Drummond Company, Inc. (ALJ decision, January 28, 1987)
Drummond Company, Inc. (FMSHRC SE 86-135): Roof and ventilation settlements approved at $1,950
Apply this to your situation
This order from 1987 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current MSHA standards and Commission precedent say, with citations.
Plain-English summary
Drummond Company faced two violations at the Mary Lee No. 1 Mine. A roof bolter began installing bolts before temporary roof supports were in place, and the mine's ventilation plan was not followed because the line brattice was too far from the face, air velocity was below the plan requirement, and methane had accumulated. The parties reduced the proposed roof-control penalty from $1,250 to $1,000 because only one miner was exposed, while the $950 ventilation penalty remained unchanged. Judge Paul Merlin approved the settlements and ordered payment of $1,950 within 30 days.
Decision snapshot
- Cited standards: 30 C.F.R. §§ 75.200 and 75.316; the settlement was evaluated under 30 U.S.C. § 820(i)
- Outcome: The settlements were approved, with $1,000 assessed for the roof-support violation and $950 for the ventilation-plan violation.
- Key point: The penalty reduction for the roof violation reflected the reduced exposure and partial protection available to the one miner involved.
Full text (FMSHRC public release)
CCASE:
SOL (MSHA) V. DRUMMOND
DDATE:
19870128
TTEXT:
Page 2
~184
Federal Mine Safety and Health Review Commission Office of Administrative Law Judges
SECRETARY OF LABOR,
CIVIL PENALTY PROCEEDING
MINE SAFETY AND HEALTH
ADMINISTRATION (MSHA)
Docket No. SE 86-135
A.C. No. 01-00515-03650 v.
Mary Lee No. 1 Mine
DRUMMOND COMPANY, INC.,
RESPONDENT
DECISION APPROVING SETTLEMENT
Before: Judge Merlin
The parties have filed a joint motion to approve settlements of the two violations involved in this case. The total of the originally assessed penalties was $2,200. The total of the proposed settlements is $1,950.
The motion discusses both violations in light of the six criteria set forth in section 110(i) of the Federal Mine Safety and Health Act of 1977. Order No. 2606500 was issued for violation of 30 C.F.R. 75.200 because a roof bolter began installing bolts before the temporary roof support jacks were in place. A reduction in the proposed penalty for this violation, from $1,250 to $1,000, is now recommended because of reduced gravity. Only one miner was exposed to the hazard, rather than two, as was originally believed. The one miner exposed was protected somewhat by a canopy and by the fact that he was standing next to the rib.
Order No. 2605858 was issued for violation of 30 C.F.R.
75.316 because of failure to comply with the approved ventilation plan. The line brattice was 38 feet from the deepest penetration of the face, rather than 10 feet as required by the plan. The air velocity was only 47 feet per minute, rather than 60 feet per minute as required by the plan. A concentration of methane of 1.4 percent had been allowed to accumulate. The operator has agreed to pay the $950 penalty originally assessed for this violation.
The representations and recommendations of the parties are accepted. The settlements are for substantial amounts and are in accord with the statutory purposes.
Page 3
~185
Accordingly, the motion to approve settlements is GRANTED and the operator is ORDERED TO PAY $1,950 within 30 days of the date of this decision.
Paul Merlin
Chief Administrative Law
What applies to your situation today?
This order bound one employer. Ezel checks the current MSHA standards and Commission precedent against your facts, with citations.
Opens in Ezel Pro.
- Checks the law as it stands today, not only this page
- Cites every source it relies on, so you can verify it
- Chat, drafting and research in one workspace