FMSHRC ALJ decision Docket VA 2012-163, VA 2011-335-R, VA 2011-336-R, VA 2011-337-R, VA 2011-405-R Decided December 6, 2013 Citations affirmed Judge William S. Steele

Dominion Coal Corporation v. Secretary of Labor, MSHA

Dominion Coal Corporation v. Secretary of Labor (FMSHRC VA 2012-163, et al.): Gas-well and preshift orders affirmed

Apply this to your situation

This order from 2013 bound only the parties to this case; it isn't precedent. Ezel answers your situation under the current MSHA standards and Commission precedent, with citations.

Currency note: this decision dates from 2013
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final ALJ decision, not Commission precedent
This decision became final under the 40-day rule in 30 U.S.C. § 823(d)(1) because no later Commission review appears in the official index. It binds the parties but is not Commission precedent. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the Commission's own document.
Read the official release (fmshrc.gov)

Plain-English summary

A continuous miner at Dominion Coal's No. 36 Mine intersected a gas well that was not properly located, mapped, or protected by a barrier. MSHA issued three orders under separate standards governing gas-well protection and mine maps, plus a fourth order for an inadequate preshift examination involving unrelated mine conditions. Judge William S. Steele held that the gas-well orders imposed distinct duties and were not duplicative. He affirmed all four orders as S&S, highly dangerous, and the result of high negligence and unwarrantable failure. Dominion was ordered to pay the Secretary's proposed penalties totaling $216,400.

Decision snapshot

  • Cited standards: 30 C.F.R. §§ 75.360(a)(1), 75.372, 75.1200, and 75.1700
  • Outcome: All four orders and their gravity and culpability findings were affirmed, and $216,400 was assessed.
  • Key point: Separate gas-well barrier and mapping standards impose distinct duties, and longstanding location errors do not excuse the operator from each requirement.

Full text (FMSHRC public release)

FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION

FEDERAL MINE SAFETY AND HEALTH REVIEW
COMMISSION

OFFICE
OF ADMINISTRATIVE LAW JUDGES

7
PARKWAY CENTER, SUITE 290

875
GREENTREE ROAD

PITTSBURGH, PA 15220

TELEPHONE: (412)
920-7240

FACSIMILE: (412)
928-8689

December 6, 2013

DOMINION
COAL CORPORATION,

Contestant,

v.

SECRETARY
OF LABOR

MINE
SAFETY AND HEALTH

ADMINISTRATION
(MSHA),

Respondent

CONTEST
PROCEEDINGS

Docket
No. VA 2011-335-R

Citation
No. 8179158; 03/07/2011                    

Docket No. VA 2011-336-R

Citation
No. 8179159; 03/07/2011

Docket No. VA 2011-337-R

Citation
No. 8179160; 03/07/2011

Docket No. VA 2011-405-R

Citation
No. 8182676; 04/04/2011

Mine: No. 36

Mine
ID: 44-06759

SECRETARY
OF LABOR,

MINE
SAFETY AND HEALTH

ADMINISTRATION
(MSHA),

Petitioner

v.

DOMINION
COAL CORPORATION,

Respondent

CIVIL
PENALTY PROCEEDING

Docket
No. VA 2012-163

A.C.
No. 44-06759-275366-01

Mine: No.
36

DECISION

Appearances:               David
J. Hardy, Esq. & Wm. Scott Wickline, Esq., Hardy Pence PLLC, Charleston, WV for Respondent                                                   

Winfield
J. Wilson, Esq, Jacob Hargraves, Esq., & Jason Grover, Esq., U.S.
Department of Labor, Office of the Solicitor, Arlington, VA for the Secretary

Before:                        Judge
Steele

STATEMENT
OF THE CASE

This
civil penalty proceeding is conducted pursuant to the Federal Mine Safety and
Health Act of 1977, 30 U.S.C. § 801 et seq. (2000) (the “Mine Act” or
“Act”). This matter concerns Order Nos. 8179158, 8179159, 8179160, and 8182676.
Order No. 8179158 was issued under Section 104(d)(1) for failure to comply with
30 C.F.R. § 75.1700. Order No. 8179159 was issued under Section 104(d)(1) for
failure to comply with 30 C.F.R. § 75.1200. Order No. 8179160 was issued under
Section 104(d)(1) for failure to comply with 30 C.F.R. § 75.372. Finally, Order
No. 8182676 was issued under Section 104(d)(2) for failure to comply with 30
C.F.R. § 75.360(a)(1). All four Orders were served on Dominion Coal Corporation
(“Dominion” or “Respondent.”). The Secretary seeks civil penalties in the
amount of $216,400.00. A hearing was held in Grundy, VA between February 20,
2013 and February 22, 2013 where the parties presented testimony and
documentary evidence. After the hearing, the parties submitted Post Hearing Briefs.

Order
Nos. 8179158, 8179159, and 8179160 concern an incident in which a continuous
miner intersected a gas well and will be considered together. Order No. 8182676
concerns an unrelated pre-shift examination and will be considered separately.

STIPULATIONS

The parties have stipulated to
the following:

1.     
Dominion is
an “operator” as defined in Section 3(d) of the Mine Act, 30 U.S.C. § 803(d),
at Mine No. 36.

2.     
Respondent’s
Mine No. 36 is a “mine” as that term is defined in Section 3(h) of the Mine
Act, 30 U.S.C. § 803(h).

3.     
Operations at
Respondent’s Mine No. 36, where the instant Orders were issued, are subject to
the jurisdiction of the Mine Act.

4.     
This
proceeding is subject to the jurisdiction of the Federal Mine Safety and Health
Review Commission and its designed Administrative Law Judges pursuant to §§ 105
and 113 of the Mine Act, 30 U.S.C. §§ 815 and 823.

5.     
The total
proposed penalty for the Orders in this proceeding will not affect Respondent’s
ability to continue in business.

6.     
The Orders at
issue in this proceeding were issued by an authorized representative of the
Secretary.

7.     
Timothy “TJ”
Howington was an “agent” of the Respondent for Mine Act purposes at the time
Order No. 8182676 was issued.

GAS
WELL ORDERS

1.     
Order
No. 8179158

a.      
Contents
of the Order

On March 7, 2011 at 9:45 a.m.,
Inspector John A. Hughes (“Hughes) issued to Respondent Order No. 8179158. Hughes
found:

The
Mine Operator’s failure to establish and maintain a 300 foot safety barrier
around a known gas well resulted in an accident on February 24, 2011 that had
the reasonable potential to cause death. At approximately 12:55 p.m. an
inundation of methane gas occurred on the 004-0 MMU. The continuous mining
machine located in the No. 4 heading unintentionally cut into an active gas
well damaging the well casings. An explosive mixture of 8.9% methane was
released from the well, detected by the continuous mining machine and observed
by the miners working on the 004-0 MMU. An emergency evacuation of the mine was
initiated and all miners were safely removed from the mine. Evidence gathered
during the accident investigation shows the Operator was aware of the well’s
presence but failed to keep track of it. The Operator’s projection map which
was submitted prior to mining and received by MSHA on May 18, 1994 has the
affected well’s location plotted. On subsequent annual maps the well’s location
is not shown and disappears from the record. The accident that resulted from
this condition was a near miss and could have resulted in a catastrophic event
affecting all of the miners underground on February 24, 2011. The Operator’s
inattention to the well’s location is a serious impediment to the safety of the
miners placed under his care. The Operator’s inadvertence toward such a serious
safety hazard and the potential consequences for failing to do so shows a
serious lack of care or due diligence on the Operator’s behalf. The mine
operator has engaged in aggravated conduct constituting more than ordinary
negligence. This violation is an unwarrantable failure to comply with a
mandatory standard. This D-1 Order is being issued in conjunction with D-1
Orders No. 8179159 and 8179160 for failure to plot a known gas well on the Operator’s
Certified Annual Mine Map required by 30 CFR sub-part 75.1200 and the
Operator’s Certified Mine Ventilation Map required by 30 CFR sub-part 75.372.

Government’s
Exhibit 15 (Hereinafter GX-15). Hughes noted that the gravity of this violation
was “Highly Likely,” “Fatal,” and would affect ten persons. Id. The
Order was marked as Significant and Substantial (“S&S”). Id. He
further marked that Respondent exhibited “High” negligence with respect to this
violation. Id.

b.     
Legal
Standards

Order
No. 8179158 was issued under Section 104(d)(1) of the Mine Act. That provision
provides the following:

If, upon any inspection of a coal or other mine,
an authorized representative of the Secretary finds that there has been a
violation of any mandatory health or safety standard, and if he also finds
that, while the conditions created by such violation do not cause imminent
danger, such violation is of such nature as could significantly and
substantially contribute to the cause and effect of a coal or other mine safety
or health hazard, and if he finds such violation to be caused by an
unwarrantable failure of such operator to comply with such mandatory health or
safety standards, he shall include such finding in any citation given to the
operator under this Act. If, during the same inspection or any subsequent
inspection of such mine within 90 days after the issuance of such citation, an
authorized representative of the Secretary finds another violation of any
mandatory health or safety standard and finds such violation to be also caused
by an unwarrantable failure of such operator to so comply, he shall forthwith
issue an order requiring the operator to cause all persons in the area affected
by such violation, except those persons referred to in subsection (c) to be
withdrawn from, and to be prohibited from entering, such area until an
authorized representative of the Secretary determines that such violation has
been abated.

The
Order deals with an alleged violation of 30 C.F.R. § 75.1700 (titled “Oil and
gas wells”). That section provides the following:

Each operator of a coal mine shall take
reasonable measures to locate oil and gas wells penetrating coalbeds or any
underground area of a coal mine. When located, such operator shall establish
and maintain barriers around such oil and gas wells in accordance with State
laws and regulations, except that such barriers shall not be less than 300 feet
in diameter, unless the Secretary or his authorized representative permits a
lesser barrier consistent with the applicable State laws and regulations where
such lesser barrier will be adequate to protect against hazards from such wells
to the miners in such mine, or unless the Secretary or his authorized
representative requires a greater barrier where the depth of the mine, other
geologic conditions, or other factors warrant such a greater barrier.

30 C.F.R. § 75.1700.

2.     
Order
No. 8179159

a.      
Contents
of the Order

On
March 7, 2011 at 9:46 a.m., Inspector John A. Hughes (“Hughes) issued to
Respondent Order No. 8179159. Hughes found:

The
Operator’s official, certified mine map located in the mine foreman’s office
does not show the location of active gas well No. 2559. The well’s location was
left off the mine map and on February 24, 2011 at approximately 12:55 p.m. an inundation
of methane gas occurred on the 004-0 MMU when the continuous mining machine
located in the No. 4 heading unintentionally cut into the gas well, damaging
the well casings. An explosive mixture of 8.9% methane was released from the
well, detected by the continuous mining machine and observed by the miners
working on the 004-0 MMU. An emergency evacuation of the mine was initiated and
all miners were safely removed from the mine. Evidence gathered during the
accident investigation shows the Operator was aware of the well’s presence but
failed to keep track of it. The Operator’s projection map which was submitted
prior to mining and received by MSHA on May 18, 1994 has the affected well’s
location plotted. On subsequent annual maps the well’s location is not shown
and disappears from the record. The accident that resulted from this condition
was a near miss and could have resulted in a catastrophic event affecting all
of the miners underground on February 24, 2011. The Operator’s inattention to
the well’s location is a serious impediment to the safety of the miners placed
under his care. The Operator’s inadvertence toward such a serious safety hazard
and the potential consequences for failing to do so shows a serious lack of
care or due diligence on the Operator’s behalf. The mine operator has engaged
in aggravated conduct constituting more than ordinary negligence. This
violation is an unwarrantable failure to comply with a mandatory standard. This
D-1 Order is being issued in conjunction with D-1 Orders No. 8179158 and
8179160 for failure to plot a known gas well on the Operator’s Certified Mine Ventilation
Map required by 30 CFR. sub-part 75.372 and failure to establish and maintain a
300 foot safety barrier around a known gas well required by 30 CFR sub-part
75.7100.

(GX-16).
Hughes noted that the gravity of this violation was “Highly Likely,” “Fatal,”
and would affect ten persons. Id. The Order was marked as S&S. Id.
He further marked that Respondent exhibited “High” negligence with respect to
this violation. Id.

b.     
Legal
Standards

Order
No. 8179159 was also issued under Section 104(d)(1) of the Mine Act. It deals
with an alleged violation of 30 C.F.R. § 75.1200 (titled “Mine Map”). That
section provides, in pertinent part, the following:

The operator of a coal mine shall have in a
fireproof repository located in an area on the surface of the mine chosen by
the mine operator to minimize the danger of destruction by fire or other
hazard, an accurate and up-to-date map of such mine drawn on scale. Such map
shall show…

(k) Either producing or abandoned
oil and gas wells located within 500 feet of such mine and any underground area
of such mine; and,

30
C.F.R. §75.1200.

3.     
Order
No. 8179160

a.      
Contents
of the Order

On
March 7, 2011 at 9:47 a.m., Inspector John A. Hughes (“Hughes) issued to
Respondent Order No. 8179160. Hughes found:

The
Operator’s official, certified mine ventilation map located in the mine
foreman’s office does not show the location of active gas well No. 2559. The
well’s location was left off the mine map and on February 24, 2011 at
approximately 12:55 p.m. an inundation of methane gas occurred on the 004-0 MMU
when the continuous mining machine located in the No. 4 heading unintentionally
cut into the gas well, damaging the well casings. An explosive mixture of 8.9%
methane was released from the well, detected by the continuous mining machine
and observed by the miners working on the 004-0 MMU. An emergency evacuation of
the mine was initiated and all miners were safely removed from the mine. Evidence
gathered during the accident investigation shows the Operator was aware of the
well’s presence but failed to keep track of it. The Operator’s projection map
which was submitted prior to mining and received by MSHA on May 18, 1994 has
the affected well’s location plotted. On subsequent annual maps the well’s
location is not shown and disappears from the record. The accident that
resulted from this condition was a near miss and could have resulted in a
catastrophic event affecting all of the miners underground on February 24,
2011. The Operator’s inattention to the well’s location is a serious impediment
to the safety of the miners placed under his care. The Operator’s inadvertence
toward such a serious safety hazard and the potential consequences for failing
to do so shows a serious lack of care or due diligence on the Operator’s
behalf. The mine operator has engaged in aggravated conduct constituting more
than ordinary negligence. This violation is an unwarrantable failure to comply
with a mandatory standard. This D-1 Order is being issued in conjunction with
D-1 Orders No. 8179158 and 8179159 for failure to plot a known gas well on the
Operator’s Certified Mine Map required by 30 CFR sub-part 75.1200 and failure
to establish and maintain a 300 foot safety barrier around a known gas well
required by 30 CFR sub-part 75.7100.

(GX-17).
Hughes noted that the gravity of this violation was “Highly Likely,” “Fatal,”
and would affect ten persons. Id. The Order was marked as S&S. Id.
He further marked that Respondent exhibited “High” negligence with respect to
this violation. Id.

b.     
Legal
Standards

Order
No. 8179159 was also issued under Section 104(d)(1) of the Mine Act. It deals
with an alleged violation of 30 C.F.R. § 75.372 (titled “Mine Ventilation
Map”). That section provides the following:

(a)        (1) At intervals not exceeding 12
months, the operator shall submit to the district manager 3 copies of an
up-to-date map of the mine drawn to a scale of not less than 100 nor more than
500 feet to the inch. A registered engineer or a registered surveyor shall
certify that the map is accurate.

(2) In addition to the informational
requirements of this section the map may also be used to depict and explain
plan contents that are required in §75.371. Information shown on the map to satisfy the requirements of §75.371 shall be subject to approval by the
district manager.

(b) The map shall contain the following
information:

(1) The mine name, company name, mine
identification number, a legend identifying the scale of the map and symbols
used, and the name of the individual responsible for the information on the
map.

(2) All areas of the mine, including sealed and
unsealed worked-out areas.

(3) All known mine workings that are located in
the same coalbed within 1,000 feet of existing or projected workings. These
workings may be shown on a mine map with a scale other than that required by
paragraph (a) of this section, if the scale does not exceed 2,000 feet to the
inch and is specified on the map.

(4) The locations of all known mine workings
underlying and overlying the mine property and the distance between the mine
workings.

(5) The locations of all known oil and gas wells
and all known drill holes that penetrate the coalbed being mined.

(6) The locations of all main mine fans,
installed backup fans and motors, and each fan's specifications, including
size, type, model number, manufacturer, operating pressure, motor horsepower,
and revolutions per minute.

(7) The locations of all surface mine openings
and the direction and quantity of air at each opening.

(8) The elevation at the top and bottom of each
shaft and slope, and shaft and slope dimensions, including depth and length.

(9) The direction of air flow in all underground
areas of the mine.

(10) The locations of all active working
sections and the four-digit identification number for each mechanized mining
unit (MMU).

(11) The location of all escapeways and refuge
alternatives.

(12) The locations of all ventilation controls,
including permanent stoppings, overcasts, undercasts, regulators, seals,
airlock doors, haulageway doors and other doors, except temporary ventilation
controls on working sections.

(13) The direction and quantity of air—

(i) Entering and leaving each split;

(ii) In the last open crosscut of each set of
entries and rooms; and

(iii) At the intake end of each pillar line,
including any longwall or shortwall.

(14) Projections for at least 12 months of
anticipated mine development, proposed ventilation controls, proposed bleeder
systems, and the anticipated location of intake and return air courses, belt
entries, and escapeways.

(15) The locations of existing methane drainage
systems.

(16) The locations and type of all AMS sensors
required by subpart D of this part. 

(17) Contour lines that pass through whole
number elevations of the coalbed being mined. These lines shall be spaced at
10-foot elevation levels unless a wider spacing is permitted by the district
manager.

(18) The location of proposed seals for each
worked-out area.

(19) The entry height, velocity and direction of
the air current at or near the midpoint of each belt flight where the height
and width of the entry are representative of the belt haulage entry.

(20) The location and designation of air courses
that have been redesignated from intake to return for the purpose of
ventilation of structures, areas or installations that are required by this
subpart D to be ventilated to return air courses, and for ventilation of seals.

(c) The mine map required by §75.1200 may be used to satisfy the requirements
for the ventilation map, provided that all the information required by this
section is contained on the map.

30
C.F.R. §75.372.

4.     
Summary
of Testimony

a. Testimony of Daniel Lee
Shortridge:

At
the time of the hearing Daniel Shortridge was employed as an outby foreman at
Dominion Coal. (Transcript Vol. I, p. 185).[1]
He was foreman on the U-Section day-shift the day the gas well was struck in February
of 2011. (Tr. I, 185-186). There were seven people on the section and over 30
people in the mine in total. (Tr. I, 185-186).

Before
Shortridge started mining that shift he checked the Section 75.1200 mine map,
as he always did to see what had been mined the day before. (Tr. I, 194-195). He
does not check the mine map for hazards, not even gas wells because they are
usually recorded. (Tr. I, 195). The map is located in the foreman’s office and
the gas well was not on that map. (Tr. I, 195).

There
was quite a bit of air on the section that day because all the air that was on
the line was going past the four heads. (Tr. I, 200). There had to be over
seven or eight thousand, but maybe more because there was a “twenty-some
thousand” line at the crosscut.[2]
(Tr. I, 200).

Shortridge
was 15-20 feet from the gas well when he heard the continuous miner hit
something. (Tr. I, 188). He was in a closed space in the mine. (Tr. I, 194). The
continuous miner raised up at the front when it hit the gas well. (Tr. I, 188).
The collision resulted in steel-on-steel contact, between the miner and the
pipe. (Tr. I, 193-194). He could not tell how deep the well case was cut
because the ripper head was still against the miner. (Tr. I, 199). He later
learned it just cut into the outer casing, not into the production line. (Tr.
I, 199). It is common for there to be sparks
when a miner is operating. (Tr. I, 194). However, when they cut into the well,
water was released and also the miner had 27 water sprays. (Tr. I, 200).

The
collision caused the continuous miner to “gas off,” shut down, as a result of
methane release. (Tr. I, 190-191). Miners will gas off at 1.5% methane. (Tr. I,
191). The miner will also produce a reading, but Shortridge did not see the
reading here. (Tr. I, 191-192). However, he later learned that Kevin Stiltner,
a miner, saw a reading of 8.9% methane. (Tr. I, 192). The explosive range for
methane is 5-15%. (Tr. I, 205). Shortridge did not know if the monitor on the continuous
miner could accurately read 5%. (Tr. I, 200, 204-205). He knew that during
calibration it was tested at 2.5%. (Tr. I, 204-205). He recalled the methane
reader on the continuous miner went as high as 2.5%, but he did not recall it
testing at 5%. (Tr. I, 204). He was also aware that water can cause a false
reading. (Tr. I, 201). Sometimes when the “sniffer” is located right up against
the coal it will gas off even if no gas is detected. (Tr. I, 201). He had not read the manual for the monitor. (Tr. I,
205).

The
collision liberated enough methane to set off Shortridge’s spotter.[3]
(Tr. I, 188-189). Shortridge was sure that methane was released into the mine. (Tr.
I, 189, 194). He was wearing his spotter on his shirt and his alarm went off,
as did Electrician Roger Clark’s. (Tr. I, 189). The spotter has a “low and
high” alarm, a low alarm has a slow beep at 0.5% of gas and a high alarm at 1%.
(Tr. I, 189-190). The alarm after the well was struck sounded like a high
alarm. (Tr. I, 190). The spotters produce a reading for methane, but Shortridge
never looked at his because he was trying to evacuate. (Tr. I, 190). Other
people reported methane readings. (Tr. I, 194).

After
the collision, Shortridge evacuated everyone from U-Section. (Tr. I, 192-193). Later,
after he called outside, the rest of the mine was evacuated. (Tr. I, 192-193). Respondent
evacuated the mine because a well was struck, which is very dangerous and not a
normal situation. (Tr. I, 193).

After
the evacuation Shortridge, James Stacy, and Greg Ratliff went back in to check
the mine and view the gas well. (Tr. I, 195-196). Respondent was issued an
imminent danger order for this incident, which means that no one is supposed to
go back into the mine to work. (Tr. I, 196, 203). It would be permissible to go
into the mine with a certified person or if directed to do so by a federal
official. (Tr. I, 203).

As
they went into the mine, Shortridge checked the return for methane and he did
not detect any. (Tr. I, 196-197). They went to the gas well, he got a gas
reading by holding the detector up against the outer casing of the gas well,
and he found that it was liberating a small amount, but not enough to set off
an alarm. (Tr. I, 197, 201). Inside the outer casing was a smaller pipe and
water was bubbling up and he would not get a gas reading unless he held it
close. (Tr. I, 201). Holding the monitor that close is not a legal check; he
was just seeing what was coming out.[4]
(Tr. I, 202). He found about three or four tenths of a percent of methane. (Tr.
I, 202-203). That is not much; it is possible to get more at the coal seam. (Tr.
I, 203). He then took a legal check and did not measure any methane. (Tr. I,
202). However, these checks were hours after the accident. (Tr. I, 204).

At
the time of this accident, the mine was on a 10-day spot inspection. (Tr. I,
198). A spot inspection sets a schedule for inspecting methane and dust
parameters based on how much gas is liberated. (Tr. I, 198).

b. Testimony of Robert Earl
Weaver, Jr.

At
the time of the hearing Robert Weaver was employed by SunCoke, the parent
company of Jewell Smokeless. (Tr. I, 206-207). At the time of the accident, he
was chief engineer of Respondent’s engineering department, also a SunCoke
subsidiary.[5]
(Tr. I, 206-207). As chief engineer Weaver managed a staff of seven people. (Tr.
I, 210). He had the power to hire and fire employees and direct the workforce. (Tr.
I, 208-209). He held that position from May 2006 to July 2010. (Tr. I, 208). Weaver
was then general manager of Jewell Coke Company. (Tr. I, 207).

Weaver
had a bachelor’s degree in mining engineering from Penn State University, a bachelor’s degree in inter-disciplinary studies, and a master’s degree in
education with an emphasis on math and science from Old Dominion University. (Tr. I, 238-239). After receiving his engineering degree, he worked for two years
under two other professional engineers (“PEs”) for Consolidation Coal Company. (Tr.
I, 239). Weaver sat for the Virginia professional engineer examination with a focus
on mining engineering in 1983. (Tr. I, 239). He passed the exam on his first
attempt. (Tr. I, 239-240). He was also licensed in Pennsylvania. (Tr. I, 240). He
was not a licensed professional in surveyor in Virginia. (Tr. I, 240).
Professional engineers have to renew their licenses; every year in West Virginia and every other year in Virginia. (Tr. II, 5). To renew the license, an
engineer must take at least eight professional development hours of continuing
education, including AutoCAD applications.[6]
(Tr. II, 5).

Weaver
first worked for Consol’s Renton Mine from 1979 to 1983. (Tr. I, 240). He was
then transferred to Bailey Mine as chief engineer for the initial layout of the
mine and worked there for two years. (Tr. I, 241). After that he began
production work. (Tr. I, 241). In 1993 he went to Enlow Fork as a mine foreman
in charge of underground operations and in 1996 he went to VP-8 as an assistant
superintendent. (Tr. I, 241). When working for Consol he certified maps. (Tr.
I, 241). He would work with the engineering department on future mine plans. (Tr.
I, 241-242). At VP-1 engineering department was under his supervision. (Tr. I,
242).

In
2006, Weaver went to work for Respondent. (Tr. I, 242). There were 8 people in
the engineering department including Weaver. (Tr. I, 247). Respondent also
contracted with an outside surveying and engineering firm: D.R. Price
Engineering of Virginia. (Tr. I, 247, Tr. II, 17-18). Respondent was working
with D.R. Price before 2006 and was still working with them at the time of the
hearing; they had been working together for over 20 years. (Tr. I, 247-248). D.R.
Price is a well-respected engineering firm, familiar with the standard of care
in Virginia, and it has a lot of experience in mining. (Tr. I, 248, Tr. II,
18). They have policies and procedures for certifying mine maps and
locating/plotting gas wells. (Tr. II, 18-19). Weaver oversaw the work conducted
by D.R. Price. (Tr. II, 27).

In
his time working for Respondent Weaver certified all of Respondent’s mine maps
and was responsible for mapping at six Dominion mines and five contractor
mines. (Tr. I, 207, 211, 214, 243). He handled hundreds of maps. (Tr. 243). This
task included preparing the maps, checking accuracy, and certification.[7]
(Tr. I, 207, 211). MSHA requires mine maps to be certified by a professional
engineer or surveyor. (Tr. I, 213). Weaver was a professional engineer in Virginia. (Tr. I, 213, 237). There are several ways to get a professional engineering
license. (Tr. I, 213-214). Those methods include getting a bachelor’s degree in
engineering and passing an exam or engineering training with a mentorship
program for four years and taking an exam. (Tr. I, 213-214). Weaver was
familiar with the standard of practice for certifying mine maps in Virginia and felt that he complied with that standard, as well as state and federal rules. (Tr.
II, 7, 11).

Respondent’s
mine maps were made in a software program called AutoCAD, which is a type of
drafting software. (Tr. I, 211-212). The mining industry started to use AutoCAD
in the 1980’s. (Tr. I, 212). The maps print primarily in 2D, but it allows for
different layers to be placed on the map and removed when needed. (Tr. I, 212).
These layers included ventilation or topographic features. (Tr. I, 212). The
AutoCAD is a complex system but a person trained in it can transfer the skills
to mining from any other industry. (Tr. I, 213). When Weaver started to work
for Respondent, he took courses on the AutoCAD so he would be up to speed. (Tr.
I, 251)

Operators
are required to produce various maps. (Tr. I, 214-215). Ventilation maps are
required by §75.372 (“372 map”) and must include gas wells and be submitted to
MSHA annually. (Tr. I, 215, Tr. II, 37). “Wall Maps” are required by §75.1200
(“1200 map”) and are used whenever any trouble occurs in the mine. (Tr. I,
215). The wall map is similar to
the 372 map, but is required under a different section of the Act. (Tr. I,
215-217). It must be kept on the surface, is required semi-annually, and serves
a different function. (Tr. I, 215-217). To update the 1200 map, the engineering
department would review new workings, changes in ventilation, new or removed
stoppings, overcasts, and other ventilation control. (Tr. I, 217). The law
allows for the 1200 map to serve as the 372 map, but Respondent produced both. (Tr.
I, 216).

Both
kinds of maps required gas wells to be shown. (Tr. I, 219). On the mine maps,
gas wells are marked with bulls-eyes. (Tr. I, 260). The outer circles show the
200 foot and 500 foot radii and, if it was a proposed well, the symbol in the
middle would be different. (Tr. I, 260). These radii requirements are more
rigorous than those required by MSHA. (Tr. I, 260). The symbols used to
identify gas wells vary from state to state. (Tr. I, 262). In addition to the
circles there would be other information like coordinates. (Tr. I, 264). There
were 400 or 500 wells at Dominion 36. (Tr. I, 264, Tr. II, 25).

There
were legally required checklists for certification of mine maps. (Tr. I,
255-257, Tr. II, 37). One checklist was for 1200 maps and one was for 372 maps
and they followed the points of the law (RX-1: the 1200 checklist and RX-2: the
372 checklist). (Tr. I, 255-257, Tr. II, 37). Map certification was an ongoing
process, starting in October or November. (Tr. I, 257-258). Certifying a map is
a team effort. (Tr. I, 254). A month before it was due, Weaver would print a
copy of the map out and then make sure it looked right. (Tr. I, 258, Tr. II,
7). When certifying the mine map, he did not redo the map every six months. (Tr.
II, 24). Instead, he would start with new features, focusing on ventilation
controls and new entries. (Tr. I, 258-259, Tr. II, 7-8, 24). They would build
on previous submissions; old section of the map did not change. (Tr. II, 8,
24). The checks would include looking to see if the gas well file was overlaid
on the map. (Tr. II, 38). When he had questions about something he would call
down to the mine or even go look himself. (Tr. I, 259). Weaver took certifying
maps seriously and did not want something to go wrong when he was underground. (Tr.
I, 252). The people who worked underground were his friends, neighbors, and
co-workers. (Tr. I, 252).

In
addition to the 372 and 1200 maps, there were other maps, including escapeway
maps, that would be located at the surface and in refuge chambers. (Tr. I,
217-218). There are also five year projection maps, which were company maps rather
than MSHA-required maps. (Tr. I, 218). A projections map would not necessarily
show the gas wells but, because it shows projected future mining, would be made
with considerations of the location of wells. (Tr. I, 218-219). Respondent only
looked ahead to one year projections to check for wells. (Tr. II, 36).

Weaver
read from GX-11 (December 23, 2008 mine map), showing that in certifying a map,
an engineer attests that he believes the map to be correct to the best of his
knowledge and belief. (Tr. II, 28).

In
May of 2008 Weaver hired Stacy Harris as a mine plan specialist partially
because of his extensive AutoCAD experience. (Tr. I, 220, 224). Weaver believed
Harris had no mining experience when hired and had never worked with mine
plans. (Tr. I, 220). To train people in the engineering department, Respondent
had “on-boarding” process. (Tr. I, 248). This was a mentoring program that
paired new and experienced employees. (Tr. I, 248). Some of the training was on
map work and AutoCAD and some was actual underground training. (Tr. I,
248-249). Harris was trained by Roger Van Dyke and Bobby O’Quinn on the
AutoCAD. (Tr. I, 249-250). They gave him small projects and double-checked his
work. (Tr. I, 250). Harris also did some channel sample work and worked on the
seal project. (Tr. I, 250). Weaver wanted Harris to understand the process from
start to finish and they spent numerous shifts underground on a couple of sets
of seals so he would know what the symbols on the map really meant. (Tr. I,
250).

The
people hired in 2008 were primarily hired for their expertise in AutoCAD and
ServeCAD. (Tr. I, 251). “ServeCAD,” was a program that sped up the use of
AutoCAD. (Tr. I, 251). Whenever ServeCAD or AutoCAD was updated, a
representative would come and teach the new features. (Tr. I, 251). Harris was
the most skilled AutoCAD user in the department. (Tr. II, 9). He knew more
about AutoCAD’s capabilities than anyone else. (Tr. II, 9).

When
the 2008 hiring occurred, the mine file in the AutoCAD was very large; it
actually encompassed three separate files and was slow to open. (Tr. I, 221,
Tr. II, 11). The map had various layers: ventilation controls, property
boundaries, mineral properties, and one-line diagrams for mining projections. (Tr.
II, 12). Harris approached Weaver and suggested combining the map into one
file. (Tr. I, 221-222, Tr. II, 12). Weaver approved and Harris completed the
task. (Tr. I, 222). Weaver had heard it referred to as a “file reduction
effort.” (Tr. I, 222). The AutoCAD would use the coordinates to line up merger
points on the map and sew the sheets together. (Tr. II, 12-13). If they did not
line up, something obvious would have occurred on the map. (Tr. II, 13). Weaver
was not involved in merging the files, he delegated it to Harris. (Tr. I,
222-224, Tr. II, 29). Weaver was confident that Harris was competent and did
not direct him to take any specific steps. (Tr. I, 223). Weaver knew Harris’
mining experience. (Tr. I, 224).

One
gas well that was on the April 2008 map was not on the December of 2008 map. (Tr.
I, 228-229). Harris told Weaver that the maps were accurate so Weaver certified
them as accurate. (Tr. I, 235). The missing gas well was not on any maps that
Weaver certified between December 2008 and the time he left the department in
May 2010. (Tr. I, 229-230). As far as he knew, the gas well was not on any map
from that time until the accident. (Tr. I, 229-230). The last annual map he
certified for MSHA at the mine was in January 2010. (Tr. II, 8-9).

Weaver
believed the gas well was on the map from the time he started in May 2006
through April 2008. (Tr. I, 232, Tr. II, 33). He did not know if the well was
on the initial project map in 1994, however old mine maps were available. (Tr.
I, 232). The well was not surveyed when Weaver was there and he did not know if
it was in 1991. (Tr. II, 33). None of those maps were checked for gas wells nor
did anyone check with the state. (Tr. I, 233). No one checked the surface for
wells because the AutoCAD produced the same map every time. (Tr. I, 233-234).

Respondent
learned about the locations of gas wells in numerous ways. (Tr. I, 243). It
spoke with gas companies regarding planned wells and applications. (Tr. I,
244). The gas companies would tell Respondent where wells would go and
Respondent would decide if the location worked or if the plan needed to be
moved. (Tr. I, 244). The gas companies would then send a proposed location and
Respondent would have 15 days to object to the Division of Gas & Oil. (Tr.
I, 244-245). If Respondent did not object, it would sign a letter with rules
and guidelines on how the well would be drilled to assure safety. (Tr. I, 245).
The companies then provided 48-hour notice before drilling. (Tr. I, 245). If
the well was close to the active working, the mine would be evacuated during
that time or other steps were taken. (Tr. I, 245-246).

Once
Respondent learned about a well, several checks were made to ensure the well’s
location was certain. The first check was plotting. (Tr. II, 6). The initial
plotting of gas wells would be done with the final location coordinates
provided by the gas well company. (Tr. I, 246, Tr. II, 6, 19). The state
required gas companies to inform anyone with an interest including surface
owners, mineral-interest owners, and the state via certified mail. (Tr. I,
19-20). Those surveys were completed by registered surveyors. (Tr. II, 6). When
Respondent received the coordinates they would plot them on the map. (Tr. I,
246, Tr. II, 6). Weaver was more concerned with gas wells ahead of the mining
than those behind the mining. (Tr. II, 36-37).

The
second check cross-referenced the wells on the mine’s maps with the Buchanan County topographic maps. (Tr. I, 226, 233, Tr. II, 6, 22). These maps were the
most accurate and up-to-date cross check. (Tr. II, 22-23). The certification
process was a month-long process, but the only thing that relates to the gas
wells was cross-referencing the gas wells with the topographic map. (Tr. I,
235, Tr. II, 38-39). Topographic maps showed anything that could be seen in a
flyover. (Tr. I, 234). The topographic map was used for many things and was
more accurate than the old USGS maps. (Tr. II, 34). Harris did not introduce
the topographic maps; he was just the first to use them to check for gas wells.
(Tr. I, 234). Weaver never asked what the topographic maps were for; he just
used them because they were used when he started at Respondent. (Tr. I, 234).

In
this case, no one checked the accuracy of the county topographic map and it did
not have the subject gas well either. (Tr. I, 235, Tr. II, 34). The topographic
maps were not the “gold standard” for determining whether a well exists, but an
additional resource used to locate wells. (Tr. II, 23). Sometimes the mine map
had wells that the topographic map did not. (Tr. II, 23). MSHA never objected
to the use of the topographical maps. (Tr. II, 23). However, he conceded that
he never called MSHA to ask if they had objections and did not know if they
knew. (Tr. II, 31). MSHA does not have requirements about the maps or files to
use. (Tr. II, 31-32). In this case, the topographic map did not have the missing
well on it, which Weaver learned when the well was intersected. (Tr. II, 23,
35). He did not know if others were missing. (Tr. I, 235).

The
third check occurred, pursuant to company policy, when mining came within 1,000
feet of a gas well. (Tr. I, 243, Tr. II, 6). Respondent would resurvey the
location to check that it was in the right place in the mine. (Tr. I, 243, Tr.
II, 6).

The
fourth check on the checklist was the state Division of Mines’ survey of
locations. (Tr. II, 6). The state would use the same maps the company used as
they submitted certified maps to the state. (Tr. II, 7, 35). The state would
not provide advance notice of these checks. (Tr. II, 7). On cross examination
he conceded that the gas well was not on the maps they gave to the state,
though it was on the earlier maps. (Tr. II, 35-36).

Weaver
later learned that the Virginia Division of Mine, Minerals, and Energy also had
the oil and gas well coordinates available to the public, but did not know of
this at the time. (Tr. I, 231, Tr. II, 20-21, 30-31). He was not familiar with
this “shape file” because he did not have it when he was in the department and
had never inquired about other maps. (Tr. I, 231, Tr. II, 20). Weaver knew that
gas and oil wells existed in Virginia, but he did not know their coordinates
were available as a public record. (Tr. I, 231-232). He believed the shape file
was a coordinate map that could be overlaid over Respondent’s maps to show the
location of all gas wells that the department has in its database. (Tr. II,
20). No one in the engineering department ever mentioned to him the shape file.
(Tr. II, 20-21).

Further,
Danny Price of D.R. Price certified a map after Weaver left, in December 2010. (Tr.
II, 18). That map was two months before the accident. (Tr. II, 18). D.R. Price
also did not discover the gas well was missing from the mine map. (Tr. II, 19).
No one at D.R. Price ever mentioned that Weaver should get a copy of the shape
file either. (Tr. II, 21-22)

Weaver
had worked in places that were “like Swiss cheese” with gas wells and at Bailey
they mined on top of an abandoned gas storage field. (Tr. I, 252-253). He knew
what could happen if a well is cut into in an uncontrolled manner. (Tr. I,
253). He used the best data available to locate wells on the mine map. (Tr. I,
253). He had never before had a gas well go missing. (Tr. I, 254). They had
people triple check gas wells when close so they knew how important they were. (Tr.
I, 255).

The
gas well should have been on the map, but somehow it was deleted. (Tr. I, 236,
Tr. II, 38). A user name and password were required to access the computers
containing the AutoCAD in the engineering department. (Tr. II, 10). All AutoCAD
users in the engineering department had access to the map and gas files without
password protection. (Tr. I, 227, Tr. II, 9-10). This did not include the
Secretary and an employee who generally worked outside. (Tr. II, 10). The mine
maps were located in a locked folder on the server. (Tr. II, 10). Only one
person could make changes to the AutoCAD at a time, once it was open others
could only open it as a “read-only” file. (Tr. II, 10).

When
Harris merged the maps some duplicate items in the files were deleted. (Tr. I,
224-225). They looked at the map afterward and it appeared unchanged. (Tr. I,
225). No safeguard was in place to ensure nothing was erroneously deleted. (Tr.
I, 226). There may have already been safeguards in the AutoCAD. (Tr. I, 226). He
was confident only duplicates were to be removed. (Tr. I, 226).

Further,
the gas well files were in a totally separate file from the map files. (Tr. II,
13). That is why they did not check the merged files for gas wells. (Tr. II,
13-14). The gas wells are not a layer of the mine map, they are a separate
file. (Tr. II, 14). To place the gas wells on the mine map, Weaver would use an
application called “ex-reference” on the AutoCAD that would overlay the gas
well files onto the mine map. (Tr. II, 14-15). If the gas wells were
ex-referenced onto the mine map and someone accidentally pushed “delete,” all
of the gas wells from the “quadrangle file” would disappear. (Tr. II, 15-16). There
were four or six quadrangle files for the mine map, so deleting would eliminate
fifty or sixty wells. (Tr. II, 16). When Weaver certified the map it showed gas
wells. (Tr. II, 24). It would have been obvious if a quad was turned off and
gas wells were missing. (Tr. II, 25). Further, deleting these gas wells from
the map would not delete the separate gas well file. (Tr. II, 17). The overlaid
ex-referenced file could not be modified on the mine map. (Tr. II, 17). No
modifications were made to the gas well files in the summer of 2008. (Tr. II,
29-30). Weaver knew this because they are certain files and Harris did not ask
him anything about working on the well files. (Tr. II, 29-30).

It
might take more mouse clicks to accidentally delete a gas well. (Tr. I,
227-228). Deleting this information would take several different steps. (Tr.
II, 38). Someone would have to delete separate files that contained the gas
well symbol, the number of the well, its date, the two-hundred foot radius, and
the five-hundred foot radius. (Tr. I, 228, Tr. II, 38). If a gas well were
deleted from the quad file it would be deleted. (Tr. II, 29). Weaver had a
strict policy in place to prevent deletion of any wells, even preview wells,
unless there was a letter from the company saying the area would not be used. (Tr.
I, 254-255). There was no process to place a deleted well back on the map other
than cross-referencing with the topographic map because no well had been
deleted, until this one. (Tr. II, 39).

No
one ever complained about the AutoCAD malfunctioning or deleting wells. (Tr.
II, 32). Weaver never called AutoCAD to explain the situation or ask them to
investigate. (Tr. II, 32). He did not know if anyone else did. (Tr. II, 32). Weaver
was not involved in the investigation and did not know why the well was
deleted. (Tr. I, 236, Tr. II, 32).

Weaver
learned that Respondent intersected the gas well while working at the Coke
plant. (Tr. II, 25, 230-231). He believed it was on the same day as the
incident but could not recall how he got the news. (Tr. II, 25). When he heard,
he drove the engineering office and got the maps out to try to determine what
happened. (Tr. II, 255). He felt that it was terrible news and was relieved
that no one got hurt. (Tr. II, 25). Mining into a gas well could be
catastrophic, including causing an explosion and fatalities. (Tr. II, 40). The
most important function of the engineering department is to ensure all hazards
are on the map; to ensure the safety of those at the mine. (Tr. II, 40). Everyone
followed procedures after the incident and got out without injury. (Tr. II,
26). He did not know how it happened. (Tr. II, 26).

Weaver
was not involved in the MSHA investigation and was not interviewed by Inspector
Hughes. (Tr. II, 26). John Kegley from the company asked him a series of
questions about the mine map and gas wells. (Tr. I, 230-231, Tr. II, 26,
40-41). He and Harris also looked at the old maps. (Tr. II, 26, 40-41). Weaver
reviewed Bobby O’Quinn’s “notes” (GX-12). (Tr. II, 41). Weaver did not agree
with Weaver’s conclusion that the well was accidentally deleted when the mine
map was reduced from three files to one. (Tr. II, 42-43). He did not believe
that O’Quinn took everything into account. (Tr. II, 43).

The
Virginia Board of Professional Engineers has the authority to sanction Virginia engineers for negligence or gross negligence. (Tr. II, 22). Weaver has never been
so sanctioned. (Tr. II, 22). Weaver did not know if the Board investigated this
incident. (Tr. II, 22). He also did not know if anyone reported this incident
to the Virginia Board of Engineering and did not report it himself. (Tr. II,
31).

c. Testimony of Herman Stacy
Harris

At
the time of the hearing, Herman Stacy Harris was employed in the engineering
department of Jewell Smokeless, Respondent’s parent company. (Tr. II, 45). He
was hired as a mine plan specialist by Weaver in May 2008. (Tr. II, 46-47, 49,
61, 64). In that capacity he worked on mine, ventilation, and roof control
plans, as well as maps. (Tr. II, 46). Before Dominion, he worked as an
estimator for Cleco Corporation in Rosedale, Virginia. (Tr. II, 62).

Respondent’s
engineering department was responsible for both the 75.372 ventilation maps and
the 75.1200 wall maps. (Tr. II, 46-47). Harris used AutoCAD and Microsoft
Office for maps. (Tr. II, 47). Harris first took AutoCAD classes at Southwest Virginia Community College in 1992-93.[8]
(Tr. II, 47, 63). He took four or five classes related to the program. (Tr. II,
63). This job was Harris’ first using AutoCAD. (Tr. II, 47, 62). Prior to this,
he had no mining experience and had not seen a mine map or mine plan. (Tr. II,
48-49). When he started with Respondent he was paired up with someone from the
engineering department who had been there for several years to review and
approve his work. (Tr. II, 62-63). He obtained a miner’s card through the
Safety Department. (Tr. II, 63-64).

Harris
reviewed the December 2008 map (GX-11), which he helped certify. (Tr. II, 76). They
began to prepare such a map about a month before it was due, perhaps in this case
starting in October 2008. (Tr. II, 76-77, 81). They update older maps with new
ventilation controls. (Tr. II, 77). They would take part of the map underground
and take new air readings and consider anything that needed to be changed. (Tr.
II, 77). The people underground then sent that information to the engineering
department where they would put the new air readings on the mine map and make
the corrections. (Tr. II, 77-78). Then they would use checklists (RX-1 and
RX-2) to ensure that all of the CFR requirements were met. (Tr. II, 78). This
process would include several people at the mine, the draftsman, and drafting
personnel. (Tr. II, 78-79). Several copies would be reviewed and two or three
checks would occur. (Tr. II, 79). At the end, Weaver would meticulously go over
the checklist and map and then sign it. (Tr. II, 79-80).

Weaver
signed the maps until he left, then Danny Price took over that responsibility. (Tr.
II, 86). Price was also responsible for the underground survey for the mine
maps. (Tr. II, 86). Price was a seasoned engineer who had done a lot of survey
work in the county. (Tr. II, 87). Price used the same process of sending out
maps with minor stylistic differences. (Tr. II, 87). Price died in fall of
2012. (Tr. II, 88). After Price, John Kegley certified the maps for a while and
now Wayne Holley and Pat Atrip review the maps.[9]
(Tr. II, 86-87).

The
December 2008 map was covered in “yellow stick-ons.” (Tr. II, 81). When MSHA
reviews a map, they request changes and Harris marks those corrections so
future maps will more accurately reflect what MSHA requires. (Tr. II, 82, 84). Respondent
learns about these corrections during a two to three hour discussion with an
inspector after the map is completed. (Tr. II, 83). Harris would later make the
changes electronically. (Tr. II, 84). These meetings generally dealt with
ventilation, but MSHA also had to be notified of all the wells. (Tr. II,
96-97). Harris conceded that MSHA did not have access to Respondent’s well
files and he did not know if they surveyed the wells. (Tr. II, 96). Harris was
not aware of the process MSHA used to evaluate maps. (Tr. II, 97).

When
Harris began working for Respondent, the mine files were large and divided into
three separate documents. (Tr. II, 49-50, 64). The mine file included the
works, ventilation, and the stoppings. (Tr. II, 64). Harris worked to combine
these into one document during the summer of 2008. (Tr. II, 50-52). Weaver did
not give a direct order to merge the files, but he was working on the project
and wanted the files combined. (Tr. II, 50). As they worked, they installed new
computers and upgraded the system to manage the larger file. (Tr. II, 50). Harris
was the one responsible for combining the files. (Tr. II, 50). The task was not
very large and it took about a day. (Tr. II, 50-51). Harris did not recall the
computer malfunctioning during the process. (Tr. II, 51). During the merge,
Harris did not believe anything duplicative was deleted; they were just
combined together. (Tr. II, 51). He described the process as lining up three
pieces of a puzzle to make one. (Tr. II, 51). After they combined the file they
double-checked it. (Tr. II, 52-53). The gas wells were not part of the mine
file; they were separate and not consolidated. (Tr. II, 64-65). The well files
were only combined into one file after the accident. (Tr. II, 93). Before that,
the gas well file was only altered by adding more gas wells. (Tr. II, 93).

The
gas well at issue in this case was on the map certified in April 2008, but not
on the next certified map in December 2008 or any map thereafter. (Tr. II,
53-54, 75). From December 2008 through February 2011 six 75.1200 maps were
made. (Tr. II, 54-55). Harris cannot say how the well disappeared; he just
knows that it was there in April and gone in December. (Tr. II, 88-89).

When
Harris began to work on the December 2008 map, there were approximately 430
wells in the gas well file. (Tr. II, 66). There were about 8,000 gas wells at
all the Dominion sites. (Tr. II, 66-67). To plot gas wells, well files must be “externally
referenced” onto the map. (Tr. II, 65, 80). The gas wells were like an
electronic transparency sheet or an animation cell. (Tr. II, 65-66). Generally,
when someone using the AutoCAD presses “delete” with respect to a well, all of
the wells disappear. (Tr. II, 80). “It’s an all or none thing.” (Tr. II, 80). Weaver
was adamant regarding his policy that gas wells were not to be removed and that
everything was to stay on the map. (Tr. II, 68-69, 94-95). However, the file
was not password protected; anyone with AutoCAD privileges could access it. (Tr.
II, 93-94, 104). It was possible to erase a well from the gas file, but to do
so an AutoCAD user would also have to delete the barriers around it and the
name. (Tr. II, 94-95). In order to highlight the multiple data points related
to the gas well at once, a user would have to highlight all of the relevant
data. (Tr. II, 95). Once a gas well was deleted, the data would be gone from
the overlay and only exist on the topographic sheet. (Tr. II, 96).

The
only thing cross-referenced against the December 2008 map during certification
was the Buchanan County topographical map. (Tr. II, 56, 74). Respondent began
using the topographic map when Harris started there. (Tr. II, 72). The
topographic map for the area was called “H-11” and it was a grid that
corresponded to Dominion 36 (RX-3). (Tr. II, 72-73). The map was used to check
surface structures, creeks, and hollows. (Tr. II, 56-58, 72-73). He used the
map to determine the amount of cover and, therefore, the size of pillars. (Tr.
II, 73-74). Sometimes they would also survey the surface. (Tr. II, 57). Respondent’s
maps always had more wells than the County map because it had more data:
preview locations, applications, and drilled wells. (Tr. II, 57-58). Sector
H-11 did not show the well at issue. (Tr. II, 58, 74). A well would be marked
with the word “well” and a black circle. (Tr. II, 74-75).

At
hearing, Harris was aware that a “shape” file with gas well coordinates was
available from the Division of Oil and Gas, but in 2008 he was not. (Tr. II,
55, 70). Price never mentioned this file, despite the fact that it surveyed
wells for CNX. (Tr. II, 88). He learned about the file from Daniel Kessner, who
works in Virginia’s mapping department. (Tr. II, 70-71). The file can be
downloaded, but it is not easy to access. (Tr. II, 55). There is no link on a
website or an easy URL. (Tr. II, 55-56, 71). There is a long path that must be
typed. (Tr. II, 56).

Harris
learned there was an omission on the map when Roger Van Dyke called into the
Vansant office and said he believed they hit a gas well. (Tr. II, 67). Harris
immediately went to the engineering department to see what happened. (Tr. II,
67). He was surprised and shocked to find a gas well was omitted and was very
concerned about the safety of those underground. (Tr. II, 67-68). He
immediately checked to see where the well was located, if it was active, and if
it was “a cover hole.” (Tr. II, 68). The engineering department checked all
8,000 wells at 36, 26, 30, and the contract mines. (Tr. II, 69, 91). They did
not find any more missing wells, though there was one in the well file that was
not in the shape file. (Tr. II, 69, 71-72, 91). After the accident, Respondent
considered creating a program to proceed forward. (Tr. II, 58). Harris now also
checks the shape file often to cross-reference it with his files. (Tr. II, 71).

Harris
was familiar with Bobby O’Quinn’s notes (GX-12). (Tr. II, 59). O’Quinn works in
Harris’ department. (Tr. II, 89). O’Quinn was part of the investigation of the
gas well plotting. (Tr. II, 59). The investigation looked at the process of
plotting gas wells, precautions to use going forward, and new procedures. (Tr.
II, 59). O’Quinn looked to see how the well was deleted. (Tr. II, 59). O’Quinn’s
notes represent only his theories on the issue. (Tr. II, 59-60, 92). He
disagreed with O’Quinn that the well was lost because of personnel changes. (Tr.
II, 89, 92). He felt that all of the employees were well trained and had
college courses on AutoCAD. (Tr. II, 90). Property engineer Mike Lewis’
retirement in September 2008 did not cause the gas well to disappear. (Tr. II,
90). The new draftsman, John Mullins and Joe Rose, were both trained and went
to vocational school. (Tr. II, 91). However, Harris was only expressing his
opinion on O’Quinn’s report; he did not investigate the gas well incident. (Tr.
II, 92). Also, Harris never spoke with John Hughes regarding his investigation.
(Tr. II, 104).

During
the time Harris was in the engineering department, Respondent received
citations for “inaccurate maps.” (Tr. II, 97). However, he could not recall
specifics. (Tr. II, 103). He also did not recall a 104(b) order for failing to
submit accurate maps. (Tr. II, 103).

d. Testimony of Roger Van Dyke

At
the time of the hearing Roger Van Dyke was employed in Jewell’s engineering
department. (Tr. II, 110). He had worked there for 32 years, including in 2008.
(Tr. II, 111). He had used AutoCAD since it hit the market in 1988 or 1989. (Tr.
II, 126). He has been working in mine mapping and surveying for about thirty
years. (Tr. II, 126). The engineering department included chief engineer
Weaver, Van Dyke, O’Quin, the property man, an environmental man, a draftsman,
an environmental engineer, and Harris. (Tr. II, 112). Harris was hired in part
because of his AutoCAD experience. (Tr. III, 112). He had no mining experience.
(Tr. II, 112). Harris was one of the most computer literate people they could
have hired and had worked at a construction company as a civil engineer. (Tr.
II, 112).

Shortly
after Harris came on board there was a project to update mine maps. (Tr. II,
112-113). They surveyed spads underground to ensure they were on line with the
mining. (Tr. II, 113). They also had surface surveys to find and record cores,
gas wells, and houses. (Tr. II, 113). Harris headed up the effort to combine
the three AutoCAD mine map files into one. (Tr. II, 113). The gas wells were
maintained on separate files at the time and were overlaid onto the mine maps. (Tr.
II, 114). The mine maps did not have any gas wells on them. (Tr. II, 114).

Van
Dyke expressed concerns about the file project to Weaver and Stacy. (Tr. II,
114-115). Van Dyke was friends with the people in the mine. (Tr. II, 115). He
felt that given the sizes of the files that they needed to be careful. (Tr. II,
115). He believed that Weaver was a professional and worked through those
concerns. (Tr. II, 115, 128). They were deliberate, did not rush, and checked
on things. (Tr. II, 115, 127). He felt confident with the people on the
project, their ethics, and their work habits. (Tr. II, 115-116). He also felt
that Harris was the best AutoCAD user they could have. (Tr. II, 128).

Van
Dyke was aware that Respondent mined into a gas well in 2011. (Tr. II, 111). He
did not know why the well was deleted. (Tr. II, 118, 128-129). He had never
experienced a situation when one well disappeared at any time before 2011. (Tr.
II, 127). They did not believe a gas well would disappear because it had never
happened before. (Tr. II, 127). At first he thought the well disappeared
because the map files were on business computers that occasionally crashed. (Tr.
II, 118-119). It was the policy of the engineering department that absolutely
nothing was taken off the map. (Tr. II, 128). That was why the file was so big
and why Van Dyke was concerned. (Tr. II, 128). He also noted that when
something is deleted on a computer file, there is no record unless there is a
backup. (Tr. II, 119). He does not know of any complaints people made about the
computers or the AutoCAD or lawsuits. (Tr. II, 120).

The
missing well was located on the April 2008 mine map. (Tr. II, 111, 120). There
was no reason to cross check the April map with the December map as they were
not mining in the same area. (Tr. II, 118, 120-122). Van Dyke conceded that if
they compared those maps they probably would have seen the missing well and
avoided the accident. (Tr. II, 121-122, 124). But even if they had compared the
maps, the focus would have been on the future projections. (Tr. II, 125). They
may have seen the issue on a five-year projection map, but it would depend on
where the mining was projected. (Tr. II, 125-126). The well was also not on the
aerial photography. (Tr. II, 118). They had no reason to do any checks beyond
normal diligence. (Tr. II, 117-118).

The
Virginia Division of Oil and Gas maintains information and coordinates about
gas wells. (Tr. II, 116). This file is a spreadsheet that is entered into
AutoCAD. (Tr. II, 120-121). When someone pushes “update,” it will add in the
wells automatically. (Tr. II, 121). If they had the access to the shape file in
2008, when they updated the map the well would have returned. (Tr. II, 121). Van
Dyke did not know if they had this information in 2008. (Tr. II, 116). In his
deposition Van Dyke said he was familiar with the shape file, but in fact he
was talking about an incident in the 1990’s where an engineer named Doug
Mullins from the state came and scanned old mine maps and sent them to the
state. (Tr. II, 116). His belief that he was aware of the shape file was a
misunderstanding. (Tr. II, 116-117). If he had been aware of the shape file,
the missing well would have been present and the hearing would not have
occurred. (Tr. II, 117).

Intersecting
a gas well can cause loss of life and catastrophic explosion. (Tr. II, 122,
127-128). Any wells in the vicinity of the mine are considered a danger and are
not taken lightly. (Tr. II, 122-123). At the time of the hearing, Respondent
would send surveyors to the surface with the projections to make sure they do
not hit a gas well again. (Tr. II, 123). Van Dyke wishes they had done this at
the time. (Tr. II, 123). When Van Dyke heard about the incident he was “pretty
tore up” and “devastated” because the incident affected his job, his friends,
and his community. (Tr. II, 126-128).

e. Testimony of John Hughes

At
the time of the hearing Inspector John Hughes worked at the Vansant office of
MSHA as a coal mine inspector, a position he held for about eight years. (Tr. II,
130). He was an authorized representative, meaning he could conduct inspections
and investigations and cite violations. (Tr. II, 130-131). MSHA has an
extensive training program at the Beckley Mine Academy involving around two
years of three-week modules. (Tr. II, 131). His training included mine accident
investigations. (Tr. II, 160-161).

Before
being hired by MSHA, Hughes worked in the mining industry from December 1991
through April 2005 as an underground miner. (Tr. II, 131). He was certified as
a general mine foreman, electrician, emergency medical technician, hoist
operator, shot firer, and solid blaster, but most of those certifications
expired. (Tr. II, 132). He was a high school graduate and had never taken
engineering or college courses and was not an engineer. (Tr. II, 153, 160). Engineering
and map certification are not his areas of expertise. (Tr. II, 160).

In
2011, Hughes had conducted five to seven accident investigations. (Tr. II,
132). In February 2011 he was involved with the instant accident investigation.
(Tr. II, 132). On the day of the incident, Hughes had been at another mine site
and was called by Supervisor Donnie Phillips. (Tr. II, 133). Phillips requested
Hughes get an emergency sampling kit (pumps, multi-gas detectors, and other
items) and bring it to the mine site. (Tr. II, 133).

The
first action MSHA took on site was to issue a K-Order and a 107(a) imminent
danger Order. (Tr. II, 134). The 107(a) Order was issued because a foreman told
the company that there was an 8.9% methane mixture; an amount in the explosive
range. (Tr. II, 134). The explosive range is between five to 15 percent, with
10 being the most violent. (Tr. II, 134). A 103(k) Order is issued any time
there is a reportable accident and constitutes a withdrawal order. (Tr. II,
134-135). The purpose of a K-Order is to secure the scene until MSHA
investigates and makes the area safe. (Tr. II, 135). After Respondent struck
the well they evacuated all 34 miners. (Tr. II, 133). The K-Order was modified
many times after the company submitted action plans regarding how to re-enter
the mine, return to the area where the accident occurred, resume production,
and get the mine back to normal. (Tr. II, 136-137). These actions occur in
steps approved by the district manager. (Tr. II, 137). The K-Order was
terminated when the investigation was complete and the mine got back to normal.
(Tr. II, 137).

When
Hughes arrived at the mine, he met Phillips and Inspector Keith Ray, traveled
to the West Virginia Portal, and set up a sampling station at the fan. (Tr. II,
133, 137-138, 169). The highest reading he found was one-tenth of one percent
methane. (Tr. II, 170). The air reading at the portal was 197,400 CFM, which is
normal. (Tr. II, 173). The velocity was 1,645 which is also normal. (Tr. II,
173). The oxygen was 20.4%, which is good. (Tr. II, 173-174). Respondent was
not cited for the ventilation or for methane. (Tr. II, 174). He did not know
the readings at the actual accident site, but no citations were issued for air
at the face. (Tr. II, 170).

Hughes
did not go underground to investigate the well but his supervisor, Dale Hess
and Inspector Jason Skiens did so with company officials. (Tr. II, 143, 163). Hughes
role in the investigation was to put a report together (GX-19) and issue the
violations. (Tr. II, 134, 144). The report dealt with the facts surrounding the
investigation, including the events and company information. (Tr. II, 144). It
included a description of the accident and a conclusion on the cause of the
accident. (Tr. II, 144).

Hughes
began the investigation on March 2 by interviewing the miners present on the
section during the accident. (Tr. II, 138, 141-142). He interviewed seven
people including James Stacy, Kevin Stiltner, Brian Cyphers, Robert Clark, Jeff
Helbert, and Craig Stollings. (Tr. II, 140). The miners were interviewed in the
bathhouse with company representatives Greg Ratliff, Allen Hilbert, and J.P.
Richardson present. (Tr. II, 140-141). The interviews were recorded and he
reviewed them for the hearing. (Tr. II, 142-143).

In
the interviews, Hughes learned the miners were cutting into the number four
heading and cut into an active gas well releasing 8.9% methane, as observed by
the miner’s methane monitor. (Tr. II, 142, 172). Hughes did not believe that
the monitor would be in default at 8.9%. (Tr. II, 164-165). The miner operator
stated that the miner shut down after the ripper heads struck the pipe and was
thrown back. (Tr. II, 142, 152). Hughes had no reason to disbelieve the miners
when they said it gassed off, but he did not see it occur. (Tr. II, 171-172). The
miner was supposed to shut down at 1.5% methane. (Tr. II, 170-171). The
regulations state 2.0%, but most mines set it at 1.5%. (Tr. II, 171). Hughes
did not look at the calibration readings or review the miners’ owner’s manual,
and he was not familiar with the manufacturers specifications for the miner,
but he was familiar the methane monitor.[10]
(Tr. II, 164-166). Hughes made no attempt to understand how the monitor worked.
(Tr. II, 166-167).

In
addition to the miner, James Stacy reported an 8.5% methane reading. (Tr. II,
142). Clark also saw his hand-held detector go off. (Tr. II, 142). After the
readings, the crew then immediately and properly evacuated the area. (Tr. II,
172). MHSA then evacuated the mine and started the investigation. (Tr. II,
172).

Hughes
assumed the continuous miner sprayed water, but none of the miners said so in
the interviews and he did not ask. (Tr. II, 177). Someone, probably Clark, stated that the well casing produced water when it was cut into and sprayed. (Tr.
II, 177-178).

The
well had three pipes, an 11-inch pipe, a 7-inch pipe, and a 3-inch pipe, all of
which were metal. (Tr. II, 151-152). The teeth on the miner were also metal and
cut through the two outer casings and scratched the inner casing. (Tr. II,
152). He saw the well casings in photographs but not in person. (Tr. II, 164).

On
cross examination, Hughes conceded that part of accident investigation is
speaking to all parties that may have relevant knowledge. (Tr. II, 161). In his
March 7, 2011 notes, Hughes wrote “the operator failed to establish policies,
practices, or procedures that would keep track of the gas well.” (Tr. II, 176).
He determined this without talking to the engineers; it was obvious because an
accident occurred. (Tr. II, 162, 176). There was no relevant information to
gather from the engineers as the facts were known. (Tr. II, 162). He also did
not interview the engineers because he would not have understood what they said
about the AutoCAD. (Tr. II, 161-163). Further, a policy that prevented
intentional deletion of the wells would not be a mitigating factor. (Tr. II,
176-177).

Hughes
also reviewed the 372 and 1200 maps Respondent filed with MSHA as part the
investigation. (Tr. II, 141). The maps showed that the well went missing from
the operator’s records in 2008 and were present on the map as early as 1994. (Tr.
II, 143). Hughes interviewed Superintendent Rick Lawson and Foreman Allen
Hilbert and they were unaware the well was deleted. (Tr. II, 169). Respondent’s
employees were surprised it was missing. (Tr. II, 169). However, Hughes did not
believe it was his job to find out how the well was deleted. (Tr. II, 178-179).
Nothing in Hughes’ investigation changed the fact that Respondent mined into a
gas well. (Tr. II, 179). “I can say, sitting her two years later, that the
company don’t know how they lost the thing. And that worries me more than me
knowing.” (Tr. II, 168).

As
a result of this investigation, and the fact that the company was already on
the “D-Sequence,” three D-Orders were issued.[11]
(Tr. II, 144-145). Order No. 8179158 was issued for failure to maintain a
three-hundred-foot barrier around the gas well. (Tr. II, 145-146, 149-150). MSHA
requires these barriers to keep miners away from the methane. (Tr. II, 150). Operators
could petition the district manager under Section 101(c) to mine closer if the
method was as safe as a barrier. (Tr. II, 150-151). That was not done here
before Respondent mined into the well. (Tr. II, 151). The Order was marked as
“highly likely” to occur before the operator could abate because it was a miracle
that 34 men were not killed. (Tr. II, 146). The Order was marked “fatal” because
a machine cutting into a gas well would likely cause a fatal explosion or
irrespirable condition. (Tr. II, 146-147). However, he conceded there was no
ignition here. (Tr. II, 172-173). The Order was marked as “highly negligent.” (Tr.
II, 147).

Order
No. 8179159 was issued for the failure to include the gas well on the 1200 map.
(Tr. II, 147-148). The 1200 is the wall map that is updated daily or after
every shift. (Tr. II, 148). This map was certified and submitted to MSHA. (Tr.
II, 148). Hughes marked this citation as Highly Likely, Fatal, S&S, and
high negligence for the same reasons as Order No. 8179158. (Tr. II, 148). Section
75.1700 of the regulations requires that operators locate, track, and map gas
wells on the wall map. (Tr. II, 149).

Order
No. 8179160 was issued for the failure to include the gas well on the 372
ventilation map. (Tr. II, 148-149). The 372 map is made pursuant to a newer
regulation and requires more information than the 1200 map. (Tr. II, 149). Hughes
marked the citation’s gravity and negligence the same as the other citations. (Tr.
II, 149).

Hughes
issued the Orders as “high” negligence without input from MSHA. (Tr. II,
162-163). MSHA knew what he would issue, but he was not ordered to issue
anything. (Tr. II, 163). Hughes believed Respondent had plenty of reasons to
know the violation of the mine map standard occurred. (Tr. II, 167). He did not
know of anyone who had specific knowledge of the condition, but management was
responsible for safety and for keeping the map up to date and the wells
tracked. (Tr. II, 167-168). He conceded that that he did not have any idea of
the practices and procedures of the engineering department in certifying maps. (Tr.
II, 168).

The
unwarrantable failure designations were not just because the well was missing,
but because the careless tracking of the well could have led to deaths. (Tr.
II, 174-175). Further, the projections were sent in without the well. (Tr. II,
175). The operator did not have a fail-safe system to keep the well on the map.
(Tr. II, 175). There is nothing more important at the mine site than to map
wells and prevent intersections. (Tr. II, 175).

f. Testimony of Gary Hartsog[12]

Gary
Hartsog attended Woodrow Wilson High School and West Virginia University. (Tr. III, 12). He received a bachelor’s degree in elementary education in 1976, a
bachelor’s degree in mining engineering in 1979, a master’s degree in mining
engineering in 1985, and a master’s degree in business administration in 2005. (Tr.
III, 12-13). Hartsog became a professional engineer in 1984 in West Virginia. (Tr. III, 14). He passed the mining engineering examination on his first
attempt. (Tr. III, 14-15). He has since been certified in 11 other states. (Tr.
III, 14). He is a professional surveyor with an underground endorsement. (Tr.
III, 14).

Hartsog
began his mining career in May of 1976 as a surveyor (or “rodman”). (Tr. III,
13). He also performed drafting and preparation of maps and checks surveys. (Tr.
III, 13). From 1976 to 1987 he worked for Eastern Associated Coal Corporation. (Tr.
III, 13). He then worked for Peabody from 1987-1991 when it acquired Eastern
Associated. (Tr. III, 13). During that time he worked as a rodman, draftsman,
mining engineer, division safety inspector, division engineer, chief engineer
at a coal mine, and general troubleshooter. (Tr. III, 13).

In
September, 1991 Hartsog resigned from Peabody to start Alpha Engineering, a
consulting engineering firm that provides engineering services. (Tr. III,
13-14). Hartsog was the owner of Alpha Engineering at the time of the hearing. (Tr.
III, 14). Alpha mostly provides services in the coal industry but not
exclusively. (Tr. III, 14). When Alpha opened, Hartsog was the only employee
but by the time of the hearing it employed 14 people. (Tr. III, 19). There were
two other professional engineers and one professional surveyor. (Tr. III, 19). Alpha
currently does some work for Respondent. (Tr. III, 134). They work for the same
engineering department that is at issue in the proceeding. (Tr. III, 135).

Hartsog
certified his first mine map in 1984 and that process has remained an important
part of his work in all of the position he has held since. (Tr. III, 15). At the
time of the hearing Hartsog would certify anywhere from six to fifty maps per
year. (Tr. III, 15). He routinely certified 75.1200 maps for clients. (Tr. III,
15-16, 91).

In
1980 Hartsog began plugging and mining through gas wells. (Tr. III, 16). He helped
write the first 101(c) petition for multiple gas well cut throughs, a petition
that is now a template. (Tr. III, 16). He has also searched for wells, done
well audits, located wells on the surface, and plugged them underground after
accidental intersections. (Tr. III, 16). There are between 70-80,000 gas wells
in Virginia and hundreds of thousands in West Virginia. (Tr. III, 16-17). Hartsog
researched Virginia gas wells while preparing for professional seminars. (Tr.
III, 17). One section of his seminar discusses searching for and finding gas
wells, different ways of mapping wells, different ways to permit, and different
ways to treat gas wells. (Tr. III, 17).

Hartsog
was first exposed to AutoCAD between 1988 and 1990. (Tr. III, 17). When he
started Alpha, one of his first steps was to buy “generic CAD,” a less
expensive program, and begin a tutorial. (Tr. III, 17-18). Over the years he
purchased AutoCAD and ServeCAD (which is specific for mining) and used them
daily. (Tr. III 18).

Hartsog
had been an expert witness three or four times in the four years before the
hearing and 15-20 times in the last twenty years. (Tr. III, 132-133). He had
helped with the investigations at Aracoma, Upper Big Branch, and Sago. (Tr.
III, 133). He “mostly” testified for the coal companies, occasionally machinery
or land companies. (Tr. III, 133). He sometimes agreed with the regulatory
agency, but he was not sure how many times. (Tr. III, 134). Once he takes a
position in opposition to a client, they tend not to call him as an expert. (Tr.
III, 134).

Respondent’s
counsel retained Hartsog to review company records and give an opinion
regarding the law and practice and write a report (RX-5). (Tr. III, 20-23). Hartsog
listed the items he reviewed in Appendix X. (Tr. III, 20-21). After he wrote
his report, he spoke with people involved in the incident and searched the
State website for well sites. (Tr. III, 20-21). He spoke with Foreman
Shortridge and people in the engineering department, specifically Van Dyke,
Weaver, and Lacy. (Tr. III, 21). Lacy was very familiar with the continuous
miner monitors. (Tr. III, 21). Hartsog also reviewed the MSHA investigative
record, some additional notes and documents. (Tr. III, 22). He also listened to
the testimony in the courtroom. (Tr. III, 22).

In
his investigation, Hartsog learned that as the miner moved into place for its
first cut, it hit a pipe which turned out to be outer casings of a gas well. (Tr.
III, 23). The danger of mining into a gas well is a release of water or
methane, though water is usually limited. (Tr. III, 100). The foreman and the
miner operator were standing next to one another and miner operator was the
first to realize they hit something. (Tr. III, 27). There was a considerable amount
of water released and some methane detected. (Tr. III, 23). The miner shut down
as it was designed to do but the monitor stayed on. (Tr. III, 23, 28). When the
monitors started to sound, the foreman immediately gathered people on the
section together, shut down the power, and evacuated the area. (Tr. III, 23,
27-28, 127-128). The mine did everything by the book. (Tr. III, 28). MSHA did
not allege that the company acted improperly after the accident. (Tr. III,
132).

A
monitor is a device that is designed to shut a machine down if it reaches a
certain level of methane. (Tr. III, 29). Monitors are designed to give a
warning at one percent and then shut down the miner at two percent, but
Respondent’s miner was set to shut down at 1.5%. (Tr. III, 29-30). Hartsog was
not sure if the miner here shut down because there was 1.5% methane or because
the monitor was completely underwater. (Tr. III, 30, 127). However, several
handheld monitors went off for some reason other than water. (Tr. III, 127). It
could have been methane or some other, possibly explosive, property in the
natural gas. (Tr. III, 127). Hartsog did not agree with Hughes that there was
an “inundation” of methane. (Tr. III, 31). He believed there was some methane,
as shown by the monitors, but it was immediately diluted and rendered harmless
and the inundation prevent worked correctly. (Tr. III, 31-32, 127, 129).

According
to the foreman there was more than enough air on the section. (Tr. III, 29). The
MSHA inspector’s notes listed 6,300 CFM, which is about 2,000 CFM more than
required. (Tr. III, 29). There was curtain in the area that directed air to the
last open break where they were mining. (Tr. III, 30). This was correct under
the ventilation plan. (Tr. III, 30-31).

The
shuttle car operator was 70 feet away and said his methane monitor showed 8.9%.
(Tr. III, 28, 39). Stiltner stated that he saw an 8.9% reading but could not
say whether it was flashing or if there was an indicator light. (Tr. III, 128).
This is the only first-hand reading in this case. (Tr. III, 129). The explosive
level of methane is between 5-15%. (Tr. III, 104, 128). However, Hartsog did
not believe there was an 8.9% reading of methane at the site. (Tr. III, 33). While
he believes that the miner saw “8.9%” on the display, the machine is not
designed to detect levels of methane above 2.5%. (Tr. II, 38, 128). It is not
calibrated for higher amounts and is not accurate to read them.[13]
(Tr. III, 38, 42, 103). The monitor may show a number over 5%, but may not be
accurate. (Tr. III, 102-103). It is possible, but very unlikely, that the
monitor could read 8.9% methane accurately. (Tr. III, 103, 105). When he stated
it could read this amount in his deposition he was mistaken, he later learned
it was very unlikely. (Tr. III, 107). He conceded that there was no proof it
could read this amount because he did not run tests. (Tr. III, 107).

Methane
levels greater than 5% will start to burn the sensor. (Tr. III, 38). Further,
water will short out the monitor and Shortridge stated that water splashed into
the spotter. (Tr. III, 33, 39). Finally, a monitor tests the air by burning a
small amount of it and if there is ethane, propone, or butane present, the gas
will burn hotter and give false high methane readings. (Tr. III, 38-39).

Hartsog
reviewed the owner’s manual for the 140B remote methane monitoring system
(RX-6). (Tr. III, 34). Page 2, under “Digital Readout,” states, “The digital
readout will continue to show increasing methane concentrations up to about
five percent, at which point both digits will begin flashing on and off. The
flashing will continue as long as the methane concentration remains above
five.” (Tr. (III, 40, 104). It also says a yellow light comes on at 1% and a
red light at 2%. (Tr. III, 40-41). Page 3 under troubleshooting lists several
displays that indicate re-calibration is necessary. (Tr. III, 41-42).

The
volume of methane necessary to show 8.9% would be 140 cubic feet (0.089
multiplied by 6,300 CFM).[14]
(Tr. III, 43). Hartsog did not believe there was never anything close to that
here. (Tr. III, 43). There was no definitive and reliable reading of methane
being that high. (Tr. III, 43-44). They just know there was some level over 1%
for some period of time, because several personal monitors went off. (Tr. III,
44). When asked if they had higher readings, the miners either did not know or
did not look. (Tr. III, 44).

Hughes
testified that Jamie Stacy, the miner operator, said he saw an 8.5% reading on
the continuous miner. (Tr. III, 39, 105-106). Hartsog had never heard anything
about this until Hughes’ testimony. (Tr. III, 39, 128-129). Hughes interviewed
all the miners on the section and taped the interviews. (Tr. III, 106). Hartsog
had read Hughes notes and they only indicated the numbers from the shuttle car.
(Tr. III, 40). However, he conceded that he did not listen to the entire
recording of Hughes’ interview with Stacy. (Tr. III, 106-107). Hughes notes did
not mention the 8.5% amount. (Tr. III, 106).

There
were two readings after the incident, a 0% reading with a legal check and a
0.2% reading against the pipe. (Tr. III, 130). Hartsog reviewed Keith Ray’s
inspection notes from February 24, 2011 and on page 10 those notes state,
“Talked to J.P. Richardson, He informed me that he had just come from the gas
well site. He stated the well was still producing CH4 at low pressure, at
ninety-eight percent pure methane. Left mine property and returned to office.” (Tr.
III, 130-131). Hartsog knew the well was still producing methane when he wrote
his report. (Tr. III, 131). These notes show that it was producing as late as
6:00 p.m. on the 24th, long after the accident occurred, but he does not know
if it was after Respondent asked the gas company to turn off the well. (Tr.
III, 131, 135). Hartsog never interviewed J.P. Richardson, but he gave no
credence to that percentage as to what the well was actually producing. (Tr.
III, 131). Generally, it is hard to say what the constituent parts of a
particular gas are and 98% methane would be very high considering it was
natural gas. (Tr. III, 135-136). Further, that percentage of methane was
alleged to be in the production string, which was not breached. (Tr. III, 136).

According
to a document found at page 3 of Hartsog’s report, the well was drilled in 1957
and went down roughly 5,000 feet. (Tr. III, 23-24). The well had multiple
casings, three of the casings went through the coal seam, and two stopped above
the coal seam. (Tr. III, 24, 100). The casings are designed to provide a
warning. (Tr. III, 100). The annulus, or open area between the casing and the
hole, was filled with ground water that came out when the well was intersected.
(Tr. III, 26, 105). This is typical for a drilled well in 1957. (Tr. III, 26). He
did not know how much water came out. (Tr. III, 104-105). Shortridge said the
water came out over the boom of the miner and the foreman, fifteen feet away,
said it came out of the well. (Tr. III, 105). State gas well production
statistics showed that the well produced 25-CFM of gas, which is very low. (Tr.
III, 25). A typical well produces 1-2,000 CFM. (Tr. III, 25). However when the
well disappeared and when it was struck, they did not know the production
statistics. (Tr. III, 124).

The
cut through did not intersect the production stream. (Tr. III, 25). Hartsog
first believed that the continuous miner had cut through two casings and left
two uncut, however, he later learned that there were two casings cut and the
production string was scratched but not cut. (Tr. III, 25-27, 131-132). Because
the production string was not breached, the methane came from the coal seam and
from the natural gas formations below. (Tr. III, 32). Coal-bed methane is more
pure than natural gas methane and the two kinds can affect spotters
differently. (Tr. III, 32-33). Natural gas methane will have ethane, propone,
or butane in it. (Tr. III, 32-33).

During
his investigation, Hartsog spoke with Weaver about Weaver’s methods, concerns,
background, past, time as chief engineer, mining experience, hiring, and goals.
(Tr. III, 44-45). Hartsog often performs the same tasks as Weaver, including
certifying maps. (Tr. III, 46). In order to certify a map a signature and stamp
are affixed. (Tr. III, 46). Competent engineers, including Weaver, take this
task seriously. (Tr. III, 46). No map is perfect and they often rely on the
maps certified earlier by other engineers. (Tr. III, 46-47). Hartsog worked at
several old mines and relied on work done a hundred years in the past. (Tr.
III, 74-75). Hartsog has found errors on maps that he has certified. (Tr. III,
76).

Hartsog
spoke with and sat in on the testimony of Harris, Van Dyke, and Weaver. (Tr.
III, 77-78). He felt he had a good understanding of the process they engaged in
before certifying the December 2008 map. (Tr. III, 78). The process that Weaver
used is typical and done in the way that Hartsog teaches in seminars. (Tr. III,
78). They printed out a map and went over it, they put airways in color, they
checked stoppings, and they sent it to the mine to check at the actual sites. (Tr.
III, 78-79). Respondent used USGS quad sheets to “ex-reference” well
information and never had any problems. (Tr. III, 79-80). The use of the
topographical maps as a point of reference was also a good practice to double
check surface features like wells, structures, and creeks. (Tr. III, 81-82,
122). The topographic map was accurate, though not for all gas wells. (Tr. III,
123).

However,
somewhere between April and October 2008 one of the wells disappeared or was
deleted. (Tr. III, 80, 108). The gas well was on the map when Weaver took over
the engineering department. (Tr. III, 107-108). The December 2008 mine map was
never checked against an old map to ensure all the gas wells were on it. (Tr.
III, 121). It is not typical to double-check map items every six months; they
only double-check the new information. (Tr. III, 80-81). Respondent had
information from the State of Virginia and updated the map as they learned of
wells. (Tr. III, 121). Weaver, Harris, and Van Dyke all testified that they did
not know about the shape file. (Tr. III, 122). Respondent’s methodology in
preparing their maps seemed sound. (Tr. III, 69). At some point Respondent had
double-checked a map against an old map but Hartsog did not know when or what
map was used. (Tr. III, 123-124).

Originally
gas well numbering was conducted by the state but in the 1970s the USGS created
a national system. (Tr. III, 136-137). That system is called API, but Hartsog
did not know what that stood for. (Tr. III, 137). The API number has a two-digit
number indicating the state, a three-digit number for the county or
jurisdiction, and a serial number. (Tr. III, 137). The December map did not
have the API number, it had company numbers. (Tr. III, 138). Hartsog crossed
referenced the map with other information to get the missing well’s API number:
2559. (Tr. III, 138-139). Hartsog believed that the number for this well would
be in a filing cabinet or record. (Tr. III, 139). In the old days there would
have been a record for each of the 420 wells in the file cabinet, but Hartsog
did not ask about it. (Tr. III, 140). Any mining company that Hartsog had would
have some written form of record for the gas wells on the property. (Tr. III,
140-141).

Hartsog
spoke with Respondent’s engineering department regarding their experience with
AutoCAD and Harris was very experienced. (Tr. III, 67-68). Harris told Hartsog
he used AutoCAD as a tool in bridge estimates, which is difficult and tedious. (Tr.
III, 68-69).

The
AutoCAD allows an engineer to work faster and be more precise, but it also
allows little details like stoppings and arrows to disappear or move. (Tr. III,
47). It is a great program but it is very complex and this can create problems.
(Tr. III, 66). It is helpful to have multiple people working on a map and
looking at it. (Tr. III, 48). Often, the makers of AutoCAD and SurvCAD do not
fix a problem when there are complaints, but instead patch it on the next
software update. (Tr. III, 66-67). An AutoCAD customer does not purchase the
software but instead a license. (Tr. III, 115). The licensing agreement will
include a “hold-harmless” provision making a law suit difficult and so AutoCAD
is used at your own risk. (Tr. III, 67, 116). AutoCAD does not have meaningful
competition. (Tr. III, 67). There is no set standard for mine mapping the United States; it varies by company and region. (Tr. III, 67).

Hartsog
believed the issue arose because Weaver never removed wells, even wells that
were proposed but never drilled, so the map looked very cluttered with things
not present. (Tr. III, 69-70, 112). No one deletes drilled wells, but this
policy addressed more and sought to avoid accidentally removing a drilled well.
(Tr. III, 112-114). Some companies will remove well permits that are rescinded
or abandoned, but Respondent does not. (Tr. III, 114). Hartsog believed there
were two possible reasons why the gas well disappeared. (Tr. III, 70-71). One
is that is was accidentally erased. (Tr. III, 71,110). He believed this was
unlikely because it would take several keystrokes and people are trained not to
do it. (Tr. III, 71, 110).

The
second possibility is that there was a glitch or file malfunction with the
AutoCAD. (Tr. III, 71,110). Usually when there is a malfunction with AutoCAD it
is caused by a corrupted file. (Tr. III, 71). A corrupted file can sometimes be
corrected, but Hartsog did not know if Respondent tried. (Tr. III, 71). In his
twenty years of experience, sometimes things happen with AutoCAD that cannot be
explained. (Tr. III, 71). However, he had no evidence of any particular
incident with the AutoCAD here. (Tr. III, 109-110). He did not believe anything
malicious occurred. (Tr. III, 71-72). However, Hartsog did not know what
happened to the well, he just knows it was deleted. (Tr. III, 109). Further, he
did not say that AutoCAD malfunction was highly likely to be the cause; it
could have been something else. (Tr. III, 111-112).

Hartsog
had seen the O’Quinn’s investigation but could not remember if O’Quinn stated
the well was accidentally deleted and he did not speak with O’Quinn. (Tr. III,
114-115).

The
Mine Act is a strict liability statute and Respondent could/should be issued a
75.1700 citation. (Tr. III, 101-102, 124). Hartsog dealt with 30 CFR Part 75 on
a daily basis and was familiar with 75.1700, a basic mine mapping regulation. (Tr.
III, 91). It requires that reasonable measures be taken to locate the gas wells
and that a barrier be placed around the well of 300 feet. (Tr. III, 92). Reasonable
efforts were made to locate the well, because they found it, probably based on
a survey. (Tr. III, 92). However, they did not provide a barrier and the well
was not on the mine map after April 2009. (Tr. III, 92, 102).

Sections
75.1200 requires a mine map and 75.372 requires a ventilation map. (Tr. III,
94). The ventilation map is almost identical to the mine map but requires more
detailed information regarding ventilation and mine evacuation. (Tr. III, 94). Section
75.372(c) states “the mine map required by 75.1200 may be used to satisfy the
requirements for the ventilation map, provided all the information required by
this section is contained by the map.” (Tr. III, 95). The well was not on the
ventilation map after April 2009. (Tr. III, 102).

No
violations were issued for ventilation or for the miner malfunctioning. (Tr.
III, 132).

Hartsog
reviewed an article by Joshua Kardon, SE, presented at the OEC International
Conference on Ethics in Engineering and Computer Science in March 1999 (RX-7). (Tr.
III, 72). The second paragraph of that article states, “[t]he fact that an
engineer makes a mistake that causes injury or damage, is not sufficient to
lead to professional liability on the part of an engineer.” (Tr. III, 73). Further,
“[w]hen one hires an engineer, one accepts the risk, and the liability of the
professional making a mistake similar to mistakes other normally competent
engineers make, using reasonable diligence and their best judgment.” (Tr. III,
73).

The
article also notes that the local practices are part of reasonable care. (Tr.
III, 73-74). It states, “[s]tandard of care is not a fixed standard in the way
of other standards, such as standards for sampling and testing concrete. The
standard of care of engineers varies with time, locale, and circumstances, and
depends on the specific practice being examined.” (Tr. II, 77). Hartsog
practices in Virginia and the greater Appalachian Region. (Tr. III, 74). To
certify a map in Virginia, an engineer signs, “I the undersigned, hereby
certify this map is correct and shows all the information to the best of my
knowledge and belief required by the laws of this state.” (Tr. III, 75). An
engineer relies on his best knowledge and belief because he is relying on his
work, the work of others, and there is an understanding that he is
“duplicating.” (Tr. III, 75-76). Unless an engineer has reason to believe
something is wrong, it is proper to certify. (Tr. III, 76). If there is reason
to believe something is wrong, then it must be checked. (Tr. III, 76).

As
a professional engineer, Hartsog did not believe that there was high negligence
in this case. (Tr. III, 83, 118). The mine map is probably the single most
important document at the mine. (Tr. III, 119). Respondent exercised
considerable care in the preparation of the maps. (Tr. III, 119). There are
many steps in making a mine map and there was a huge amount of data to use. (Tr.
III, 83). Certifying mine maps is an ongoing process and he believed that
Respondent’s engineering department were constantly working, not just on gas
wells but on workings, ventilation, environmental concerns, roof control, and
abandoned mines. (Tr. III, 83). He has not learned anything that is troubling
about Respondent’s conduct. (Tr. III, 118). The information he had when he made
his report, and what he has learned since, indicates that Respondent followed
the standard of care. (Tr. III, 119-120). That includes the “work that was
done” on the map in 2008. (Tr. III, 119-120). Hartsog
read Van Dyke’s deposition about his concerns regarding the file update. (Tr.
III, 120-121). However, he never spoke to Van Dyke before issuing the report. (Tr.
III, 121).

Hartsog’s
opinion that Respondent behaved properly may have been different if there had
been an explosion. (Tr. III, 124-125). It would be the first such explosion and
he would have to re-analyze the situation, but he did not know how his opinion
would differ. (Tr. III, 125). He conceded that if an explosion had occurred,
Respondent’s conduct would not have been any different. (Tr. III, 125). Other
factors, including the number of persons affected and the fatality level, would
change and he would have to analyze those changes. (Tr. III, 125-126).

Price
Engineering was established for many years in the area and has worked in mining
and civil engineering. (Tr. III, 84). They had a good professional reputation. (Tr.
III, 84, 116-117). In fact, Price went to some of Hartsog’s seminars in the
early 2000s. (Tr. III, 84). Price Engineering is headquartered locally in Honaker, Virginia and has 20 years of experience in the region. (Tr. III, 84, 117). The map
certified by Price did not have the gas well. (Tr. III, 117). The fact that
Price did not notice the well was missing does not excuse it. (Tr. III, 117). It
simply shows that two different registered engineers did not catch the problem.
(Tr. III, 117). “[I]t’s a little disturbing to me that he didn’t catch it. I
wish he had.” (Tr. III, 117).

Hartsog
would not agree that mining into a well is “very, very dangerous.” (Tr. III,
100-101). It is not the most dangerous thing that could happen in a mine, roof
conditions can be more dangerous. (Tr. III, 101). He looked at other mines
where similar events occurred. (Tr. III, 85). In December 2004 Newtown Energy
mined into a gas well at Coalburg No. 1 Mine in Kanawha County, West Virginia. (Tr. III, 85). A week later they struck another well in the same mine. (Tr.
III, 85). MSHA shut the mine down and ordered an audit. (Tr. III, 85). Alpha
was hired to do that audit and MSHA relied on that audit, even citing it in the
K-Order, in allowing the mine to get back to work. (Tr. III, 85-86). In that
case the CAD operator had simply failed to put a new well permit on the map. (Tr.
III, 86). Hartsog also reviewed MSHA’s website and spoke with “old hands” and
no one could recall an incident in which there was an ignition or explosion
from intersecting a gas well. (Tr. III, 88, 101). However, an ignition is
always a possibility when mining. (Tr. III, 101). The miner bit and the pipe
were both steel, which may have created sparks. (Tr. III, 126-127). Intersecting
a gas well is common. (Tr. III, 88). However, he did not believe it was “minor
thing” or that losing one well among many was “no big deal.” (Tr. III,
107-108). The number of wells is no excuse; they should have mapped them. (Tr.
III, 108-109).

Hartsog
did not believe that this event was likely to cause the death of 10 people. (Tr.
III, 89). This is because the production of the gas well was not touched and
there were precautions in place and no inundation or ignition was likely. (Tr.
III, 89). In reaching this conclusion he relied on the airflow, the production
of the well, the observations of the people, and the instruments immediately
after the occurrence. (Tr. III, 89). The investigators only found 0.2% methane
when they returned to the mine and the legal check showed 0.0% methane. (Tr.
III, 89-90). Further he relied on the fact that people observed water in the
area. (Tr. III, 90).

The
conclusions in Hartsog’s report represent a reasonable degree of professional
engineering certainty. (Tr. III, 98-99). He would not have given an opinion
that did not reflect that level of certainty.[15]
(Tr. III, 99).

g. Rebuttal Testimony of David
Steffey

At
the time of the hearing Dave Steffey was a mining engineer for MSHA, a position
he held since June 1, 2005. (Tr. III, 148-149). He received bachelor’s degrees
in biology (1995) and mining engineering (1999) from the University of Kentucky . (Tr. III, 149). In 1999 he also received an “environmental option,” a specialized
program beyond the mining engineering degree. (Tr. III, 149-150). It included
classes in chemistry and engineering and labs on microbiology and ecology. (Tr.
III, 150). The engineering classes included maps, minerals processing. (Tr.
III, 150).

Steffey
started at Massey Energy as a summer student, went to Marshall Miller as a
summer student, and then worked there full-time after college. (Tr. III,
160-161). He worked there for five months, but was not a licensed professional
engineer. (Tr. III, 161). He then went to Sidney Coal Company for about
three-and-a-half years, but not as a licensed professional engineer. (Tr. III,
161). He then worked for the Kentucky Division of Mines, but not as a licensed
professional engineer. (Tr. III, 161-162). In that position he did some
engineering tasks, like reviewing mine permits and permits for slurry
impoundments. (Tr. III, 162). He did so under the supervision of a licensed
professional engineer. (Tr. III, 162).

A
professional engineer is someone who completed a degree in engineering,
typically from an ABET (Accreditation Board of Engineering) accredited school. (Tr.
III, 151). There is also an exam on the fundamentals of engineering and a four
year apprenticeship under a professional engineer. (Tr. III, 151). Finally,
there is a professional engineer’s exam. (Tr. III, 151-152). He started with
MSHA as a Mining Engineer during the UBB investigation before he was a licensed
professional engineer. (Tr. III, 162-165). “Mining Engineer” was an MSHA title
for people with degrees in mining engineering. (Tr. III, 162-163). He was not a
licensed professional engineer or surveyor in Virginia. (Tr. III, 165-166). Steffey
has never been a licensed professional engineer while working in a mine and has
never published peer reviewed literature. (Tr. III, 166-167). Steffey
eventually became a licensed professional engineer in Kentucky. (Tr. III, 151).
Steffey passed the mining engineering test and passed the environmental
engineering test on his second try. (Tr. III, 177-178).

A
methane monitor usually sits at the right (intake) side of the continuous miner,
but occasionally on the return. (Tr. III, 152, 178). Steffey did not know what
side the monitor was on February 24, 2011. (Tr. III, 179). It is on the side
frame and mounted for protection. (Tr. III, 178). It consists of a platinum
wire wrapped in a metal oxide container, known as a catalytic sensor. (Tr. III,
152). This sensor allows combustion of gases at a lower temperature, around 400
degrees (rather than 1,000 degrees typical for methane) to detect methane. (Tr.
III, 152-153). When a methane monitor goes above 5%, it will flash. (Tr. III,
153). The ideal condition for combustion is 10 moles of air for each mole of
methane, or around 9.09% methane. (Tr. III, 153-154). Steffey did not have
experience with monitors; he talked to experts to ensure his understanding was
correct. (Tr. III, 167-168). During the hearing he also reviewed Respondent’s
documents, a paper on catalytic bead monitors, a 1913 paper from the U.S.
Bureau of Mines, spoke with the Division of Mines, and reviewed the AutoCAD
ex-reference section. (Tr. III, 168-170). He gave the documents he reviewed to
the attorney. (Tr. III, 169).

The
catalytic sensor is calibrated up to 2.5% and will accurately read up to 3%. (Tr.
III, 154). From 3-5% the monitor becomes less accurate, reading less than is
actually present, but not enough to be concerned. (Tr. III, 154-155). From
5-8.5%, the methane reading is no longer reading methane. (Tr. III, 155, 170). However,
from 8.5-9.09% it becomes more accurate; it is fairly accurate to 10% and then
it can no longer read. (Tr. III, 155, 170). At 8.9% the methane detector would
either be accurate or give a low reading. (Tr. III, 155-156, 170). It is not
possible to get a reading higher than the actual amount. (Tr. III, 156).
According to information he read and received from an electrical engineer, a
monitor does not stop reading at 5% and burn up. (Tr. III, 170-171). However,
older methane sensors did not have metal oxide and would burn up and it is
possible new ones would burn at high enough temperatures. (Tr. III, 171).

It
is impossible to run the miner without water present to cool the cutting and
tram motors and operate the sprays. (Tr. III, 156). There is often a water
spray right next to the monitor and he has never seen that generate a problem
anywhere. (Tr. III, 173-174). Water will render a monitor ineffective and it
will fluctuate wildly. (Tr. III, 172). However, the monitor is on the side of
the miner and the hole in the well would have been in the middle near the pan. (Tr.
III, 172). The boom of the miner is waist high, so if water was running over
the boom there would have been several feet of water and he did not believe
that this happened. (Tr. III, 173).

It
is dangerous to cut through the outer casing of the well because methane is
present and sets off monitors on people standing far back. (Tr. III, 157). An
explosive mix was possible, Respondent was lucky it did not occur. (Tr. III,
157). There was 90% methane and some other gasses (butanes, isobutene, and
propane) mixed in. (Tr. III, 157). Some of the other gases have a lower
explosive limit. (Tr. III, 157). If the gas well had 90% methane and the man
standing far back found 1.5%, somewhere in between was an explosive mix; it did
not go from 90% to 1.5% without passing through the explosive range. (Tr. III,
157-158). He does not know how long the methane was present before it was taken
away by the mine’s ventilation, it could have been a matter of seconds. (Tr.
III, 179, 180). Steffey could calculate the concentration of a known quantity,
it would be the concentration multiplied by the CFM, but he does not have the
actual number from that day.[16]
(Tr. III, 174-175).

h. Surrebuttal Testimony of
Hartsog

The
methane monitor is placed on the return side so it will pick up the maximum
methane emitted in the face operation. (Tr. III, 182). The monitor is designed
to measure the hazard where it is greatest. (Tr. III, 182). The monitors are
accurate for their zone of calibration, 0%-2.5%, anything outside of that would
be suspect. (Tr. III, 183). The owner’s manual did not say the accuracy decreased
from 5-8.5% and then increased at 8.5%. (Tr. III, 183-184). That does not
comport with any mining engineering principle Hartsog has heard. (Tr. III,
184). No textbook or treatise on methane monitors would indicate this either. (Tr.
III, 185).

  1. Contentions of the Parties

The
Secretary contends that all three Orders issued with respect to the gas well
intersection were validly issued, were the result of high negligence and
unwarrantable failure (“UWF”), were S&S, and had appropriate penalties. (Secretary’s
Post-Hearing Brief at 15-31). Specifically, the Secretary argues that Order
No. 8179158 is valid because Respondent knew that a gas well existed from 1994
to 2008 but did not build a barrier. (Id. at 18). Further, he argues
that Order No. 8179159 was valid because the gas well was not plotted on the
mine map after 2008. (Id. at 19). He argues that Order No. 8179160 was
valid because the gas well was not plotted on the ventilation map after 2008. (Id. at 20). The Secretary contends that all three alleged violations were S&S
because mandatory standards were violated, a catastrophic explosion was
possible, an explosion could cause injuries, and those injuries would be
serious. (Id. at 22-25). The Secretary also contends that all three
alleged violations were the result of high negligence and UWFs because of the
high standard of care required given the extreme gravity of the danger and the
fact that Respondent should have known about the cited conditions. (Id. at 25-31). The Secretary also argues that the three alleged violations are not
duplicative as they impose separate and distinct duties on the operator. (Id. at 21-22).

Respondent
contends that all three Orders issued with respect to the gas well intersection
were invalid, were not the result of negligence, were not UWFs, were not
S&S, and were duplicative. (Respondent’s Post-Hearing Brief at 22-45).
Specifically, Respondent argues that the Orders were not valid because it took
reasonable steps to locate the wells, as required by the standards cited. (Id. at 22-23). Respondent contends that the violations were not the result of high
negligence because the engineers used in the preparation of the maps were
highly regarded and met the standard of care in Virginia. (Id. at
24-25). Further, Respondent argues that the Secretary relies on irrelevant
evidence in claiming high negligence and ignores mitigating circumstances. (Id. at 25-29). Respondent also argues that consideration of the alleged gravity of
the violation in the context of the alleged negligence is inappropriate. (Id. at 29-33). Respondent also contends that the gravity designation was incorrect
as an accident was unlikely in this situation. (Id. at 33-35). Similarly,
Respondent argues that this situation meets none of the requirements for a UWF
designation. (Id. at 36-38). Finally, Respondent argues that each
standard cited in these three Orders deals with the same duty and serve the
same purpose and are therefore impermissibly duplicative. (Id. at
38-45).

  1. Findings and Conclusions

a.      
Validity

i.     
Order
No. 8179158

Order
No. 8179158 was validly issued. An operator may violate 30 C.F.R. § 75.1700 in
two ways: 10 failing to take
reasonable care in locating oil and gas wells penetrating an underground area
of the mine or 2) upon location of a well, failing to establish and maintain a
barrier around such well. In the instant case, it is undisputed that Respondent
located the Clinchfield No. 2 gas well and, in fact, plotted that well on its
map between 1994 and 2008. (Tr. II, 143). However, it is also undisputed that
no barrier was ever placed around the well. (Tr. II, 145-146, 149-150, Tr. III,
92-93, 102). Respondent’s witness, Hartsog, actually conceded that Respondent
violated this standard. (Tr. III, 101-102, 124). Therefore, Respondent did not comply with §75.1700 and
the instant Order was appropriate.

In its brief, Respondent cites to Ohio
County Coal Company, 24
FMSHRC 502 (May 2002) (ALJ Melick) for the proposition that it took reasonable care
with respect to this gas well. (Respondent’s Post-Hearing Brief at 22-23). In Ohio
County Coal Company, an operator intersected two previously unidentified
oil wells. 24 FMSHRC at 503-504. The operator had hired an outside firm to
locate and map the gas wells on its property. Id. at 505. That outside firm
had created a CAD file with the requested information, but that file contained
a “frozen layer” of information that contained the missing wells and was not
visible on the map. Id. Judge Melick held that the operator had not
violated 30 C.F.R §75.1700 because it had taken “reasonable measures” to locate
the wells when it contracted with a long-established, reputable firm to
complete that task. Id.

However,
the reasoning in Ohio County Coal Company is not applicable to this
Order. That case dealt with the first requirement of § 75.1700; specifically
the obligation to use “reasonable care” in locating gas wells. In this case,
Respondent had already located the well and had plotted it on its maps from
1994 to 2008. Therefore, it appears that Respondent complied with the first
requirement of § 75.1700. Respondent failed to comply with the second
requirement of the cited standard. Because the well was located, the operator
was required to establish a barrier around the well. No such barrier was
created in this case.

Even
if the issue of “reasonable care” were pertinent to the inquiry here,
Respondent’s reliance on Ohio County Coal would be misplaced. There, the
operator hired the outside firm to conduct its entire mapping process, which
Judge Melick believed was “reasonable care.” In the instant case, Respondent
had conducted its own gas well mapping in its internal engineering department. (Tr.
I, 207, 211, 214, 243, Tr. II, 46-47). An outside firm was only brought in
later to certify maps based on Respondent’s internal data. (Tr. II, 18-19,
86-88). In fact, the gas well went missing before D.R. Price began certifying
the maps. Therefore, any failure to properly track the well and build a barrier
once its was located was the result of Respondent’s actions and Respondent
cannot shift the blame to an outside engineering firm.

ii.     
Order
No. 8179159

Order
No. 8179159 was validly issued. An operator commits a violation of 30 C.F.R.
§75.1200 if the mine map located on the surface does not show, among other
things, producing or abandoned wells located within 500 feet of the mine. In the instant case, it is undisputed that
the mine map did not show the gas well that was eventually intersected. (Tr. I,
228-231, Tr. II, 24- 53-54, 67, 88-89,111, 143). Therefore, Respondent did not
comply with §75.1200 and the instant Order was appropriate.

Respondent’s brief treats all three
Orders related to the gas well as a single issue (in fact, it claims that the
Orders are duplicative, an assertion that is addressed infra). As a
result, Respondent again relies on Ohio County Coal Company to argue
that this Order is not valid. (Respondent’s Post-Hearing Brief at 23). This
is unfortunate as Ohio County Coal Company did not deal with a violation
of §75.1200. None of the reasoning in that case is applicable to the
requirements of the mine map. As noted supra, Ohio County Coal
Company interprets the term “reasonable efforts” contained in §75.1700. Section
75.1200 does not require operators to make reasonable efforts to plot gas wells
on the mine map. It imposes an absolute duty to create and store a mine map
that includes, among other things, gas wells. The standard states that the map
“shall” show the active and abandoned wells, not that it “may” show the wells. Respondent’s
arguments that it took reasonable efforts to accurately plot gas wells (that
Bob Weaver is an experienced and reputable engineer; that D.R. Price is a
well-regarded, licensed engineer that had never had an accident before; and
that no one associated with Respondent knew of the “shape file”) are irrelevant
to whether the standard was violated. Here, Respondent conceded that the gas
wells were not on the map. As a result, Respondent violated the standard.

iii.     
Order No. 8179160

Order
No. 8179160 was validly issued. An operator commits a violation of 30 C.F.R.
§75.372 if its map showing the information contained in the ventilation plan
under §75.371 does not contain, among other things, the locations of all known oil and gas wells that penetrate
the coalbed being mined. In the instant case, it is undisputed that the
ventilation map did not show the gas well that was eventually intersected. (Tr.
I, 228-231, Tr. II, 24- 53-54, 67, 88-89,111, 143). Furthermore, it is
undisputed that Respondent knew of that well and even placed it on its maps between
1994 and 2008. (Tr. II, 143). Therefore, Respondent did not comply with §75.372
and the instant Order was appropriate.

Once again, Respondent’s Brief relies
on Ohio County Coal to argue that this Order was not valid. Once again,
the issue of whether Respondent took reasonable care to create the ventilation
map is irrelevant. Section 75.772 creates an absolute duty to place the known
gas wells on a ventilation map. Respondent conceded that the well at issue here
was known since 1994 and was not on ventilation the map. Therefore, regardless
of Respondent’s efforts at compliance, it violated the standard.

b.
The Orders are Not Redundant

While
each of the Orders related to the gas well incident are individually valid,
Respondent also raises a related argument that the Orders are duplicative (or,
actually, triplicative). Respondent contends that the three Orders are so
closely related that the Secretary is, in essence, seeking to punish it three
times for the same conduct. For the reasons set forth below, I find that the
three gas well Orders are not redundant.

Under
well-settled Commission case law violations are not duplicative, even if they
emanated from the same events, when the cited standards impose separate and
distinct duties on an operator. See Cyprus Tonopah Mining Corp., 15
FMSHRC 367, 378 (Mar. 1993); Western Fuels-Utah, Inc., 19 FMSHRC 994,
1004 (June 1997); Spartan Mining Company, 30 FMSHRC 699, 716, (Aug.
2008).

Two
standards do not impose separate and distinct duties when the obligations of
one are completely “subsumed” within the obligations of the other. Western
Fuels-Utah, Inc., 19 FMSHRC at 1004). An ALJ described this concept as
analogous to criminal law wherein “the lesser included offense merges within
the greater offense and must be dismissed.” Peabody Coal Company, 17
FMSHRC 1627, 1630 (Sep. 1995) (ALJ Melick) (citing due process for the analogy rather
than double jeopardy). For example, in Western Fuels-Utah, Inc., the
Commission found that two violations were duplicative when one was issued for
the failure to install a self-contained dry powder chemical system to protect
belt components and another was issued for failure to provide the correct
number of nozzles and reservoirs for this chemical system. 19 FMSHRC at 1004. The
Commission found that violation of the narrower standard requiring sufficient
nozzles was also necessarily a violation of the broader standard requiring the
installation of the chemical system to protect the belt. Id. Therefore,
the Commission held that these violations were duplicative. Id. In
short, two violations are duplicative when, in all instances, a violation of
one cannot be committed without also violating the other. Spartan Mining
Company, 30 FMSHRC at 718.

In
the instant case, each of the three Orders asserted violations of a distinct
standard that imposed a separate duty on Respondent. Order No. 8179158 dealt
with Respondent’s failure to comply with §75.1700, which imposes a duty on an operator
to make reasonable efforts to locate gas wells and, once gas wells were
located, to establish a barrier around them. Order No. 8179159 dealt with
Respondent’s failure to comply with §75.1200, which imposes a duty on an
operator to create a mine map and store it on the surface. Finally, Order No.
817160 dealt with Respondent’s failure to comply with §75.372, which imposes a
duty to certify and submit a ventilation map every 12 months. Simply because it
is possible to violate three regulations in a single event, or series of
events, does not mean that the regulations are redundant.

Order No. 8179158 is obviously
distinct from the other two violations. The obligations to seek out gas wells
and, once they are found, to establish barriers around them are wholly
different from the obligation to produce and submit maps. One can easily
imagine a situation wherein a gas well is properly plotted on all mine maps but
the operator fails to establish a barrier and mines within 300 feet of the
well. Similarly, an operator may be aware from experience that a gas well
exists and conscientiously establish a 300 foot barrier around it, but still
fail to place that well on its mine or ventilation map. Therefore, unlike the
situation in Western Fuels-Utah, Inc., the obligations of §75.1700 are
not subsumed by and do not subsume the obligations of §75.1200 and §75.372.

Order Nos. 8179159 and 8179160 are
more closely related; however I find that they relate to separate and distinct
obligations placed on Respondent. The similarities between the requirements of
§75.1200 and §75.372 are superficial; they both require the production of maps.
However, the differences between the two show that a violation of §75.1200 is
not a “lesser included offense” within a violation of §75.372.

Section 75.1200 maps and §75.372 maps
place different burdens on Respondent because they serve different purposes. In
fact, Weaver conceded that these maps serve different functions. (Tr. I, 216). Section
75.1200 is the “wall map” kept at the surface and referred to whenever problems
occur. (Tr. I,
215-217). The ventilation map must be certified and submitted to MSHA (wall
maps do not need to be submitted). It would be possible for an operator to
create a wall map but fail to create a ventilation map or vice versa.

Some
of the confusion as to whether these two Orders are duplicative may stem from
the fact that it is possible for the §75.1200 map to serve as the §75.372 map. (Tr.
I, 216). However, it is only possible for the §75.1200 map to serve as the
§75.372 map if it meets all of the requirements for both standards. It would be
possible for an operator to create a map that is certified and submitted to
MSHA and meets all of the requirements of §75.372 and §75.1200, except that the
map is not posted at the surface. In such a situation, the map would conform to
§75.372 but fail under §75.1200. Similarly, there could be a situation wherein
a map meets all of the requirements of §75.1200 and §75.372 except that the map
is not submitted to MSHA. In such a situation, the map would conform to
§75.1200 but fail under §75.372. Each of the regulations require additional and
distinct conduct from the other, thereby implying separate and distinct duties.
In practical application it may be more efficient for an operator to conflate
the requirements and treat them as one, however this does not mean that they
are singular. Therefore, the fact that one map can be used under both standards
does not show that the standards are duplicative.[17]

Respondent argues that these
violations are not distinct because all three arise from the same “initial
conduct,” specifically failure to plot the well on the December 23, 2008 map. (Respondent’s
Post-Hearing Brief at 43). Specifically,
Respondent argues that the duty to produce the §75.372 map subsumed all of the
other requirements such that the violation in Order No. 8179160 necessarily
entailed the violation of §75.1200 and §75.1700. (Respondent’s Post-Hearing Brief
at 43-44).

However, as the Commission held in Cyprus
Tonopah Mining Corp., violations are not duplicative if they impose
separate and distinct duties, even if they “emanated from the same events.” 15 FMSHRC at 378. Even if the
same “initial conduct” resulted in all three violations and the condition or
practice described was similar, the issue at hand was whether the duties were
the same. Respondent’s reasoning that all three standards impose the same duty relies
on a level of abstraction that cannot be supported. For example, Respondent
notes, “the regulations all have the same purpose – protecting all those
working at a mine by insuring that gas wells are properly located and
identified on certified maps.” (Respondent’s Post-Hearing Brief at 44). That
is the broad purpose of all standards that relate to gas wells. But, as
explained supra, these standards impose different specific duties on
Respondent to achieve the goal of safe mining near gas wells. Those duties
relate to gas well plotting, but that does not mean they are the same duty. Any
one standard can be violated without violating the others. At a certain level
of abstraction, the purpose to the Mine Act is to provide a safe environment
for miners. It would be absurd to state that, as a result, any two citations at
a mine are duplicative because they all serve that broad purpose. However, that
is the logical conclusion of Respondent’s understanding of “purpose.”

In
a related argument, Respondent notes that “as it pertains to gas wells,” the §75.1200
map and the §75.372 map contain, “exactly the same information.” (Respondent’s
Post-Hearing Brief at 44). Respondent argues that, regardless of whether
the standards as a whole are duplicative, they are duplicative
with respect to the requirement to plot gas wells. The essence of this argument
seems to be that even if the standards require different things in general, as
applied in this particular instance they both require a map with gas wells. As
a result, Respondent argues these Orders are duplicative.

If
Respondent’s previous argument was too abstract, this one is too focused. Respondent
fundamentally misunderstands the nature of the distinct requirements of these
standards, which serve important functions under the Mine Act. Nothing in the
case law cited by Respondent suggests that the issue is whether two violations,
in a given instance, are similar. The issue is whether violating one standard
as a general matter necessarily implies violation of the other. The fact that
in this particular instance the standard required, among other things, two maps
that both required gas wells does not make these standards duplicative because
those standards also each had other obligations that were distinct such that it
was possible to violate one without violating the other. It would be entirely
possible in this instance for Respondent to create a ventilation map that
contained a gas well but also create a wall map that did not. The fact that
Respondent duplicated its mistake on two separate maps does not mean that the
standards are duplicative.

Finally,
Respondent argues that these violations are duplicative in part because all
three violations occurred at the same point: when the miner hit the gas well. (Respondent’s
Post-Hearing Brief at 45). This is not correct. Respondent violated
§75.1700 at the very latest the instant it mined within 300 feet of the gas
well; Respondent violated §75.1200 when it created and stored on the surface a
mine map that did not show the gas well; and Respondent violated §75.372 when
it certified and submitted a ventilation map that did not show the gas well. The
fact that all three violations were discovered at the same time and through the
same agency does not mean they occurred at the same time.

c. Gravity and S&S

With
respect to gravity, all three gas well Orders were marked by Inspector Hughes
as “Highly Likely,” “Fatal,” “S&S” and affecting 10 persons. These
determinations are supported by a preponderance of the evidence.

The
Mine Act requires that “gravity of the violation” be considered in assessing a
penalty. 30 U.S.C. §820. The Secretary promulgated a three-factor inquiry to
determine the gravity of a citation for purposes of determining the penalty. Those
factors are:

[T]he
likelihood of the occurrence of the event against which a standard is directed;
the severity of the illness or injury if the event has occurred or was to
occur; and the number of persons potentially affected if the event has occurred
or were to occur.

30
C.F.R. §100.3(e).

With
respect to Order No. 8179158, the
event against which the standard, 30 C.F.R §75.1700, is directed is explosion or methane inundation as a
result of the intersection of a gas well. The standard seeks to prevent
operators from mining into gas wells by requiring that those wells be located
and that barriers be established around them. In the instant case,
uncontroverted evidence shows that intersection was not only highly likely, but
that a gas well actually was intersected and some amount of methane was
released. (Tr. I, 188-191, 230-231,
Tr. II, 25, 67, 111, Tr. III, 23, 127). No explosion occurred in this case,
but if it were to occur, I credit Inspector Tuggle’s testimony that it would
result in fatal injuries to 10 persons.

With
respect to Order No. 8179159, the
event against which the standard, 30 C.F.R §75.1200, is directed is, amongst other things, explosion or
methane inundation as a result of the intersection of a gas well. The standard
seeks to prevent operators from mining into gas wells by requiring that those
wells be plotted on the wall map used by the operator in planning. Again,
uncontroverted evidence shows that intersection was not only highly likely, but
that a gas well actually was intersected and some amount of methane was
released. (Tr. I, 188-191, 230-231, Tr. II, 25, 67, 111, Tr. III, 23, 127). I
credit Inspector Tuggle’s testimony that if the event occurred, it would result
in fatal injuries to 10 persons.

Finally,
with respect to Order No. 8179159,
the event against which the standard, 30 C.F.R §75.372, is directed is, amongst other things,
explosion or methane inundation as a result of the intersection of a gas well. The
standard seeks to prevent operators from mining into gas wells by requiring
that those wells be plotted on the ventilation map used that is certified and
submitted to MSHA. Again, uncontroverted evidence shows that intersection was
not only highly likely, but that a gas well actually was intersected and some
amount of methane was released. (Tr. I, 188-191, 230-231, Tr. II, 25, 67, 111,
Tr. III, 23, 127). I credit Inspector Tuggle’s testimony that if the event
occurred, it would result in fatal injuries to 10 persons.

Respondent argues that these Orders
were not highly likely to result in fatalities to ten persons. (Respondent’s
Post-Hearing Brief at 33-35). First, Respondent notes that the production
stream of this particular well had two protective casings. (Id. at 33-34
citing Tr. III, 24-25). It further noted that while the outer two
casings were breached, the production casing was not ruptured (though the
evidence suggests that it was scratched). (Id. at 34 citing Tr.
III, 25, Tr. II, 152, Tr. II, 25-27, 131-132). Respondent supported its
contention that the production line was not breached by noting that after the
accident the legal check showed no methane and closer checks showed only 0.2%
methane. (Id. citing Tr. I, 197). Respondent cited to the high
level of air flow in the area to show that any dangerous levels of methane was
quickly removed from the area. (Id. at 35 citing Tr. II, 170,
173). Similarly, Respondent questioned the reliability of the 8.9% methane
reading by the miner spotter. (Id. citing Tr. III, 38-41). In
making this claim, Respondent cited Hartsog’s testimony and the fact that the
water released by the intersection could have caused a false reading. (Id. citing Tr. III, 27, 30, 33, 107).

Respondent’s arguments are not
compelling. To state that an explosion was less than highly likely merely
because Respondent was fortunate enough not to breach the production casing of
the well would do a severe disservice to the health and safety of the miners. Even
though the gas well was not breached and it was likely that the methane in the
area was something less than 8.9%, that does not mean that an explosion was
unlikely. The uncontested fact remains that Respondent mined into a producing
gas well. Respondent was exceptionally fortunate that either water or the
methane released from the outer casings caused the miner to shut off before the
production stream was breached. Good luck in avoiding an actual explosion does
not change the fact that a fatal explosion was highly likely. I credit Hughes’
testimony, the metal bits on the miner and the metal casing of the production
pipe could have easily caused sparks that resulted in an explosion. (Tr. II,
152). Hughes further credibly testified that the production well was scratched.
(Tr. 152). Hartsog confirmed this fact. (Tr. III, 25-27,131-132). If the miner
had continued cutting for even a few more seconds, the production stream would
have been breached with sparks flying.

In a related argument, Respondent
claimed that even if the production string had been breached, the well was a
low producing well, making explosion less likely. (Respondent’s Post-Hearing
Brief at 24 citing Tr. III, 25). I find that, even in light of the
fact that this gas well was not producing at capacity, an explosion was still
highly likely. Once again, I credit Hughes testimony. Following a rigorous
investigation into the incident, Hughes believed that a fatal explosion was
highly likely. (Tr. II, 146). Nothing in the evidence suggests that an
explosion was impossible as a result of the lower amount of methane in the
well. Perhaps the explosion would have been smaller than if Respondent had
intersected a different well, but that hardly justifies a reduction in the
cited gravity.

It should be noted that none of Respondent’s
witnesses, with the exception of Hartsog, were under the impression that this
situation was anything but dire. All of Respondent’s witnesses (except Hartsog)
stated that intersection of a gas well constituted a real and grave danger,
even in light of the fact that the production stream was not intersected and
the well was low producing. (Tr. I, 193, Tr. II, 25-26, 40, 67-68, 122, 127-128).

Finally,
Respondent argues that only six miners were on the section and that only the
miner operator would have been affected. (Respondent’s Post-Hearing Brief
at 35). I credit Inspector Hughes’ testimony that there were 34 miners in the
mine at the time of the intersection and that all of those miners were
evacuated. (Tr. II, 133). In the event of a catastrophic explosion at least 10
miners would be affected, perhaps more. As Hughes testified, it was a miracle
that 34 men were not killed. (Tr. II, 146).

The S&S nature of a violation and the gravity of a
violation are not synonymous. The Commission has pointed out that the “focus of
the seriousness of the violation is not necessarily on the reasonable
likelihood of serious injury, which is the focus of the S&S inquiry, but
rather on the effect of the hazard if it occurs.” Consolidation Coal Co.,
18 FMSHRC 1541, 1550 (Sept. 1996) emphasis added. A violation is S&S “if, based
upon the particular facts surrounding the violation there exists a reasonable
likelihood that the hazard contributed to will result in an injury or illness
of a reasonably serious nature.” Cement Div., National Gypsum Co., 3
FMSHRC 822, 825 (April 1981). The Commission later clarified this standard,
explaining:

In
order to establish that a violation of a mandatory safety standard is
significant and substantial under National Gypsum, the Secretary of
Labor must prove: (1) the underlying violation of a mandatory safety standard;
(2) a discrete safety hazard – that is, a measure of danger to safety –
contributed to by the violation; (3) a reasonable likelihood that the hazard
contributed to will result in an injury; and (4) a reasonable likelihood that
the injury in question will be of a reasonably serious nature.

Mathies
Coal Co., 6
FMSHRC 1, 3-4 (Jan. 1984).

In
the instant case, Inspector Hughes’ designation of S&S is clearly correct. The
first prong of Mathies is satisfied with respect to all three violations,
for the reasons discussed above.

The
second prong, that a discrete safety hazard was contributed to by the
violation, is also met. The law requires gas well barriers, plotting of gas
wells on mine maps, and the submission of ventilation maps with gas wells for a
reason. That is to prevent the intersection of producing gas wells causing
explosions or gas inundations.

The
Commission has recently clarified the third element of Mathies, stating
the test “is whether there is a reasonable likelihood that the hazard
contributed to by the violation…will cause injury.” Musser Engineering Inc.
and PBS Coals, Inc., 32 FMSHRC 1257, 1281 (Oct. 2010); see also Cumberland Coal Resources LP, 33 FMSHRC 2357, 2365-2369 (Oct. 2011). The Commission
emphasized that the Secretary need not “prove a reasonable likelihood that the
violation itself will cause injury…” Id. In this case, there is no
question that the hazard contributed to by the each of the violations,
specifically a catastrophic explosion or inundation of gas, would cause an
injury.

Finally,
the fourth prong of Mathies is met as injuries resulting from an
explosion or inundation of gas would likely be fatal. Therefore, the S&S
designations for each of the three violations related to the gas well are
appropriate.

d. Unwarrantable Failure and
Negligence

All
three gas well Orders were marked as an high negligence and unwarrantable
failure. In light of the evidence presented, I find that these designations
were appropriate. I will discuss each designation in turn.

Negligence
“is conduct, either by commission or omission, which falls below a standard of
care established under the Mine Act to protect miners against the risks of
harm.” 30 C.F.R. § 100.3(d). “A mine operator is required to be on the alert
for conditions and practices in the mine that affect the safety or health of
miners and to take steps necessary to correct or prevent hazardous conditions
or practices.” Id. Low negligence exists when “[t]he operator knew or
should have known of the violative condition or practice, but there are
considerable mitigating circumstances.” Id. Moderate negligence is when
“[t]he operator knew or should have known of the violative condition or
practice, but there are mitigating circumstances.” Id. High negligence
exists when “[t]he operator knew or should have known of the violative
condition or practice, and there are no mitigating circumstances.” Id. See
also Brody Mining, LLC, 2011 WL 2745785 (2011)(ALJ). Finally, an
operator exhibits reckless disregard where it displays “conduct which exhibits
the absence of the slightest degree of care.” 30 C.F.R. § 100.3(d). Mitigating
circumstances may include, but are not limited to, actions taken by the
operator to prevent or correct hazardous conditions or practices. Id.

Therefore,
the first issue is whether Respondent knew or should have known that violations
at issue in this case existed. That is, whether it knew or should have known
that its maps were incorrect and no barrier was placed around the well. Well-settled
Commission precedent recognizes that the negligence of an operator’s agent is
imputed to the operator for penalty assessments and unwarrantable failure
determinations. See Whayne Supply Co., 19 FMSHRC 447, 451 (Mar.
1997); Rochester & Pittsburgh Coal Co., 13 FMSHRC 189,
194-197 (Feb. 1991); and Southern Ohio Coal Co., 4 FMSHRC 1459,
1463-1464 (Aug. 1982). An agent is defined as someone with responsibilities
normally delegated to management personnel, has responsibilities that are
crucial to the mine’s operations, and exercises managerial responsibilities at
the time of the negligent conduct. Martin Marietta Aggregates, 22 FMSHRC
633, 637-638 (May 2000) see also 30 U.S.C. §802(e) (an agent is “any
person charged with responsibility for the operation of all or part of a…mine
or the supervision of the miners in a…mine.”). In this case, there is no
question that Weaver was Respondent’s agent. He testified extensively as to his
responsibilities, his managerial power, and his actions in certifying the maps
from May 2006 to July 2010.[18]
(Tr. I, 206-209). If Weaver was negligent with respect to these violations,
that negligence is imputable to Respondent.

A
preponderance of the evidence shows that Weaver should have known that the well
was not being accounted for in mapping and planning. It is uncontested that the
well had been plotted on every map from 1994 to 2008, a period that encompassed
two years in which Weaver himself was certifying maps. (Tr. I, 208, 232 Tr. II,
33, 143). It is also uncontested that this producing gas well simply
disappeared from Respondent’s planning and maps without explanation. (Tr. I,
228-230, 236, Tr. II, 26, 38, 53-54, 88-89, 118, 128-129, 169). The only
precaution that Weaver took to prevent gas wells from disappearing was a verbal
policy against deleting wells and a system to cross check the certified map against
the Buchanan County topographic map. (Tr. I, 235, Tr. II, 56-57). There is no
question that the topographic map was inaccurate and that no one ever checked
it for accuracy. (Tr. I, 233-235. Tr. II, 56-57, Tr. III, 123). As supervisor,
Weaver never took any of the various actions that could have revealed that the well
was missing. He never compared the maps to state records, he never inspected
the surface, he did not check Respondent’s paper files (which Hartsog claimed
any mine he worked at would have) and he did not compare new maps to older,
more accurate maps. (Tr. I, 233-234, Tr. II, 56 Tr. III, 121-123). Respondent
should have known of the violations because taking any of these reasonable
actions would have revealed to Respondent that the well was not plotted or
planned for and an obvious danger existed. Weaver, and therefore Respondent,
was negligent.

The
fact that Respondent had older files and maps on hand that would indicate that
a gas well had gone missing raises a related issue. Respondent and the
Secretary agree that none of the people working at the mine knew about the
missing well. (Respondent’s Post-Hearing Brief at 38 and Secretary’s
Post-Hearing Brief at 31). However, it cannot be said that the operator
was unaware of the missing well. See e.g. Alliance 3PL Corp. v. New Prime,
Inc., 614 F.3d 703, 706-707 (7th Cir. 2010) cert. den. 131 S.Ct.
1477, 179 L.Ed.2d 302 (2011) (Court held that corporation, as an entity, can
have knowledge about a subject. Further, “[a] corporation knows what its
managers know, and it does not acquire amnesia when the management team
changes.”) (citations omitted). Essentially, there were old maps and old
files that were readily available for use. Respondent possessed those files and
maps and therefore “knew” the information. The negligent failure of the people
working for Respondent to utilize this institutional knowledge does not mean
that the knowledge did not exist. As a result, Respondent was negligent.

Having
determined that Respondent was negligent, the next issue is whether there were
any mitigating factors present. Respondent argues that there are several. In
considering Respondent’s arguments regarding mitigation, it is important to
consider the standard of care. The Commission has held that an operator has a
heightened standard of care when a condition poses a serious risk. See Lafarge
Construction Materials, 20 FMSHRC 1140 (Oct. 1998). The amount of care
demanded by the standard of reasonable conduct must be in proportion to the
risk. Musser Engineering, Inc., 32 FMSHRC at 1286. As the danger becomes
greater, the actor is required to exercise caution commensurate with it. Id.;
see also A.H. Smith Stone Co., 5 FMSHRC 13, 15 (Jan. 1983) (holding that
“[a]n operator must address a situation presenting a potential source of
explosion, as here, with a degree of care commensurate with the danger”). In
short, in considering whether the actions taken by Respondent mitigate its
negligence, it is important to realize that the miners faced extremely grave
danger and that Respondent was therefore held to a high standard of care.

Respondent
argues that considering the gravity and the negligence of a violation is
improper. (Respondent’s Post-Hearing Brief at 30). Specifically,
Respondent notes, “the definition of ‘negligence’ set forth in the Code of
Federal Regulations does not include, as a consideration for determining the
level of negligence, the potential gravity of the hazard. If Inspector Hughes’
view is correct, then must all citations be marked high negligence,
unwarrantable failure every time there is a potential for a mine fire or
explosion? Such a position is not supported under the law.” (Id.). As
shown above, Commission case law supports a heightened level of scrutiny for
especially grave dangers. That is especially true, as here, where the danger
was highly likely to be realized.

Respondent
then goes on to distinguish the instant case from Musser Engineering, Inc.,
by noting that the operator in Musser had actual knowledge that it was
placing miners in grave danger, while in the present case Respondent placed
miners in grave danger with only constructive knowledge of the hazard. (Id. at 30-33). This is a distinction without difference. An operator’s negligence is
gauged by its failure prevent hazards it knows or should know, there is no
lessening of the standard of care as a result of ignorance.

In
a related argument, Respondent argues that it followed the standard of care for
engineering in the Commonwealth of Virginia. (Id. at 24). This argument is
based on Hartsog’s testimony to that effect. (Tr. III, 75-77). While I credit
Hartsog’s testimony that Weaver would not be personally liable in Virginia with respect to his engineering license, the engineering profession does not
dictate the operator’s standard of care with for these violations. The Mine Act
sets the standard in this case. As noted previously, Respondent did not take
the proper precautions to ensure that a gas well was not intersected; therefore
Weaver’s personal liability with respect to his engineering license is not
relevant.

Respondent
further notes that in making the initial determination that Respondent did not
meet the standard of care in this case, Inspector Hughes did not interview
anyone from the engineering department. (Respondent’s Post-Hearing Brief
at 25). As has already been noted, the testimony of several members of the
engineering department reveals that Respondent was negligent, and whether
Hughes conducted the interviews is irrelevant. Further, even if he had
conducted the interviews, the general consensus of the engineering department
is that no one knows what happened. It is hard to see what useful information
Inspector Hughes could have gleaned from an interview.

Therefore,
with the heightened standard of care in mind, I will now consider Respondent’s
proposed mitigating factors. First, Respondent argues that it believed that its
maps were accurate and no one knew that the well could go missing. (Respondent’s
Post-Hearing Brief at 24, 26). As has already been noted, Respondent’s
reliance on its maps was clearly misplaced. It did not take reasonable measures
beyond cross-checking its maps with inaccurate topographic information from the
county to ensure that its maps were accurate. Simply believing something that
is demonstrably false is not a mitigating factor.

Respondent
also argues that only one out of 8,000 wells was unaccounted for on its maps
and planning. (Id. at 24). The Secretary’s characterization of this
danger seems apt: one gas well in 8,000 (or actually around 450 in the area of
the mine) was not a “needle in a haystack,” but a “hand grenade.” (Secretary’s
Post-Hearing Brief at 28). While it was a single gas well, that gas well
contained the potential to explode and cause fatal injuries to ten miners. Given
the heightened level of care necessary when dealing with highly likely
explosive hazards, the excuse that “we only missed one” is not particularly
compelling. The fact that only one well went missing is not a mitigating
factor. This is especially true in light of the fact that no one knows how the well
went missing. This leaves open the distinct possibility that more wells could
just as easily have disappeared. Luck is not a mitigating factor.

Respondent
further contends that Weaver and the engineering department were competent and took
reasonable steps to ensure the accuracy of the maps. (Respondent’s
Post-Hearing Brief at 25-27). It notes that D.R. Price also did not notice
the missing gas well. (Id. at 27). As has already been shown, regardless
of the level of competence shown generally by Weaver, the engineering
department, and D.R. Price, in this particularly instance they did not take all
reasonable precautions to ensure that the gas well was properly plotted. Respondent
did not check its old maps, it did not search its paper files (if it had them),
and it did not survey the surface. Respondent presented evidence at hearing
that such precautions were not customary and that additional precautions would
be unduly burdensome. It should be noted that the customary precautions
resulted in Respondent mining into an active gas well. Further, as Respondent
notes in discussing abatement, after the accident occurred it took just the
sorts of actions that had once been deemed unnecessary (checking old maps and
communicating with the state). (Respondent’s Post-Hearing Brief at 37). Nothing
about Respondent’s inadequate steps to ensure the accuracy of the maps
mitigates its negligence.

In
addition to the alleged mitigating factors above, Respondent also argues that
the Secretary makes several “Red Herring” arguments with respect to negligence.
Specifically it argues that it was unreasonable to believe the company should
use the shape file from the state and that there is no evidence that the gas
well went missing during the file merger. A preponderance of the evidence shows
that no one was aware of the shape file and that there was no reasonable way to
access this file unless the exact address was known. (Tr. I, 231, Tr. II, 20-21,
30-31, 55, 70, 116). Therefore, I find that Respondent is not negligent for
failure to use the shape file. However, that does not in any way change the
fact that Respondent was negligent for failure to police its own files or check
the surface for gas wells.

Both
Respondent and the Secretary presented extensive evidence with respect to the
AutoCAD file merger. The Secretary presented evidence that Respondent’s
internal review of the accident pointed to this merger as the cause of the lost
well and further showed that the person in charge of the file merger, Harris,
did not have any previous work experience with the AutoCAD. (Tr. II, 47, 62). Respondent
countered with evidence that the merger could not have caused the gas well to
be lost and that Harris was competent with AutoCAD. (Tr. I, 223, Tr. II, 42-43,
89-92, 128). I believe that this argument is largely irrelevant. I am inclined
to agree with Inspector Hughes, “I can say, sitting here two years later, that
the company don’t know how they lost the thing. And that worries me more than
me knowing.” (Tr. II, 168). It does not matter why or how the well went
missing. Respondent was charged with making accurate maps and keeping a barrier
around its well. It negligently failed to do so despite having the information
necessary to keep track of the well. And that all Respondent can argue in response
is that they do not know why the well is missing, but only that it was not the
AutoCAD does not mitigate their negligence; it concerns me that this sort of
event will happen again. Until Respondent learns why it lost the well, I am
concerned that it will be unable to prevent future well disappearances.

None
of the arguments presented by Respondent persuade me that the negligence was in
any way mitigated. I find that a high negligence designation is appropriate.

The
Commission has recognized the
close relationship between a finding of unwarrantable failure and a finding of
high negligence. San Juan Coal Co., 29 FMSHRC 125, 139 (Mar. 2007)
(remanded because a finding of high negligence without a corresponding finding
of unwarrantable failure was “seemingly at odds.”). Emery Mining Corp.,
defines an unwarrantable failure, as “aggravated conduct constituting more than
ordinary negligence.” Emery Mining Corp., 9 FMSHRC 1997, 2002 (Dec.
1987). Such conduct may be characterized as reckless disregard, intentional
misconduct, indifference, or serious lack of reasonable care. Id. at
2004; see also Buck Creek Coal, 52 F.3d 133, 135-136 (7th Cir. 1995). The
Commission formulated a six factor test to determine aggravating conduct.[19]
IO Coal Co., Inc., 31 FMSHRC 1346, 1350-1351 (Dec. 2009). Before
discussing the high negligence designation, I will consider each of those
factors in turn:

1.     
Extent
of the violative conditions

The missing gas well in this case
was the only well missing out of over 8,000 gas wells monitored by Respondent
and one of only 350-450 within the footprint of the mine. (Respondent’s
Post-Hearing Brief at 36). Therefore, the three violations in this matter
were not particularly extensive.

However,
as noted by the Secretary, not all of the IO Coal factors are
necessarily relevant in all factual scenarios. Consolidation Coal Co.,
22 FMSHRC 340, 353 (Mar. 2000). While the condition centered on a single gas
well, I believe for the reasons discussed infra with respect to the
other factors, that an unwarrantable failure designation is still appropriate.

2.     
The
Length of Time of the Violation Existed

The violations at issue here
existed for years. With respect to Order No. 8179158, Respondent was required to establish a barrier
around gas wells as those wells were discovered. Respondent knew about the
Clinchfield No. 2 gas well at least since 1994. However, after the production
of the December 2008 maps, Respondent no longer planned its mining with that
gas well in mind. The coal around the gas well was no longer considered a
barrier, but instead simply a resource to be mined. When the gas well was eventually
intersected, Respondent had already failed to establish a barrier around the
well for over two years.

With Respect to Order No. 8179159,
Respondent had been creating and storing mine maps under §75.1200 without the
subject gas well for over two years at the time of the intersection. This fact
is not in contest.

With respect to Order No. 8179160,
Respondent had been certifying and submitting ventilation maps to MSHA under
§75.372 without the subject gas well for over two years at the time of the
intersection. This fact is not in contest.

Respondent argues that the condition
had not lasted for an extensive amount of time because it had found the well
and still believed that it was part of its well file. Respondent’s knowledge is
irrelevant to this factor. Respondent may have taken proper care with the gas
well at one time, but for two years it failed to do so.

3.     
Whether
the violation is obvious or poses a high degree of danger

The violations at issue here
posed an exceptionally high degree of danger. Even Respondent’s witness
testified that cutting into a gas well was “about the worst thing that could
happen” in a mine and result in an explosion or fatality. (Tr. II, 127). As
discussed in the gravity section, supra, Respondent was exceptionally
lucky that this high degree of danger was not realized.

The
degree of danger posed by mining into an active gas well are so grave that even
if most of the other IO Coal factors did not point towards unwarrantable
failure such a designation would still be appropriate. As the Commission has
noted, “when violations have exposed miners to extremely dangerous conditions,
the Commission has not always relied on most of the remaining factors.” Lafarge
Construction Materials, 20 FMSHRC at 1147 citing Midwest Material
Co., 19 FMSHRC 30, 34-37 (Jan. 1997).

4.     
Whether
the operator had been placed on notice that great efforts were necessary for
compliance or on notice that this was an issue.

The evidence supports
Respondent’s claim that it had never lost a gas well before and that MSHA had
never cited if for this condition or stated that the mapping or barrier
procedures were inadequate. I do not find this factor to be particularly
relevant to this determination.

5.     
The
operator’s efforts in abating the violative condition

Respondent abated the condition
shortly after the accident and also attempted to take steps to ensure that all
other gas wells were present. However, the issue of abatement is not
particularly important in this case. An accident had already occurred, and
Respondent had failed to take action before miners were placed in danger.

6.     
Operator’s
knowledge of the existence of the violation

As
noted previously, Respondent credibly argues that no one at the mine had actual
knowledge of the violative condition. (Respondent’s Post-Hearing Brief
at 38). Further, the Secretary concedes this point. (Secretary’s
Post-Hearing Brief at 31). However as with negligence, “[i]t is
well-settled that an operator’s knowledge may be established, and a finding of
unwarrantable failure supported, where an operator reasonably should have known
of a violative condition.” IO Coal Co., 31 FMSHRC at 1356-1357 (citing
Emery, 9 FMSHRC at 2002-2004). A supervisor’s knowledge and involvement is
an important factor in an unwarrantable failure determination. See Lopke
Quarries, Inc., 23 FMSHRC 705, 711 (July 2001) citing (REB
Enterprises, Inc., 20 FMSHRC 203, 224 (Mar. 1998) and Secretary of Labor
v. Roy Glenn, 6 FMSHRC 1583, 1587 (July 1984). Therefore, the issue with
respect to knowledge is whether Respondent should have known the violative
condition existed. As already shown in the negligence discussion, Respondent
should have known that the violations existed and further, had documentary
knowledge of the missing well.

In
light of the length of time the cited conditions existed, the extremely high
danger posed by the violations, the fact that Respondent did not abate this
condition until an incident had occurred, and Respondent’s knowledge of the
condition, a finding of unwarrantable failure is appropriate.

e. Penalty

Under
the assessment regulations described in 30 C.F.R. §100, the Secretary proposed penalties
of $70,000.00 for Order No. 8179158, $70,000.00 for Order No. 8179159, and
$60,00.00 for Order No. 8179160. While the Secretary’s proposal was duly
considered, under 30 U.S.C. §820(i), the power to assess a penalty is vested
with the Commission. That law also dictates several factors be considered
before an assessment is made. I evaluate each of those factors as follows:

(1)
The Operator’s history of previous violations – The operator had received
mapping violations in the past. However, the record is not clear about how
prevalent these particular violations were.

(2)
The appropriateness of the penalty compared to the size of the Operator’s
business – The evidence shows that Respondent had between 1,000-2,000 employees
and that this mine was very large. (Tr. I, 210). Therefore, it is a large
business.

(3)
Whether the Operator was negligent – As previously shown, the operator
exhibited high negligence and an unwarrantable failure to comply with all three
standards

(4)
The effect on the Operator’s ability to remain in business – The parties have
stipulated that the Orders at issue here would not affect Respondent’s ability
to remain in business.

(5)
The gravity of the violation – As previously shown, these violations were
highly likely to result in fatal injuries to ten persons.

(6)
The demonstrated good-faith of the person charged in attempting to achieve
rapid compliance after notification of a violation – The evidence shows the
condition was abated in good faith, but not until after an accident had already
occurred.

In
light of my affirmation of the Secretary’s designations with respect to
validity, negligence, and gravity, I hereby AFFIRM the originally
assessed penalties of $70,000.00 for Order No. 8179158, $70,000.00 for Order
No. 8179159, and $60,000.00 for Order No. 8179160

PRE-SHIFT
EXAMINATION ORDER

1.     
Order
No. 8182676

a.      
Contents
of the Order

On April 4, 2011 at 6:01 p.m.,
Inspector Mark A. Tuggle issued to Respondent Order No. 8182676. Tuggle found:

An
inadequate preshift examination has been conducted along the #1 Mains belt and
track area of this mine. The following conditions were found within 2 hours of
the last belt preshift examination along this belt: 1) a loose bolt was found
at crosscut 1 just inby the first air lock door immediately over the track
(citation 8182670) 2) there are 3 pieces of belt structure located at cross cut
11, 16, and 30 that have been completely cut in two pieces by the belt which
the belt is still contacting 2 of the stands and these stands are hot and/or
smoking from friction with the belt. Additionally, 2 damaged rollers were found
at cross cut 16 and cross cut 30 which had the bearings and ends missing on the
top rollers with the roller outer shell contacting and grinding on the metal
inner support shaft (citation 8182671) 3) There is a hole in the brattice which
is used to separate the main return air course from the active T-Section and
the belt/track neutral entry. This return was cited 2/14/11 for explosive
methane mixture (citation 8182672) 4) a second brattice located at cross cut 37
used to separate the same return/neutral entry also has a hole in it. (citation
8182673) 5) a second roof bolt was found at crosscut 66 ½ where the draw rock
has fallen from around the bolt leaving the bolt head 14 inches from the mine
roof, located directly over the main line track (citation 8182674)

These
condition have existed between 1 day (rollers damaged) up to 1 week (holes in
brattices, cut stands and roof bolts not supporting mine roof). This area is
preshifted on every shift. No foreman has found these conditions, corrected the
conditions, dangered these areas off or taken similar actions to prevent miners
from being exposed to these hazards. The damaged belt components present a
potential fire/smoke hazard, while the roof conditions present crushing
injuries hazard to miners and the breached in the 2 brattices make the
return/neutral stoppings not effective to isolate the two air course. By
existing a week, there has been up to 21 preshift examinations of this area.

These
conditions were easily visible from the track entry of this mine. The damaged
rollers and air rushing through the brattices could also be heard from the
track entry. All miners travel through this area as they enter or leave the
mine. All miners are exposed to the hazards found during this period.

Standard
75.360(a)(1) was cited 10 times in two years at mine 4406759 (10 to the
operator, 0 to a contractor).

(GX-2).
Tuggle noted that the gravity of this violation was “Reasonably Likely,” “No
Lost Workday/Restricted Duty,” and would affect six people. Id. The
Order was marked as S&S. Id. He further marked that Respondent
exhibited “High” negligence with respect to this violation. Id.

b. Legal Standards

Order
No. 8182676 was issued under Section 104(d)(2) of the Mine Act. That provision
provides the following:

If
a withdrawal order with respect to any area in a coal or other mine has been
issued pursuant to paragraph (1), a withdrawal order shall promptly be issued
by an authorized representative of the Secretary who finds upon any subsequent
inspection the existence in such mine of violations similar to those that
resulted in the issuance of the withdrawal order under paragraph (1) until such
time as an inspection of such mine discloses no similar violations. Following
an inspection of such mine which discloses no similar violations, the provisions
of paragraph (1) shall again be applicable to that mine.

30
U.S.C. § 814(d)(2).

The
Order deals with an alleged violation of 30 C.F.R. §360(a)(1) (titled “Preshift
Examination”). That section provides the following:

(a)(1) Except as provided in paragraph (a)(2) of
this section, a certified person designated by the operator must make a
preshift examination within 3 hours preceding the beginning of any 8-hour
interval during which any person is scheduled to work or travel underground. No
person other than certified examiners may enter or remain in any underground
area unless a preshift examination has been completed for the established
8-hour interval. The operator must establish 8-hour intervals of time subject
to the required preshift examinations. 

30
C.F.R. §360(a)(1)

  1. Summary of Testimony

a. Testimony of Mark Adam
Tuggle

At
the time of the hearing, Mark Tuggle was employed by MSHA as a rig and
impoundment specialist in Northern Virginia. (Tr. I, 30). He inspected longwall
and conventional coal mines. (Tr. I, 30). He started at MSHA in August, 2006
and became an authorized representative in September 2007. (Tr. I, 30). He
received training as a coal mine inspector. (Tr. I, 30). In April 2011, Tuggle
was a CMI (coal mine inspector). (Tr. I, 31).

Tuggle
received an Associate’s Degrees in basic engineering from Southwest Virginia Community College, a civil engineering degree from the University of South Alabama, and a BSET in mining engineering from Bluefield State College. (Tr. I, 32). He
was once certified in general and civil engineering. (Tr. I, 32). He began, but
did not complete, engineering training in Virginia. (Tr. I, 33). He had miner’s
cards (now lapsed) in Virginia, Kentucky, and Pennsylvania. (Tr. I, 34). He was
a certified blaster in Virginia and Kentucky. (Tr. I, 34).

Before
MSHA, Tuggle worked in the mines. (Tr. I, 31). He started working summers for
Consol and Alum Creek doing general utility. (Tr. I, 31). At Consol, Tuggle was
a general laborer: shoveling, building stoppings, running the scoop, and moving
belt. (Tr. I, 33). At Alum Creek he was an engineer, surveyed underground, made
maps, and surveyed new shafts. (Tr. I, 33). After graduating from college he
worked at Enlow Fork Mining in Pennsylvania from 1991 to 1993. (Tr. I, 31). At
Enlow Fork he was general underground working on the longwall, belts, and
maintenance and then worked in the safety department. (Tr. I, 31, 33). He then
worked for Republic Energy and was an engineer from 1993 until 2006. Tr. I,
31). At Rapoca, he was an engineer and surveyed underground. (Tr. I, 33). He
was never a foreman. (Tr. I, 98).

Tuggle
had experience in assessing the adequacy of roof control, mostly from
experience underground and investigating roof falls. (Tr. I, 34-35). However,
he did not work on roof control at any of his jobs. (Tr. I, 36). He also had
experience in assessing stoppings and ventilations systems and building
stoppings. (Tr. I, 35). To do so, Tuggle would look at the structure and see if
it was leaning or leaking. (Tr. I, 35). He also made ventilation system plans
for Rapoca’s mine. (Tr. I, 35). Tuggle’s experience with assessing the adequacy
of belt structure came from doing belt moves, working general labor, and with
MSHA. (Tr. I, 35-36).

Tuggle
conducted an inspection of Dominion Number 36 on April 4, 2011. (Tr. I, 39). To
prepare, Tuggle reviewed the Uniform Mine File and the mine plans. (Tr. I, 39).
He reviewed the maps and locations where the sections were at, reviewed past
citations and D-sequence events, and prior accidents.[20]
(Tr. I, 39). He also printed out a form for mine management to show percentage
estimates and top citations. (Tr. I, 39-40).

On
the day of the citations at issue here, there were three active working
sections and three portals (the Virginia, West Virginia, and CJ&L portals).
(Tr. I, 42-43). Tuggle entered the mine at the Virginia portal then traveled up
the mainline belt and track entry, and then up the U-section. (Tr. I, 43). That
was the only area he inspected that day, however he and another inspection
(probably Steve Hale) eventually inspected the entire mine.[21]
(Tr. I, 43-44).

Tuggle
reviewed a D-2 order[22]
he wrote and issued his first day at the mine (GX-2).[23]
(Tr. I, 44-45). The Order was issued under §75.360(a)(1) for inadequate
pre-shift examination conducted by T.J. Howington. (Tr. I, 45-46). Tuggle was
not sure when Howington began his pre-shift examination, but it occurred three
hours before the start of the next shift. (Tr. I, 46). Tuggle arrived at the
mine at 1:50 p.m., which was before that shift. (Tr. I, 46). He was also not
sure when Howington completed the pre-shift examination. (Tr. I, 46-47). Howington
did not record any conditions or hazards on the pre-shift examination. (Tr. I,
50). On cross examination, Tuggle admitted that Howington said he examined the
area between noon and 3:00 p.m. and there is no information to contradict that
claim, just the missing DTI’s. (Tr. I, 100). Howington had performed the
examination, he just forgot to sign the book. (Tr. I, 128).

Pre-shift
examinations are conducted to ensure the safety of miners entering or working
underground, to make sure no hazardous conditions are present. (Tr. I, 52-53). It
is essential to the safety of men working in the mines. (Tr. I, 90). An outby
preshift examination would include looking for roof and rent conditions in the
belt and track entry, the belt itself, lifeline hazards, draw-rock, damaged rollers,
damaged belt structure, accumulations of coal, float coal dust, hazardous
tracking conditions, any travel mine, gas readings at power centers, methane,
oxygen deficiency, damaged timbers, escapeways, fire suppression, and any
hazard that could cause harm to a miner. (Tr. I, 36-38, 53, 99-100). A
pre-shift would also cover refuge chambers; including the spotter, pressure
readings, gas check, and conditions around it. (Tr. I, 37). However, Tuggle had
no personal experience with pre-shift examinations. (Tr. I, 34, 98).

An
inadequate pre-shift would prevent miners from noticing hazards and could lead
to fire, crushing injury, roof fall, damaged track, lifelines not functional,
unusable refuge chambers, and other issues. (Tr. I, 90). To write an order for
failure to conduct a pre-shift examination, the inspector must find conditions
present that a normal examiner should have seen. (Tr. I, 51-52). There must be
reason to see the condition; obvious signs, sounds, or clear visibility. (Tr.
I, 52). There can also be an order if the examiner obviously did not enter the
area. (Tr. I, 52). On cross examination, Tuggle conceded that there is an
element of judgment with a pre-shift examination and there is no definition of
“hazardous condition.” (Tr. I, 126-127). Of the 2,800 feet of belt, 80
stoppings, and 2,800 roof bolts Tuggle found only five conditions. (Tr. I,
127-128). But that is a lot for 2,800 feet. (Tr. I, 128).

In
order to determine a violation is an unwarrantable failure there must be
conditions that should have been seen or something that is obvious with no
action taken. (Tr. I, 55). In this case, there were several: holes in stoppings
that created audible air rushing, damaged rollers clanking like a cow bell, the
smell of smoke on the track, visible smoke, structure bouncing, belt splices
catching, and roof faults hanging from the top.[24]
(Tr. I, 55). Tuggle testified at length about each condition he observed.[25]
(Tr. I, 55-89).

The
first condition Tuggle found was a loose roof bolt at cross-cut one, just inby
the first airlock door immediately over the track (Citation No. 8182670). (Tr.
I, 56, 58). All mine traffic passed through this area. (Tr. I, 58). He noticed
the condition when they were closing the air-lock door. (Tr. 58-59, 106-107). This
was a recordable hazard. (Tr. I, 56). Tuggle was not sure how long this
condition lasted but it was at least a couple of days. (Tr. I, 57). He knew
this because several layers of rock dust had accumulated on the roof-bolt
plate, a condition that takes time.[26]
(Tr. I, 57). The bolt was a glue bolt so it still provided some beaming
properties in the strata above, but the immediate skin was not supported.[27]
(Tr. I, 57-58, 107-108). The plate was 5.5 inches from the roof, meaning the
draw rock had fallen and the bolt was never tightened. (Tr. I, 58, 106-108). This
condition created an unsupported area measuring six feet by nine feet and could
have resulted in a draw-rock fall that would injure miners. (Tr. I, 58-59). He
did not know how long the bolt was. (Tr. I, 107). On cross examination, Tuggle
conceded that bolts in the mine were close to a four-by-four bolting pattern,
meaning four rows across, four bolts every four feet or 2,800 total bolts in
the Number 1 Entry. (Tr. I, 105-106). He found only two damaged bolts amongst
the 2,800 total. (Tr. I, 106).

Tuggle
stated this condition was reasonably likely to result in “lost
workday/restricted duty” injuries to two persons. (Tr. I, 59, 61). Injury was
reasonably likely because the cited condition was located directly above the
main track in an area where mantrips entering and leaving the mine must stop. (Tr.
I, 61-62). The injuries would result from crushing, which could be fatal
depending on the size of the rock. (Tr. I, 62-63). He marked this citation as
Significant and Substantial (“S&S”) because most mining injuries are from
lack of skin control. (Tr. I, 63). He also marked the citation for moderate
negligence because every foreman (section foreman, pre-shift examiner, belt
boss, mine superintendent, and mine foreman) had to go in that area when
entering or exiting the mine. (Tr. I, 61-62). He believed two people would be
injured if the fall struck the bus. (Tr. I, 62). This citation was not
contested and was paid. (Tr. I, 56). Respondent abated by adding a header around
the bolt to provide skin control. (Tr. I, 124-125). As far as Tuggle knows, the
bolt is still there. (Tr. I, 125).

The
second condition Tuggle observed consisted of three pieces of belt structure at
crosscuts 11, 16, and 30 that had been cut in two by the belt (Citation No.
8182671). (Tr. I, 63-64). Two of the belts were still contacting the stands and
were hot and/or smoking from the friction. (Tr. I, 63). Belt smoking can occur
in a matter of minutes. (Tr. I, 126). There were
two damaged rollers at crosscut 16 and 30. (Tr. I, 63). The rollers had
bearings and ends missing from the top rollers and the outer shells were
grinding on the metal support shafts. (Tr. I, 63).

At
crosscut 11, the belt had completely cut through the structure. (Tr. I, 67). A stand
is shaped like an “H” and the belt had cut into it on the right side rail and
it was putting the belt in a bind. (Tr. I, 67). This condition lasted several
hours, perhaps even a day or two, though there was no way to tell exactly how
long. (Tr. I, 66, 121-122).

At
crosscut 16, the stand was ready to fall and there was a bad or damaged top
roller. (Tr. I, 68). The bearing end of the roller was ground off and the
roller was grinding on the inner support shaft. (Tr. I, 68). The structure was
cut in two. (Tr. I, 68). The stand was taking weight and starting to twist. (Tr.
I, 68). This created a sound like a clanging cow bell. (Tr. I, 69-70). Also,
one top roller’s bearings were completely gone the roller was grinding directly
onto the support shaft. (Tr. I, 68). These conditions lasted several hours, perhaps
even a day or two, though there was no way to tell exactly how long. (Tr. I,
66). He does not believe the twisting if the rails would happen in less time. (Tr.
I, 120).

At
crosscut 30 another structure was cut in two and was smoking. (Tr. I, 65, 70).
Respondent had put up another piece of structure to allow production to
continue without removing the damaged stand. (Tr. I, 65-66, 70, 125). All belt
work and maintenance is done on the midnight shift. (Tr. I, 125-126). Further,
the belt had pulled the damaged stand under the belt where it was cutting
splices out of the belt. (Tr. 70). There was also a damaged top roller at this
location. (Tr. I, 70). This condition had existed for several days as shown by
the fact that Respondent added more structure rather than replacing the damaged
structure and because there was rock dust and litter around the foot area. (Tr.
I, 65, 72).

This
condition was a fire hazard from belt friction and from metal-on-metal grinding
at the rollers and also a carbon monoxide hazard. (Tr. I, 64, 70-71). This belt
carried coal from all the sections, plus coal from the Chad Jolo Mine. (Tr. I,
64). A fire could occur from the belt heating up the coal or from damaged
structure touching the belt. (Tr. I, 71). There was a fire suppression system
(including water) on this structure, but only at the drives, not at the middle
of the belt where the condition was located. (Tr. I, 71-72, 114). Tuggle could
not say if the belt was or was not fire resistant as the regulation requiring
such belts was not fully enacted at that time. (Tr. I, 114). In addition, with
the belt moving, hanging, and twisting, there could be more problems inby and
outby. (Tr. I, 71). Finally, if a miner was near the structure when it gave
way, it could cause injury. (Tr. I, 71).

The
reasonably likely injury from these conditions would be lost workday/restricted
duty from fire, smoke, or crushing injury. (Tr. 71). Tuggle believed only a
miner shoveling the belt would be affected, but if the fire was big enough it
could affect everyone at the mine. (Tr. I, 72). Tuggle marked this condition as
“reasonably likely” because there were three damaged stands, two of which were
smoking, and two damaged rollers. (Tr. I, 72). He marked this condition as
S&S because an accident was reasonably likely. (Tr. I, 73-74). Under normal
mining conditions all of the splices would rip out and there could have been a
fire. (Tr. I, 74). He marked the cited condition for “moderate negligence” because
the conditions were located immediately beside the track entry where examiners
travel in and out and all foreman would travel. (Tr. I, 73). Also, the damaged
rollers were audible and the structure could be seen jumping. (Tr. I, 73).

The
third condition Tuggle observed was a hole in a stopping at crosscut 16
(Citation No. 8182672). (Tr. I, 74, 77). The stopping was about six feet tall
and eighteen feet wide, or about a hundred and twenty square feet. (Tr. I,
114-115). He could hear a loud rushing sound like a compressor two crosscuts
before the condition. (Tr. I, 74-75). However, he would not disagree that
Howington could not hear clearly on the manbus. (Tr. 119-120).

The
hole in this stopping measured 16 inches long and three and a half inches wide
where a wedging had fallen into the return from the top. (Tr. I, 115-116). However,
this stopping was also leaning, ready to fail, and the plaster was cracked so
air was leaking around each individual block as well, but there was no way to
measure this amount. (Tr. I, 175, 116-117). This stopping separated the neutral
air of the track entry from the main return. (Tr. II, 76, 115, 117). The
condition short-circuited air into the return and aversely affected the return
from the active T-section. (Tr. I, 75). The stopping was located 16 crosscuts
inby the main return fan and, had it failed, it would have reversed the air
going up the belt/track entry and eliminated all return on the active T-section
where miners were working. (Tr. I, 75-76). However, Tuggle did not have a “pedo
tube” to measure the pressure differential between the neutral and the return,
did not do a smoke test, and did not do any other kind of test. (Tr. I,
116-117). Tuggle conceded that air in the neutral would go to the face and then
come down the return. (Tr. I, 118).

The
condition existed for several days because, in reviewing the mine history,
Tuggle learned that the main return had been roofed out with water and the fan
had created a giant vacuum that could pull out the stopping. (Tr. I, 77). It is
possible for airflow to make a stopping bow; this is based on common sense. (Tr.
I, 126). While he conceded he could say exactly when the condition occurred,
there was no way that the condition occurred after Howington’s exam, because
the area contained draw rock covered with rock dust. (Tr. I, 118-119).

Tuggle
testified that this condition would lead to lost-workdays/restricted duty
injury because the T-section had, in the past, had methane gas build up to
explosive level and the return had previously filled with water. (Tr. I,
77-78). If the stopping failed, there would be no actual ventilation on the
T-Section. (Tr. I, 78). This condition affected one person because the brattice
was still intact, but if it failed it would affected everyone on the section. (Tr.
I, 78). Tuggle believed that the condition was reasonably likely to create an
injury because the stopping was already leaning and bowed, so it was not
stable. (Tr. I, 79). The condition was S&S because it could have resulted
in an explosion on the T-section. (Tr. I, 79). Also, there was a CO monitoring
system along the belt-line. (Tr. I, 112-113). That system can pick up five
parts per million (“PPM”) of CO and could issue an alert and sound an alarm at
ten or fifteen PPM. (Tr. I, 113). While Tuggle conceded monitor was functioning
on the day of the citation, tuggle believed a short-circuit of air would have
rendered the CO system useless and would eliminate warnings at the face. (Tr.
I, 79-80, 112-113). This citation was marked for “moderate negligence” because
the sound of air going through the stopping could be heard over the belt,
people talking, and the equipment. (Tr. I, 79). Also, the condition was located
right next to the track. (Tr. I, 79).

The
fourth condition cited was another hole in a stopping at crosscut 37 (Citation
No. 8182673). (Tr. I, 80). This was in the same return and entry as the last
condition. (Tr. I, 81). The hole was sixteen inches long by three inches high
from a missing wedge at the top of the stopping. (Tr. I, 81, 110). The stopping
itself was five and a half feet to six feet tall and 18-20 feet wide and was
plastered. (Tr. I, 110-111). The condition could
be heard over the sounds of the belt and manbus. (Tr. I, 81). Anyone entering
or leaving the mine passed this area. (Tr. I, 81-82). If there were an
emergency, this would be the escape route. (Tr. I, 82).

The
hazard here was loss of ventilation to the face of T-section and the loss of
the CO system along the belt line. (Tr. I, 82). (Tr. I, 111). On cross examination,
he conceded that there were two sources of air to the T-Section. (Tr.
(111-112). There was just a small leak and if the air made it to the face it
would go down that return anyway. (Tr. I, 112). This condition had existed
several days because dust was visible inside the hole and pooling. (Tr. I, 82).

Tuggle
marked the citation as lost-workdays/restricted duty because the condition
could have short-circuited and allowed methane to build up or for CO to go
unmonitored. (Tr. I, 83). Tuggle modified this citation from “reasonably
likely” to “unlikely” and S&S to Not S&S because the brattice was till
stacked properly, the cap wedges and half-headers (which create stability) were
still there, and it was tight on the ends. (Tr. I, 83). Tuggle marked this
citation as “moderate” negligence because it was located directly beside the
track entry and it could be heard over a crosscut away over the belt and
manbus. (Tr. I, 84). Every foreman would travel passed this area. (Tr. I, 84).

On
cross-examination Tuggle conceded that the belt in the cited entry was roughly
2,800 feet long. (Tr. I, 102-103). If the mine had seventy-foot centers, there
would be about forty stoppings on each side, so an examiner would pass 80
stoppings. (Tr. I, 103-104). The only light an examiner has is the two manbus
lights and his headlamp. (Tr. I, 104-105). These were the only two problems
noted in those stoppings. (Tr. I, 109-110).

The
fifth condition was a roof bolt falling at crosscut 66 ½, 2,000 feet from the
first bolt, directly over the main track (Citation No. 8182674). (Tr. I, 84,
87, 108). Draw rock had fallen from around the bolt leaving the bolt head 14
inches from the roof on a bolt that was 4-6 feet long. (Tr. I, 84-86, 108-109).
Fourteen inches is a lot because it indicates the immediate area was pretty
ratty and left an unsupported area seven feet six inches by seven feet six
inches. (Tr. I, 86-87). This condition had existed for several days because the
area where the draw rock had fallen was not fresh and the roof was dusted. (Tr.
I, 84-85). This observation was not in his notes, just his recollection. (Tr.
I, 85). As with the first bolt, this was a resin bolt, so there would be
beaming, so the hazard would be limited to draw rock. (Tr. I, 109).

An
accident was reasonably likely because every ride would travel this area. (Tr.
I, 87-88). Two people sitting on the end of a manbus would be affected. (Tr. I,
87). This condition was S&S. Tr. (I, 88). This citation was marked for
moderate negligence because there was obviously 14-inches of bolt hanging and
every foreman traveled the area every shift. (Tr. I, 87). This condition was
abated when the bolt was replaced. (Tr. I, 125).

In
determining the violation existed, Tuggle considered the area the examiner was
required to check, the conditions he found, and the fact that it was apparent
that DTIs were being added but the conditions were not actually being observed.
(Tr. I, 88, 94). The examiner was required to cover a vast amount of area and
did not have time to conduct the exam properly. (Tr. I, 88). It would take
“hours upon hours” to examine the “miles of belt” and other areas required to
be checked by the examiner. (Tr. I, 94-95). Tuggle did not blame miners for
these conditions. (Tr. I, 95). Two months before this Order, Tuggle told
Respondent that it did not have enough miners to run the mine properly. (Tr. I,
95). Respondent did not correct this problem until after the D-2 order. (Tr. I,
95-96). Tuggle conceded that after the conversation a new superintendent, Rick
Lawson (“Lawson”), was brought in and there was a new foreman, but only because
the previous superintendent was promoted. (Tr. I, 122). Tuggle referred to
Lawson as a “superman” and stated that Howington was a good worker. (Tr. I,
122). He also agreed that mine foreman Ron Helton (“Helton”) was a good and
conscientious man. (Tr. I, 123). He did not criticize mine management. (Tr. I,
123). He does not know why no violations were listed on the pre-shift. (Tr. I,
95). The adequacy of the pre-shift did affect the health and safety of miners
as they were exposed to all these conditions every time they entered or exited
the mine. (Tr. I, 96-97).

He
marked the subject order as reasonably likely because there were so many
conditions present. (Tr. I, 90-91). He also marked it as “lost
workdays/restricted duty” because it paralleled the conditions noted in the
underlying citations. (Tr. I, 90). Six persons would be affected because if the
stoppings were to fail, then air would be lost to the six miners off of the T-Section.
(Tr. I, 91). This condition was S&S because any of these conditions could
have caused a fatal injury. (Tr. I, 92). There could have been a fire, a
crushing injury, or an explosion. (Tr. I, 92).

Tuggle
marked this order for “high” negligence because the damaged rollers were
audible, the broken brattices were audible, and all of the conditions were
along the main travelway where the examiner traveled. (Tr. I, 91). Also, all
foreman and management would travel this same way, meaning there were opportunities
for many people to see these conditions and danger them off or correct them. (Tr.
I, 91-92).

Tuggle
believed the condition had existed for several days. (Tr. I, 92). He was
especially sure that several days had passed with respect to the bolt at 66 ½
and where a second piece of structure was placed but the damaged structure
remained. (Tr. I, 93). This also showed that management was aware of the
condition. (Tr. I, 93). However, the Order was written only for the immediate
pre-shift prior to the inspection because there were no DTIs at the belt. (Tr.
I, 93).

b. Testimony of Timothy J.
Howington, Jr.

Timothy
Howington graduated from high school in 1999 and began in the mines in 2001.[28]
(Tr. I, 131). He began working for Abby Contract at Dominion 36 doing general
manual labor. (Tr. I, 132). He became certified to conduct pre-shift
examinations in 2010 and was trained to do belt examinations by David Adair. (Tr.
I, 133-134). Adair got Howington familiar with the mine: showing him the
mainline and each section, the belt drives, the power centers, and the face. (Tr.
I, 134). Howington learned what to look for and where to travel. (Tr. I, 134). Adair
knew his stuff and Howington felt properly trained. (Tr. I, 134-135). On cross
examination, he conceded that he could not recall when in 2010 he was certified
to do examinations, but it may have been less than a year at the time at issue.
(Tr. I, 162-163).

Howington
recalled working the day shift on April 4, 2011 and the violation being issued.
(Tr. I, 136, 138). However, he did not specifically recall the instant
pre-shift. (Tr. I, 162). Generally, he conducted the pre-shift for the oncoming
evening shift starting at around noon. (Tr. I, 136). He started then because it
had to be completed by 3:00 or 3:30 p.m. when the evening shift arrived. (Tr.
I, 136). It took three hours to conduct the pre-shift because the area was
enormous, it was a mile long. (Tr. I, 163). He was probably in the area cited
around 2:30 and 3:00 p.m., unless he had help. (Tr. I, 155). He only
occasionally had help. (Tr. I, 163-165). When he received help, the task was
easier. (Tr. I, 164). He was confident in his abilities, but it was a big mine.
(Tr. I, 164).

He
started the examination on T-section at the T-6 drive. (Tr. I, 138). He then
left the T-section and dated everything on the T-section. (Tr. I, 138). He then
went back towards U-Section and date the five belt drives there. (Tr. I, 138). Then
he would head outside at West Virginia where his last date board was located. (Tr.
I, 138-139). This route allowed him to finish before the next shift started and
avoid running into the new shift. (Tr. I, 139). Then he would go back through
the mine and get outside down the mainline. (Tr. I, 139). He took the report
for the exam outside and filled out the book himself at this time. (Tr. I,
137).

During
his examinations, Howington would look for hazardous conditions and violations
including bad rollers, belt rubbing the stand, the belt itself, draw rock on
the top, roof conditions, the flow of air, and accumulations. (Tr. I, 139-140,
142). He had been taught to look for these things. (Tr. I, 140). He would
travel on a manbus and use the light from his cap. (Tr. I, 139). He did not fix
his eyes on one spot, but tried to look around. (Tr. I, 143). He would get off
of his manbus and look around at the belt drives, the power centers, and broken
belts. (Tr. I, 141). He took this task seriously because he was looking out for
every other person in the mine and he took pride in his job. (Tr. I, 140). He
rode the manbus for the examination because the area was so big. (Tr. I,
163-164).

He
also recalled the five conditions cited by Tuggle. (Tr. I, 141). With respect
to the cited stoppings, a condition would have to be pretty loud to hear while
riding on the manbus, as the manbus and the belts are loud. (Tr. I, 142, 165). The
manbus makes a metal on metal sound and the belts make a lot of sound. (Tr. I,
142-143). While traveling, Howington looks at stoppings to ensure there are no
big holes, stoppings out, or anything effecting ventilation. (Tr. I, 149-150). He
looks at the stoppings with his light, he does not stop at every stopping. (Tr.
I, 150). The entry also had stoppings every 70 feet on both sides. (Tr. I,
148). Traveling inby the stoppings on the left were 10 feet away and the ones
on the right were 15-20 feet away, on the other side of the belt. (Tr. I,
148-149).

Howington
had seen missing wedges in the top of a stopping before. (Tr. I, 156). It
occurs when the plaster gets dry and breaks apart and air blows out the wedge. (Tr.
I, 156). This can happen at any time. (Tr. I, 156). The stoppings were about 50
inches high and 18-20 feet wide. (Tr. I, 158). It is not easy to see a
three-inch by 16-inch hole moving down the entry in a manbus. (Tr. I, 158-159).
The second brattice was in the same return and could have happened in less than
a minute. (Tr. I, 159). It would also not be easy to spot. (Tr. I, 159-160).

With
respect to bolts, the cited entry was about 43 breaks (2,800 feet) long. (Tr.
I, 145). The bolts in this area were five across and four feet apart in a 20-22
foot-wide entry. (Tr. I, 145-147). The bolts were 42 and 48 inches long and had
resin. (Tr. I, 146). There were 2,800 bolts in the entry and it would be
impossible Howington to look at all of them. (Tr. I, 147). When he travels, he
is not only looking at bolts, but everything else. (Tr. I, 147-148). He also
examined Two other belt entries. (Tr. I, 144).

The
first condition in the Order was a loose bolt. (Tr. I, 150). Howington looked
at the bolts but did not see this one. (Tr. I, 150-151). He sometimes sees
bolts where draw rock has dropped away. (Tr. I, 151). These do not provide
support. (Tr. I, 151). To fix it, he takes a couple of “half-headers” and
wedges them between the plate and the roof; the bolt is not removed but stays
cemented. (Tr. I, 151). Howington did this occasionally. (Tr. I, 151). The
fifth condition was also a roof bolt that Howington did not see. (Tr. I, 160). It
takes no time for draw rock to fall. (Tr. I, 160). The bolt did not have to be
removed; it still had the resin glue. (Tr. I, 160). This could be corrected by
wedging in half-headers. (Tr. I, 160).

Finally,
Howington discussed belts. He had seen problems with the belt in the past. (Tr.
I, 152). Belts may begin rubbing at any time from a bad splice or something
else. (Tr. I, 152-153). Belts can be knocked out of line when a splice contacts
a roller and this will cause the belt to run side to side. (Tr. I, 152-153). It
is also possible for the structure to bend or break in two. (Tr. I, 153). With
respect to holes or damage to rollers, such a condition may take awhile but he
was not sure. (Tr. I, 153-156). Rollers can be good one minute and bad the
next. (Tr. I, 156). He could not always hear problems with the belt. (Tr. I,
165). If he noticed bad structure he stopped the bus, called outside to tell
them he was shutting the belt down, then he knocked the breaker at the power
center, and replaced the structure. (Tr. I, 154).

Howington
understood that this case was about citations issued for things he missed on
the pre-shift. (Tr. I, 161). He tried to do the best he could when doing
pre-shifts, including checking for hazards and violations. (Tr. I, 161). He did
not believe he was highly negligent. (Tr. I, 161). The conditions would not
have been easy to see. (Tr. I, 161-162). However, he conceded that all of the
cited conditions could have been present during his examination. (Tr. I, 163).

c. Testimony of Ronald
Helton

At
the time of the hearing, Ronald Helton had worked in the mines for almost 13
years and worked for Suncoal. (Tr. I, 167). He was certified to conduct belt
examinations. (Tr. I, 167). In April 2011 he worked at Dominion 36 on the third
shift.[29]
(Tr. I, 167-168, 177). He did not recall if he was pre-shifting outby areas or
active working sections at the time or if he conducted a pre-shift prior to the
one at issue here. (Tr. I, 177-178).

Helton
took conducting pre-shift examinations seriously because he checked for hazards
and violations and because of his training. (Tr. I, 168). That classroom
training was conducted by Van Dyke and Helton also picked things up from other
places. (Tr. I, 169). In order to conduct a pre-shift, Helton would check
utility belts, look for bad rollers, bad belt, roof conditions, accumulations
and rubbing. (Tr. I, 169-170). Helton would ride a mantrip during his
pre-shifts, a process authorized by MSHA. (Tr. I, 170).

Helton
reviewed the Order at issue. (Tr. I, 170). The first condition was a loose bolt
at crosscut 1 by the first airlock door over the track and there was another
loose bolt at crosscut 66 ½ where draw rock had fallen out. (Tr. I, 171). Helton
had seen such conditions during pre-shifts before and he saw these he would
have put header boards above them. (Tr. I, 171). Draw rock can fall from around
a bolt at any time and it can happen quickly. (Tr. I, 172).

The
Order notes that three pieces of belt structure damaged at crosscut 11, 16, and

  1. (Tr. I, 172). Two pieces were cut by the belt and the belt was causing
    friction and smoke on two stands. (Tr. I, 172). As an examiner, Helton would
    never walk by something that was smoking and not fix it. (Tr. I, 172). Helton
    had seen belts wobble or move, various thing cause this including crooked
    splices, broke belts, or upside belts. (Tr. I, 172-173). This condition can
    occur very quickly. (Tr. I, 173). Belt can wobble out of alignment, cut into
    structure, and then go back into alignment. (Tr. I, 173). He also noted that
    the belts are miles long. (Tr. I, 172).

The
Order also notes two damaged rollers at crosscuts 16 and 30 with bearings and
ends missing on the top rollers and the roller outer shell contacting and
grinding on the metal support shaft. (Tr. I, 173). Helton had found and removed
damaged rollers during pre-shifts. (Tr. I, 173). Bearings go out quickly, even
on a new roller, causing the roller to wear out. (Tr. I, 174).

The
Order also noted two places where there were holes in the brattices. (Tr. I,
174). This condition can happen at any time from vibrations and the earth
moving. (Tr. I, 174-175). Helton had seen and corrected similar conditions
during pre-shifts. (Tr. I, 175). He would not be able to hear air going through
the hole while on the mantrip. (Tr. I, 175-176). Helton has never had problems
doing a pre-shift from the mantrip. (Tr. I, 176).

On
cross examination, Helton conceded that he did not recall Tuggle’s inspection
or the five conditions cited. (Tr. I, 177-178). He would have noted the
conditions as hazardous if he had seen them. (Tr. I, 178)

  1. Contentions of the Parties

The
Secretary contends that Order No. 8182676 was validly issued, was the result of
high negligence and an unwarrantable failure (“UWF”), was S&S, and had
appropriate penalties. (Secretary’s Post-Hearing Brief at 31-43). Specifically,
the Secretary argues that this violation was valid because Respondent’s
pre-shift examiner failed to notice five separate obvious hazardous conditions
during a pre-shift examination. (Id. at 31-33). The Secretary argues
that this condition was S&S because there was a violation of a mandatory
standard, that violation could lead to numerous safety hazards including roof
fall or fire, all five underlying violations were reasonably likely to occur,
and four out of the five were likely to result in serious injury. (Id. at 33-34). The Secretary also argues that this condition was UWF because it was
obvious, extensive, over a large area, existed for some time, and Respondent
had prior warning. (Id. at 34-37). Finally, the Secretary contends that
the penalty was appropriate considering Respondent’s history, size, negligence,
business strength, abatement, and the gravity of the violation. (Id. at 38-44).

Respondent
contends that Order No. 8182676 was invalid, was not the result of negligence,
was not a UWF, and was not S&S. (Respondent’s Post-Hearing Brief at
46-62). Specifically, Respondent argues this violation was not valid because
the pre-shift examiner testified that he had conducted the examination
thoroughly and the Secretary presented no evidence to show that he did not. (Id. at 54). Respondent also argues that the negligence was not hight because the
conditions were not obvious, there was no evidence that the examiner ignored
conditions, and the conditions could have occurred at any time. (Id. at 56-58). Finally, Respondent argues that this situation meets none of the
requirements for a UWF designation. (Id. at 59-62)

4.
Findings and Conclusions

a. Validity

Order
No. 8182676 was validly issued. An operator commits a violation of 30 C.F.R. §75.360(a)(1) when it
fails to conduct an adequate pre-shift examination within three hours preceding
the beginning of any eight-hour interval during which any person is scheduled
to work or travel underground. Under §75.360(b) an examiner must inspect for,
amongst other things, “hazardous conditions.” An inspector’s determination that
a pre-shift examination was inadequate is subject to review under “an objective
test of whether a reasonably prudent person, familiar with the mining industry and the
protective purposes of the standard, would have recognized the hazardous
condition that the regulation seeks to prevent.” Utah Power & Light Co.,
12 FMSHRC 965, 968 (May 1990), aff'd, 951 F.2d 292 (10th Cir. 1991)
(citation omitted). The Commission has held that the terms of §75.360 are
“unambiguous” and are of “fundamental importance in assuring a safe working
environment underground.” Buck Creek Coal, 17 FMSHRC 8, 15
(Jan. 1995); see also Jim Walter Resources, Inc., 28 FMSHRC 579, 598
(Aug. 2006). Therefore, review of the validity of Order No. 8182676 turns on
whether a reasonably prudent person, familiar with the mining industry and the
protective purpose of §75.360(a)(1) would have recognized that circumstances
were present in the area covered by the pre-shift examination that constituted
“hazardous conditions.”

In
the instant case, Inspector Tuggle conducted an inspection of the mine on April
4, 2011. (Tr. I, 39). It is undisputed that during that inspection Tuggle wrote
five citations for hazardous conditions along the mainline belt and track
entry. (Tr. I, 43, 59-60). It is further undisputed that Respondent did not
contest those five citations and paid the penalties assessed thereto without
modification. (GX-3). In fact, Helton conceded at hearing that these conditions
were hazardous within the meaning of the standard. (Tr. I, 178). Under Old
Ben Coal Company, uncontested violations are final orders of the Commission
and if the penalty has been paid, the operator’s right to contest the
violations has been extinguished. Old Ben Coal Company, 7 FMSHRC 205,
209 (Feb. 1985). It is further uncontested that Respondent’s pre-shift
examiner, T.J. Howington, did not record any of these five conditions in
pre-shift book and did not correct them. (Tr. I, 51). Therefore, I find that
the Respondent has conceded that the five hazardous conditions cited by
Inspector Tuggle exist and, as a result, Respondent violated 30 C.F.R.
§75.360(a)(1) by failing to record or correct them.

Respondent
cites to Cyprus Cumberland Resources, to argue that suspicion that a
hazardous condition may have existed at the time of the pre-shift examination
is not sufficient to establish a violation of §75.360. Cyprus Cumberland Resources, 18 FMSHRC 1271, 1278 (Jul. 1996) (ALJ Melick). Respondent notes
that Inspector Tuggle was not present at the time of the pre-shift examination,
a point that is not contested. Further, it points to Howington’s testimony that
he did not see any of the cited conditions. In essence, it argues that because
Tuggle was not present for the pre-shift examination and Howington testified
that it was properly conducted, there is no evidence that the conditions
existed during the examination.

Respondent’s
reading of Judge Melick’s decision in Cyprus Cumberland Resources does
not stand up to scrutiny. Judge Melick did not hold that an inspector must be
present when a pre-shift examination or that the examiner admit the examination
was inadequate in order to issue a citation. If he had that decision would be clearly
erroneous. Such a holding would render any citation for pre-shift examination
invalid so long as the examiner stated he followed the law. Instead, Judge
Melick simply stated that in his opinion there must be more than speculation to
support a pre-shift violation.

In
the instant case, the Secretary showed, by a preponderance of evidence, that
the conditions existed during the pre-shift examination and were not recorded
or corrected. Inspector Tuggle testified that that the first loose roof bolt
had been present since before the last examination because rock dust had
accumulated on the roof plate. (Tr. I, 57). Similarly, the roof near the second
loose bolt had dust that was not fresh. (Tr. I, 84-85). He testified that it
would take a day or two for the belt to cut all the way through the belt
structure. (Tr. I, 66). He testified that the first hole in stopping at
crosscut 16 may have existed for several days given the flood issues that
occurred in the mine. (Tr. I, 77). Finally, he testified that the hole in the
stopping at crosscut 37 contained visible, pooling rock dust and therefore had
existed before the examination. (Tr. I, 82). Howington even conceded that the
conditions could have been present during his examination. (Tr. I, 163).

I
found the Inspector Tuggle’s testimony was credible with respect to the amount
of time the conditions existed. Furthermore, in order to reject the Secretary’s
explanation of the condition would require that I would have to believe the
following scenario:

Between
roughly noon and 3:30 p.m. Howington conducted a pre-shift examination,
specifically checking the area cited between 2:30 and 3:00 p.m., and found that
the area was pristine. (Tr. I, 136, 155, 163). However, as soon as Howington
left the cited area, it rapidly, almost cartoonishly, degenerated. Within an
hour or so of Howington’s examination of the cited area, a host of hazardous conditions
suddenly appeared. At the airlock door, a roof bolt became loose, at crosscut
11 the belt cut into the belt structure, at crosscut 16 the belt structure was
cut in two by the belt and the rollers were grinding on the support shaft, at
crosscut 30 the belt structure was cut in two and began to smoke, at crosscut
16 a hole developed in the stopping and the stopping began to lean over, at
crosscut 37 another hole developed in the stopping, and at crosscut 66 1/2
another bolt failed. After that hour, Tuggle arrived and cited the conditions
(which Respondent conceded existed).

I
find that such a bizarre series of events was unlikely. It was far more likely,
and the preponderance of evidence supports, that the cited conditions existed
for some time but were either not noticed or not reported by Howington.
Therefore, Respondent’s examination was not adequate and the Order was valid.

b.
Gravity and S&S

With
respect to Order No. 8182676, the
event against which the standard, 30 C.F.R §75.360(a)(1), is directed is basically any hazardous condition. The
Commission has recognized preshift examinations as “of fundamental importance
in assuring a safe working environment underground.” Buck Creek Coal, 17 FMSHRC 8, 15 (Jan. 1995); see also Jim Walter Resources,
Inc., 28 FMSHRC 579, 598 (Aug. 2006). Chairman Jordan and Commissioner
Marks have referred to the preshift inspection requirement as “the linchpin of
Mine Act safety protections.” Manalapan Mining Co., Inc., 18 FMSHRC
1375, 1391 (Aug. 1996) (Jordan and Marks, concurring and dissenting in part). “The
preshift examination is intended to prevent hazardous conditions from
developing.” Enlow Fork Mining Co., 19 FMSHRC 5, 15 (Jan. 1997). The
standard seeks to ensure that safety hazards from causing injury by encouraging
operators to report and correct those hazards first. In the instant case, Inspector Tuggle credibly testified that
this condition was reasonably likely to result in lost workday/restricted duty
injuries to six persons. (Tr. I, 90-93). Furthermore, Respondent conceded that
the five individual conditions cited were validly issued and that four of the
five were reasonably likely to result in serious injuries to six persons. Therefore,
inspector Tuggle’s determination with respect to the gravity of the cited
danger is appropriate.

Further
Inspector Tuggle’s designation of S&S is clearly correct. The first prong
of Mathies is satisfied with respect to this violation for the reasons
discussed above.

The
second prong, that a discrete safety hazard was contributed to by the
violation, is also met. The law requires an adequate pre-shift to check for all
dangers that might occur in the mine. In this case, an adequate pre-shift would
have found roof fall danger from loose roof bolts, the risk of fire from belt
friction and broken rollers, and the risk of loss of ventilation or carbon
monoxide build-up from damaged stopping. All or one of these conditions could
have contributed to a safety hazard.

The
third prong, that there is a reasonable likelihood that the hazard contributed
to by the violation will cause injury, is also met. In the event of a roof
fall, a miner could suffer crushing injuries. (Tr. I, 62-63). In the event of a
fire, a miner could be burned. (Tr. I, 71). Finally, in the event loss of
ventilation or carbon monoxide build up, and explosion could occur or a miner could
suffocate. (Tr. 78-81).

Finally,
the fourth prong of Mathies is met as injuries resulting from roof fall,
fire, explosion, or CO build-up would likely result in at least lost
workday/restricted duty injuries and possibly fatal injuries. Therefore, the
S&S designations for each of the three violations related to the gas well
are appropriate.

c. Negligence

Inspector
Tuggle marked this Order as exhibiting “high” negligence. I find the
preponderance of the evidence substantially reports this designation.

The
first issue with respect to negligence is whether Respondent knew or should
have known that violations at issue in this case existed. That is, whether it
knew or should have known that the underlying violations existed such that the
pre-shift examination was inadequate. The parties have stipulated that
Howington was an agent of Respondent at the time of the examination. If Howington,
or other agents of Respondent, were negligent with respect to this violation,
that negligence is imputable to Respondent.

A
preponderance of the evidence shows that Respondent knew or should have known
that the hazards were present in the along the mainline belt and track entry. Inspector
Tuggle credibly testified that the first damaged bolt had 5.5 inches of draw
rock fallen while the second had 14 inches (which is a lot). (Tr. I, 58, 87, 106-109).
He also testified that the damaged belts were smoking, that several pieces of
belt structure were cut in half, others were in a bind, and that they were
making a loud clanging noise that could be heard over the din of equipment and
voices. (Tr. I, 63, 65, 67-70). Perhaps more importantly, some of the damaged
belt structure had been supplemented with additional structure, implying that
the damaged equipment was seen but not removed. (Tr. Tr. I, 65-66, 70, 125). He
further testified that the holes in the stoppings created loud rushing noises
that could be heard over equipment. (Tr. I, 74-75, 79, 81, 91). All of these
violations occurred along the main track where everyone would travel in the
mine, including foremen. (Tr. I, 61-62, 73, 79, 84, 87, 91-92). Finally, Tuggle
testified that five conditions along a 2,800-foot entry would be a lot. (Tr. I,
127-128). These conditions were visibly and audibly obvious and Respondent
should have known they existed at least during the pre-shift exam. In fact, the
evidence with respect to the supplemental structures shows that Respondent knew
about some of the conditions but did not correct them.

In
its brief, Respondent seeks to mathematically show that the conditions were not
obvious and therefore that it should not have known they existed. Specifically,
it noted that there were 2,800 roof bolts in the area and that only two were
damaged. (Respondent’s Post-Hearing Brief at 55). It also noted that
there were 80 stoppings in the area and that only two had holes that
constituted just 0.00325% of the surface area. (Id. at 56). Respondent
operates a large mine and a large mine is going to have extremely high numbers
of bolts and stoppings. That does not automatically create an excuse for
failure to conduct a proper pre-shift examination. If Respondent has an entry
with 2,800 roof bolts and 80 stoppings then it should be able to monitor that
number of bolts and stoppings. There is no certain low number of violations
that form a “safe harbor” for finding a pre-shift was not negligent.

Having
determined that Respondent was negligent, the next issue is whether there were
any mitigating factors present. Respondent argues that there are several.

Respondent
also notes that, unlike the inspector, Howington had only three hours to
conduct the pre-shift and that there was no evidence that he ignored the
conditions. (Respondent’s Post-Hearing Brief at 55). If three hours was
insufficient time for Howington to conduct a proper pre-shift examination then
he should have been given more time or an additional miner should have been
assigned to conduct pre-shift examinations. In fact, the evidence shows that
Inspector Tuggle told Respondent before this violation was issued that it had
insufficient resources designated for pre-shift examinations. (Tr. I, 95). Furthermore,
Respondent’s witness agreed that the area to be covered by this examination was
enormous. (Tr. I, 163). Howington’s harried pace in conducting the examination
likely lessens his personal negligence in this matter, but it does not in any
way change Respondent’s negligence. In fact, Respondent’s failure to
provide time and resources for an adequate examination heightens its lack of
care.

Further,
Respondent notes that Howington and Helton both testified that they could not
hear the clanging and air rushing over the equipment. (Respondent’s
Post-Hearing Brief. at 57). I credit Tuggle’s testimony that the rushing
was audible over the equipment. Perhaps the failure of Respondent’s employees
to hear the equipment stemmed from the fact that they were moving too quickly
through the area. However, even if Howington and Helton could not hear the
conditions, they were still visible in a widely traveled area.

Respondent
also argued that all of the cited conditions could have occurred in minutes. (Respondent’s
Post-Hearing Brief at 56-58). However, as discussed in the validity section
supra, the conditions clearly existed since at least the start of the
pre-shift and, in a few cases, for several days.

None
of the arguments presented by Respondent persuade me that the negligence was in
any way mitigated. I find that a high negligence designation is appropriate.

This
Order was also cited for an unwarrantable failure. I find that a preponderance
of the evidence also supports this designation, as dictated by the IO Coal
factors. Specifically:

1.     
Extent
of the violative conditions

The inadequate portion of the
pre-shift examination covered a 2,800-foot area of the main track and belt
entry of the mine. (Tr. I, 127-128). It consisted of at least seven different
conditions contained in five different underlying citations. (Tr. I, 56, 67-70,
74, 76-77, 80, 84). Respondent argues that only a small number of bolts, belts,
and stoppings were in violation over the course of this area. (Respondent’s
Post-Hearing Brief at 59). However, I credit the testimony of Inspector
Tuggle, that five different violations in a half mile area is “a lot.” (Tr. I, 127-128).
While there were thousands of bolts and dozens of stopppings, I find that the
cited conditions were extensive given the small area and the obvious nature of
the violations. Furthermore, the area encompassed by the pre-shift examination
was characterized as “vast,” and Respondent even argued that 3 hours would not
be enough time to find the conditions cited. As a result, the inadequate
pre-shift touched on all areas of the

2.     
The
Length of Time of the Violation Existed

As noted in the discussion of the
validity of these conditions, the cited conditions lasted, in many cases, for
several days. All of the conditions existed before the pre-shift examination at
issue. A preponderance of the evidence shows that these obvious conditions
existed for extensive periods of time. The amount of time is especially
extensive in light of the fact that a worker was specifically assigned to
search for these kinds of conditions.

3.     
Whether
the violation is obvious or poses a high degree of danger

The underlying violations at
issue here dealt with extremely grave hazards. As noted supra, the bolt
conditions created the possibility of crushing injuries, the belt conditions
created the possibility of fire, and the stopping conditions created the
possibility of suffocation. The pre-shift examination was supposed to serve as
a first line of defense against these hazards, “to prevent hazardous conditions
from developing.” Enlow Fork Mining Co., 19 FMSHRC at 15. By failing to
conduct an adequate pre-shift examination, Respondent exposed its miners to the
underlying hazardous conditions.

4.     
Whether
the operator had been placed on notice that great efforts were necessary for
compliance or on notice that this was an issue.

Inspector Tuggle credibly
testified that he had raised the issue of pre-shift examination with mine
management in the past. (Tr. I, 95). In essence, he stated that there were not
enough people conducting the pre-shift examinations. This situation was not
corrected by the time of the instant Order, as evidenced by Howington’s testimony
that he had to inspect an enormous area and that it would have helped to have
assistance. (Tr. I, 163-165).

Respondent
argues that, while Tuggle had warned Respondent about pre-shift examination
three months prior to the instant Order, new management had come taken over
since then and the people working were qualified. (Respondent’s Post-Hearing
Brief at 60). As Tuggle noted at the hearing, new management was not
brought in to correct the conditions but instead because the previous members
of management were promoted. (Tr. I, 122). Further, simply bringing in new
management did not correct the situation, as Howington was still required to
inspect a vast area by himself and was unable to do so adequately.

5.     
The
operator’s efforts in abating the violative condition

Respondent abated the condition
by conducting an adequate pre-shift examination. However, the issue of
abatement is not particularly relevant. Miners had already been exposed to
these conditions for several days.

6.     
Operator’s
knowledge of the existence of the violation

As
discussed with respect to negligence, supra, Respondent knew or should
have known that the pre-shift examination was inadequate. The underlying
conditions were visibly and audibly apparent. These conditions clearly posed
health and safety dangers to miners. Respondent should have known that the
pre-shift was inadequate. Further, there is some evidence that Respondent had
seen conditions with the belt and chosen to supplement the belt structure
rather than replace the damaged equipment.

In
light of the extensiveness of the condition, the length of time the cited
conditions existed, the high danger posed by the violations, the fact that
Tuggle had warned Respondent just three months earlier, and Respondent’s knowledge
of the condition, a finding of unwarrantable failure is appropriate.

d. Penalty

Under
the assessment regulations described in 30 CFR §100, the Secretary proposed
penalties of $16,400.00 for Order No. 8182676.
I evaluated each of the statutory factors as follows:

(1)
The Operator’s history of previous violations – Respondent was cited 10 times
under Section 75.360(a)(1) in the last two years.

(2)
The appropriateness of the penalty compared to the size of the Operator’s
business – The evidence shows that Respondent had between 1,000-2,000 employees
and that this mine was very large. (Tr. I, 210). Therefore, it is a large
business.

(3)
Whether the Operator was negligent – As previously shown, the operator
exhibited high negligence and an unwarrantable failure to comply with all three
standards

(4)
The effect on the Operator’s ability to remain in business – The parties have
stipulated that the Orders at issue here would not affect Respondent’s ability
to remain in business.

(5)
The gravity of the violation – As previously shown, this violation was reasonably
likely to result in fatal injuries to six persons.

(6)
The demonstrated good-faith of the person charged in attempting to achieve
rapid compliance after notification of a violation – The evidence shows the
condition was abated in good faith.

In
light of my affirmation of the Secretary’s designations with respect to
validity, negligence, and gravity, I hereby AFFIRM the originally
assessed penalties of $16,400.00 for Order No. 8182676.

.

ORDER

Respondent,
Dominion Coal Corporation, is hereby ORDERED to pay
the Secretary of Labor the sum of $216,400.00 within 30 days of the date of
this decision.[30]

/s/ William S. Steele

William S. Steele

Administrative
Law Judge

Distribution:
(Certified Mail)

Winfield
J. Wilson, Esq, Jacob Hargraves, Esq., & Jason Grover, Esq., U.S. Department of Labor, Office of the Solicitor, 1100 Wilson Blvd., 22nd Floor West, Arlington, VA 22209.

David J.
Hardy Esq. & Wm. Scott Wickline, Esq., Hardy Pence PLLC, 500 Lee Street,
East, Suite 701, PO Box 2548, Charleston, WV 25329

[1] Hereinafter the
transcript be cited as “Tr.” followed by the volume and page number.

[2] It is unclear
from the transcript what these numbers mean.

[3] A methane
detector, in this case an M-20 methane detector, is interchangeably referred to
as a “spotter.” (Tr. I, 189).

[4] A “legal check” of methane is one in which the
monitor is held 12 inches back from the source. (Tr. I, 202).

[5]
Weaver is not sure how much coal the mine produced. (Tr. I, 209-210). SunCoke
is a medium-sized company with between 1,000 and 2,000 employees. (Tr. I, 210).
The mine is a big mine and it is currently “hot idle,” meaning it is not
producing right now. (Tr. I, 238).

[6] CAD stands for “computer-aided drafting.” (Tr. III,
18).

[7]
Besides mine maps, Weaver’s duties as chief engineer included mine, roof
control, ventilation, fire-fighting and evacuation plans, keeping up escapeway
maps, and showing the location of self-contained self-rescuers on maps. (Tr.
246). In addition, he looked for the coal seam and checked its thickness,
brought in drillers and contractors, checked the thickness of the seam, and
created closure maps ad conducted reclamation. (Tr. I, 246-247).

[8] He had an associate’s degree in engineering from Southwest,
a four-year degree from Bluefield State in civil engineering, and a master’s
degree from Virginia Tech in curriculum and instruction, specializing in
distance learning. (Tr. II, 61).

[9] The court reporter’s notes indicate that she was not
positive if Wayne Holley and Pat Atrip were the correct names. I include the
names as recorded because the record was not changed to reflect any correction.

[10] Hughes was ambivalent about whether he had read the
manual for the methane monitor, first saying he had done so and then saying he
had not. (Tr. II, 165). He then conceded he was not sure what type of
monitoring system the miner used. (Tr. II, 165).

[11]The D-Sequence occurs when there has been a violation
of a mandatory standard that is S&S and an unwarrantable failure. (Tr. II,
145). The first issuance is a d(1) Citation and if the company goes 90 days
without another D issuance, then the D-Sequence ends. (Tr. II, 145). If they
get a d(1) Order in conjunction with the (d)(1) Citation, then there must be a
clean inspection before the mine comes off the D-Sequence. (Tr. II, 145). From
February 11 to February 24 there had been three D-Orders at the mine, placing
the company on the D-Sequence. (Tr. II, 145).

[12] Hartsog was accepted as an expert witness, with the
caveat that his testimony was not dispositive to be considered as an expert. (Tr.
III, 19).

[13]
A monitor is calibrating by setting it at zero with no methane and then taking
a known calibration of gas, which in this case was 2.5%, and put a cup over the
top of the monitor head. (Tr. III, 42-43). This gives a span of 0-2.5%. (Tr.
II, 43).

[14] The formula suggested by Hartsog in his testimony is
unclear. The equation 0.089 X 6,300 equals 560.7, not 140. However, it is not
clear if there are additional variables that he did not discuss in his brief
testimony on this matter.

[15]
In making his report, Hartsog had a copy of the February 2012 AutoCAD form. (Tr.
III, 48). He produced an aid with that file to show how the maps form together
(RX-8). (Tr. III, 55). The first map shows the gas wells in yellow (except for
the struck well in blue one). (Tr. III, 55). There were around 420-430 wells in
the mine footprint. (Tr. III, 55-56). The second maps shows the same area but
with the workings included. (Tr. III, 56). Anything done on one map is separate
from what is done to the other, just as the well data was different from the
map. (Tr. III, 56-57). If someone were working on the map and highlights the
well data and pushed “delete,” then all of the wells would disappear. (Tr. III,
57). The wells are kept on a separate file so they can easily be removed and
create a less cluttered map. (Tr. III, 58).

Hartsog also created a map that
superimposed the mine over the city of Charleston, WV. (Tr. III, 58-59). This
map was based on the February 2012 data. (Tr. III, 59). Between 2008 and 2012
the workings had gotten larger, but they had not removed gas wells. (Tr. III,
59-60).

A final map created by Hartsog
showed all of the gas wells in the shape file for Mine 36 (RX-9). (Tr. III,
63). The existing wells were yellow and the missing well was blue. (Tr. III,
63). The map shows the gas wells on all of Respondent property in Buchanan County and the black square shows the mine footprint. (Tr. III, 63-64). There were
a total of about 8,000 wells, 420 of them on the mine property and only one
missing. (Tr. III, 64).

[16] Respondent’s Counsel argued with Steffey that he was
unable to conduct the calculation to determine the concentration of methane at
the time of the accident. (Tr. III, 175-177). Steffey argued that there were
too many unknown quantities to do the calculation. (Tr. III, 175-177).

[17] I would also note that while there was an option to
use a single map, Respondent chose not to do so. (Tr. I, 216).

[18] In his brief, the Secretary argued that, although
Weaver worked for Jewell Smokeless rather than directly for Respondent, those
companies constituted a unitary operator under Berwind Natural Resources
Corp., 21 FMSHRC 1284 (Dec. 1999). (Secretary’s Post-Hearing Brief
at 29, FN 9). Respondent did not address this issue in its brief. I find that
Respondent and Jewell Smokeless constituted a unitary operator and, as such,
Weaver acted as Respondent’s agent.

[19] While an administrative law judge may determine, in
his discretion, that some factors are not relevant, or may determine that some
factors are much less important than other factors under the circumstances, all
of the factors must be taken into consideration and at least noted by the
judge. IO Coal, 31 FMSHRC at 1351

[20]
The ventilation map submitted by Danny Price MSHA on December 23, 2010 showed
the areas, the pillars, and the entries, including belt entries, that this mine
encompasses. (Tr. I, 40). The sealed areas were marked with a crosshatch and
SCSR caches were marked “S.” (Tr. I, 40-41). It was an accurate depiction of
the area Tuggle inspected on April 4, 2011. (Tr. I, 42).

[21] Tuggle eventually traveled the Number 2, 3, and 4
belt and turned off of U-Section. (Tr. I, 100-101). He believes the belt was
around five to ten thousand feet. (Tr. I, 101). There was roughly two miles
from Number 2 Belt to Number 5 Belt. (Tr. I, 101-102). On April 4, 2011 Tuggle
traveled that 2 miles of belt and did not observe any conditions. (Tr. I, 102).

[22]
A D-2 order is issued after a mine has been established on the D-1-6 series. (Tr.
I, 44). This occurs when there is a D-1 citation, a follow-up D-1 Order, and
then a second follow-up inspection leads to the D-2 series. (Tr. I, 44). An
operator remains on the D-2 series from that point until an inspection is
completed without a D-citation. (Tr. I, 44). In this case, the predicate D-1
citation was Citation No 8179671, issued on February 14, 2011. (Tr. I, 45).
Tuggle issued the underlying D-1 citation when he reviewed the pre-shift book
and saw that Howington had not signed or put his official numbers in the book. (Tr.
I, 47). According to his notes, the date, time, and initials (DTI’s) at the
Number 1 belt drive were at 2:06 p.m., however Tuggle issued the citation at
the belt book at 2:02 p.m. (Tr. I, 48). Howington returned to sign the book,
terminating the underlying citation. (Tr. I, 50-51).

[23] The transcript occasionally notes a “day-two” order
instead of a “D-2” Order. However, it is clear from the context of the
testimony that this is a scrivener’s error.

[24] The underlying citations, Citation Nos. 8182670,
8182671, 8182672, 8182673, and 8182674 were admitted into evidence as GX-6. (Tr.
I, 59-60).

[25]
The citations only covered the first 66 crosscuts because Tuggle was required
to look at the active section that day. (Tr. I, 89). It was getting late and
they did not have time to travel slowly, so he may not have been as diligent
with the rest of the belt. (Tr. I, 89).

[26]
Tuggle’s testimony regarding timing often dealt with the amount of rock dust
present. Tuggle did not know when Number 1 was last rock-dusted. (Tr. (I,
123-124). Lots of factors determine how quickly draw-rock weathers including
airflow, humidity, temperature, and whether the entry is drying. (Tr. I, 124). In
this case, Tuggle does not know any of those factors. (Tr. I, 124).

[27] In roof control, when the bolt binds the layers of
material together it basically forms a beam, like a truss in the roof of a
home. (Tr. I, 85). The actual skin control is the immediate rock that is
visible. (Tr. I, 85).

[28]
Howington did not work at Dominion 36 at the time of the hearing, he had worked
for D&H Mining as a section box for around six months. (Tr. I, 135). He was
subpoenaed for a deposition about his April 4, 2011 examination. (Tr. I, 135). After
that deposition, he did not speak to Respondent’s attorney or anyone else about
his testimony. (Tr. I, 137-138).

[29] When asked if he was conducting pre-shift
examinations at Dominion 36 on April 2011, Helton testified, “I’d say I was,
but” and then the transcript states the rest of his answer was unintelligible. There
were several instances in which Helton’s answers could not be recorded. No
weight can be given to the answers to those questions.

[30] Payment should be sent to: MINE SAFETY AND HEALTH
ADMINISTRATION, U.S. DEPARTMENT OF LABOR, PAYMENT OFFICE, P. O. BOX 790390, ST. LOUIS, MO 63179-0390