by  failing  to  stabilize  a  grizzly  ramp  wall 
that  was  not  able  to  support  the  load  to  which  it  was 
subjected.    Citation  No.  8693974  is  AFFIRMED.

  1. Gravity 

Inspector  Frey  designated  Citation 
No.  8693974  as  an  S&S  violation.    I  have  already  found  that  the 
failure  to  stabilize  a  grizzly  ramp  wall  was  in  violation  of  30  CFR 
§  56.  9303  thus  meeting  element  one  of  the  Mathies  test.    The 
second  Mathies  element  is  a  contribution  to  a  discrete  safety  hazard.   
By  failing  to  stabilize  the  grizzly  ramp  wall,  Respondent  exposed  miners 
to  crushing  injuries  from  ecology  blocks  toppling  or  material  sloughing 
off  the  ramp.    Tr.  182,  191.   

The  third  Mathies  element 
requires  showing  a  reasonable  likelihood  that  the  hazard  contributed  to 
will  result  in  an  injury.    Inspector  Frey  testified  that  miners  were 
exposed  to  the  ecology  blocks  and  sloughing  material  because  they  have 
to  access  the  travel  way  to  perform  maintenance,  repair,  inspection,  cleanouts, 
and  to  access  the  surge  tunnel.    Tr.  193.    The  inspector  testified 
that  eventually,  with  continued  mining  operations,  the  ecology  blocks  would 
topple  into  the  travel  way,  the  k-rails  would  slough  into  the  travel 
way,  and  gravel  would  slough  into  the  travel  way.    Tr.  191.    Also, 
Frey  stated  that  there  could  be  a  landslide  of  debris  if  the  retaining 
wall  or  ecology  blocks  failed  to  hold  back  the  material  on  the  grizzly 
ramp.    Tr.  191.    The  inspector  also  testified  that  the  vibration  from 
mobile  equipment  around  the  ramp  would  cause  material  to  move  down  the 
ramp  quicker  and  would  eventually  cause  the  grizzly  ramp  to  fail.    Tr. 
191-192.    Frey  also  observed  that  the  grizzly  ramp  hazard  was  obvious 
when  he  walked  up  the  travel  way.    Tr.  190.    He  noted  that  the  ramp 
hazard  would  likely  continue  to  exist  into  the  future  because  the  ramp 
failure  was  not  recognized  in  any  workplace  examinations.    Tr.  190-193.     
According  to  the  inspector,  the  operator  was  unaware  of  the  state  of 
the  grizzly  ramp  wall.  Tr.  190.   

Respondent  argued  that  the  violation 
was  not  reasonably  likely  to  lead  to  a  significant  injury  because  the 
ecology  blocks,  k-rails,  or  gravel  material  would  not  slough  off  in  a 
way  that  would  lead  to  a  significant  injury.    Tr.  439-446.    The  operator 
testified  that  the  ecology  blocks  were  locked  in  place  because  of  a 
v-notch  at  the  bottom  of  every  block.    Tr.  442.    Walker  avowed  that 
neither  the  ecology  blocks  nor  k-rails  had  moved  at  all  since  they  were 
installed  to  hold  back  material  on  the  grizzly  ramp.    Tr.  443.    He 
also  testified  that  even  though  the  retaining  wall  under 
the  ramp  was  cracked,  it  was  reinforced  with  rebar.    Tr.  444.    I 
defer  to  and  credit  the  inspector’s  straight  forward  and  compelling  testimony 
that  it  was  reasonably  likely  the  ecology  blocks,  k-rails,  or  gravel 
material  sloughing  off  the  ramp  would  lead  to  a  significant  injury  because 
his  observations  are  clearly  supported  by  the  photos  he  took.    Tr.  194, 
Sec’y  Ex.,  P-9.

The  fourth  Mathies  element 
requires  a  reasonable  likelihood  that  a  resulting  injury  will  be  reasonably 
serious.    The  inspector  testified  that  he  was  concerned  that  a  miner 
could  be  crushed  or  struck  by  an  ecology  block  or  k-rail  falling  down 
the  slope  of  the  ramp.    Tr.  194.    I  share  his  concern  and  find  it  is  reasonably  likely  the  ecology  blocks,  k-rails,  or  gravel 
material  sloughing  off  the  ramp  would  lead  to  fatal  crushing  injuries.   
Tr.  193-194.         

As  the  evidence  produced  at  hearing 
supports  all  four  elements  of  the  Mathies  formula,  I  find  that 
the  Secretary  has  established  that  Citation  No.  8693974  was  an  S&S 
violation. 

  1. Negligence   

Inspector  Frey  testified  that  he 
was  worried  about  continued  mining  operations  because  the  grizzly  ramp 
had  probably  degraded  over  time  and  the  hazards  were  not  recognized  by 
the  operator.    Tr.  193.    The  inspector  believed  the  hazards  on  the 
grizzly  ramp  had  not  been  recognized  because  the  area  was  not  cordoned 
off  to  prevent  access  and  there  was  no  workplace  examination  identifying 
the  hazards.    Tr.  193.    Frey  also  testified  that  the  toppling  ecology 
blocks,  sloughing  k-rails,  and  cracked  retaining  wall  were  obvious  signs 
that  the  ramp  was  failing.    Tr.  195.    However,  he  also  acknowledged 
that  the  deterioration  progressed  slowly  thus  “kind  of  working  itself 
into  the  background”  on  not  being  noticed.    Tr.  195.

For  all  these  reasons,  I  find 
that  Citation  No.  8693974  was  the  result  of  moderate  negligence  on  the 
part  of  Delta  Concrete,  as  they  should  have  been  aware  of  the  violation 
because  the  toppled  ecology  blocks  and  sloughing  material  were  obvious 
and  next  to  a  travel  way  where  sufficient  workplace  examinations  should 
have  been  taking  place.    Tr.  143.  I  find  the  slow  progression  of  the 
deterioration  to  be  a  mitigating  factor  leading  one  to  believe  immediate 
attention  was  not  necessary.    Therefore,  the  negligence  designation  for 
Citation  No.  8693974  is  upheld  at  moderate.       

  1. Penalty 
    Assessment

The  Secretary  has  proposed  a  regularly 
assessed  penalty  of  $243.00.    Respondent’s  past  history  of  previous  violations 
revealed  that  the  mine  has  a  total  of  seven  past  violations  and  no 
repeated  violations  of  56.  9303.    Sec’y  Ex.  P-1.    Walker,  the  operator 
testified  that  Respondent  is  a  small  mom  and  pop  operation  with  15  current 
employees  at  the  time  the  citation  was  issued.    Tr.  301.    Respondent 
has  not  argued  or  presented  any  evidence  indicating  that  the  proposed 
penalty  would  affect  its  ability  to  continue  business  operations.    I 
upheld  the  moderate  negligence  designation  for  this  citation  because  the 
toppling  ecology  blocks,  sloughing  k-rails,  and  cracked  retaining  wall 
were  obvious  signs  that  the  grizzly  ramp  was  failing.    Tr.  195.    I 
found  that  it  was  reasonably  likely  the  ecology  blocks,  k-rails,  or  gravel 
material  sloughing  off  the  ramp  could  lead  to  a  significant  injury  to 
a  miner.    Tr.  194.    According  to  the  record,  the  citation  was  terminated 
based  upon  a  seasonal  closure  and  shutdown  of  the  mine.   

After  considering  all  six  penalty 
criteria  and  noting  the  penalty  analysis  earlier  in  this  decision,  I 
uphold  the  Secretary’s  proposed  penalty  and  assess  Respondent  a  civil 
monetary  penalty  of  $243.00  for  Citation  No.  8693974.   

C. Citation 
No.  8693975

Inspector  Frey  issued  Citation  No. 
8693975  on  August  23,  2013  for  an  alleged  violation  of  30  CRF  56.18002a.   
Tr.  180.    The  inspector  alleged  within  the  citation  that: 

A  competent  person  has  not  been 
performing  workplace  exams  at  least  once  per  shift  at  Delta  Concrete 
based  upon  the  number  of  discrete  safety  hazards  found  during  inspection 
and  the  length  of  time  necessary  for  them  to  accumulate.    A  miner  performing 
their  duties  could  be  fatally  injured  if  exposed  to  a  hazard  that  should 
have  been  found  and  corrected  in  an  examination  of  working  places.   

Sec’y  Ex.  10. 

Frey  determined  that  the  violation  was  reasonably 
likely  to  cause  an  injury,  the  resulting  injury  would  be  fatal,  the 
violation  was  S&S,  affected  one  person,  and  was  the  result  of  Respondent’s 
high  negligence.  Sec’y  Ex.  10.    The  Secretary  has  proposed  a  penalty 
of  $807.00.   

  1. Findings 

Inspector  Frey  issued  Citation  No.  8693975, 
because  he  determined  that  a  competent  person  had  not  been  performing 
workplace  exams  at  least  once  per  shift  at  Delta  Concrete.    This  was 
in  violation  of  30  CFR  §  56.18002a  which  mandates  that: 

A  competent  person 
designated  by  the  operator  shall  examine  each  working  place  at  least 
once  each  shift  for  conditions  which  may  adversely  affect  safety  or  health.   
The  operator  shall  promptly  initiate  appropriate  action  to  correct  such 
conditions.

A  competent  person  according  to  56.2  is  “a 
person  having  abilities  and  experience  that  fully  qualify  him  to  perform 
the  duty  to  which  he  is  assigned.”  30  C.F.R.  §  56.2.    MSHA’s  Program 
Policy  Manual  states  a  competent  person  is  “any  person  who,  in  the  judgment 
of  the  operator,  is  fully  qualified  to  perform  the  assigned  task.    MSHA 
does  not  require  that  a  competent  person  be  a  mine  foreman,  mine  superintendent, 
or  other  person  associated  with  mine  management.”    Sec’y  Ex.,  P-19.   

Inspector  Frey  testified  that  there  was  evidence 
that  mining  related  activities  had  occurred  on  days  where  there  was  no 
record  of  examination.    Tr.  214.    After  inspecting  Delta  Concrete,  inspector 
Frey  stated  that  the  number  of  hazards  identified  led  him  to  question 
the  competency  of  the  person  performing  those  inspections.    Tr.  214.   
The  operator  acknowledged  that  at  the  time  they  were  cited,  Respondent 
was  not  conducting  competent  person  inspections  every  shift  as  required 
by  56.18002a.    Tr.  474.    The  inspector  stated  that  there  were  missing 
records  of  examinations  for  when  work  would  have  been  performed  based 
upon  looking  at  production  reports.    Tr.  217.    Inspector  Frey  noted 
that  most  of  the  hazards  cited  at  the  mine  were  open  and  obvious  hazards 
that  should  have  identified  by  sufficient  workplace  examinations.    Tr. 
214.   

The  inspector  noted  no  less  than 
four  citations  where  he  believed  the  operator  should  have  discovered  the 
hazards  during  a  previous  workplace  examination.    Tr.  216.    For  Citation 
Nos.  8693966  and  8693970,  the  operator  should  have  discovered  the  inadequate 
splices  during  workplace  examinations  because  the  splices  were  open  and 
obvious  and  a  competent  miner  would  have  spotted  the  hazard.    Tr.  216-219.   
For  Citation  No.  8693968,  the  operator  should  have  observed  the  damaged 
480-volt  cable  adjacent  to  a  travel  way  during  a  workplace  examination 
because  the  damage  had  existed  for  a  significant  period  of  time  based 
on  the  amount  of  damage  to  the  cable.  Tr.  217-218.    Lastly,  for  Citation 
No.  8693969,  the  operator  should  have  observed  the  defective  handrail 
during  a  workplace  examination  because  a  reasonable  miner  would  have  noticed 
it  while  climbing  up  to  the  operator’s  station.    Tr.  219.

I  credit  the  inspector’s  testimony 
that  the  hazards  were  extensive  and  had  most  likely  existed  for  a  significant 
period  of  time  demonstrating  that  inadequate  work  place  examinations  had 
taken  place  while  the  plant  was  operational.    Tr.  215.    Respondent  argued 
that  there  was  a  communications  failure  between  Inspector  Frey  and  Operator 
Walker  regarding  who  was  responsible  for  workplace  examinations.    Walker 
avowed  that  as  owner  operator  he  was  the  competent  person  who  was  responsible 
for  the  exams  while  Frey  believed  Crusher  Operator  Jimmy  Hanlon  was  responsible.   
Tr.  334-335,  127,  129-130,  217.    Respondent  further  asserted  he  believed 
workplace  exams  were  required  for  operation  days  only  and  not  maintenance 
days.    Tr.,  473-474.    Regardless  of  the  alleged  communication  issues 
I  find  sufficient  evidence  to  conclude  that  there  was  a  lapse  in  required 
workplace  exams  due  to  the  absence  of  exam  records  and  the  fact  that 
the  electrical  violations  had  existed  for  an  extended  period  while  the 
plant  was  operational  prior  to  the  inspection.    As  such,  I  find  that 
Respondent  violated  30  CRF  56.18002a  because  a  competent  person  had  not 
been  performing  workplace  examinations  at  least  once  per  shift  at  Delta 
Concrete.    Citation  No.  8693975  is  AFFIRMED.

  1. Gravity 

Inspector  Frey  designated  Citation 
No.  8693975  as  an  S&S  violation.    I  have  already  found  that  Respondent 
failed  to  have  a  competent  person  perform  workplace  examinations  at  least 
once  per  shift  in  violation  of  30  CFR  §  56.18002a.    The  second  Mathies 
element  is  a  contribution  to  a  discrete  safety  hazard.    There  were  a 
number  of  discrete  safety  hazards  that  existed  at  Delta  Concrete  which 
included  inadequate  splices,  damaged  power  cords,  and  a  broken  handrail 
that  were  not  discovered  during  workplace  examinations.    Tr.  226-228, 
P-10.           

The  third  Mathies  element 
requires  showing  a  reasonable  likelihood  that  the  hazard  contributed  to 
was  likely  to  result  in  an  injury.    For  the  electrical  citations,  the 
inspector  testified  that  many  of  the  electrical  hazards  were  located  in 
travel  ways  where  miners  perform  maintenance,  repair,  inspection,  and  cleanouts.   
The  inspector  also  testified  that  other  discrete  safety  hazards  like  the 
defective  handrail  or  grizzly  ramp  were  also  in  locations  where  miners 
frequently  work  and  these  hazards  were  obvious  and  had  existed  for  a 
significant  period  of  time  while  Respondent  was  operational.    Based  on 
the  testimony  of  the  inspector,  I  find  a  reasonable  likelihood  that  the 
failure  to  conduct  workplace  examinations  reasonably  contributed  to  the 
likelihood  a  significant  injury  would  occur.   

The  fourth  Mathies  element 
requires  a  reasonable  likelihood  that  a  resulting  injury  will  be  reasonably 
serious.    Inspector  Frey  testified  that  under  the  right  circumstances 
a  miner  coming  into  contact  with  a  defective  splice  or  power  cord  would 
be  potentially  fatal  because  most  of  the  defective  hazards  had  electrical 
capacity  up  to  480  volts.    Tr.  59.    The  inspector  also  testified  to 
five  separate  fatalgrams,  each  showing  that  a  480-volt  shock  can  be  fatal.   
Tr.  60.    Frey  stated  that  the  non-electrical  hazards  posed  a  significant 
risk  of  injury  to  miners  which  included  crushing  injuries  from  the  grizzly 
ramp  and  fall  hazards  from  the  defective  handrail.    I  credit  the  inspector’s 
testimony  that  many  of  the  hazards  cited  on  August  19,  2013  could  lead 
to  fatal  injuries  and  that  six  out  of  nine  citations  were  designated 
as  potentially  fatal.    The  failure  to  identify  and  address  these  hazards 
via  workplace  examinations  significantly  contributed  to  the  reasonable  likelihood 
of  a  serious  injury  or  fatality  occurring.   

As  the  evidence  produced  at  hearing 
supports  all  four  elements  of  the  Mathies  formula,  I  find  the 
Secretary  has  established  that  Citation  No.  8693975  was  an  S&S  violation. 

  1. Negligence 

Inspector  Frey  testified  that  the 
negligence  designation  was  high  because  the  operator  should  have  been 
aware  that  work  place  examinations  were  not  being  conducted  as  required 
by  a  competent  person.    Tr.  228.    Frey  testified  that  the  Walker  stated 
during  their  conversation  that  equipment  operator  Jimmy  Hanlon  did  not 
have  sufficient  training  and  was  not  competent  to  perform  some  workplace 
examinations.    Tr.  229.    Walker  testified  that  his  conversation  with 
the  inspector  was  contrary  to  inspector  Frey’s  testimony,  but  did  acknowledge 
that  Hanlon  was  not  competent  to  perform  workplace  examinations  for  electrical 
hazards.    Tr.  378.    Based  on  both  parties’  testimony,  I  credit  the 
inspector’s  testimony  that  the  number  of  electrical  hazards  demonstrates 
that  a  competent  miner  whether  it  be  Hanlon  or  Walker  himself,  was  not 
performing  adequate  workplace  examinations.    Tr.  233. 

Frey  also  reviewed  the  workplace 
examination  reports  from  Delta  Concrete  and  determined  that  work  was  performed 
on  days  when  examinations  were  not  recorded.    Tr.  230.    Frey  stated 
that  when  he  inspected  Respondent,  he  was  not  provided  with  examination 
records  for  every  day  he  could  substantiate  work  taking  place.    Tr. 

230.    The  inspector  stated  that  there  were  some  records  of  examinations 
on  some  days,  but  there  were  gaps  between  days  when  work  was  performed.   
Tr.  215.    The  mine  operator  acknowledged  that  the  miners  doing  workplace 
examinations  did  not  do  examinations  on  maintenance  days  if  the  wet  plant 
was  not  going  to  produce  gravel,  even  if  the  miners  worked  in  the  cited 
areas.    Tr.  472-474.    He  also  testified  that  at  the  time  of  the  citation, 
there  were  competent  miners  doing  the  workplace  inspections,  but  it  was 
not  on  a  daily  basis.    Tr.  473.    Based  on  the  testimony  from  both 
parties  it  is  easy  to  conclude  there  was  a  fundamental  misunderstanding 
between  Frey  and  Walker  about  who  was  responsible  for  the  workplace  examinations.   
Walker  ultimately  admitted  he  was  the  responsible  competent  person  after 
his  son  left  employment  from  the  mine  in  2011  and  acknowledged  that 
workplace  exams  had  only  been  conducted  on  a  shift  by  shift  basis  while 
the  plant  was  operational  and  not  when  maintenance  only  was  being  performed.   
However,  it  is  clear  from  the  evidence  that  at  a  minimum  the  electrical 
violations  had  existed  since  2011,  no  less  than  a  year  and  a  half  to 
two  years  prior  to  the  2013  inspection.    A  competent  workplace  exam 
while  the  plant  was  operational  during  this  time  should  have  identified 
the  electrical  issues.    Therefore,  I  find  the  high  negligence  designation 
to  be  appropriate  and  uphold  it.

  1. Penalty 
    Assessment

The  Secretary  has  proposed  a  regularly 
assessed  penalty  of  $807.00.    Respondent’s  past  history  of  previous  violations 
revealed  that  the  mine  has  a  total  of  seven  past  violations  and  no 
repeated  violations  of  56.  18002a.    Sec’y  Ex.  P-1.    Walker,  the  operator 
testified  that  Respondent  is  a  small  mom  and  pop  operation  with  15  current 
employees  at  the  time  the  citation  was  issued.    Tr.  301.    Respondent 
has  not  argued  or  presented  any  evidence  indicating  that  any  of  the 
proposed  penalties  would  affect  its  ability  to  continue  business  operations.   
I  upheld  the  high  negligence  designation  for  this  citation  because  of 
the  many  open  and  obvious  hazards  present  at  Delta  Concrete  that  should 
have  been  identified  by  sufficient  workplace  examinations.    I  also  found 
that  significant  injury  was  reasonably  likely  because  many  of  the  electrical 
hazards  were  located  in  travel  ways  where  miners  perform  maintenance, 
repair,  inspection,  and  cleanouts.   

After  considering  all  six  penalty 
criteria  and  noting  my  penalty  analysis  earlier  in  this  decision,  I  uphold 
the  Secretary’s  proposed  penalty  and  assess  Respondent  a  civil  monetary 
penalty  of  $807.00  for  Citation  No.  8693975.

D. Citation 
No.  8693977

Inspector  Frey  issued  Citation  No. 
8693977  on  August  23,  2013  for  an  alleged  violation  of  30  CRF  56.9300a.   
Tr.  241.    The  inspector  alleged  within  the  citation  that: 

The  scale  does  not  have  rub  rails 
or  any  other  mid  axle  height  barrier  with  approximately  a  4  foot  drop 
off  on  either  side.    Trucks  drive  across  the  scales  as  needed  depending 
upon  business.    Driving  off  the  scale  could  cause  a  truck  to  turn  on 
its  side  leading  to  cuts,  bruises,  strains,  sprains,  or  broken  bones 
for  the  driver.

Standard  56.9300a  was  cited  1 
time  in  two  years  at  mine  5001783  (1  to  the  operator,  0  to  a  contractor).

Sec’y  Ex.  11. 

Inspector  Frey  determined  that  the  violation 
was  unlikely  to  cause  an  injury,  the  resulting  injury  would  be  lost 
workdays  or  restricted  duty,  the  violation  was  not  S&S,  affected  one 
person,  and  was  the  result  of  Respondent’s  low  negligence.    Sec’y  Ex. 

11.    The  Secretary  has  proposed  a  penalty  of  $100.00.   

  1. Findings

Inspector  Frey  issued  Citation  No. 
8693977,  because  he  determined  that  the  operator’s  scale  for  weighing 
vehicles  was  in  violation  of  30  CFR  §  56.9300a  which  mandates  that: 

Berms  or 
guardrails  shall  be  provided  and  maintained  on  the  banks  of  roadways 
where  a  drop-off  exists  of  sufficient  grade  or  depth  to  cause  a  vehicle 
to  overturn  or  endanger  persons  in  equipment.

Frey  testified  he  observed  an  operator’s 
scale  for  weighing  vehicles  at  the  Delta  Junction  mine  that  did  not 
have  rub  rails,  berms,  or  guardrails  and  there  was  a  four  foot  drop 
off  on  either  side  of  the  scale.    Tr.  243-245.    The  Commission  requires 
a  three-part  test  for  finding  violations  of  30  C.F.R.  §  56.9300:  (1) 
whether  the  scales  are  part  of  a  roadway;  (2)  whether  each  scale  has 
a  drop-off  of  sufficient  grade  or  depth  to  cause  a  vehicle  to  overturn 
or  endanger  persons;  and  (3)  whether  the  scales  are  equipped  with  berms 
or  guardrails  that  are  at  least  mid-axle  height  of  the  largest  self-propelled 
mobile  equipment  that  travels  the  roadway.    Lakeview  Rock  Prods.,  Inc., 
33  FMSHRC  2985  (Dec.  2011). 

Since  issuance  of  Lakeview  the 
case  that  has  most  fully  considered  the  question  of  whether  an  elevated 
scale  is  part  of  a  roadway  has  been  Knife  River  Corp.,  34  FMSHRC 
1109  (May  10,  2012)  .    In  Knife  River,  Judge  Thomas  McCarthy 
applied  the  Commission's  three-part  test  and  provided  a  thorough  analysis 
in  determining  that  an  elevated  truck  scale  with  10-inch  rub  rails  was 
not  part  of  the  roadway.    The  judge  found  unpersuasive  the  argument 
that  the  scale  is  part  of  a  continuous  road  and  therefore,  by  definition, 
part  of  the  roadway.    34  FMSHRC  at  1121.    He  noted  that  because  the 
Commission  required  in  Lakeview  an  initial  determination  of  whether 
the  scale  was  part  of  the  roadway,  the  judge  must  examine  the  “design, 
location,  and  use  of  the  truck  scale”,  in  making  his  determination.   
Id.    The  judge  agreed  with  the  Secretary's  position  that  the  plain 
language  of  Section  56.9300  would  apply  to  an  area  where  vehicles  must 
travel,  but  found  that  the  Secretary  in  his  case  failed  to  establish 
that  the  scale  constituted  such  an  area  where  vehicles  must  travel.   
Id.  at  1122.    He  noted  that  the  scale  at  Knife  River  was  not 
located  on  the  main  haulage  road  where  all  the  vehicles  entering  or 
exiting  the  mine  were  required  to  travel,  but  rather  was  removed  on 
a  single-lane  access  road.    Id.    The  only  trucks  that  drove  on 
the  scale  were  those  being  weighed.    Id.    The  judge  specifically 
found  that: 

Drivers  do  not  use  the  scale 
as  one  typically  uses  a  road,  bridge,  bench,  or  ramp  (i.e.,  as  a  means 
of  traveling  from  one  point  to  another)…    Rather,  the  scale  is  used 
as  a  piece  of  equipment  for  the  sole  purpose  of  weighing  vehicles,  which 
slowly  move  across  the  scale  with  intermittent  stops  before  proceeding 
back  on  course.    The  fact  that  trucks  enter  one  end  of  the  scale  and 
exit  on  another  is  completely  secondary  to  the  scale's  function  and  use.   
Id.   

I  find  that  advancing  a  functionalist 
approach,  rather  than  a  formal  approach  that  examines  the  scale  superficially, 
Judge  McCarthy  allowed  the  first  element  of  the  Commission's  test  to 
have  meaning.    Citing  Lakeview  Rock  Products,  Inc.,  35  FMSHRC  473, 
487,  2013  WL  1385621,  at  *13-14. 

In  this  case  Respondent  argued 
that  the  operator’s  scale  was  not  a  roadway  that  vehicles  used  as  an 
entrance  or  exit  to  the  mine  site.    Tr.  437.    Respondent’s  Google  image 
of  the  Delta  Junction  mine  shows  the  location  of  the  main  roadway  used 
by  miners  and  contractors  in  red.    Tr.  317-319,  Resp.  Ex.  A,  Photo 

7.    Walker,  the  operator,  testified  that  the  main  roadway  in  red  ran 
from  left  to  right,  and  that  the  lines  depicted  traffic  flow  from  the 
two  exit  and  entrance  points.    Id.    Also,  Walker  testified  the 
location  of  the  scale  access  point  and  exit  were  next  to  the  office 
and  indicated  that  a  miner  would  not  use  this  access  as  an  entrance 
to  or  exit  from  the  mine  site.    Tr.  318,  437.    Walker  also  testified 
that  the  specific  purpose  of  the  scale  was  for  weighing  vehicles  and 
was  not  a  roadway  that  miners  would  regularly  use.    Tr.  437.    Frey 
testified  that  he  considered  the  scale  to  be  a  part  of  the  roadway 
because  vehicles  and  trucks  would  have  to  drive  across  the  scale  twice 
in  order  to  be  properly  weighed.    Tr.  243-244.    First,  a  truck  driver 
with  an  empty  trailer  would  have  to  drive  over  the  scale  and  then  weigh 
the  trailer  end.    Tr.  243.    Second,  the  truck  driver  would  then  drive 
over  it  again,  after  being  loaded,  to  get  a  heavy  weight  to  determine 
the  saleable  amount  of  product.    Tr.  243.    Because  of  the  vehicle  traffic 
that  the  scale  road  took  on,  the  inspector  believed  that  it  was  part 
of  a  roadway.    Tr.  243-244.   

After  considering  both  parties’ 
arguments,  I  find  that  the  design,  location,  and  use  of  the  scale  at 
the  Delta  Junction  mine  establishes  that  it  is  not  part  of  the  mine’s 
roadway.    I  credit  Walker’s  testimony  that  the  scale  road  was  next  to 
the  office  and  that  it  was  not  used  as  an  entrance  or  exit  roadway 
to  or  from  the  mine.    Like  Knife  River,  the  scale  was  not  located 
on  the  main  travel  way  road  that  ran  left  to  right,  but  rather  the 
scale  area  was  removed  onto  a  single-lane  access  by  the  main  office.   
Resp.  Ex.  A,  Photo  7.    I  credit  Walker’s  testimony  that  the  sole 
purpose  of  the  scale  area  was  to  weigh  vehicles  and  not  as  a  roadway 
miners  used  as  an  entrance  and  exit.    The  design  and  placement  of  the 
scale  at  the  mine,  based  on  the  Google  image  of  the  Delta  Junction 
mine  site,  clearly  demonstrates  that  a  miner  wishing  to  weigh  a  vehicle 
would  have  to  pull  off  the  main  roadway  onto  the  scale  road  to  be 
weighed.    Resp.  Ex.  A,  Photo  7.    Therefore,  I  find  that  the  Secretary 
has  failed  to  prove  a  violation  of  30  CRF  56.9300a  because  the  scale 
access  area  was  not  part  of  a  roadway.    Accordingly,  Citation  No.  8693977 
is  VACATED. 

VI. PENALTY  ASSESSMENT  SUMMARY

The  following  chart  summarizes  my  findings  and 
the  assessed  penalties  in  this  docket:

Citations

Originally 
Proposed  Assessment

Judgment  Amount

Modification

Citation  No.

Proposed  Amount

Judgment 
Amount

Modification

8693966

$807.00

$400.00

Negligence  level  reduced  from  high  to  moderate

8693967

$100.00

$100.00

8693968

$807.00

$807.00

8693970

$807.00

$400.00

Negligence  level  reduced  from  high  to  moderate

8693978

$807.00

$807.00

8693969

$243.00

$243.00

8693974

$243.00

$243.00

8693975

$807.00

$807.00

8693977

$100.00

$0.00

Vacated

Total

$4721.00

$3807.00

VII. ORDER

Based 
upon  the  findings  above,  Citation  Nos.  8693966  and  8693970  are  AFFIRMED 
with  modified  negligence  levels.    Citation  Nos.  8693967,  8693968,  8693978, 
8693969,  8693974,  and  8693975  are  AFFIRMED  as  written.    Citation 
No.  8693977  is  VACATED.    Based  on  the  criteria  in  section  110(I) 
of  the  Mine  Act,  30  U.S.C.  §  820(I),  I  assess  eight  penalties  contested 
at  hearing  above  for  a  total  judgment  penalty  of  $3807.00.    Delta  Concrete 
Inc.  is  hereby  ORDERED  to  pay  the  Secretary  of  Labor  the  total 
sum  of  $3,807.00  within  30  days  of  this  order.[1]

/s/
David Simonton

David 
P.  Simonton

Administrative 
Law  Judge

Distribution:    (First  Class  U.S.  Mail)

Sean  J.  Allen,  Office  of  the  Solicitor,  U.S. 
Department  of  Labor,  1244  Speer  Blvd.,  Suite  216,  Denver,  CO  80202  for 
Petitioner

Robert  Groseclose,  Cook,  Schuhmann  &  Groseclose, 
Inc.,  714  Fourth  Avenue,  Suite  200,  Fairbanks,  AK  99701  for  Respondent

[1] 
Payment  should  be  sent  to:  MINE  SAFETY  AND  HEALTH  ADMINISTRATION,  U.S. 
DEPARTMENT  OF  LABOR,  PAYMENT  OFFICE,  P.  O.  BOX  790390,  ST.  LOUIS,  MO 
63179-0390

Get today's answer for your situation

You just read what one judge decided for one employer in 2014, and it binds only those parties. Ezel checks the current MSHA standards and Commission precedent and answers your specific situation, with citations.

Opens in Ezel Pro. Every answer cites the authority it relies on.