EPA EAB Board decision Docket PSD 99-4, PSD 99-5, CO-183-10097-00030 Decided June 22, 2000 Mixed result

Steel Dynamics, Inc.

In re Steel Dynamics, Inc. (EAB PSD Appeal Nos. 99-4 and 99-5): permit partly remanded for BACT review

Apply this precedent to your situation

This is citable Board precedent from 2000, and it may have been appealed since. Ezel checks how it stands today and answers your situation, with citations.

Currency note: this decision dates from 2000
The EPA regulations may have been amended, penalty amounts have been adjusted, and later Board or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final EAB decision
This Environmental Appeals Board Order Granting Review in Part and Denying Review in Part is a final disposition of the PSD permit appeals. The Board remanded three components of the permit for further analysis of lead emissions and BACT limits, and denied review on the remaining issues. The full text below is the official EPA release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official EPA EAB release. The full text is the agency's own release.
Read the official release (epa.gov)

Plain-English summary

The Indiana Department of Environmental Management issued Steel Dynamics a PSD permit for a new steel mill in Whitley County, Indiana. The petitioners and EPA challenged many permit terms, including best available control technology for lead, nitrogen oxides, and carbon monoxide. The Board remanded the permit for IDEM to document its lead potential-to-emit analysis, complete the cost-effectiveness analysis for selective catalytic reduction on the reheat furnace, and reconsider the form of the electric arc furnace limits. The Board denied review of the majority of the other procedural, technical, and enforceability challenges.

Decision snapshot

  • Cited authorities: Clean Air Act §§ 161, 165, and 169; 42 U.S.C. §§ 7470, 7475, 7479, and 7602; 40 C.F.R. §§ 50.2, 52.21, 81.315, and 124.13 through 124.19.
  • Outcome: Three permit components were remanded for further proceedings, and review of all other issues was denied.
  • Key point: A PSD permitting authority must document its technical and economic analysis well enough for the Board and the public to evaluate the BACT determination and significant comments.

Full text (EPA EAB public release)

                              STEEL DYNAMICS, INC.                                     165



                IN RE STEEL DYNAMICS, INC.
                       PSD Appeal Nos. 99-4 & 99-5

ORDER GRANTING REVIEW IN PART AND DENYING REVIEW
IN PART

                            Decided June 22, 2000



                                      Syllabus

   Petitioners United Association of Plumbers and Steamfitters, Local Union 166

(“Union”) and Citizens Organized Watch (“COW”) filed petitions for review of a Preven-
tion of Significant Deterioration (“PSD”) permit issued by the Indiana Department of Envi-
ronmental Management (“IDEM”) to Steel Dynamics, Inc. (“SDI”) for the construction of a
new steel mill in Whitley County, Indiana. Petitioners raise a multitude of procedural and
substantive challenges to the terms of SDI’s permit. The U.S. Environmental Protection
Agency’s (“EPA”) Office of General Counsel and Office of Regional Counsel for Region
V, on behalf of EPA’s Office of Air and Radiation and Region V, join petitioners, in sev-
eral instances, in arguing that the permit should be remanded to IDEM for further consider-
ation, while in many other instances they urge that review should be denied.

   Held: The Environmental Appeals Board (“Board”) denies review of the clear major-

ity of issues raised by petitioners (see bulleted lists below). However, the Board finds, in
three instances, that the permit should be remanded.

   First, the Board remands the permit so that IDEM may reconsider its best available

control technology (“BACT”) determination for nitrogen oxide (“NOx”) emissions from the
mill’s reheat furnace. Petitioners, supported by EPA, raised significant questions about
IDEM’s technical and economic analyses of the available pollution control options and
argued that selective catalytic reduction (“SCR”) technology should have been selected as
BACT rather than the combustion controls chosen by IDEM. The Board finds that IDEM
failed to conduct an adequate cost-effectiveness analysis of SCR technology. IDEM must
perform a thorough cost-effectiveness analysis, document its findings, submit those find-
ings to public review, and consider and respond to significant public comments in its docu-
mentation of the final permit decision. See Part II.B.3.

   Second, the Board remands the permit so that IDEM may reconsider the form of the

BACT limitations chosen for NOx and carbon monoxide (“CO”) emissions from the electric
arc furnace (“EAF”). IDEM imposed hourly emissions limits, in pounds per hour, for these
pollutants, rather than either production limits (in pounds per ton or pounds per MMBtu)
and hourly limits or production limits alone, as was done at fifteen similar steel mills
across the country. Petitioners and EPA argued that both hourly and production limits are
needed to ensure that emissions are controlled regardless of the production rate or opera-
tional conditions at the facility. Thus, IDEM must justify its choice of the form of the limits

                                                                               VOLUME 9

166 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

or impose production limits in addition to the hourly limits for these pollutants. See Part
II.C.2.

    Third, the Board remands the permit so that IDEM may reconsider its analysis of the

proposed steel mill’s potential to emit lead. Although IDEM concluded that the mill need
not install BACT to control emissions of lead because the projected lead levels fell below
the applicable significance level for the PSD program (i.e., 0.6 tons of lead per year),
IDEM’s conclusion was based on data that were not contained in the administrative record.
Accordingly, the Board is unable to determine whether or not the significance level for
lead would be exceeded and, thus, whether BACT for lead should be installed at this facil-
ity. In addition, IDEM failed to consider the Union’s detailed alternative calculation of the
mill’s potential to emit lead. See Part II.A.

   Review of all other issues is denied. In brief, the Board finds that petitioners failed

to establish clear error or an abuse of discretion on the part of IDEM in its analysis and
treatment of:

• BACT for particulate matter (“PM”) emissions from the EAF, see Part II.B.1.a-.c
(findings summarized as follows):

  •      No showing by petitioners that technologies other than baghouses are poten-
         tial options for control of condensible PM at this facility;

  •      Petitioners’ stack test evidence showing actual filterable PM emissions lower
         than the limit established in SDI’s permit is not enough, without more infor-
         mation, to overcome IDEM’s use of fifteen BACT determinations from steel
         mills to set the filterable PM limit; and

  •      IDEM’s failure to explain in the administrative record its choice of total PM
         emissions limit is not clearly erroneous where other information in record is
         adequate to deduce rationale behind limit and conclude that IDEM applied
         considered judgment in setting limit.

• BACT for NOx emissions from the EAF, see Part II.B.2 (IDEM’s original BACT
analysis (in which it selected low-NOx/oxyfuel burners as BACT in this context) and
response to comments contain reasonably detailed summaries of the technical and
environmental hurdles raised by the potential application of SCR in this context;
moreover, petitioners failed to rebut IDEM’s analysis in any of its particulars);

• The technical feasibility component of the BACT analysis for NOx emissions from
the reheat furnace, see Part II.B.3.b.i (complexity of issue and fact that IDEM found
SCR to be economically infeasible forestall remand on this ground; however, absent
definitive decision on this matter on remand, Board will presume SCR is technically
feasible);

• BACT for PM emissions from the slag-handling area, see Part II.B.4.a-.c (findings
summarized as follows):

  •      IDEM evaluated all options timely brought to its attention and documented its
         findings in the record;

VOLUME 9
STEEL DYNAMICS, INC. 167

•      Costs of constructing and maintaining complete enclosure of slag-dumping
       area with baghouse are facially much more expensive than outdoor, nearly as
       efficacious, water-based controls, and thus IDEM did not err by failing to
       specify all information petitioners seek; and

•      Petitioners’ contention that IDEM underestimated PM emissions from slag-
       handling operations fails where arguments are based on outdated and incom-
       plete information.

• Enforceability of NOx limits imposed on nine separate heaters, preheaters, and dry-
ers that all vent to a single stack, see Part II.C.1.b (petitioners failed to rebut general
understanding that low-NOx burners should easily achieve the BACT limit for these
sources, so IDEM’s failure to require specific compliance testing for the units is not
clear error);

• Enforceability of a single pounds-per-hour limit for emissions of sulfur dioxide
(“SO2”) from the EAF, see Part II.C.2 (sulfur-related conditions in permit — i.e., an-
nual stack tests and vendor certifications of sulfur content in raw materials — and
fact that BACT for SO2 is no control alleviate concern about SO2 emissions exceed-
ing the BACT limit at any given rate of production);

• Enforceability of raw material sulfur limits, see Part II.C.3 (restatement on appeal of
charges made during comment period, without any information or arguments to re-
but the explanations provided in the response to comments, is not sufficient to grant
review);

• Enforceability of conditions imposed to regulate PM emissions from the slag-han-
dling area, allegedly in absence of daily slag production limits and recordkeeping
requirements, continuous fenceline opacity monitoring, and public review of slag
enclosure design specifications, see Part II.C.5 (no supportable reason to question
IDEM’s technical judgment in this regard);

• Enforceability of permit conditions for fugitive dust emissions from transportation
activities on paved and unpaved roadways at the mill, see Part II.C.6 (petitioners
failed to demonstrate that their monitoring proposal was preferable to that selected
by IDEM);

• Enforceability of limits on EAF emissions of NOx, SO2, and PM allegedly in ab-
sence of specified averaging times and sampling durations, see Part II.C.7 (petition-
ers offered no evidence that stack test durations of at least one hour or tap-to-tap
runs of ninety minutes are inadequate to obtain reasonable assessment of facility
performance);

• Enforceability of Preventive Maintenance Plan requirements, see Part II.C.9 (peti-
tioners failed to rebut IDEM’s explanations in the response-to-comments document);

• Soil and vegetation impacts analysis, see Part II.D.1 (petitioners have provided no
information that contradicts IDEM’s conclusion that the proposed mill will not ad-
versely affect soils and vegetation in the area); and

• Several other miscellaneous issues, see Part II.D.3.

                                                                              VOLUME 9

168 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

   Moreover, the Board finds that petitioners failed to preserve for review on appeal

their arguments, in part or in full, regarding:

• A number of purportedly available control options suggested as BACT for PM emis-
sions from the slag-handling area, see Part II.B.4.a;

• Enforceability of NOx limits imposed on the ladle metallurgy refining station and the
continuous caster, both of which vent, along with the EAF, to the EAF baghouse
stack, see Part II.C.1.a;

• Enforceability of single pounds-per-MMBtu limit for emissions of NOx and CO
from the reheat furnace and of NOx from the heaters, preheaters, and dryers, see Part
II.C.2;

• Enforceability of emissions limits on NOx and SO2 emissions from the EAF and on
NOx emissions from the reheat furnace, in the absence of a requirement that SDI
install continuous emissions monitors, see Part II.C.4;

• Enforceability of conditions imposed to regulate PM emissions from the slag-han-
dling area, in absence of limitations on slag area’s potential to emit PM, see Part
II.C.5; and

• Enforceability of limits on EAF emissions of NOx, SO2, and PM in absence of
prespecified stack test methods and conditions and public review thereof, see Part
II.C.7.

   The Board also finds that petitioners failed to present, with sufficient specificity to

warrant review, arguments regarding alleged procedural errors in the public notice and
comment process. See Part II.C.2. Finally, the Board exercises its discretion not to decide
petitioners’ contentions with respect to:

• Alleged procedural errors in IDEM’s handling of information pertaining to BACT
for NOx emissions from the reheat furnace, see II.B.3.a; and

• Enforceability of limit on emissions of lead from the EAF, which the Board finds
may be rendered moot on remand of the lead BACT issue, see II.C.8.

Before Environmental Appeals Judges Scott C. Fulton, Ronald L.
McCallum, and Kathie A. Stein.

  Opinion of the Board by Judge Stein:

  On July 7, 1999, the Indiana Department of Environmental Management

(“IDEM” or “Department”) issued a federal prevention of significant deterioration
(“PSD”) permit, pursuant to Clean Air Act (“CAA”) § 165, 42 U.S.C. § 7475, to
Steel Dynamics, Inc. (“SDI”) for the construction and operation of a new steel
beam mill in Whitley County, Indiana. IDEM is authorized to make PSD permit-
ting decisions for new and modified stationary sources of air pollution in Indiana
pursuant to a 1981 delegation agreement with Region V of the U.S. Environmen-
tal Protection Agency (“EPA” or “Agency”). See 40 C.F.R. § 52.21(u); 46 Fed.

VOLUME 9
STEEL DYNAMICS, INC. 169

Reg. 9580, 9583-84 (Jan. 29, 1981). Because IDEM acts as EPA’s delegate under
the PSD program, IDEM’s PSD permits are considered EPA-issued permits, and
appeals of the permit decisions are heard by the Environmental Appeals Board
(“Board”) pursuant to 40 C.F.R. § 124.19. See In re Maui Elec. Co., 8 E.A.D. 1,
2 n.1 (EAB 1998).

  In this case, two parties — the United Association of Plumbers and

Steamfitters, Local Union 166 (“Union”), and Citizens Organized Watch
(“COW”) — filed appeals of IDEM’s permit decision for SDI, requesting on nu-
merous grounds that the permit be remanded to the Department for further consid-
eration. In addition, EPA’s Office of General Counsel and the Office of Regional
Counsel for Region V, on behalf of EPA’s Office of Air and Radiation and Re-
gion V, filed friend of the court briefs, also requesting remand of the PSD permit
on several of the grounds raised by petitioners. IDEM and SDI filed responsive
briefs supporting the permit decision. Briefing was completed on December 20,
1999.

  The numerous issues raised in this case are, for the most part, procedurally,

factually, and technically complex. The Board carefully evaluated approximately
400 pages of submitted legal briefs and hundreds of pages of technical documen-
tation and exhibits in reaching its decision. For the reasons set forth below, we
deny review on the clear majority of issues raised. However, we also conclude
that petitioners have met the burden of showing that review of three issues is
warranted, and that the permit should be remanded to IDEM for further action on
those issues consistent with this opinion.1

   The three issues that merit review are, first and foremost, IDEM’s best

available control technology (“BACT”) analysis for emissions of nitrogen oxides
from the proposed steel mill’s reheat furnace. Petitioners, supported by EPA as
friend of the court, raised significant questions about IDEM’s technical and eco-
nomic analyses of the available pollution control options and argued that selective
catalytic reduction technology should have been selected as BACT rather than the
combustion controls chosen by IDEM. Second, petitioners, again supported by
EPA, argued that IDEM erroneously imposed only hourly limits on the proposed
mill’s electric arc furnace emissions of carbon monoxide and nitrogen oxides.
These parties argued that both hourly and production limits were needed at this
facility to ensure that emissions are controlled regardless of the production rate or
operational conditions at the facility. We have remanded the permit for further

    1 Due to the extensive briefing of these issues on appeal to date, further briefing would not be

helpful. See In re Renkiewicz SWD-18, 4 E.A.D. 61, 67 n.5 (EAB 1992) (“Although § 124.19 * * *
contemplates that additional briefing will be submitted upon the grant of a Petition for Review, a direct
remand without additional submissions is appropriate where, as here, it does not appear that further
briefs on appeal would shed light on the issues to be addressed on remand.”).

                                                                                       VOLUME 9

170 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

explanation and action on IDEM’s part regarding the forms of these limits. Fi-
nally, although IDEM concluded that the plant need not install BACT to control
emissions of lead because the projected lead levels fell below the applicable sig-
nificance level for the PSD program, IDEM’s conclusion was based on data that
were not contained in the administrative record. Accordingly, we are unable to
determine whether or not the significance level for lead would be exceeded and
thus whether BACT for lead should be required at this facility.

   We do not lightly decide to remand a portion of this permit, as we are mind-

ful of the importance of resolving PSD permits expeditiously and of the fact that a
remand will further lengthen the permit issuance process. Nonetheless, we remain
convinced that a remand here is the appropriate outcome. These are important
issues that may materially affect the quality of environmental protection in the
area surrounding this facility. We are influenced by the strength of the technical
presentation made to us not only by petitioners, but also importantly by EPA who
as friend of the court has expressed serious concerns to us about several aspects of
this permit. Although we recognize that IDEM as the permit issuer is deserving of
deference, especially with respect to areas involving its technical expertise, EPA’s
views on technical issues also carry significant weight.2 We must be satisfied that
the decisionmaker fully took into account the conflicting expert opinions and that
the approach selected in the final permit is both rational and supportable in this
light.

                                    I. BACKGROUND

A. Statutory and Regulatory Background

    Congress enacted the PSD provisions of the CAA in 1977 for the purpose

of, among other things, “insur[ing] that economic growth will occur in a manner
consistent with the preservation of existing clean air resources.” CAA § 160(3),
42 U.S.C. § 7470(3). To that end, parties must obtain preconstruction approval
(i.e., PSD permits) to build new major stationary sources, or to make major modi-
fications to existing sources, in areas of the country deemed to be in “attainment”
or “unclassifiable” with respect to federal air quality standards called “national
ambient air quality standards” (“NAAQS”). See CAA §§ 107, 160-169B,
42 U.S.C. §§ 7407, 7470-7492.

  NAAQS are established on a pollutant-by-pollutant basis and are currently

in effect for six air contaminants: sulfur oxides (measured as sulfur dioxide

   2 In keeping with the deference accorded the permit issuer, we have, in numerous other in-

stances, concluded that there was no clear error or abuse of discretion in the judgments exercised by
IDEM, including on issues where EPA expressed a contrary view.

VOLUME 9
STEEL DYNAMICS, INC. 171

(“SO2”)), particulate matter (“PM”), carbon monoxide (“CO”), ozone (measured as
volatile organic compounds (“VOCs”)), nitrogen dioxide (“NO2”), and lead.
40 C.F.R. § 50.4-.12. In areas deemed to be in “attainment” for any of these pol-
lutants, air quality meets or is cleaner than the NAAQS for that pollutant. CAA
§ 107(d)(1)(A)(i), 42 U.S.C. § 7407(d)(1)(A)(i); In re Maui Elec. Co., 8 E.A.D.
1, 4 (EAB 1999). In “unclassifiable” areas, air quality cannot be classified on the
basis of available information as meeting or not meeting the NAAQS.3 CAA
§ 107(d)(1)(A)(iii), 42 U.S.C. § 7407(d)(1)(A)(iii).

   Applicants for PSD permits must demonstrate, through analyses of the an-

ticipated air quality impacts associated with their proposed facilities, that their
facilities’ emissions will not cause or contribute to an exceedence of any
applicable NAAQS or air quality “increment.”4 CAA § 165(a)(3),
42 U.S.C. § 7475(a)(3); 40 C.F.R. § 52.21(k)-(m). In addition, applicants for
PSD permits must employ the “best available control technology,” or “BACT,” to
minimize emissions of pollutants that may be produced by the new source in
amounts greater than applicable “significance” levels established by the PSD regu-
lations.5 CAA § 165(a)(4), 42 U.S.C. § 7475(a)(4); 40 C.F.R. § 52.21(j)(2).

  The BACT requirement, which is of substantial importance to this appeal, is

defined in the regulations as follows:

   [BACT] means an emissions limitation (including a visible emission
   standard) based on the maximum degree of reduction for each pollu-
   tant subject to regulation under [the] Act which would be emitted
   from any proposed major stationary source or major modification



   3
     Areas may also be designated as “nonattainment,” meaning that the concentration of a pollu-

tant in the ambient air exceeds the NAAQS for that pollutant. CAA § 107(d)(1)(A)(ii),
42 U.S.C. § 7407(d)(1)(A)(ii). The PSD program is not applicable, however, in nonattainment areas.
See CAA § 161, 42 U.S.C. § 7471.
4 Air quality increments represent the maximum allowable increase in concentration that may

occur above a baseline ambient air concentration for a pollutant. See 40 C.F.R. § 52.21(c) (incre-
ments for six regulated air pollutants).
5
The significance levels are as follows:

   POLLUTANT                    SIGNIFICANCE LEVEL

        CO                       100 tons per year (“tpy”)
       NO2                                40 tpy
        SO2                               40 tpy
        PM                                15 tpy
  ozone(as VOCs)                          40 tpy
       lead                              0.6 tpy

40 C.F.R. § 52.21(b)(23).

                                                                                   VOLUME 9

172 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

   which the Administrator, on a case-by-case basis, taking into account
   energy, environmental, and economic impacts and other costs, deter-
   mines is achievable for such source or modification through applica-
   tion of production processes or available methods, systems, and tech-
   niques, including fuel cleaning or treatment or innovative fuel
   combustion techniques for control of such pollutant.

40 C.F.R. § 52.21(b)(12); accord CAA § 169(3), 42 U.S.C. § 7479(3). As the
Board has noted on prior occasions, “[t]he requirements of preventing violations
of the NAAQS and the applicable PSD increments, and the required use of BACT
to minimize emissions of air pollutants, are the core of the PSD regulations.” In re
Encogen Cogeneration Facility, 8 E.A.D. 244, 247 (EAD 1999); accord In re
Hawaii Elec. Light Co., 8 E.A.D. 66, 73 (EAB 1999).

B. Factual and Procedural Background

  On September 2, 1998, SDI filed an application with IDEM for permission

to construct a new steel beam mill consisting of two electric arc furnaces
(“EAFs”), a ladle metallurgy refining station (“LMS”),6 various natural gas-fired
preheaters and dryers, a continuous caster, a reheat furnace,7 a slag-handling and
processing area, storage silos, a cooling tower, and associated equipment and
transportation facilities. See IDEM Office of Air Management, PSD Construction
Permit for Steel Dynamics, Inc. § A.2 (July 7, 1999) (“Permit”); IDEM Office of
Air Management, Technical Support Document for New Construction and Opera-
tion, Steel Dynamics, Inc. app. C (Mar. 14, 1999) (“TSD”). The proposed mill is
expected to produce molten steel at a maximum rate of 200 tons per hour. Permit
§ A.2.

   The portion of Whitley County, Indiana in which SDI’s new mill will be

sited is designated as attainment or unclassifiable for SO2, CO, NO2, PM10, and

   6   As IDEM explained in the technical support document for the proposed permit:

   Molten metal in the EAF will be tapped into ladles and transported by electric overhead
   traveling cranes to the [LMS]. At the LMS, a sample of the molten steel will be taken
   and analyzed for its various constituents. Additional alloying materials may be added to
   meet the required product specifications. After the alloy addition, the molten metal will
   be stirred and reheated in the ladle by electrodes.

IDEM Office of Air Management, Technical Support Document for New Construction and Operation,
Steel Dynamics, Inc. app. B at 19 (Mar. 14, 1999) (“TSD”).
7
Steel is processed through the reheat furnace in preparation for rolling; the furnace is used to
attain the optimal temperature for rolling each shape/thickness of steel. See TSD app. B at 23.

VOLUME 9
STEEL DYNAMICS, INC. 173

ozone (VOCs).8 40 C.F.R. § 81.315. As currently configured, the mill has the
potential to emit all of these pollutants in quantities sufficient to trigger the pro-
tections of the PSD program, TSD app. C, pt. A, which necessitated SDI’s PSD
permit application.

  In response to SDI’s application, IDEM initiated a course of action designed

to encourage public participation in the permit decisionmaking process. See In re
Knauf Fiber Glass, GmbH, 8 E.A.D. 121, 124 (EAB 1999) (CAA “emphasizes the
importance of public participation and input into the decisionmaking process”).
On March 14, 1999, IDEM solicited public comments on its proposal to issue a
PSD permit for SDI’s steel mill. IDEM received comments from a number of
parties, including the Union, COW, and EPA Region V. After extending the com-
ment period for thirty days, until May 14, 1999, IDEM revised the draft permit
and issued it in final form on July 7, 1999, along with a document responding to
the comments on the proposed permit. See Permit; IDEM Office of Air Manage-
ment, Addendum to the Technical Support Document for New Construction and
Operation, Steel Dynamics, Inc. (July 7, 1999) (“ATSD”) (response-to-comments
document).

  On August 6, 1999, the Union filed PSD Appeal No. 99-4 with this Board,

and on August 9, 1999, COW filed PSD Appeal No. 99-5. See Petition of the
United Association of Plumbers and Steamfitters, Local Union 166, and Its Mem-
bers (“Union Pet’n”); Petition of Citizens Organized Watch, Inc. (“COW Pet’n”).
At the request of the Board, IDEM provided a response to the petitions for review,
and the Board granted SDI leave to file its own response to the petitions. See
IDEM’s Response to Petitions of the Union and COW (“IDEM Resp.”); SDI’s
Consolidated Response to Petitions for Review (“SDI Resp.”). The Board then
granted EPA’s Office of General Counsel and Office of Regional Counsel for Re-
gion V’s (collectively, “Amici”) request to file an amicus curiae brief responding
to the two petitions and IDEM’s response, as well as Amici’s subsequent supple-
mental brief responding to SDI’s response. See Amicus Brief of EPA Region V
& EPA Office of Air & Radiation (“Amicus Br.”); Supplemental Amicus Brief
of EPA Region V & EPA Office of Air & Radiation. The Board also granted
IDEM’s and SDI’s requests for leave to file separate replies to the amicus brief.
See IDEM’s Response to Amicus Brief (“IDEM Reply”); SDI’s Response to Ami-

    8 Whitley County has no designation for lead. 40 C.F.R. § 81.315. IDEM asserts, however,

that the County has been classified as attainment or unclassifiable for lead. TSD at 4. In any case, the
proposed steel mill must comply with PSD requirements for lead provided it has the potential to emit
lead in amounts greater than or equal to the significance level. See U.S. EPA, Office of Air Quality
Planning & Standards, New Source Review Workshop Manual at A.31 (draft Oct. 1990) (major
source with significant emissions of a regulated pollutant in area not classified as nonattainment is
subject to PSD review for that pollutant). The issue of whether the facility has the potential to emit
lead in quantities greater than or equal to the significance level is a matter of considerable dispute and
is discussed infra Part II.A.

                                                                                        VOLUME 9

174 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

cus Brief (“SDI Reply”). Finally, the Board granted the Union’s request to file a
reply to IDEM’s, SDI’s, and Amici’s briefs and requested that Amici file a sur-
reply to IDEM’s and SDI’s replies. See Union’s Reply Brief (“Union Reply”);
Amicus Reply Brief (“Amicus Reply”). Briefing was completed on December 20,
1999.

                                    II. DISCUSSION

  Under the rules governing this proceeding, a PSD permit ordinarily will not

be reviewed unless it is based on a clearly erroneous finding of fact or conclusion
of law, or involves an important matter of policy or exercise of discretion that
warrants review. See 40 C.F.R. § 124.19; 45 Fed. Reg. 33,290, 33,412 (May 19,
1980). The Board’s analysis of PSD permits is guided by the preamble to section
124.19, which states that the Board’s power of review “should be only sparingly
exercised” and that “most permit conditions should be finally determined at the
[r]egional [or state] level.” 45 Fed. Reg. at 33,412; accord In re Kawaihae
Cogeneration Project, 7 E.A.D. 107, 114 (EAB 1997). The burden of demonstrat-
ing that review is warranted rests with the petitioner, who must state his/her ob-
jections to the permit and explain why the permit issuer’s previous response to
those objections is clearly erroneous, an abuse of discretion, or otherwise warrants
review. In re Hawaii Elec. Light Co., 8 E.A.D. 66, 71 (EAB 1999); Kawaihae,
7 E.A.D. at 114; In re EcoEléctrica, L.P., 7 E.A.D. 56, 60-61 (EAB 1997).

  In the pages below, we begin by examining IDEM’s alleged failure to con-

duct a BACT analysis for lead emissions from the proposed steel mill. Next, we
address a number of challenges to various components of the BACT analyses that
IDEM did conduct. Those challenges are centered on: (1) “condensible” and “fil-
terable” PM emissions from the EAF; (2) NOx emissions from the EAF; (3) NOx
emissions from the reheat furnace; and (4) PM emissions from the slag-handling
area. We then turn our attention to nine instances in which petitioners claim SDI’s
permit conditions are not federally enforceable. Finally, we conclude by address-
ing a number of miscellaneous issues.

A. Potential to Emit Lead: Potential BACT Review

  As mentioned above, PSD permitting authorities must establish emissions

limits based on the best available control technology, or BACT, for each regulated
pollutant the permittee has the potential to emit (“PTE”)9 in significant amounts.

  9   PTE is defined as:

  [T]he maximum capacity of a stationary source to emit a pollutant under its physical
  and operational design. Any physical or operational limitation on the capacity of the
                                      Continued

VOLUME 9
STEEL DYNAMICS, INC. 175

40 C.F.R. § 52.21(j)(2). Lead has a PSD significance level of 0.6 tons per year
(“tpy”). Id. § 52.21(b)(23)(i). Accordingly, if a proposed source has a potential to
emit lead in quantities greater than or equal to that number, an analysis of the
BACT for lead must be conducted for that facility. Id. § 52.21(j)(2).

   In this case, IDEM estimated the mill’s potential to emit lead as 0.45 tpy,

assuming the presence of pollution controls and 8,760 hours of mill operation per
year at rated capacity. TSD at 5. More specifically, IDEM estimated the EAF
would emit 0.42 tpy of lead after controls, at a rate of 0.0005 pounds of lead per
ton of steel produced, and the melt shop would emit 0.03 tpy of lead after con-
trols, at a rate of 0.007 pounds of lead per ton of steel produced. Id. app. A at 1.
Because its estimates showed the proposed mill’s PTE lead fell beneath the PSD
significance level, IDEM did not conduct a BACT analysis for lead. See id. app.
B. IDEM did not include explanations of the underlying basis for its lead calcula-
tions in the TSD, the ATSD, or any other document in the public record. How-
ever, in response to comments regarding lead emissions, IDEM did add a limit of
0.134 pounds per hour (or 0.59 tpy — just under the 0.6 tpy PSD significance
level) for lead emissions from the EAF, as well as a requirement that SDI conduct
a stack test after start-up to measure emissions of lead compounds. See Permit
§§ D.1.11(a), D.1.15(d).

   The Union challenges as clearly erroneous IDEM’s estimate of the proposed

steel mill’s PTE lead, asserting that the emissions will be high enough to exceed
the PSD significance level and that IDEM should have conducted a BACT analy-
sis for lead. Union Pet’n at 7-8. More specifically, the Union filed extensive com-
ments demonstrating the ways in which IDEM underestimated the mill’s emis-
sions of lead and other hazardous air pollutants (“HAPs”). Id. at 7. The Union
commented, among other things, that IDEM erroneously failed to consider all po-
tential sources of lead emissions, such as dryers, preheaters, and slag-processing
activities, and erroneously excluded emissions of lead in “condensible” (as op-

(continued)
source to emit a pollutant, including air pollution control equipment and restrictions on
hours of operation or on the type or amount of material combusted, stored, or
processed, shall be treated as part of its design if the limitation or the effect it would
have on emissions is federally enforceable.

40 C.F.R. § 52.21(b)(4). In 1995, the U.S. Court of Appeals for the District of Columbia Circuit va-
cated the requirement that limitations be federally enforceable and remanded this regulation to EPA
for reconsideration. Chemical Mfrs. Ass’n v. EPA, Nos. 89-1514 to -1516, 1995 WL 6500098, at *1
(D.C. Cir. Sept. 15, 1995) (citing National Mining Ass’n v. EPA, 59 F.3d 1351 (D.C. Cir. 1995)). EPA
has not yet proposed a revised regulation, but according to Amici, in the interim EPA has recognized
certain state-enforceable limits on PTE if those limits are shown to be effective. Amicus Br. at 5 n.2.

                                                                                       VOLUME 9

176 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

posed to “filterable”) form.10 Union Pet’n ex. 1, J. Phyllis Fox Comments at 1-4
(“Union/Fox Cmts”). The Union also argued that, to the extent IDEM relied on the
quantity of dust generated by other EAFs (“EAF dust”) to estimate the proposed
mill’s PTE lead, such reliance was erroneous because EAF dust is not a reasona-
ble surrogate for actual stack emissions. Id. at 4-5 & tbl. 1. Finally, the Union
pointed out that “[t]he basis of IDEM’s lead emissions is not discussed in any of
the materials [the Union’s technical expert] reviewed.” Id. at 4, 9.

   As an alternative to IDEM’s purportedly flawed estimation of the proposed

mill’s PTE lead, the Union calculated its own PTE estimate using actual stack test
data compiled by Research Triangle Institute in 1993, under contract to EPA, for
EAF steel manufacturing facilities from all across the nation. Id. at 6 & tbl. 1;
Union Pet’n ex. 1-A, apps. A, F (Research Triangle Institute, Detailed Summary
of Information Collection Request Responses for Electric Arc Furnace (EAF)
NESHAP (Feb. 1, 1993)). The Union maintains that data from sixteen mills in the
study show that, on average, 0.0046 tons of lead are emitted per ton of steel pro-
duced. Union/Fox Cmts at 9, 12 & tbl. 1. The Union concludes that, as applied to
the proposed SDI mill (which has a production rate of 200 tons of steel per hour),
the PTE lead is, after controls, 4.03 tpy. Id.; see Union Pet’n at 7-8.

   The Union claims that IDEM did not rebut this emissions estimate in its

response to public comments on the proposed permit but, rather, accepted it.
Union Pet’n at 8. Moreover, citing case law and EPA guidance, the Union argues
that the 0.134 lb/hr (or 0.59 tpy) restriction IDEM placed on SDI’s actual emis-
sions of lead from the EAF is an invalid limit on PTE and without force or effect
because it is not accompanied by production or operational requirements neces-
sary to ensure compliance. Id. at 9-11. According to the Union, IDEM’s decision
to set the lead limit just below the BACT threshold was made specifically to cir-
cumvent PSD regulation. Id. at 9.

  COW agrees that IDEM underestimated lead emissions and, as a result, er-

roneously failed to conduct a BACT analysis for lead emissions from the pro-
posed steel mill. COW Pet’n at 4. COW also contends, as does the Union, that
IDEM’s decision to limit EAF emissions to 0.134 pounds per hour of lead cannot,
without meaningful production or operational controls, shield the steel mill from
the requirement that it undergo BACT review for lead. Id. at 15-16; Union Pet’n at

  1. Accordingly, COW and the Union request that, on remand, the permit be con-
    ditioned to include production or operational requirements that will assure a limit
    10 Small particulates of lead suspended in the air can be measured in two forms: “condensible”
    

particulates, which can be captured and measured using a condenser-type device, and “filterable” par-
ticulates, also known as “in-stack” or “noncondensible” particulates, which are captured and measured
using a filter-type device. See 40 C.F.R. pt. 51, app. A, methods 201, 201A (filterable), 202 (condensi-
ble); see also infra Part II.B.1.

VOLUME 9
STEEL DYNAMICS, INC. 177

of 0.134 pounds per hour is met, or, alternatively, that a lead BACT analysis be
performed. COW Pet’n at 16; Union Pet’n at 11.

   In its response to these petitions, IDEM begins by asserting that it did not

accept the alternative emission factors proposed by the Union, as the Union al-
leged in its petition for review. IDEM Resp. at 5-6; see Union Pet’n at 8. IDEM
explains that it imposed the emissions limit of 0.134 pounds per hour for two
reasons: (1) to accommodate Region V’s concern that fluctuations in the lead con-
tent of scrap metal could cause SDI to exceed its PTE of 0.45 tpy; and (2) because
IDEM has no authority to restrict a non-PSD facility’s (i.e., one whose PTE is less
than the significance threshold) actual emissions. IDEM Resp. at 6. IDEM then
criticized the Union’s PTE analysis on several grounds. IDEM asserts, among
other matters, that the Union failed to provide data showing how condensible lead
emissions — which the Union claimed IDEM erroneously omitted — should be
factored into PTE calculations. Id. at 7. IDEM also asserts that the Union’s PTE
figure of 4.03 tpy is derived from “a wide range of generic sources.” Id. at 8.

  IDEM then explains for the first time on appeal that its own estimate of

potential lead emissions was based on an EAF dust analysis of SDI’s purportedly
similar Butler, Indiana facility, which indicated a PTE of 0.26 tpy. IDEM states
on appeal that it adjusted the 0.26 tpy estimate upward to account for condensible
lead emissions, consistent with estimates done for other Indiana steel mills, and
then verified the estimate using ambient monitoring data. See id. IDEM claims
that this method of calculating the proposed steel mill’s PTE lead is reasonable
and that petitioners failed to demonstrate that IDEM’s approach is clearly errone-
ous or involves an exercise of discretion or important policy matter warranting
Board review.11 Id.

   Amici weigh in on the side of IDEM and SDI. Amici take the position that

petitioners failed to show IDEM’s PTE calculation to be clearly erroneous. Ami-

   11 For its part, SDI contends that IDEM “thoroughly investigated the Union’s lead calculations

and concluded that those numbers were wrong.” SDI Resp. at 19. SDI claims that the Union used an
“unreasonable” 0.0046 pounds per ton of steel to estimate lead emissions, which the Union asserted
was derived from an EPA study but which, SDI contends, “was apparently created by cherry-picking
16 of the many reporting facilities” in the EPA report. Id. at 20 n.16.

     A review of the Union’s materials reveals the following basis for the 16 sources the Union used

to estimate the proposed mill’s PTE lead. The Union selected a group of 19 sources (16 nonstainless
steel mills and 3 stainless steel mills) that had conducted stack testing specifically for metals. Of those
19 sources, 14 nonstainless steel mills and 2 stainless steel mills (for a total of 16 mills) reported
results for lead. Other facilities included in the report conducted stack testing to determine total PM
emissions and then engaged in EAF dust analysis to compute the metal fractions, while still other
facilities performed no stack testing at all. These latter two groups of sources were not included in the
Union’s data set. See Union Pet’n ex. 1-A, apps. A, F (EAF NESHAP Report); Union Pet’n ex. 4, att.
B.

                                                                                         VOLUME 9

178 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

cus Br. at 5-6. Amici note that, based on data IDEM proffered from SDI’s Butler
facility, IDEM estimated filterable lead emissions from the proposed mill’s EAF
to be 0.26 tpy. Id. at 6. Amici note further that IDEM added 0.19 tpy as an esti-
mate for condensible lead emissions. Amici then assert that the record basis for
IDEM’s condensible estimate is “uncertain” but dismiss this concern by conclud-
ing that petitioners did not show IDEM’s total lead estimate to be clearly errone-
ous. Id. Amici offer their own abbreviated analysis of condensible emissions,
based on data provided by the Union and EPA studies, and conclude that condens-
ible lead emissions “could range from 0.27 to 0.82 tpy,” which means that total
lead emissions “could range from 0.54 to 1.08 tpy.”12 Id. at 7. Amici then state that
they are “concerned that [their] conservative estimate is so close to the signifi-
cance threshold for lead, but [they] cannot say with certainty that SDI’s total lead
emissions will exceed this threshold.” Id.

   Amici also note that PTE is defined by regulation as a facility’s maximum

capacity to emit given its physical and operational design, which includes air pol-
lution control equipment. Id. at 4. In this regard, according to Amici, the hourly
emissions limit is not an essential ingredient of the permit because it is not needed
to ensure the proposed mill’s lead emissions remain beneath the significance
level.13 See id. at 4-5, 7. Thus, Amici recommend that the Board deny review of
the petitioners’ challenge to the lead emissions limit. Id. at 4.

  The Union replies to the arguments made by IDEM and SDI (and presuma-

bly also to many of the arguments made by EPA) by stating that “much of the
information used to argue this issue is presented for the first time in IDEM’s and
SDI’s briefs, and IDEM relies on new evidence not in the administrative record.”

    12
       As far as we can determine, Amici calculated these figures by adopting IDEM’s 0.26 tpy

estimate for filterable lead as its starting point. To compute the upper limits of their condensible and
total lead estimates (i.e., 0.82 tpy condensible lead and 1.08 tpy total lead), Amici used the Union’s
highest estimate of the percentage of condensible PM in total PM, which was 76 percent. See infra
Part II.B.1.a (discussing basis for Union’s condensible PM estimates). To compute the lower limits of
their condensible and total lead estimates (i.e., 0.27 tpy condensible lead and 0.54 tpy total lead),
Amici used an estimate derived from EPA studies of PM, which found that condensible PM may
comprise as much as 51 percent of PM emissions after controls. Amici Br. at 6 (citing, as source of 51
percent figure, Compilation of Air Pollutant Emission Factors AP-42, vol. I, chap. 12.5, Stationary
Point and Area Sources (5th ed., Oct. 1986)).

    The Union contends that Amici’s total lead emissions estimates “confirm[] Petitioners’ claim

that actual lead emissions will exceed the PSD threshold of 0.6 [tpy].” Union Reply at 9 n.3.
13 In cases where a source’s PTE “would otherwise be significant, the source may choose to

limit its PTE beneath [the] significance threshold to avoid PSD review and application of [BACT].”
Amicus Br. at 5. Such a source is called a “synthetic minor” source, as contrasted to “‘true’ or ‘natural’
minor sources whose emissions would not exceed significance thresholds even when they operate at
full capacity without pollution controls.” Id. at 5 n.3. In cases of synthetic minors, the emissions limit
would be needed to ensure emissions remain beneath the significance level. Here, however, IDEM
takes the position that the significance level will not be exceeded.

VOLUME 9
STEEL DYNAMICS, INC. 179

Union Reply at 6. According to the Union, the detailed technical issues raised by
IDEM and SDI for the first time before the Board “should have been developed
fully and resolved during the drafting and review of the permit.” Id. The Union
contends that IDEM “failed to evaluate fairly and respond adequately to petition-
ers’ technical comments.” Id. It notes that IDEM failed to mention, let alone re-
spond to, the Union’s alternative calculation of SDI’s PTE lead (4.03 tpy) in its
response to comments. The Union also claims that IDEM did not report its lead
emission factors and calculations in its response to comments and that this infor-
mation was revealed for the first time in IDEM’s response to the Union’s petition.
Id. at 8.

   As we have stated in the past, “the regulations governing PSD permitting

decisions require that material relied upon in making a permit decision be in-
cluded in the record.” In re Hawaiian Elec. Light Co., 8 E.A.D. 112 (EAB 1999);
see In re RockGen Energy Center, 8 E.A.D. 536, 557-58 (EAB 1999) (final per-
mit decision must be based on administrative record); 40 C.F.R. §§ 124.9, .18
(draft and final permit decisions must be based on information in administrative
record). In this case, the data supporting a condensible lead estimate of 0.19 tpy,
which IDEM claims on appeal “is consistent with estimates that were done for
other similar Indiana steel mills,” IDEM Resp. at 8, were not, insofar as we can
determine, included in the public record for this permit. Nor is the EPA study on
which Amici rely for their low estimate of the ranges for condensible and total
lead (i.e., condensible PM as fifty-one percent of total PM) in the record.14 Indeed,
the only data we can locate in the record pertaining to the condensible fraction of
lead or PM were placed there as part of the Union’s comments. See Union/Fox
Cmts at 26 (offering condensible PM stack test data from two steel mills, which
shows condensible PM comprises sixty-two to seventy-six percent of total PM);
see infra Parts II.B.1.a, .c. A permitting agency may, of course, add material to
the administrative record when it responds to public comments, see
40 C.F.R. §§ 124.17(b), .18, but here, IDEM did not do so. Instead, IDEM was
silent on these issues in its response to comments, and now it seeks to introduce
new information to support its decision with respect to lead. See, e.g., IDEM
Resp. at 8.

   Not only are the data supporting IDEM’s condensible lead estimates not in

the record, but the data are critical to determining whether or not the PSD lead
significance level of 0.6 tpy is exceeded. Even if we were to assume that the 0.26
tpy figure IDEM used for filterable lead is appropriate, we note that the condensi-
ble lead fraction selected then determines whether the proposed mill will exceed
or fall below the PSD lead significance threshold. As Amici’s example demon-
strates, a condensible fraction of fifty-one percent brings the total lead estimate in

    14 We note that in estimating the condensible fraction of lead emissions, Amici apparently

relies on data regarding the condensible fraction of PM. See supra note 12.

                                                                                 VOLUME 9

180 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

beneath the significance level (at 0.54 tpy), whereas a condensible fraction of sev-
enty-six percent brings the total lead estimate in in excess of the significance level
(at 1.08 tpy). However, if a condensible fraction of sixty-five percent were chosen
(as it is by IDEM in the PM context, discussed in Part II.B.1.c below), then the
total lead estimate is 0.74 tpy, and lead BACT would be triggered. In light of
these differing results and IDEM’s failure to document in the administrative re-
cord the basis for its decisionmaking process regarding the condensible fraction of
lead, the Department clearly erred in its analysis of SDI’s potential to emit lead.15

   Moreover, the record shows that IDEM did not specifically address in its

response to comments the Union’s alternative calculation of a lead PTE of 4.03
tpy. See ATSD at 21-23, 31-36, 39-43, 72, 84-85 (failing to mention or discuss
Union’s 4.03 tpy lead estimate). Neither IDEM nor SDI, nor Amici for that mat-
ter, has directed us to portions of the administrative record demonstrating other-
wise. Under the procedural rules for PSD permits, permitting agencies must
“briefly describe and respond to all significant comments on the draft permit.”
40 C.F.R. § 124.17(a)(2). An allegation that an agency underestimated lead
emissions, accompanied by a detailed alternative analysis of such emissions — as
here — is significant enough to warrant consideration and at least some form of
acknowledgment and response.16 See In re McGowan, 2 E.A.D. 604, 606 (Adm’r
1988) (technical comments supported by affidavits were “significant,” and docu-
ment containing conclusion without supportive reasoning is not adequate response
to petitioner’s detailed comments). Although a permitting agency may group re-
lated comments together and provide one unified response for each issue raised,
see In re NE Hub Partners, L.P., 7 E.A.D. 561, 583 (EAB 1998), review denied

   15  In cases such as this, where a permitting agency’s PTE calculation does not trigger BACT

review, it would be good practice for the agency to explain its PTE calculation on the record, at least
briefly, and allow for public comment on that calculation/explanation. This would then obviate an
argument that providing PTE numbers in a table or series of equations, without any narrative explain-
ing their provenance — as was done here — may constitute inadequate notice to the public. See In re
Knauf Fiber Glass, GmbH, 8 E.A.D. 121, 174-75 (EAB 1999) (remanding environmental justice (“EJ”)
portion of PSD permit because no details of EJ analysis were included in administrative record); see
also Hawaii Elec., 8 E.A.D. at 112 (EAB 1999) (declining to rely on SO2 and PM data not included in
administrative record and thus not subject to public review, yet offered on appeal for first time by
permit agency in attempt to bolster air quality analysis); 40 C.F.R. §§ 124.7-.8 (specifying require-
ments for statement of basis or fact sheet to accompany the draft permit, including explanations of the
derivation of the conditions of the permit and the significant questions considered in preparing the
draft permit).

    16 Of course, a petitioner cannot gain review of a permit merely by presenting an alternative

theory regarding a technical matter. If the Board is presented with conflicting expert opinions, as is the
case here, we will “look to see if the record demonstrates that the [permitting agency] duly considered
the issues raised in the comments and if the approach ultimately selected * * * is rational in light of all
the information in the record, including the conflicting opinions.” In re NE Hub Partners, L.P.,
7 E.A.D. 561, 568 (EAB 1998), review denied sub nom. Penn Fuel Gas, Inc. v. U.S. EPA, 185 F.3d
862 (3d Cir. 1999).

VOLUME 9
STEEL DYNAMICS, INC. 181

sub nom. Penn Fuel Gas, Inc. v. U.S. EPA, 185 F.3d 862 (3d Cir. 1999), there is
no indication that the Union’s alternative lead calculations were addressed in this
manner.

  Finding clear error on IDEM’s part, we remand the permit so that IDEM

may reconsider its analysis of the proposed steel mill’s potential to emit lead. See
Hawaii Elec., 8 E.A.D. at 102-03 (finding response to comments inadequate and
declining to rely on new information submitted for the first time by delegated
state agency on appeal to the Board in attempt to cure deficiency). IDEM is di-
rected to provide in the administrative record a clear rationale for its treatment of
the condensible fraction of lead, including documentation of its decisionmaking
process and the data upon which its decisions are based. IDEM is also directed to
consider the Union’s alternative calculation of a PTE of 4.03 tpy.17

B. BACT Issues

  We turn our attention next to petitioners’ challenges to IDEM’s BACT deci-

sions regarding: (1) PM emissions from the EAF; (2) NOx emissions from the
EAF; (3) NOx emissions from the reheat furnace; and (4) PM emissions from the
slag-handling area.

   1. PM/PM10 BACT for EAF

   Particulate matter, or “PM,” is “the generic term for a broad class of chemi-

cally and physically diverse substances that exist as discrete particles (liquid drop-
lets or solids) over a wide range of sizes.” 62 Fed. Reg. 38,652, 38,653 (July 18,
1997). Particulate matter with an aerodynamic diameter of ten micrometers or less
is referred to as “PM10.”18 Id. at 38,653 n.1. A number of methods to measure PM
in its various forms have been developed.19 For instance, PM can be measured as
“filterable” particulates, which are collected on a filter, or as “condensible” par-
ticulates, which are captured in a condenser or impinger train.20 SDI’s EAF will

    17 Moreover, if SDI’s proposed mill is found to have a potential to emit lead in excess of the

significance level, then IDEM must conduct a BACT analysis for lead emissions from the mill. In such
a case, IDEM must issue its BACT determination in draft form and provide for public notice of and
comment on the BACT decision.
18 For ease of reference, we will refer to all PM/PM10 as “PM” in this opinion.
19 See, e.g., 40 C.F.R. pt. 50, apps. L, J, M; id. pt. 51, app. M, methods 201, 201A, 202; id. pt.

60, app. A, methods 5, 17.
20 See 40 C.F.R. pt. 51, app. A, methods 201, 201A (methods for measuring filterable PM),

202 (method for measuring condensible PM); see also In re AES Puerto Rico L.P., 8 E.A.D. 324 (EAB
1999) (“‘emissions that contribute to ambient PM10 concentrations are the sum of in-stack [non-con-
densible] PM10 * * * and condensible emissions’”) (quoting 55 Fed. Reg. 14,246, 14,246 (Apr. 17,
1990)), aff’d sub nom. Sur Contra La Contaminacion v. EPA, 202 F.3d 443 (1st Cir. 2000).

                                                                                       VOLUME 9

182 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

emit both of these varieties of PM during operation.

   In analyzing BACT for EAF emissions of these pollutants, IDEM’s ap-

proach evolved over the course of the permitting process. Initially, IDEM focused
solely on SDI’s emissions of filterable PM, concluding that BACT for that type of
PM is a baghouse with an emissions limit of 0.0018 grains per dry standard cubic
feet (“gr/dscf”) of exhaust air. TSD app. B at 19. After receiving and considering
comments on this determination, however, IDEM expanded its focus to include
condensible as well as filterable PM. IDEM established a total PM emissions limit
of 0.0052 gr/dscf to cover both filterable and condensible PM and made the limit
adjustable, subject to revision after an initial stack test is conducted and public
notice and comment received on any proposed limit change. Permit § D.1.6(b).
IDEM also retained the filterable PM-only limit of 0.0018 gr/dscf and the use of
the baghouse as components of its revised BACT determination. Permit § D.1.6;
ATSD at 10-11. IDEM did not specify any particular technology as BACT for
condensible PM per se, but by adopting a total PM limit of 0.0052 gr/dscf, IDEM
appears implicitly to have established a limit for condensible PM of 0.0034
gr/dscf. See Permit § D.1.6.

   Petitioners raise three challenges to IDEM’s BACT analysis for PM emis-

sions from the EAF. First, petitioners contend that IDEM failed to conduct a com-
plete, “top-down” analysis of available control technologies for condensible PM
when it added the total PM limit to the permit. Second, petitioners argue that the
emissions limit devoted solely to filterable PM, 0.0018 gr/dscf, does not represent
BACT for that pollutant. Third, petitioners claim that IDEM failed to justify its
selection of 0.0052 gr/dscf as the new total PM BACT emissions limit. Each of
these contentions is addressed in turn.

           a. Top-Down BACT Analysis for Condensible PM

   In 1990, EPA issued draft guidance for permitting authorities to use in,

among other things, analyzing PSD requirements. See U.S. EPA, Office of Air
Quality Planning & Standards, New Source Review Workshop Manual (draft
Oct. 1990) (“NSR Manual”). The NSR Manual sets forth a “top-down” process for
determining BACT. The process includes five steps: (1) identifying all available
control options for a targeted pollutant; (2) analyzing the options’ technical feasi-
bility; (3) ranking feasible options in order of effectiveness; (4) evaluating their
energy, environmental, and economic impacts; and (5) selecting BACT as the
most effective option not eliminated in a preceding step.21 Id. at B.5-.9; see In re

  21   EPA guidance states:

  [T]he top-down process provides that all available [pollution] control technologies be
  ranked in descending order of control effectiveness. The PSD applicant first examines
                                       Continued

VOLUME 9
STEEL DYNAMICS, INC. 183

Knauf Fiber Glass, GmbH, 8 E.A.D. 121, 129-31 (EAB 1999) (expounding on
steps in top-down analysis); In re Hawaii Elec. Light Co., 8 E.A.D. 66, 84 (EAB
1998). This top-down analysis is not a mandatory methodology, but it is fre-
quently used by permitting authorities to ensure that a defensible BACT determi-
nation, involving consideration of all requisite statutory and regulatory criteria, is
reached.22 See Knauf, 8 E.A.D. 129-30 n.14 (EAB 1999) (“[w]e would not reject a
BACT determination simply because the permitting authority deviated from the
NSR Manual, but we would scrutinize such a determination carefully to ensure
that all regulatory criteria were considered and applied appropriately”).

   In its original BACT review, IDEM analyzed four technologies for the con-

trol of filterable PM emissions. See TSD app. B at 16-19 (evaluating electrostatic
precipitators, cyclone collectors, high energy wet scrubbers, and fabric filters
(baghouses)). IDEM selected a baghouse as BACT for filterable PM and imposed
an emissions limit of 0.0018 gr/dscf. Draft Permit § D.1.6. In so doing, IDEM did
not explain why it chose to focus only on filterable PM rather than total PM. See
TSD app. B at 16-19.

   In comments on the draft permit, the Union asserted that “a substantial frac-

tion of the particulate matter released during steelmaking exits as condens[i]ble
PM.” Union/Fox Cmts at 26. The Union supported its assertion with stack test
data from two steel mills, which showed that approximately sixty-two to seventy-
six percent of total PM emitted by EAFs, after controls, is condensible PM. See
id. (citing test data from Beta Steel of Portage, Indiana and IPSCO Steel of Mus-
catine, Iowa). In its petition, the Union underscores the importance of accounting
for condensible PM emissions by referencing EPA guidance that advises permit
issuers to be sure to measure condensibles emitted by sources where such PM
constitutes a significant fraction of total PM. Union Pet’n at 12 (citing Letter from
Thomas G. Pace, Acting Chief, SO2/PM Programs Branch, Office of Air Quality
Planning & Standards, U.S. EPA, to Sean Fitzsimmons, Iowa Department of
Natural Resources at 2 (Mar. 31, 1994)).

(continued)
the most stringent — or “top” — alternative. That alternative is established as BACT
unless the applicant demonstrates, and the permitting authority in its informed judg-
ment agrees, that technical considerations, or energy, environmental, or economic im-
pacts justify a conclusion that the most stringent technology is not “achievable” in that
case.

NSR Manual at B.2.
22 While the NSR Manual is not a binding rule and is not accorded the same weight as an EPA

regulation, it is considered by this Board to be a statement of the Agency’s thinking on certain PSD
issues. See, e.g., Hawaii Elec., 8 E.A.D. at 72 n.7 ; In re Masonite Corp., 5 E.A.D. 551, 558 & n.8
(EAB 1994).

                                                                                      VOLUME 9

184 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

  As noted previously, IDEM responded to these and related comments by

adding to the permit, in addition to the filterable limit, a limit of 0.0052 gr/dscf for
emissions of total PM (including both filterable and condensible PM) from the
EAF stack. Permit § D.1.6(b); see ATSD at 8-11. IDEM also reevaluated the air
quality impact analysis using the new PM limit and found that the proposed mill
would remain in compliance with the NAAQS and air quality increments even
with the increased limit. IDEM Resp. at 12.

  In establishing the new permit provision, IDEM addressed four technolo-

gies suggested by the Union for control of condensible PM emissions23 by stating:

   [IDEM] is unaware of any BACT decision in the country considering
   a means to control [condensible PM] emitted from an EAF. [IDEM] is
   unaware of any large industrial processes (i.e., greater than 1 million
   cubic feet of exhaust air per minute) using any of the processes men-
   tioned by the Union. However, of the control technologies described
   by the [Union], scrubbers have the most common industrial applica-
   tion. High energy scrubbers were included in the BACT analysis and
   found to be infeasible due to the economic and environmental im-
   pacts. There is very limited information with regard to the amount of
   condensible [PM] that is emitted from an EAF. Based on the informa-
   tion available to [IDEM, including condensible stack tests conducted
   at IPSCO Steel in Muscatine, Iowa, SDI in Butler, Indiana, and Beta
   Steel in Portage, Indiana], the amount of uncontrolled condensible
   PM is fairly consistent with the amount of controlled filterable PM
   from the baghouse exhaust. [IDEM] is unaware of any control tech-
   nology [that] would be economically feasible to control that amount
   of PM from a system exhausting 1.3 million cubic feet of air per
   minute.

ATSD at 11 & n.1.

 Petitioners argue that in so responding, IDEM bypassed the top-down

BACT analysis needed to ensure proper control of condensible PM emissions.
Union Pet’n at 13-14; COW Pet’n at 10. They contend that the series of statements
quoted above are conclusory, lacking in any supporting data or analysis in the
administrative record. Union Pet’n at 13. According to the Union, “IDEM has sim-

     23 The four technologies are dry sorption processes, carbon columns, condensers, and distilla-

tion. See Union/Fox Cmts at 27. The Union also suggested scrubbers as a control technology for con-
densible PM, see id., but IDEM had previously addressed that technology in its initial BACT analysis
for filterable PM. See TSD app. B at 17 (evaluating high energy wet scrubbers for control of filterable
PM). IDEM rejected scrubbers because they would have unacceptably high — in comparison to
baghouses — environmental and economic impacts (e.g., higher utility costs and generation of large
quantities of sludge). Id.

VOLUME 9
STEEL DYNAMICS, INC. 185

ply concluded that it is not feasible to control condensibles, without making an
earnest attempt to investigate the issue and without providing any analysis to sat-
isfy its burden of showing that a particular technology is technically or economi-
cally unachievable.” Union Pet’n at 14.

  In its response on appeal, IDEM argues that the control technologies the

Union suggests for use here “have not been applied to EAFs and were not consid-
ered to have a demonstrated or practical potential to achieve a high level of con-
trol for total PM due to the fact that they are not used on large industrial
processes, like the EAF.” IDEM Resp. at 13 (citing ATSD at 11); see NSR Man-
ual at B.12 (technologies lacking demonstrated potential to achieve highest levels
of control need not be considered in BACT analysis). IDEM also asserts that the
control technologies identified by the Union have not been demonstrated in a
commercial application on identical or similar emission units and thus are akin to
“innovative control technologies,” which are not required to be evaluated in a
BACT analysis. Id. (citing NSR Manual at B.13). IDEM apparently concludes
(without explicitly stating) that the four control options advanced by the Union
are not “available”24 in this context and thus were excluded from BACT review
under Step 1 of the top-down analysis. See id.; ATSD at 9-11.

   Petitioners, as proponents of a permit provision that is different from that

adopted by the permit issuer, have the burden of demonstrating clear error or
abuse of discretion in IDEM’s decision. See 40 C.F.R. §§ 124.13, .19(a); see also
In re Hawaii Elec. Light Co., 8 E.A.D. at 73 (EAB 1999) (burden of demonstrat-
ing review is warranted rests with petitioner); In re Maui Elec. Co., 8 E.A.D. 1, 7
(EAB 1999) (same). However, after IDEM claimed it was unaware of any large
facilities using any of the Union’s suggested technologies, petitioners failed to
identify in rebuttal even a single industrial facility, steel mill or otherwise, large
or small, nationwide or internationally, with such equipment in place or even un-
dergoing testing. See Union Pet’n at 12-15; COW Pet’n at 10. Similarly, petition-
ers failed to identify any facilities attempting to control condensible PM emis-
sions from an EAF using any technologies other than baghouses.25 They also

    24 According to the NSR Manual, the term “available,” as used in the first step of the top-down

BACT analysis, is defined as “those air pollution control technologies or techniques with a practical
potential for application to the emissions unit and the regulated pollutant under evaluation.” NSR Man-
ual at B.5. Availability should be construed in its broadest sense, with the goal of developing a com-
prehensive list of potentially applicable control options. In re Knauf Fiber Glass, GmbH, 8 E.A.D.
121, 130 (EAB 1999).

    25 In its comments on the draft permit, the Union identified two steel mills — IPSCO Steel of

Muscatine, Iowa and Nucor Steel of Crawfordsville, Indiana, which both use baghouses — as having
condensible PM emissions limits in place. See Union/Fox Cmts at 26-27. Neither of these mills, how-
ever, is mentioned in the portion of the Union’s petition addressing this issue, see Union Pet’n at 12-
15, nor are any facilities identified with respect to this issue in the COW petition. See COW Pet’n at
10.

                                                                                      VOLUME 9

186 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

failed to produce any evidence demonstrating that there is a strong reason to be-
lieve the Union’s suggested technologies are transferable to this type and size of
facility. Petitioners therefore have given us no reason to question IDEM’s decision
not to apply the four technologies. See, e.g., Hawaii Elec., 8 E.A.D. 71-72 (peti-
tioner must explain why permit issuer’s prior response to petitioner’s objections is
clearly erroneous or otherwise warrants review); see also In re Mecklenburg
Cogeneration Ltd. Partnership, 3 E.A.D. 492, 494 n.3 (Adm’r 1990) (“[A] permit
issuer does not commit clear error if it carefully considers the potentially transfer-
rable technologies in the context of a particular project * * * but its level of con-
siderati on or documentation nonetheless falls short of matching the level that
would be expected, for example, if the permit issuer were rejecting a top technol-
ogy with a proven track record in the same source category. A rule of reason
proportionate to the technology’s track record necessarily governs how much de-
tail and documentation must go into consideration of a particular technology.”).
Because we find no clear error or abuse of discretion in IDEM’s condensible PM
BACT analysis, we deny review on this ground.

        b. Filterable PM Limit as BACT

  Next, petitioners argue that the filterable PM limit, 0.0018 gr/dscf, is not

BACT. Union Pet’n at 15-20; COW Pet’n at 10-11. Petitioners introduced evi-
dence and arguments on this issue during the comment period and now claim that
IDEM ignored much of that information, choosing instead simply to reiterate its
position that 0.0018 gr/dscf is the most stringent filterable PM limit applied to any
EAF baghouse. On appeal, petitioners argue, in essence, that two dozen similar
steel mills emit less than the proposed filterable PM limit of 0.0018 gr/dscf. Peti-
tioners also argue that IDEM’s cost-effectiveness analysis, which found Gore-Tex
bags economically infeasible, improperly includes costs for a selective catalytic
reduction system that is used for NOx removal, not PM removal. Union Pet’n at

  1. Finally, petitioners argue that IDEM failed to set a filterable PM limit that will
    adequately protect people from the adverse health impacts of HAPs emitted as
    PM. Id. at 17-19. Each of these arguments is described more fully below.

    Petitioners begin by contending that a limit of 0.0018 gr/dscf is unreasona-
    bly high because numerous steel mills have actual filterable PM emissions lower
    than that limit. The Union points to EAF stack test measurements of filterable PM
    emissions from Nucor Steel, at 0.0017 gr/dscf; IPSCO Steel, at 0.0008 gr/dscf;
    and twenty-one other steelmaking facilities at 0.0001 to 0.0015 gr/dscf of filtera-
    ble PM emissions. Union Pet’n at 16 & exs. 1-A, -J. In addition, COW cites
    stack test results for Northstar Steel, at 0.00029 gr/dscf of filterable PM emis-
    sions. COW Pet’n at 10-11. This evidence, petitioners claim, proves that SDI’s
    limit is not the lowest achievable concentration for EAF baghouses. Union Pet’n
    at 19. Thus, because BACT requires the establishment of emissions limits “com-
    mensurate with the current state and capabilities of the chosen technologies,” peti-

VOLUME 9
STEEL DYNAMICS, INC. 187

tioners allege that IDEM erred in setting such a high limit. COW Pet’n at 11; see
Union Pet’n at 19-20.

  In response, IDEM argues that single stack tests, such as the ones cited, are

not representative of the level of emissions a source may consistently achieve
over a period of days and years. IDEM Resp. at 14. According to IDEM, “[t]o set
a limit based only on a stack test, or even a few stack tests, without information to
support the ability of a source to continuously achieve that limit, is inappropriate
and unrealistic since it would likely be setting the source up for non-compliance.”
Id.

  Amici disagree with this argument, pointing out that IDEM’s claim that

stack test data are inadequate to establish BACT performance levels “runs directly
counter to the approach outlined” in the NSR Manual and “call[s] into question
IDEM’s reliance on stack testing to demonstrate compliance.”26 Amicus Br. at 12
n.11; see NSR Manual at B.23-.24 (experiences of other sources (among other
things) “provide the basis for determining achievable [BACT] limits”; perform-
ance data (i.e., stack tests) and recent regulatory decisions should be used to iden-
tify BACT limits). However, Amici do not suggest a remand on this basis, claim-
ing instead that “[t]he information submitted to IDEM by the Petitioners did not
include adequate information to determine whether the limits obtained during the
stack tests would be practicably achievable by this proposed facility.”27 Amicus
Br. at 14.

  In our view, and contrary to petitioners’ arguments, IDEM appears to have

taken into consideration petitioners’ comments regarding the low actual emissions
achieved at the two dozen mills. For example, IDEM included direct but abbrevi-
ated responses to petitioners’ three specifically named examples (i.e., Nucor Steel,
IPSCO Steel, and Northstar Steel) in its response-to-comments document. See
ATSD at 10. Moreover, in its comment summary, IDEM quoted sentences that
immediately preceded and followed the Union’s statements about the twenty-one
low-emissions stack tests, which suggests at a minimum that an IDEM employee
read the Union’s comments regarding those tests. Compare Union/Fox Cmts at 27
with ATSD at 9. This inference is confirmed later in the response-to-comments
document, near the end of IDEM’s lengthy PM BACT response, when IDEM
asserts:

    26 The Union agrees with Amici, noting that IDEM’s “line of argument leads one to the conclu-

sion that source tests produce results that are ‘only occasionally achievable,’ which is not only untrue,
but also a rather strange position for a regulatory agency to take.” Union Reply at 11.
27 Unfortunately, Amici do not specify what further information they believe necessary to de-

termine whether the low emissions levels the Union cites could be practically achieved by SDI’s pro-
posed mill.

                                                                                       VOLUME 9

188 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

   The comments from the Union state[] the numbers lower than 0.0018
   gr/dscf as limits. However, these were the results of stack tests per-
   formed at sources with much higher limitations established in their
   permits. [IDEM] does not believe that enough information has been
   established to establish a lower limitation for the filterable portion of
   [PM].

ATSD at 11.

  This passage appears to be a reference to petitioners’ two dozen stack tests

and, furthermore, appears to indicate that IDEM was able to determine, from
some unspecified source or sources, the BACT limitations for those facilities.
While IDEM did not specify in the administrative record what information it be-
lieved to be lacking from petitioners’ examples, based on the totality of the cir-
cumstances, including the fact that IDEM considered and briefly responded to the
comments and gave extensive consideration to the overall filterable PM limit, we
find IDEM’s abbreviated treatment of petitioners’ evidence to be minimally ade-
quate and therefore have decided not to remand on this basis.28

   IDEM examined BACT analyses for fifteen steel mills and determined that

0.0018 gr/dscf is the lowest filterable PM BACT limit ever established for this
type of facility. See TSD app. B at 16-19 (six of fifteen mills in IDEM sample
have 0.0018 gr/dscf as filterable PM BACT; remainder have higher limits). Peti-
tioners do not dispute that this is the case. Union Reply at 14. Permit agencies
have discretion to set BACT limits at levels that do not necessarily reflect the
highest possible control efficiencies but, rather, will allow permittees to achieve
compliance on a consistent basis. In re Masonite Corp., 5 E.A.D. 551, 560-61
(EAB 1994); see In re Knauf Fiber Glass, GmbH, 9 E.A.D. 1,15 (EAB 2000)
(“There is nothing inherently wrong with setting an emission limitation that takes
into account a reasonable safety factor.”). IDEM appears to have essentially done
that in this case by opting for the most stringent filterable PM limit ever imposed
on similar facilities, albeit not the lowest level of emissions such facilities have
ever achieved. Indeed, while the Union’s stack test evidence suggests that a lower
limit may be achievable by some steel mills, we cannot on this record conclude,
without more, that it was clearly erroneous for IDEM to reject the Union’s evi-
dence in favor of the fifteen BACT determinations. See Amicus Br. at 14.

  Accordingly, we deny review of the filterable PM BACT limit of 0.0018

gr/dscf. We find no clear error or abuse of discretion in IDEM’s overall treatment
of this issue, nor do any other matters warrant an exercise of our discretion to

    28 It would have been much better practice for IDEM to have provided a more detailed re-

sponse to comments and not left petitioners guessing as to what further information it needed to estab-
lish a lower PM limitation.

VOLUME 9
STEEL DYNAMICS, INC. 189

grant review.29

          c. Justification of Total PM Emissions Limit

  Finally, petitioners claim that IDEM added the new 0.0052 total PM limit to

SDI’s permit without explaining why it selected that figure as opposed to a lower
figure. Union Pet’n at 14; COW Pet’n at 10. The Union contends that it supplied
two source tests from similar steel mills showing total PM emissions of 0.0017
gr/dscf (Nucor Steel, Crawfordsville, Indiana) and 0.0045 gr/dscf (IPSCO Steel,
Muscatine, Iowa), which suggest the 0.0052 gr/dscf limit chosen by IDEM is un-
reasonably high because it exceeds these two sources’ actual emissions. Union
Pet’n at 14-15.

   In response, SDI correctly points out that the Nucor stack test was con-

ducted using EPA Reference Method 5D, which measures filterable PM only;
thus the test is not instructive in the way the Union intended. SDI Resp. at 28; see
Union Pet’n ex. 1-I (Nucor stack test report); see also 40 C.F.R. pt. 60, app. A,
method 5D (“Determination of PM Emissions from Positive Pressure Fabric Fil-
ters”). SDI also notes that IPSCO’s stack test showed emissions of 0.0037 gr/dscf
condensible PM (i.e., greater than the 0.0034 gr/dscf implicitly attributed to con-
densible PM in SDI’s permit) and 0.0008 gr/dscf filterable PM (i.e., less than
SDI’s proposed filterable PM limit of 0.0018). SDI Resp. at 28 n.26; see Union
Pet’n ex. 1-K (IPSCO stack test report). SDI “vehemently disagrees” with any at-

   29 We also deny review on the basis of petitioners’ two alternate grounds for remand, which

consisted of allegations pertaining to (1) a Gore-Tex versus polyester bag cost-comparison chart, and
(2) HAPs emitted as PM and their purportedly adverse effect on human health.

    First, with respect to the bag-costing issue, petitioners claim that SCR costs are erroneously

included in the analysis and thus invalidate the conclusion that Gore-Tex bags are cost-ineffective in
comparison to polyester bags. Union Pet’n at 17. We note that IDEM rejected Gore-Tex bags for
reasons unrelated to cost concerns. See ATSD at 9-11 (explaining that at Tuscaloosa Steel in Alabama,
Gore-Tex bags are used because of their superior heat-resistance capabilities (the baghouse there is
extremely close to the EAF), and noting that Tuscaloosa Steel’s stack tests have not shown improved
PM-reduction performance over standard polyester bags, but rather equivalent performance). Moreo-
ver, petitioners did not rebut either of the heat or equivalent-performance premises upon which IDEM
relied to rule out Gore-Tex. In such circumstances, we find it unnecessary to consider the cost issue
raised by petitioners. There has been no showing of clear error or abuse of discretion on IDEM’s part.

   Second, with respect to the health/HAPs issue, IDEM has considerable discretion to evaluate

HAPs emissions and potential health impacts as part of its consideration of environmental impacts in
general. See NSR Manual at B.50-.53; see also In re North County Resource Recovery Assocs.,
2 E.A.D. 229, 230 (Adm’r 1986) (referencing statutory and regulatory definitions of BACT as requir-
ing consideration of environmental impacts). In this case, IDEM performed an air quality analysis for
HAPs and added permit limits for the HAPs of most concern (lead, manganese, mercury, beryllium,
and fluorides). IDEM Resp. at 16-17; see TSD app. C at 8-9; Permit § D.1.11. We find no clear error
or abuse of discretion in IDEM’s treatment of this issue.

                                                                                     VOLUME 9

190 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

tempt to set permit limits for its mill on the basis of this single stack test from
IPSCO Steel. SDI Resp. at 28.

   IDEM, for its part, contends that it had little information to guide its analy-

sis of a total PM limit. It surveyed fifteen steel mills with BACT installed
(baghouses in all cases) and found that only one mill, IPSCO Steel, had a total
PM emissions limit (all other mills had filterable PM-only limits). IDEM Resp. at
11; see TSD app. B at 17-18. IPSCO Steel’s total PM limit was 0.0025 gr/dscf,
Union Pet’n ex. 1-K, but because the mill tested out of compliance in November
1998, the limit is purportedly being revisited by the permitting authorities in Iowa.
See ATSD at 10; Union Pet’n ex. K (IPSCO Steel November 1998 stack test re-
sults). Thus, IDEM did not rely on IPSCO’s total PM limit, or its actual emissions
as demonstrated by the stack test, in its limit-setting analysis. See ATSD at 10.

   Instead, IDEM concluded from its review of the RACT/BACT/LAER

Clearinghouse30 and its fifteen-mill survey that 0.0018 gr/dscf is the most strin-
gent filterable PM limitation applied to an EAF and should be considered BACT.
See id. at 9-10; TSD app. B at 17-19. Petitioners’ comments did not change
IDEM’s conclusion on this point. ATSD at 9-10. IDEM then apparently decided
to attribute to condensible PM a maximum of 0.0034 gr/dscf, for a total PM limit
of 0.0052 gr/dscf. On appeal, IDEM contends that the condensible PM fraction
constitutes sixty-five percent of the total PM limit, which is consistent with the
Union’s estimate of condensible PM percentages in EAF exhaust gases (i.e., sixty-
two to seventy-six percent). IDEM Resp. at 11-12. IDEM also notes that the New
Source Performance Standard for EAFs requires that filterable PM emissions not
exceed 0.0052 gr/dscf. Id. at 11 & n.5.

  IDEM and SDI claim that IDEM’s approach to establishing a total PM limit

is similar to that taken by permitting authorities in two cases: In re AES Puerto
Rico L.P., 8 E.A.D. 324 (EAB 1999), aff’d sub nom. Sur Contra La Contamina-
cion v. EPA, 202 F.3d 443 (1st Cir. 2000), and In re Hadson Power 14, 4 E.A.D.
258 (EAB 1992). IDEM and SDI argue that in this case, as in those, the permit
issuer had very little information on actual emissions of the targeted pollutants.
When the issuers decided to set emissions limits that could be adjusted in accor-
dance with certain parameters, and in at least one case supported the limit with a
worst-case air quality analysis, the Board found such approaches to be reasonable.
See AES Puerto Rico, 8 E.A.D. at 354-57 (EAB 1999) (setting low emissions

    30 “RACT/BACT/LAER” stands for “Reasonably Available Control Technology/Best Availa-

ble Control Technology/Lowest Achievable Emission Rate.” Each of these acronyms refers to techno-
logical standards established by different sections of the CAA. BACT is the standard from the PSD
provisions of the CAA. See CAA § 165(a)(4), 42 U.S.C. § 7475(a)(4). The RACT/BACT/LAER
Clearinghouse contains information on emission controls and emission limits for industrial facilities
across the country. The Clearinghouse is organized by source category, thereby making it relatively
easy to access emission control information for a particular industrial enterprise.

VOLUME 9
STEEL DYNAMICS, INC. 191

limit with potential for upward adjustments, subject to a cap); Hadson Power,
4 E.A.D. at 288-93 (setting high emissions limit with potential for downward ad-
justments). Here, IDEM and SDI argue, IDEM conducted a worst-case air quality
analysis, and it set a reasonable limit based on all available data and subject to
adjustment in accordance with actual emissions data, just as the authorities in AES
Puerto Rico and Hadson Power did. IDEM Resp. at 12; SDI Resp. at 25-26.

  We agree that there is no clear error or abuse of discretion in IDEM’s han-

dling of this issue. While IDEM failed to explain its derivation of the 0.0052 fig-
ure in the response to comments document, it is nonetheless a simple calculation
to subtract the filterable PM limit, 0.0018 gr/dscf, from the total limit, 0.0052
gr/dscf, and thereby conclude that condensible PM is implicitly limited to 0.0034
gr/dscf. This condensible PM figure is approximately sixty-five percent of the to-
tal PM figure, which is in keeping with the Union’s own estimates of condensible-
to-total PM ratios. See Union/Fox Cmts at 26 (estimating that approximately
sixty-two to seventy-six percent of total PM emitted by EAFs, after controls, is
condensible PM). Thus, while IDEM should have clearly explained its decision-
making process in the record, see In re Knauf Fiber Glass, GmbH, 8 E.A.D. 121,
134-35 (EAB 1999), the reality in this case is that petitioners could deduce the
likely basis for IDEM’s choice of the total PM emissions limit and we are able to
discern that IDEM applied its considered judgment in setting that limit.31

  Moreover, we have not been presented with a compelling reason to believe

that IDEM’s failure to explain its total PM limit calculus led to a clearly erroneous
permit decision. See In re Mecklenburg Cogeneration Ltd. Partnership, 3 E.A.D.
492, 494 n.3 (Adm’r 1990) (“For a remand, there must be a compelling reason to
believe that the omissions led to an erroneous permit determination — in other
words, that they materially affected the quality of the permit determination.”).
Rather, it appears from IDEM’s explanations on appeal that a remand would elicit
nothing more from IDEM than a reassertion of those explanations. Accordingly,
we deny review of the total PM BACT limit. We find no clear error or abuse of

    31 Notably, we do not read Hadson Power or AES Puerto Rico in such a way as to sanction

cursory documentation of a BACT analysis where little permit limit and/or actual emissions informa-
tion is available, so long as the chosen limit is conditioned on certain parameters. Instead, permit
issuers must adequately document their decisionmaking processes. See, e.g., 40 C.F.R. § 124.17(a)(1)
(response to comments must specify reasons for any changes made between draft and final permits);
see also In re Ash Grove Cement Co., 7 E.A.D. 387, 417-18 (EAB 1997) (remanding RCRA permit
because permitting authority’s rationale for certain permit limits was not clear and therefore did not
reflect considered judgment required by regulations); In re Austin Powder Co., 6 E.A.D. 713, 720
(EAB 1997) (remand due to lack of clarity in permitting authority’s explanation). While for the rea-
sons noted in the text, under the circumstances here we have decided not to remand due to the lack of
explanation, permitting agencies should not view this as an invitation to avoid their responsibilities to
explain their decisionmaking. Imprecision on this front can both lead to potentially avoidable appeals,
with their attendant delays, and unnecessarily increase the potential for remand.

                                                                                       VOLUME 9

192 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

discretion in IDEM’s overall treatment of this issue, and no other issues warrant
an exercise of our discretion to grant review.

  2. NOx BACT for EAF

  The Union next contends that IDEM failed to require BACT for SDI’s emis-

sions of NOx from the EAF. Union Pet’n at 20-22. IDEM determined that combus-
tion controls consisting of low-NOx/oxyfuel burners constitute BACT in this con-
text. ATSD at 19-21; TSD app. B at 8-12. The Union, however, argues that
selective catalytic reduction (“SCR”) technology should have been chosen as
BACT. Union Pet’n at 22.

  In conducting its original NOx BACT review, IDEM evaluated four control

technologies, including SCR, and concluded that SCR was technically infeasible
for application to the EAF. TSD app. B at 8-9. IDEM explained:

  In order for a[n] SCR system to effectively reduce NOx emissions, the
  exhaust gas stream should have relatively stable gas flow rates, NOx
  concentrations, and temperature — steady-state system. The EAF op-
  eration is a highly transient process and is a batch operation. The tem-
  perature of the EAF exhaust gas will vary widely over the melt cycle,
  and the gas flow rates and NOx concentrations will exhibit a wide
  amplitude.

Id. at 9. This language is taken almost verbatim from SDI’s PSD application. See
IDEM Resp. ex. D at 12-13 (SDI’s BACT analysis). Notably, Dames & Moore,
the consultant that prepared this portion of SDI’s application, concluded that SCR
constitutes a “technology transfer” situation in the EAF context, because no other
EAF that it was aware of uses an SCR for NOx reduction. Id. at 13; see NSR
Manual at B.11 (“Opportunities for technology transfer lie where a control tech-
nology has been applied at source categories other than the source under consider-
ation.”). IDEM noted that in SCR systems, ammonia is injected into exhaust gases
upstream of a catalyst bed, upon which the ammonia reacts with NOx to form
nitrogen and water. IDEM Resp. at 9. IDEM stated:

  SCR systems are highly susceptible to catalyst poisoning due to con-
  tamination of the catalyst by reactive materials entrained in the EAF
  gas stream. Other problems with catalysts are their propensity to foul-
  ing and masking. Fouling occurs when the catalyst’s cell openings are
  plugged with a solid material. Masking occurs when the catalyst sur-
  faces are covered with residues [that] prevent their contact with the
  flue gas. The problems with catalyst poisoning, fouling, and masking
  would, at a minimum, require the placement of the SCR unit down-
  stream of the particulate control device (baghouse). Because SCR cat-
  alysts require high gas stream temperatures (500 to 1,100˚F), the gas

VOLUME 9
STEEL DYNAMICS, INC. 193

  stream would have to be reheated from approximately 200˚F to the
  proper operating temperature for the catalyst. This would require sub-
  stantial energy expenditure (natural gas combustion) and result in ad-
  ditional NOx emissions, not to mention CO emissions. SCR catalyst
  suppliers and manufacturers that were contacted confirm the above
  problems. Therefore, this technology is considered technically
  infeasible.

Id.

  In its response to comments, IDEM specified that to ensure proper SCR

function, 1.3 million cubic feet per minute of exhaust gases would have to be
reheated prior to entry into the SCR from the EAF baghouse. ATSD at 20-21.
This reheating process would be fueled by natural gas and would result in addi-
tional NOx and CO emissions. Id. at 20; TSD app. B at 9. IDEM found that these
environmental impacts, combined with the technical difficulties of applying a
steady-state technology to a highly variable manufacturing process, rendered SCR
infeasible. ATSD at 20; see IDEM Resp. at 19.

   According to the Union, “‘[a] permitting authority’s decision to eliminate

potential control options as a matter of technical infeasibility * * * must be ade-
quately explained and justified.’” Union Reply at 17 (quoting In re Knauf Fiber
Glass, GmbH, 8 E.A.D. 121, 131-32 (EAB 1999)). The Union argues that IDEM
erroneously failed to provide detailed information about exhaust stream character-
istics and technological capabilities to support its conclusion of SCR infeasibility,
in contravention to guidance set forth in the NSR Manual. Union Pet’n at 22 (cit-
ing NSR Manual at B.19). Indeed, the Union claims that IDEM advanced only
“cursory, conclusory, speculative, and unsubstantiated opinion” rather than actual
support for its decision. Id. at 20. The Union also argues that it provided IDEM
with information about two Japanese steel mills that installed SCR in the 1970s
and successfully used the technology to achieve NOx reductions of eighty-four to
ninety percent. Id. at 20-21; Union Reply at 15. The Union alleges that IDEM
failed to address this information in its response to comments and its BACT anal-
ysis, in contravention of EPA guidance directing consideration of technologies
employed internationally. Union Pet’n at 20-21 (citing NSR Manual at B.11-.12
(BACT analysis must identify technologies used outside the United States “to the
extent that the technologies have been successfully demonstrated in practice on
full scale operations”)).

 In defense of the BACT analysis, neither IDEM nor SDI raises the obvious

argument that the Union’s Japanese-mill comments were not considered because

                                                                      VOLUME 9

194 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

they were received after the close of the public comment period.32 Instead, IDEM
stresses that under the NSR Manual, only those international applications success-
fully demonstrated in practice need be considered. IDEM Resp. at 18 (citing NSR
Manual at B.11). IDEM apparently discounted the Union’s Japanese evidence be-
cause the two mills in question are no longer operating and virtually no data are
available regarding SCR performance at the mills.33 See id. For its part, SDI notes
that fuel oil and kerosene, which fueled the Japanese mills, Union Pet’n ex. 2, are
“markedly different” from the oxyfuel and natural gas it plans to burn, and empha-
sizes that “the emissions from such disparate processes cannot be compared to
SDI.” SDI Resp. at 41. Finally, SDI argues that the Union’s Japanese steel mill
information constituted an “insignificant comment” and thus did not warrant an
IDEM response. Id. (citing 40 C.F.R. § 124.17(a)(2) (permit issuer must briefly
respond to all “significant” comments) & In re NE Hub Partners, L.P., 7 E.A.D.
561, 582-84 (EAB 1998) (no duty to respond to insignificant comments), review
denied sub nom. Penn Fuel Gas, Inc. v. U.S. EPA, 185 F.3d 862 (3d Cir. 1999)).

   While the Union correctly identifies IDEM’s burden to justify its BACT

decision, it fails to carry its own burden of establishing that IDEM clearly erred or
abused its discretion in this BACT analysis. See 40 C.F.R. § 124.19(a) (burden
of demonstrating review is warranted rests with petitioner); accord In re
Kawaihae Cogeneration Project, 7 E.A.D. 107, 114 (EAB 1997); In re EcoEléc-
trica, L.P., 7 E.A.D. 56, 60-61 (EAB 1997). As we have explained, “[W]here an
alternative control option has been evaluated and rejected, those favoring the op-
tion must show that the evidence ‘for’ the control option clearly outweighs the
evidence ‘against’ its application.” In re Inter-Power of New York, Inc., 5 E.A.D.
130, 144 (EAB 1994); see In re Maui Elec. Co., 8 E.A.D. 1, 15 (EAB 1998).
Here, the Union submitted nothing challenging the steady-state requirements of

    32 Permitting authorities are under no obligation to consider comments received after the close

of the public comment period. See, e.g., 40 C.F.R. § 124.18(a)-(b) (final permit decisions must be
based on administrative record, which includes comments received during public comment period); id.
§ 124.13 (to ensure consideration of their comments, interested persons “must raise all reasonably as-
certainable issues and submit all reasonably available arguments supporting their position by the close
of the public comment period”).

   In this case, there is no dispute that the Union’s Japanese steel mill evidence was not received

by IDEM until after the public comment period closed. See Union Pet’n at 20-21 & exs. 2, 3-C
(explaining that it notified IDEM on June 3, 1999, approximately two weeks after the close of the
public comment period, that SCR technology had been used to control NOx emissions from EAFs in
Japan, and noting that later that month it sent IDEM a copy of correspondence it had received from
Hitachi Zosen, an SCR manufacturer, which indicated that SCR had been installed at two Japanese
steel mills in the 1970s and that the mills were no longer in operation).
33 The Union points to the correspondence it received from Hitachi Zosen, which lists “DeNO
x
Efficiency” for the mills as 90 and 84 percent, respectively, and “Outlet NOx” as 30 and 42 parts per
million, respectively. Union Reply at 15-16; Union Pet’n ex. 3-C. There is no information in the re-
cord, however, to substantiate when or how these removal levels were achieved or to explain the
operating parameters of the steel mills’ EAFs or SCR systems.

VOLUME 9
STEEL DYNAMICS, INC. 195

SCR, the varied state of the EAF, or the phenomena of SCR catalyst poisoning,
fouling, or masking in the EAF context. Moreover, the Union did not provide data
calling into question the significant temperature differential between the baghouse
and the SCR system, or the associated environmental impacts, identified by
IDEM. Whereas data or information on any of these issues may have provided us
sufficient reason to examine IDEM’s analysis further, a bald claim that the analy-
sis is “cursory” and “speculative” is simply not, on these facts, enough to substanti-
ate a grant of review. The Japanese mill evidence is similarly unpersuasive, given
its age, the mills’ lack of continued operation, the fuel and operational differences
among the three mills, and the paucity of information about SCR performance at
the Japanese mills.34 As Amici explain, the information “failed to describe
whether application of SCR was successful, or the manner in which it might have
been applied.” Amicus Br. at 17.

   In view of all the evidence, we find IDEM’s explanations in the original

BACT analysis and the response to comments to be reasonably detailed summa-
ries of the technical and environmental hurdles raised by the potential application
of SCR in this operational context. Moreover, IDEM’s analysis stands unrebutted
in any of its particulars. See Maui, 8 E.A.D. at 15-16 (EAB 1998) (petitioner’s
failure to rebut permit issuer’s reasons for rejecting a control option leads to de-
nial of review). Accordingly, we find no clear error or abuse of discretion in
IDEM’s determination of NOx BACT for the EAF.

   3. BACT for Reheat Furnace Emissions of NOx

          a. Background

  Next, petitioners, supported by Amici, challenge IDEM’s analysis of BACT

for NOx emissions from the reheat furnace. In its original BACT review for this
unit, IDEM evaluated four technologies: (1) combustion controls (e.g., low-
NOx/oxyfuel burners); (2) SCR; (3) Non-Selective Catalytic Reduction (“NSCR”);
and (4) Selective Non-Catalytic Reduction (“SNCR”). See TSD app. B at 23-24;
see also id. at 8-10. IDEM found combustion controls and SNCR to be technically
feasible, expressed reservations about SCR’s technical feasibility (because of
compliance problems with an SCR/reheat combination at Beta Steel in Portage,
Indiana), and apparently found NSCR to be technically infeasible.35See id. at 23-

    34 Petitioner’s exhibits 2 and 3-C contain a limited amount of information about the two Japa-

nese steel mills. See Union Pet’n exs. 2, 3-C; supra note 33. That information, however, is not suffi-
ciently developed or supported to allow us to draw meaningful conclusions about SCR performance or
operating conditions at the mills.

   35 We say “apparently” here because IDEM is wholly silent on the subject of NSCR. See TSD

app. B at 23-24. However, because IDEM did not consider NSCR’s economic feasibility, we infer that
the Department likely considered NSCR to be technically infeasible.

                                                                                     VOLUME 9

196 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

  1. IDEM then determined that SCR’s cost-effectiveness was $4,300 per ton of
    NOx removed and that SNCR’s ranged from $5,300 to $5,700 per ton. IDEM de-
    cided these figures made SCR and SNCR economically infeasible and concluded
    that BACT for NOx emissions from SDI’s reheat furnace consisted of natural gas-
    fired, ultra low-NOx burners with an emissions factor of 0.11 lbs/MMBtu. Id. at
    24.

    In comments on the proposed permit containing this BACT determination,
    the Union and EPA Region V separately pointed out that Beta Steel’s compliance
    problems were caused by design issues, not failures in technical capability.36
    ATSD at 1-2. On the economic side, Region V observed that IDEM’s economic
    analysis did not specify a dollar amount “by which one technology would be con-
    sidered economically infeasible and another would be feasible” and noted that it
    had previously permitted “many controls for various units that have exceeded
    $7500/ton of pollutant removed.” Union Pet’n ex. 6-7 (Electronic Mail from
    Kushal Som, EPA Region V, to IDEM (Apr. 5, 1999)). Region V concluded by
    asserting that, with a cost analysis figure of $4,300 per ton of NOx removed, SCR
    should be BACT for the reheat furnace. ATSD at 2; COW Pet’n ex. 2, at 1 (Letter
    from Pamela Blakley, EPA Region V, to Paul Dubenetzky, IDEM (Apr. 30,
    1999)) (“EPA Cmts”).

    In its response to the comments regarding technical feasibility, IDEM stated
    that “SCR operates best when inlet NOx concentration and exhaust temperature
    are constant.” ATSD at 2-3. IDEM then asserted that reheat furnaces are not
    steady-state processes with constant NOx and temperature levels, so SCR would
    not be an appropriate control device for such a furnace. Id. at 3. IDEM stressed
    that Beta Steel continued to have operational problems and had not consistently
    been able to achieve its targeted ninety percent NOx reduction. Id. Moreover,
    IDEM speculated that SDI’s mill would have more difficulties with SCR than
    Beta’s mill because Beta manufactures only one product, whereas SDI will manu-
    facture a variety of steel products and thus will have more variable furnace firing
    rates and frequent steel roll changes, which will adversely affect the efficacy of an
    SCR system. Id. at 3-4. IDEM concluded by stating that it still questioned whether

    36 For instance, the Union mentioned that duct insulation located upstream from the SCR had
    

disintegrated and clogged the SCR catalyst, which Beta later had cleaned. ATSD at 2; Union/Fox
Cmts at 21-22. The Union also noted that Beta’s SCR manufacturer “believes the SCR has achieved
vendor guarantees, that the problem was not related to the SCR system, but rather upstream design
flaws, and that the problem has been corrected.” ATSD at 2; Union/Fox Cmts at 21.

    In informal comments submitted to IDEM on April 5, 1999, Region V notes that the Beta Steel

catalyst contractor and “SCR expert,” Doug Hennigen, told the Region that “SCR is certainly techni-
cally feasible with the continuous nature, and size, of the SDI process.” Union Pet’n ex. 6-7 (Electronic
Mail from Kushal Som, EPA Region V, to IDEM (Apr. 5, 1999)). EPA reiterates in its formal com-
ments its view that SCR is technically feasible for steel reheat furnaces and is BACT for NOx here.
COW ex. 2 at 1.

VOLUME 9
STEEL DYNAMICS, INC. 197

SCR is technically feasible in this context. Id. at 4; see also IDEM Resp. at 20
(arguing that IDEM determined “SCR may or may not be technically feasible”).

  On the economic side, IDEM at some point asked SDI “to provide a more

detailed economic analysis” so that the Department could respond to comments on
the draft permit. IDEM Reply at 4. SDI proceeded to obtain SCR specifications
from its reheat furnace vendor and transmitted those specifications to two SCR
vendors, who subsequently supplied bids to provide a facility-specific SCR sys-
tem. Id. After receiving this information, IDEM explained in the response-to-
comments document that the $4,300-per-ton figure it had relied on at the draft
permit stage was based on a generic SCR system designed to meet eighty percent
removal from a unit that met steady-state conditions. ATSD at 4. The facility-
specific bids obtained by SDI revealed that the actual costs were substantially
higher than IDEM’s original $4,300 estimate. Specifically, one vendor proffered a
bid of $19,000 per ton of NOx removed (at ninety percent control efficiency), and
the other bid, from the manufacturer of Beta Steel’s SCR, came in at $33,785 per
ton (also at ninety percent control efficiency).37 IDEM Reply at 4. Based on these
figures, IDEM concluded that SCR was economically infeasible for the reheat
furnace. ATSD at 4.

   On appeal, petitioners allege that IDEM erred in eliminating SCR from con-

tention and argue that, contrary to IDEM’s findings, SCR is both technically and
economically feasible. Union Pet’n at 23; see COW Pet’n at 11. Petitioners claim
that in determining SCR’s feasibility, IDEM failed to conduct a thorough and in-
dependent BACT evaluation and instead relied on inaccurate and misleading in-
formation provided by SDI. Union Pet’n at 24; COW Pet’n at 11. Amici, for its
part, also criticize IDEM’s treatment of this issue, arguing that SCR is technically
feasible and that IDEM clearly erred in its consideration of SCR’s economic feasi-
bility for the reheat furnace. Amicus Br. at 19; Amicus Reply at 12-20.

   As evidence that SCR is technically feasible, petitioners point to the exper-

iences of Beta Steel in Portage, Indiana. Beta installed SCR technology on its
reheat furnaces in 1992, and at least one of its stack tests, from March 10-11,
1999, indicates average NOx emissions of 0.019 lb/MMBtu. Union Pet’n ex. 3, att.
D. This actual emissions figure is well below the 0.11 lb/MMBtu NOx limit IDEM
established for SDI’s reheat furnace. See Permit § D.5.1. As to economic feasibil-
ity, the Union alleges that SDI submitted “substantial additional information” on
the cost-effectiveness of SCR after the public comment period closed on May 14,
1999. See Union Pet’n at 24 & ex. 6-8. This information included comparisons of
the SDI and Beta reheat furnaces and a reheat furnace at Tuscaloosa Steel in Ala-

    37 The ATSD erroneously reports this bid as $35,192. See ATSD at 4; IDEM Resp. at 25 n.10

(acknowledging the “$35,192 [figure] is the incremental cost effectiveness for SCR at 50% removal
efficiency,” not 90% removal efficiency).

                                                                                VOLUME 9

198 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

bama; design data for SDI’s reheat furnace; bids from two vendors (mentioned
above) to purchase and install the SCR system at SDI’s proposed mill; and revised
estimates of SDI’s SCR-related capital and operating costs. Id. ex. 6-8. The Union
submitted its own analysis of this information on June 30, 1999, questioning
much of the information and urging IDEM to gather additional data before mak-
ing the final permit decision. Union Pet’n ex. 3. According to the Union, IDEM
did not acknowledge its June 30th analysis in the response-to-comments docu-
ment issued with the permit on July 7, 1999, but rather adopted the “technically
flawed” and “misleading” information provided by SDI. Id. at 25.

  Neither IDEM nor SDI dispute that IDEM received SDI’s revised cost-ef-

fectiveness information after the close of the public comment period or that IDEM
relied on SDI’s newly submitted information in making its final BACT decision.38
See ATSD at 3-4. As a result of its reliance on SDI’s new information, IDEM’s
final NOx BACT analysis for the reheat furnace is markedly different from its
draft analysis. Compare TSD app. B at 9, 23-24 with ATSD at 2-4. For instance,
IDEM reports the SCR bid information SDI relayed to it (i.e., estimates of
$19,000/ton and $33,785/ton at ninety percent removal efficiency) and concludes
on this basis that SCR is economically infeasible. In addition, as support for its
reservations about SCR’s technical feasibility, IDEM states that one of the two
SCR bidders withdrew its bid when it determined that it could not guarantee sev-
enty percent NOx removal given the projected wide fluctuations in flue gas tem-
perature and flow rate inputs to the SCR. ATSD at 4.

  IDEM did not address in its response to comments the Union’s detailed June

30th analysis of IDEM’s revised BACT determination and underlying data. In that

   38   IDEM explains the sequence of events as follows:

   IDEM recognizes that Beta Steel has been able to achieve lower NOx emissions with
   the use of SCR, and therefore when public comments asked IDEM to further investi-
   gate SCR, IDEM requested that SDI provide a more detailed economic analysis. A.C.
   Leadbetter & Son, Inc. (“Leadbetter”), the reheat furnace supplier, provided informa-
   tion to SDI relating to the design parameters of the SCR system. * * *

   Subsequently, SDI obtained two bids. Wheelabrator Air Pollution Control, Inc. (“Whee-
   labrator”) submitted the first bid, which was later withdrawn for technical infeasibility.
   * * * The second bid was submitted by Huntington Environmental Systems, Inc.
   (“HES”), the same firm that designed Beta Steel’s SCR. * * * The Union submitted
   information to IDEM claiming some of the costs were overestimated and unreasonable.
   * * * Consequently, SDI submitted the “Overly Conservative Estimated Capital and
   Operating Costs” to IDEM * * *.

IDEM Reply at 4-5 (citations omitted).

   Amici set forth their own version of events in their reply brief. See Amicus Reply at 3-6. This

chronology reveals that the vast majority of IDEM’s economic analysis for SCR occurred after the
close of the public comment period. See id.

VOLUME 9
STEEL DYNAMICS, INC. 199

analysis, the Union raises numerous specific questions about IDEM’s technical
and economic SCR analyses, contending, for example, that the design parameters
included in SDI’s data are incomplete; that three months to a year or more of
continuous operating data from other reheat furnaces should be reviewed; and that
varying operating conditions and changes in product mix could be accommodated
through the use of permit conditions. Union Pet’n ex. 3 at 2-4. The Union also
lists thirteen specific costs it believes were overestimated and gives facially plau-
sible reasons for each such challenge. See id. at 5-9. Finally, the Union claims that
because Wheelabrator Air Pollution Control Inc., the vendor that withdrew its
SCR bid, is allegedly “not a major vendor of SCR systems and has not historically
had a major presence in this field,” SDI “should be encouraged to obtain price
quotes and performance guarantees from other SCR vendors.”39 Id. at 9-10.

  Petitioners and Amici raise several questions about the series of events sum-

marized above, including: (1) whether IDEM complied with the procedural re-
quirements of federal PSD permitting in this instance; and (2) whether IDEM rea-
sonably decided, using its considered judgment, the substantive
issues — technical and economic — pertaining to potential SCR application to
SDI’s reheat furnace. As to the first issue, the parties on both sides have strong
views on whether or not IDEM committed procedural errors in its handling of the
SCR data that was put into the record after the close of the public comment pe-
riod. We find that, in light of our disposition of the issues in Part II.B.3.b.ii below,
and in particular our decision to remand the BACT determination for the reheat
furnace, it is not necessary to decide this question. The substantive questions,
however, are addressed in turn below.

           b. Substantive Issues

                   i. Technical Feasibility

   Under Step 2 of the top-down BACT guidance contained in the NSR Man-

ual, a technology is considered to be “technically feasible” if it is “demonstrated,”
meaning that it has been installed and operated successfully on the type of source
under review. NSR Manual at B.17. If a technology is not demonstrated, then it
will be deemed technically feasible only if it is commercially available and “appli-
cable” to the equipment under consideration. Id. at B.17-.18. Applicability is gen-
erally assumed in cases where a commercially available control option has been
or is soon to be deployed on the same or a similar source type. Id. at B.18. Indeed,
“[d]eployment of the control technology on an existing source with similar gas

    39 The Union notes that the Institute of Clean Air Companies, a nonprofit association of air

pollution control companies, identifies Wheelabrator as a provider of many types of pollution control
equipment (such as electrostatic precipitators, fabric filters, and flue gas desulfurization systems), but
does not include the company on its list of SCR or SCR catalyst vendors. Union Pet’n ex. 3 at 9-10.

                                                                                        VOLUME 9

200 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

stream characteristics is [a] generally sufficient basis for concluding technical fea-
sibility barring a demonstration to the contrary.” Id. at B.18-.19.

   However, the NSR Manual further explains:

   For process-type control alternatives the decision of whether or not it
   is applicable to the source in question would have to be based on an
   assessment of the similarities and differences between the proposed
   source and other sources to which the process technique had been ap-
   plied previously. Absent an explanation of unusual circumstances by
   the applicant showing why a particular process cannot be used on the
   proposed source[,] the review authority may presume it is technically
   feasible.

Id. at B.19.

   In this case, IDEM did not make a definitive decision about SCR’s technical

feasibility. Instead, IDEM claimed that “Beta Steel has not been able to meet de-
signed 90+% reduction[] [and, moreover,] has inconsistently been able to achieve
a level of reduction greater than that seen by low NOx burner technology,” the
technology chosen as BACT for SDI. ATSD at 3. IDEM also described antici-
pated variations in conditions at SDI’s reheat furnace as being more extreme than
those at Beta Steel’s given the wide array of steel shapes to be produced at SDI.40
Id. at 3-4. IDEM concluded by expressing its belief that “the problems at Beta
would be magnified in a system such as proposed by SDI. For these reasons,
[IDEM] questions whether SCR is technically feasible, but in any case does not
believe that SCR would work as intended.” Id. at 4; see also IDEM Resp. at 20
(arguing that IDEM determined “SCR may or may not be technically feasible”).

   The Union marshals a two-pronged attack on IDEM’s equivocal position on

this issue. First, the Union challenges IDEM’s implicit conclusion that SCR is not

    40
       For example, the new analysis found SDI’s “walking beam” furnace to be substantially more

variable than the “pusher” furnace used by Beta. Referencing a comparison of SDI’s and Beta’s reheat
furnaces prepared by SDI, the Union explains the differences between the two types of furnaces as
follows:

   [T]he Beta furnace is a “pusher” furnace while the proposed SDI reheat furnace is a
   “walking beam” furnace. A pusher furnace is a batch furnace in which cold steel is
   manually “pushed” into the front end of a hot furnace and hot metal is pushed out the
   back end every 6 to 7 minutes. A walking beam furnace, on the other hand, is a contin-
   uous process that is electronically controlled. Steel moves constantly down the length
   of the furnace.

Union Pet’n ex. 3 at 3 (footnote omitted). Contrary to IDEM’s findings, the Union concludes that
“typically, operating conditions should be much more variable and fluctuate substantially more in a
pusher furnace than a walking beam furnace.” Id.

VOLUME 9
STEEL DYNAMICS, INC. 201

“demonstrated” because it has not been entirely “successful” at Beta. According to
the Union, “unrefuted source tests and other emission measurements separately
placed into the record by each party demonstrate that [Beta Steel’s] SCR currently
is consistently achieving a NOx limit of 0.02 lb/MMBtu.”41 Union Reply at 28
(citing five purported examples of such data). Second, the Union contends that the
“unusual circumstances” IDEM describes are surmountable and do not merit a
conclusion that SCR is not “applicable” to SDI’s furnace. In this regard, the Union
raises a series of technical arguments challenging IDEM’s findings on SCR capa-
bilities.42 Id. at 25-28. The Union also takes issue with SDI’s product mix, which
it claims was changed after the close of public comment, and contends that the
impact of these changes on permitted emission units and the BACT analysis was
not subject to public review. Union Pet’n at 27-28.

   In general, we accord deference to permitting agencies when technical is-

sues are in play. As SDI rightly notes, the Board “assigns ‘a heavy burden to per-
sons seeking review of issues that are quintessentially technical.’” SDI Reply at 9
(quoting In re Ash Grove Cement Co., 7 E.A.D. 387, 403 (EAB 1997)). In this
case, however, we have the unusual situation in which we have no technical feasi-
bility decision from the permitting agency (although we do have strong indicators
that, if pressed, the agency might well make a finding of infeasibility). We also
have the EPA regional office, which granted IDEM its delegated PSD authority,
opining that SCR is technically feasible for this application. ATSD at 1-2; see
Amicus Br. at 20; Amicus Reply at 4.

  We do not find IDEM’s nondecision on the technical feasibility question to

be clearly erroneous or an abuse of discretion given the complexity of the issue
and the fact that IDEM found SCR to be economically infeasible (irrespective of
whether it is technologically infeasible). We therefore will not remand on the
merits of this issue. However, absent a definitive decision by IDEM on remand

   41 The Union also identifies four design flaws in the Beta Steel reheat furnace/SCR configura-

tion and claims that “[c]onsultants to Beta expect that the resolution of these control issues will allow
the SCR system to meet permit limits.” Union Pet’n at 24. The four purported design flaws are: (1)
improper insulation used in upstream ducting disintegrated and clogged SCR catalyst; (2) NOx control
monitor was situated at SCR outlet rather than inlet, making it more difficult to control NOx levels
during transient conditions; (3) approximately 10 percent of exhaust flow bypassed the SCR system
due to operator error; and (4) a section of heat exchanger tube sheet failed, resulting in exhaust tem-
peratures lower than those required for optimal SCR operation. Id. at 23-24.
42 For example, the Union argues that IDEM has not substantiated its claim that SCR systems

are not an appropriate control device for nonsteady-state processes. The Union lists several ways in
which transient conditions could be accommodated, such as by employing premixing chambers to
dampen NOx fluctuations; using burners, fans, and/or heat exchangers to stabilize temperatures; choos-
ing appropriate catalysts; and electronically coupling furnace burner operation to the SCR control sys-
tem. Union Pet’n at 26. Another example involves the issue of catalyst plugging caused by high partic-
ulate levels, which the Union contends could be resolved by using a larger volume of catalyst with
larger openings or by periodic cleaning. Id. at 28.

                                                                                       VOLUME 9

202 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

regarding technical feasibility, it is appropriate for us to presume that SCR is tech-
nologically feasible.

                  ii. Economic Feasibility

   In determining whether BACT for a pollutant should be based on a particu-

lar control technology, the permit issuer must consider the economic impacts of
using that technology. 40 C.F.R. § 52.21(b)(12) (BACT definition); see NSR
Manual at B.26 (economic feasibility considered in Step 4 of top-down BACT
analysis). In general, a permit issuer will gauge economic impacts by estimating
the average43 and incremental 44 cost-effectiveness of various pollution control op-
tions, measured in dollars per tons of pollutant emissions removed. See, e.g., In re
Masonite Corp., 5 E.A.D. 551, 564 (EAB 1994); NSR Manual at B.31. The
agency will then compare a control option’s cost-effectiveness

   with what other companies in the same industry have been required to
   pay in recent BACT determinations to remove a ton of the same pol-
   lutant. In most cases, a control option is determined to be economi-
   cally achievable if its cost-effectiveness is within the range of costs
   being borne by other sources of the same type to control the pollutant.
   [In re Inter-Power of New York, Inc., 4 E.A.D. 130, 135 (EAB 1994);
   NSR Manual at B.44.] “In the absence of unusual circumstance[s], the
   presumption is that sources within the same [source] category are
   similar in nature, and that [they can bear the same] cost[s] and other
   impacts.” [NSR Manual] at B.29.

Masonite, 5 E.A.D. at 564.45

    43 “The ‘average cost-effectiveness’ of a particular technology is calculated by dividing the

average annualized cost of installing and operating the control technology by the tons per year of
pollutant that the technology would remove.” In re Masonite Corp., 5 E.A.D. 551, 564 (EAB 1994)
(citing NSR Manual at B.37).
44“Incremental cost-effectiveness” is calculated by comparing the costs and emissions per-
formance levels of one pollution control option to those of the next-most-stringent control option. NSR
Manual at B.41.
45The NSR Manual sets forth further guidance on this subject:
Before costs can be estimated, the control system design parameters must be specified.
The most important item here is to ensure that the design parameters used in costing are
consistent with emissions estimates used in other portions of the PSD application * * *.

   To begin, the limits of the area or process segment to be costed [should be] specified.
   This well defined area or process segment is referred to as the control system battery
   limits. The second step is to list and cost each major piece of equipment within the
   battery limits. The top-down BACT analysis should provide this list of costed equip-
   ment. The basis for equipment cost estimates also should be documented, either with
                                          Continued

VOLUME 9
STEEL DYNAMICS, INC. 203

  In this case, IDEM’s economic analysis is derived from information SDI

submitted, at IDEM’s request, IDEM Reply at 4, after the close of the public com-
ment period. See Amicus Reply at 3-6 (chronology of events). The information
consisted of reheat furnace design specifications compiled by A.C. Leadbetter &
Son, Inc., the furnace vendor; letters and bids from the two SCR vendors; and
estimated capital and operating cost projections provided by SDI (and apparently
adopted by IDEM) for various NOx control efficiency levels. See Union Pet’n ex.
6-8. As mentioned in Part II.B.3.a above, the vendors submitted bids of $19,000
and $33,785 per ton, respectively, for a site-specific SCR system targeted to
achieve ninety percent removal of NOx from the reheat furnace’s exhaust stream.
See ATSD at 4. IDEM relies on this information to conclude that SCR is not
economically feasible for SDI’s reheat furnace. Id.

   In its June 30th comments and again on appeal, the Union raises numerous

challenges to IDEM’s economic analysis and underlying data. First, the Union
claims the reheat furnace’s design specifications, provided by Leadbetter, were
incomplete, and therefore independent review of these important parameters was
foreclosed.46 Union Pet’n at 28-29 & ex. 3 at 2-4. Second, the Union argues that
the cost-effectiveness analyses contained in the record “grossly exaggerate the
costs of SCR by using cost factors for other, more expensive technologies and
innumerable technically flawed assumptions, documented in [Union Pet’n] Ex-
hibit 3.”47 Union Pet’n at 28. Third, the Union contends that the cost-effectiveness

(continued)
data supplied by an equipment vendor (i.e., budget estimates or bids) or by a referenced
source [such as the OAQPS Control Cost Manual (Fourth Edition), EPA 450/3-90-006,
January 1990, Table B-4].

NSR Manual at B.32-.33.
46 In particular, the Union contends that the following information is needed to design and cost

an SCR system for SDI: (1) average and maximum NOx inlet and outlet concentrations or mass flow
rates; (2) flue gas water and oxygen content; (3) exhaust temperatures; (4) ammonia slip; (5) particu-
late loading; (6) any pressure drop considerations; and (7) turndown ratios. Union Pet’n ex. 3 at 2. In
addition, the Union points out that Leadbetter did not specify the flue gas NOx rate of change, in
pounds of NOx per hour per minute, for various operational states of the reheat furnace. Without this
information, the Union argues, there is “no support for the vendor quotes in the cost effectiveness
analysis.” Id.
47 In its June 30th comments (Union Pet’n ex. 3), the Union identified the following alleged

overestimated or unnecessary costs: (1) $56,000 for a “noise dampened compressor housing”; (2)
$80,000 for a “CEM ammonia system”; (3) $206,000 for instrumentation (temperature probes, inlet
flowrate, NOx measurements); (4) $103,000 for freight costs; (5) $299,000 for foundations and sup-
ports; (6) $996,000 for handling and erection of the SCR system; (7) $747,000 for piping; (8)
$249,000 each for engineering/supervision and construction/field expenses; (9) $99,000 per year plus
benefits for 1.5 full-time SCR operators; (10) $360 per ton for ammonia, including vaporizer rental;
(11) $249,000 for emergency response training; (12) $125,000 every two years for catalyst replace-
ment; and (13) $457,000 for overhead. Union Pet’n ex. 3 at 6-9; id. ex. 6-8. In each case, the Union
Continued

                                                                                       VOLUME 9

204 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

analyses failed to consider both average and incremental costs, contrary to the
recommendations of the NSR Manual guidance. Union Pet’n at 29 (citing NSR
Manual at B.41). Fourth, the Union claims IDEM failed to compare SDI’s pro-
jected costs to the costs incurred by other similar sources, again in contravention
of NSR Manual guidance. Id. (citing NSR Manual at B.31-.32).

   Although the Union included many of these charges in its June 30th com-

ments, IDEM addressed none of them in its response to comments. See ATSD at
1-4. IDEM therefore presents its first written responses in its appellate briefs.
First, IDEM claims that an incremental cost analysis, which compares two or
more control options, is “illogical and without meaning” because low-NOx burners
are built into reheat furnaces and allegedly cannot be separately costed and com-
pared to a stand-alone system such as SCR.48 IDEM Resp. at 23-24. Second,
IDEM claims that it did provide average and incremental cost estimates, contrary
to the Union’s charge. Id. at 24; see id. ex. E. Third, IDEM contends that Leadbet-
ter, the reheat furnace vendor, supplied adequate design specifications to the two
SCR vendors, enabling the SCR vendors to design and cost their SCR systems
accurately. Id. at 24. Finally, IDEM claims that SDI’s final revised cost estimate,
which is titled “Overly Conservative Estimated Capital and Operating Costs,” con-
tained changes to SDI’s original estimate that were based on the Union’s June 30,
1999 comments. Id. at 25. According to SDI, even after it incorporated “most” of
the Union’s “unrealistic and unfounded” assumptions in the estimate, it still com-
puted SCR’s cost-effectiveness as a “staggering” $19,546 per ton of NOx removed.
SDI Resp. at 48-49.

  Amici weigh in on the Union’s side, claiming that the economic analysis

contains no comparison of SCR costs to those of similar sources. Amicus Br. at

  1. Amici also argue that cost data for the major pieces of equipment within the
    SCR system are lacking. Id. at 22, 26. Amici state:

    Considering that SDI’s cost effectiveness escalated dramatically from
    $4,300 to over $30,000, then reduced to a purportedly final figure of
    $19,546, calculated after close of public comment period, and that no
    cost comparison with similar sources or any costs or basis for costs of
    major pieces of equipment was provided, more comprehensive and
    detailed project cost data should have been provided.

(continued)
provided a facially plausible explanation of why the costs were overestimated or not needed or re-
quested further documentation. See id. ex. 3 at 6-9.

   48 The Union disputes this, stating that “low-NO burners are never ‘inherently part of’ any
                                                     x

piece of fired equipment, including heaters. They are typically separately manufactured by specialty
vendors and are never used unless required for regulatory purposes because they are more expensive
than conventional burners.” Union Reply at 23-24 (footnote omitted).

VOLUME 9
STEEL DYNAMICS, INC. 205

Id. at 26 (supporting argument by quoting NSR Manual at B.35, which states,
“[W]here initial control cost projections on the part of the applicant appear exces-
sive or unreasonable (in light of recent cost data)[,] more detailed and comprehen-
sive cost data may be necessary to document the applicant’s projections.”).

   We agree with the Union’s and Amici’s assessment of this situation. The

NSR Manual suggests that where the top pollution control candidate — here SCR
— is found to be inappropriate due to economic impacts, the rationale for the
finding should be “fully documented for the public record.” NSR Manual at B.29;
see In re Knauf Fiber Glass, GmbH, 8 E.A.D. 121, 131 (EAB 1999) (“A permit-
ting authority’s decision to eliminate potential control options * * * due to collat-
eral impacts[] must be adequately explained and justified.”). IDEM has not fully
documented, for public review, its economic analysis. We have been unable to
detect, nor have we been directed to, any information in the administrative record
about SCR costs at other steel mills or other facilities. Yet this kind of informa-
tion is recommended for inclusion in a complete and thorough cost-effectiveness
analysis.49NSR Manual at B.31-.32, .35; see In re Masonite Corp., 5 E.A.D. 551,
564 (EAB 1994) (cost-effectiveness data are “compared with what other compa-
nies in the same industry have been required to pay in recent BACT determina-
tions to remove a ton of the same pollutant”); In re Inter-Power of New York, Inc.,
5 E.A.D. 130, 149 (EAB 1994) (absence of comparative cost-effectiveness data
“makes a cost-effectiveness determination more vulnerable to attack”).

   IDEM and SDI argue that no cost data exist for Beta Steel’s SCR because

Beta adopted the technology voluntarily; IDEM and SDI also contend that no
other similar facilities exist. IDEM Reply at 6-7; SDI Reply at 15. Amici rightly
point out that IDEM could have — and indeed should have — asked Beta’s SCR
vendor to describe whether, how, and why SDI’s SCR cost estimate differed from
Beta Steel’s. Amicus Reply at 19. In addition, Amici note that several other recent
NOx BACT analyses have been conducted for reheat furnaces, and “[t]hough these
facilities rejected SCR, an explanation of the differences between SDI’s estimate
and these estimates still could have been [provided].” Id. Finally, in light of the
fact that SDI’s cost-effectiveness estimate appears to be five-to-ten times higher
than any of five recent reheat furnace/SCR estimates calculated for other steel
mills (which Amici found ranged from $3,000 to $6,000 per ton of NOx removed,

    49 SDI disputes the contention that cost-comparison data are required as part of the BACT

economic analysis. SDI Reply at 15. As support, SDI argues that our decision in Masonite “found that
a permitting agency could not use other facilities’ cost estimates as a basis for its BACT determina-
tion.” Id. at 15 n.20. Masonite simply cannot be read to support such a broad proposition. See In re
Masonite Corp., 5 E.A.D. 551, 563-69 (EAB 1994) (finding that other facilities were not similarly
situated to Masonite because they did not already have regenerative thermal oxidizer technology in-
stalled on-site); see also id. at 567 n.22 (“We reject [petitioner’s] argument that [cost] comparisons to
other facilities are irrelevant.”).

                                                                                       VOLUME 9

206 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

id. at 17-18), IDEM should have carefully investigated and independently evalu-
ated the cost analyses submitted by SDI.

  We have also found in the record and briefs no costing information on the

major pieces of equipment within the SCR system. According to SDI’s analysis,
that equipment consists of “catalyst, housing, ammonia injection grid, internal
support structure, housing and frame, inlet ductwork, and ammonia/air dilution
skid.” Union Pet’n ex. 6-8 (Estimated Capital and Operating Costs tables). IDEM
and SDI suggest that it is impossible to separate out these costs, see IDEM Reply
at 6; SDI Reply at 15, but surely at least some of the figures, such as catalyst
costs, could be independently priced.50

   In this case, it is important to specify these costs, to the greatest extent pos-

sible, not only because the NSR Manual suggests doing so is part of a sound eco-
nomic analysis, see NSR Manual at B.32-.33, but also because of the multiplying
effect the costs have on the rest of the analysis. Thirteen of the other items listed
in SDI’s estimated cost tables are determined as percentages of the total purchased
equipment cost (“PE”), of which the SCR cost is the largest component. For exam-
ple, in SDI’s “Overly Conservative Estimated Capital and Operating Costs” table,
the total PE is $5,483,500. The SCR portion of this figure is $5,250,000. Cost
items such as “engineering and supervision,” “construction and field expenses,”
and “contractor fees” are each calculated as ten percent of PE, or $548,000
each.51See Union Pet’n ex. 6-8. One only need compare these costs to those con-
tained in the original cost estimate, which were $249,000 for each of these three
cost items (based on a total PE of $2,489,000), to understand how important it is
that the PE estimate be as accurate as possible.

  For the foregoing reasons, we agree with the Union and Amici that IDEM’s

decision to reject SCR on economic infeasibility grounds was clearly erroneous
because IDEM’s cost-effectiveness analysis was incomplete. See Knauf, 8 E.A.D.

   50 According to SDI’s economic analysis, catalysts must be replaced on a regular basis. See

Union Pet’n at ex. 6-8 (Estimated Capital and Operating Costs tables) (specifying costs for catalyst
replacement every two or six years).
51 We note that SDI did not adjust its 10%-of-PE estimate for these items, despite its claim to

have incorporated most of the Union’s comments into the Overly Conservative Estimated Capital and
Operating Costs table. In its June 30th comments, the Union had stated:

   The engineering/supervision and construction/field expenses are both estimated as 10%
   of the PE [for a total of 20%], based on the OAQPS Manual. However, * * * SCR
   systems are relatively simple compared to most pollution control systems[, consisting
   only of a reactor, catalyst, and ammonia grid and control system]. Thus, they are inex-
   pensive to engineer and build. Costs to design and construct an SCR system is typically
   no more than 10% of the [PE costs].

Union Pet’n ex. 3 at 7 (nos. 6, 8) (emphasis added).

VOLUME 9
STEEL DYNAMICS, INC. 207

at 142 (EAB 1999) (finding BACT determination incomplete and therefore
clearly erroneous because permitting agency rejected legitimate questions on the
particular design of BACT without any explanation); Masonite, 5 E.A.D. at 566
(BACT decision clearly erroneous because based on incomplete cost-effective-
ness analysis). We therefore remand this issue to IDEM for reconsideration.

          c. Remand Conditions

  On remand, IDEM is directed to perform a complete analysis of SCR’s cost-

effectiveness, including comparisons of costs to other facilities and to other tech-
nologies,52 see NSR Manual at B.31-.46, document its findings, submit those find-
ings to public review, and consider and respond to significant public comments in
its documentation of the final permit decision. In executing this task, IDEM must
consider comments currently in the record, including the Union’s June 30th com-
ments, as well as any new comments received on reproposal. If IDEM decides to
base its decision on the ground that SCR is technically infeasible, and thus an
economic infeasibility analysis is unnecessary, the Department must nonetheless
consider and respond to all significant technical feasibility-related comments cur-
rently in the record in the documentation of its final permit decision.

   4. BACT for PM Emissions from Slag-Handling Operations

   Next, petitioners challenge IDEM’s analysis of BACT for SDI’s slag-han-

dling operations. Slag, a mixture of lime, silica, and other impurities found in iron
ore and scrap metal, is a natural byproduct of the steelmaking process. Slag is
separated from molten steel exiting the blast furnace, poured into slag pots, and
transported to a mill’s slag-processing area. There, the molten slag is dumped into
pits, cooled with water, excavated, crushed, and screened to desired aggregate
sizes for off-site use or disposal. Union Pet’n ex. 7. Dry, solidified slag, called
“skull,” is typically added to the bottom of slag pots to aid in molten slag removal,
and the skull is periodically dumped into skull slag pits and reused. Union Pet’n at
30.

 Particulate matter is emitted at many points during these slag operations.

According to IDEM, PM emissions

    52 For instance, we note that IDEM originally found SNCR to be technically feasible but re-

jected it after finding its cost-effectiveness to be $5,300 to $5,700 per ton of NOx removed. TSD app.
B at 24. Because these numbers fall within the range of costs Region V has found to be economically
feasible, and because this has not been refuted by IDEM, we would expect IDEM would compare and
contrast SCR costs to those of SNCR, as well as to any other top options. We would also expect that
IDEM would evaluate the five steel mills Amici reviewed and found had anticipated SCR costs of
$3,000 to $6,000, as well as any other steel mills or other relevant facilities that have recently ex-
amined — and costed — SCR application to their reheat furnaces.

                                                                                     VOLUME 9

208 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

    will be associated with slag pot dumping, deskulling, slag cooling,
    digging of slag pits by a front-end loader, loading of grizzly feeder by
    a front-end loader, crushing, screening, conveyor transfer points,
    loading of materials into piles, wind erosion of storage piles, load out
    of materials from piles, and vehicle movement around piles. All [PM]
    emissions from slag handling and processing will be fugitive in
    nature.

TSD app. B at 26.

  IDEM determined that BACT for PM emissions from these operations

would consist of the use of skull slag to suppress emissions during dumping of
molten slag into pits; water suppression using spray bars and other means; mini-
mization of slag drop heights;53 a roofed, open-sided enclosure over the slag-
dumping pits; and associated visible emissions limits for each operational stage.
ATSD at 12-13; Permit § D.7.4 & att. A (Fugitive Dust Control Plan); TSD app.
B at 27. The BACT requirements are summarized in the following table:

                                                                        Visible Emission
 Slag Handling/-                                                           Limitation

Processing Operation Control Measure (% opacity)
Transferring of skull Minimizing the drop 3% opacity on a six-
slag to slag pot height by dumping the minute average
slag skull slowly
Pouring of liquid slag EAF/LMS baghouse 3% opacity on a six-
from EAF or ladle met- minute average
allurgical station
(“LMS”) to slag pots
Transporting of slag see BACT for road- see BACT for road-
pot with liquid slag to ways ways
pot dumping station

    53 During slag-handling and -processing operations, slag is repeatedly scooped up in one loca-

tion and dumped in another. “Drop height” refers to the vertical distance slag is dropped during these
transfer operations. See Permit att. A § 5 (Fugitive Dust Control Plan) (front end loader-to-truck drop
height must be less than 48 inches; slag stacker-to-slag pile drop height must be less than 48 inches;
skull slag-to-slag pot drop height must be minimized).

VOLUME 9
STEEL DYNAMICS, INC. 209

Dumping of liquid slag Skull slag from the bot- 3% opacity on a six-
from slag pot to slag tom of the slag pot will minute average
pit and cooling suppress PM emissions
during dumping and
applying water; partial
enclosure with roof ex-
tending over entire slag
pit area will also re-
duce PM emissions
Transferring of skull None — due to safety 3% opacity on a six-
slag from slag pot to reasons. The skull is minute average
skull pit reused and water in the
skull can cause an ex-
plosion during pouring
of liquid slag into the
slag pots
Digging slag and skull water suppression 3% opacity on a six-
slag pits minute average
Stockpiling of slag ad- water suppression 3% opacity on a six-
jacent to the grizzly minute average
feeder
Wind erosion of stock- water suppression 3% opacity on a six-
piles minute average
Crushing water suppression via 3% opacity on a six-
spray bars minute average
Screening water suppression via 3% opacity on a six-
spray bars minute average
Conveyor transfer water suppression via 3% opacity on a six-
points spray bars minute average
Continuous stacking of water suppression via 3% opacity on a six-
processed slag to stock- spray bars and mini- minute average
piles mizing the drop heights
Load-out of processed water suppression 3% opacity on a six-
slag from stockpiles to minute average
haul trucks for off-site
shipment
In-plant hauling of slag water suppression of 3% opacity on a six-
pots (filled) and processed slag or tarp- minute average
processed slag ing of haul trucks

                                                             VOLUME 9

210 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

See TSD app. B at 27, as modified by ATSD at 12-13 & Permit §§ D.7.1, D.7.4
& att. A. In addition, IDEM placed a limitation on SDI’s annual production of
slag to ensure that total PM emissions from slag handling and processing would
not exceed 10.9 tons per year. See Permit § D.7.1 (SDI may not process more than
262,800 tons of slag per year).

  Petitioners contend that IDEM erred in conducting the slag-handling BACT

analysis because the Department allegedly: (1) failed to consider all available
slag-handling controls; (2) relied on a flawed cost-effectiveness analysis; and (3)
underestimated slag-handling emissions. Union Pet’n at 32-41; COW Pet’n at 12-

  1. Each of these contentions is addressed in turn below.

        a. Consideration of All Available Slag-Handling Control
           Options
    

    First, petitioners contend that IDEM failed to identify all available PM con-
    trol options, in contravention of the top-down BACT guidance set forth in the
    NSR Manual. Union Pet’n at 32; COW Pet’n at 12; see NSR Manual at B.5 (first
    step in top-down analysis is to identify all “available” control options, which are
    “those air pollution control technologies or techniques with a practical potential
    for application to the emissions unit and the regulated pollutant under evalua-
    tion”). The Union claims that five viable control options were mentioned in mater-
    ials placed in the administrative record after the close of public comment and
    should have been, but were not, evaluated: (1) strategically placed spray bars; (2)
    “excellent” pit watering practices; (3) controlling, in the melt shop, input into slag
    pots; (4) creating a mist shroud around slag pits; and (5) complete enclosure of the
    entire slag-handling operation from slag transport to slag load-out. Union Pet’n at
    33; see id. ex. 6-12, -13 (letters relating other steel mills’ experiences).

    The Union also charges that IDEM failed to consider and/or explicitly in-
    vestigate: (1) spray bars for use in controlling PM emissions from slag transport,
    dumping, excavation, and other slag-handling operations besides crushing,
    screening, conveying, and stacking; (2) pit watering to reduce PM emissions
    (rather than simply to cool molten slag); (3) alternative controls to use when wa-
    tering is not feasible due to weather conditions; (4) potential trapping of hydrogen
    sulfide, a toxic gas released during slag quenching, by the partial, roofed enclo-
    sure over the slag pits; (5) complete enclosures of the type purportedly in use at
    Beta Steel in Portage, Indiana, USX Steel in Gary, Indiana, and a steel mill in
    Thailand; (6) enclosure of slag-processing operations such as conveying, crush-
    ing, and stockpiling; (7) methods to ensure the forty-eight-inch drop height speci-
    fied in SDI’s Fugitive Dust Control Plan is achieved; and (8) use of gravity-feed-
    plow reclaimers, rake reclaimers, bucket wheel reclaimers/sprays to control stor-
    age pile load-out emissions. Union Pet’n at 33-38. COW, for its part, claims that
    IDEM failed to consider electrostatic precipitators, high-efficiency cyclones, and
    high-energy scrubbers in this BACT analysis. COW Pet’n at 12-13.

VOLUME 9
STEEL DYNAMICS, INC. 211

   IDEM’s response to this flurry of arguments is simple: the Department as-

serts that the issue of its purported failure to consider all available control options
was not raised during the public comment period, despite being reasonably ascer-
tainable at that time. IDEM Resp. at 26; accord SDI Resp. at 52-53. IDEM ex-
plains that the only comments submitted regarding other controls pertained to to-
tal enclosure of the slag-handling operations. IDEM Resp. at 26; see ATSD at 11-
12, 52. Noting that the Board generally requires issues reviewed on appeal to have
been raised with specificity during the comment period, IDEM argues that none
of the issues identified by petitioners have been preserved for review by the
Board, except those issues related to partial enclosure of the slag pits (a new con-
dition in the final permit) or total enclosure of all slag operations (raised during
the public comment period). IDEM Resp. at 26-27 (citing 40 C.F.R. §§ 124.13,
.19; In re RockGen Energy Center, 8 E.A.D. 536, 540 (EAB 1999); In re Pollu-
tion Control Indus. of Ind., Inc., 4 E.A.D. 162, 166-69 (EAB 1992)).

   As to those issues, IDEM asserts that it considered and rejected the possibil-

ity of conducting slag dumping inside the melt shop because of the high costs of
controlling a small amount of emissions. IDEM Resp. at 27 (citing TSD app. B at
27). IDEM also rejected total enclosure of the slag pits because of health and
safety concerns but accepted partial enclosure because natural ventilation allevi-
ated the severity of such concerns.54 Id. at 29 (citing ATSD at 13; Union Pet’n ex.
6-13). Finally, IDEM states that it considered enclosures of specific slag-handling
equipment, such as feeders, crushers, and conveyors, but determined that the visi-
ble emissions limits it established for the equipment would dictate whether enclo-
sure would be needed to achieve compliance. Id. Therefore, IDEM concludes that
petitioners’ claims are unfounded.

  SDI supports IDEM’s analysis and conclusions, see SDI Resp. at 49-56, as

do Amici, who contend that the record does not support petitioners’ view that
IDEM clearly erred in its consideration of available control options. Amicus Br. at

  1. To the contrary, Amici argue that the record clearly documents IDEM’s con-
    sideration of most of the control options identified by petitioners. See id. (citing
    portions of TSD, ATSD, and Permit as proof that IDEM considered fugitive dust

    54
    IDEM explained:

    The applicant has concerns regarding total enclosure of [the slag dumping area] due to
    possible visibility and safety concerns which could occur. Although[] this operation
    does not have large amounts of [PM] emitted, when trapped in an enclosure with large
    amounts of moisture and heat, a dense fog can be created inside the structure which
    would risk the visibility and safety of workers. Heat dissipation is also a concern with a
    total enclosure being used for control. SDI is concerned that a structure built adequately
    to allow exhaustion to a baghouse would come into such close proximity to the slag that
    melting of supports and walls over a period of time would make the structure a hazard.

ATSD at 13.

                                                                                      VOLUME 9

212 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

control, spray bars, pit watering, partial and complete enclosure, and enclosure of
conveyor belts). For its part, IDEM argues that it considered most of the ques-
tioned controls and is requiring that SDI implement those or superior controls.
IDEM Resp. at 28 (“SDI will be using spray bars, pit watering practices, and will
be partially enclosing slag pits and using water suppression, rather than creating a
mist shroud”).

   IDEM is correct in recognizing that reasonably ascertainable issues must be

raised during the public comment period or are lost to review. See
40 C.F.R. § 124.13 (all reasonably ascertainable issues and reasonably available
arguments supporting a position must be raised by close of public comment pe-
riod); see also In re Spokane Regional Waste-to-Energy, 2 E.A.D. 809, 816
(Adm’r 1989) (agency’s opportunity to respond to significant comments is mean-
ingless unless interested parties clearly state their positions during public com-
ment period). Upon review of the administrative record and all arguments pertain-
ing to slag-handling operations, we agree that none of the control options or
techniques mentioned in the petitions — other than complete and partial enclosure
of the slag dumping area and enclosure of slag-processing equipment — were
raised during the public comment period. Moreover, we have no reason to believe
that these other issues were not reasonably ascertainable during that time. See In
re Keystone Cogeneration Sys., Inc., 3 E.A.D. 766, 766 (Adm’r 1992) (petitioner
must demonstrate that issues raised on appeal were raised during comment period
or were not reasonably ascertainable at that time); 40 C.F.R. §§ 124.13, .19(a).

  With respect to the arguments that were preserved for review, petitioners

have failed to establish clear error or abuse of discretion in IDEM’s evaluation of
slag-handling control options. In accordance with the PSD permitting rules,
40 C.F.R. § 124.17(a)(2), IDEM evaluated all options timely brought to its atten-
tion by commenters and documented its findings in the record. See ATSD at 11-
13, 52 (discussing complete and partial enclosure of slag dumping area and enclo-
sure of slag-processing equipment); TSD app. B at 26-28 (discussing enclosure
option). We therefore deny review of IDEM’s alleged failure to consider available
slag-handling control options.

          b. Cost-Effectiveness Analysis

 Second, the Union finds fault with IDEM’s reliance on SDI’s estimate that

complete enclosure of the slag dumping area would cost $61,000 per ton of PM
removed.55 The Union contends that SDI submitted this estimate after the com-
ment period closed and thus the estimate has not been subject to public review.

   55 SDI estimated that total enclosure of the slag dumping area with baghouse control would

cost $16,000 per ton, assuming 52.56 tons of PM removed, ranging up to $61,000 per ton, assuming
13.8 tons of PM removed. SDI Resp. at 56.

VOLUME 9
STEEL DYNAMICS, INC. 213

Union Pet’n at 38. The Union also contends that the estimate is wholly unsup-
ported, with the design basis, vendor quotes, and enclosure descriptions all con-
spicuously absent. Id. at 38-39. Moreover, the Union argues that SDI’s analysis is
based solely on average costs and does not include consideration of incremental
costs, although NSR Manual guidance suggests both types of costs should be con-
sidered. Id. at 39. Finally, the Union argues that the cost-effectiveness analysis is
grossly overestimated and unreasonable, and thus more detail is warranted to doc-
ument SDI’s cost projections. Id. (citing NSR Manual at B.35).

   In response, IDEM notes rhetorically that even assuming SDI’s projections

are double the actual costs, the average cost-effectiveness would still be over
$30,000 per ton and economically infeasible. IDEM Resp. at 30. IDEM then as-
serts that a specific incremental cost analysis is not necessary because most steel
mills conduct slag-handling operations outdoors, and the cost of constructing and
maintaining an enclosure with a baghouse is on its face significantly more expen-
sive than outdoor control operations. Id. at 30-31. IDEM concludes that it did not
err in determining that complete enclosure of the slag-handling operations would
be economically infeasible. Id. at 31.

   Citing Board precedent, Amici agree that where “‘the cost of employing a

particular technology may be so obviously excessive in relation to the removal
efficiency of the technology,’” the technology may be rejected without engaging
in exhaustive cost-effectiveness calculations. Amicus Br. at 30 (quoting In re Ma-
sonite Corp., 5 E.A.D. 551, 566 (EAB 1994)). According to Amici, IDEM suffi-
ciently demonstrated that baghouse controls for a slag enclosure would not con-
trol PM emissions in a cost-effective manner. Id.

   We note that “if a particular technology has a cost that is exceptionally high

relative to another technology, but has only a negligibly higher emissions reduc-
tion efficiency, its greater cost (economic impact) might justify rejecting it as
BACT.” In re World Color Press, Inc., 3 E.A.D. 474, 480 n.18 (Adm’r 1990).
Here, IDEM estimated that “the difference in controlled emissions between the
use of a baghouse and wet suppression would only be 0.003 tons per year.” TSD
app. B at 27. In such a case, it is facially clear, as IDEM contends, that the costs
associated with constructing and maintaining a complete enclosure of the slag
dumping area are unduly high when compared to the costs of more modest but
nearly equally efficacious water-based controls. We find no clear error or abuse of
discretion in IDEM’s reliance on SDI’s cost estimates, even though the estimates
do lack the details the Union alleges. Cf. In re Genesee Power Station, 4 E.A.D.
832, 845-48 & nn.13-14 (EAB 1993) (requiring electric power plant to spend
more than $5 million to reduce PM emissions by 23 tons per year is not cost-
effective).

                                                                      VOLUME 9

214 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

          c. Slag-Handling Emissions Estimates

   Third, petitioners argue that IDEM substantially underestimated PM emis-

sions from SDI’s slag-handling operations. The Union contends that IDEM’s esti-
mates assume fifty percent control for slag and skull dumping, achieved via water
suppression and by placing skull in the bottom of the slag pots to facilitate slag
removal. Union Pet’n at 40. The Union found no evidence in the record that wa-
tering and skull use would be optimized to reduce PM emissions, as opposed to
cooling and aiding in the removal of slag. Thus, the Union concludes that no re-
duction in emissions is warranted for these two operations. Id. The Union also
objects to IDEM’s assumption that only a single slag drop will occur. According
to the Union, slag will be dropped at least seven times: from pit excavators into
trucks; from trucks into storage piles; from storage piles into grizzly feeder; from
grizzly feeder into crusher; from crusher onto conveyors/screens; from stacker
into storage piles; and from storage piles into trucks for off-site transport. Id. at
40-41. The Union therefore concludes that IDEM’s drop emissions estimate is
seven times less than actual emissions. Id. at 41. Finally, the Union claims that
IDEM’s estimate excludes six sources of fugitive emissions: (1) adding/removing
skull to/from slag pot; (2) excavating cooled slag from slag pits; (3) wind erosion
of stockpiles; (4) crushing; (5) conveying; and (6) transporting slag within the
facility. Id. According to the Union, the “underestimated emissions bias the cost-
effectiveness analysis, making attractive slag-handling control options appear to
be economically infeasible.” Id. at 39-40.

  IDEM defends its analysis by pointing out that the Union’s arguments are

based on IDEM’s original slag calculations, which are printed in Appendix A of
the TSD but were substantially altered for the final permit. IDEM Resp. at 31.
IDEM recalculated SDI’s slag-handling emissions in accordance with factors pro-
vided by EPA during the comment period, adjusted to include the correct slag
production total.56 See IDEM ex. F (Region V e-mail to IDEM regarding predic-
tive emission factor equations for SDI’s slag-handling operations). IDEM adopted
EPA’s suggested emission factors for PM emissions from the tops of slag pots,
from slag/skull dumping, and from slag processing; in so doing, IDEM claims that
all emissions from slag-handling operations were encompassed in its calculus.
IDEM Resp. at 32. IDEM also adopted more conservative control estimates based
on EPA’s comments, choosing fifty (rather than ninety) percent control for the
dumping of slag and skulls due to water suppression and skull slag use, even
though the slag pit will also be partially enclosed. Moreover, IDEM assumed no

    56 EPA Region V submitted comments on the draft permit claiming IDEM had substantially

underestimated slag-handling emissions of PM. See ATSD at 11. After reviewing EPA’s calculations,
IDEM explained that EPA had used an incorrect yearly-slag-processed figure. EPA used the steel
production capacity of 200 tons per hour to determine slag emissions, but according to IDEM “a very
conservative estimate would give 15% slag produced for every ton of steel,” for a total of 262,800 tons
of slag per year. Id. at 12.

VOLUME 9
STEEL DYNAMICS, INC. 215

control for emissions from the top of the slag pots during transport and fifty per-
cent control for enclosure and water suppression of slag processing operations. Id.
Amici conclude from this that petitioners have not shown IDEM’s final estimate,
which uses these multiple conservative assumptions, underestimates actual emis-
sions. Amicus Br. at 31.

   IDEM considered the parties’ comments on this issue and recalculated its

emissions estimates in accordance with suggestions from EPA Region V. IDEM’s
analysis appears to incorporate a number of conservative assumptions, purport-
edly to ensure that emissions are not underestimated and the cost-effectiveness
analysis not unduly biased. See ATSD at 11-12; IDEM ex. F. The matters at issue
here are essentially technical, and we have historically deferred to a permit
agency on issues — such as this one — heavily dependent on that agency’s tech-
nical expertise. See, e.g., In re NE Hub Partners, L.P., 7 E.A.D. 561, 567 (EAB
1998) (“‘Board traditionally assigns a heavy burden to persons seeking review of
issues that are quintessentially technical’”) (quoting In re Ash Grove Cement Co.,
7 E.A.D. 387, 403 (EAB 1997)), review denied sub nom. Penn Fuel Gas, Inc. v.
U.S. EPA, 185 F.3d 862 (3d Cir. 1999). Petitioners’ arguments here were pre-
mised on an outdated calculation and did not take into account IDEM’s revisions
based on EPA’s suggested predictive emission factor equations. Compare TSD
app. A at 3-4 with ATSD at 12 and IDEM Resp. ex. F. As a result, we find that
petitioners have not carried their burden of showing clear error or abuse of discre-
tion on IDEM’s part. We therefore deny review on this ground.

C. Enforceability Issues

   Moving on from their direct challenges to IDEM’s BACT determinations,

petitioners next target the enforceability of numerous BACT-related provisions in
SDI’s permit. As foundation for their arguments, petitioners rely on EPA guidance
in the NSR Manual, which states:

  To complete the BACT process, the reviewing agency must establish
  an enforceable emission limit for each subject emission unit at the
  source and for each pollutant subject to review that is emitted from
  the source. * * *

  * * * BACT emission limits or conditions must be met on a continual
  basis at all levels of operation (e.g., limits written in pounds/MMbtu
  or percent reduction achieved), demonstrate protection of short term
  ambient standards (limits written in pounds/hour), and be enforceable
  as a practical matter (contain appropriate averaging times, compliance
  verification procedures and recordkeeping requirements).

NSR Manual at B.56; see Union Pet’n at 41-42 (quoting NSR Manual).

                                                                     VOLUME 9

216 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

   According to petitioners, SDI’s permit has nine categories of unenforceable

permit provisions: (1) single emissions limits for multiple commonly vented emis-
sions units; (2) emissions limits that cannot ensure continuous compliance at all
levels of operation; (3) raw material sulfur limits; (4) no continuous emissions
monitoring requirements for SO2 or NOx; (5) slag production and emissions lim-
its; (6) transportation fugitive dust conditions; (7) limits on NOx, SO2, and PM
emissions from the EAF; (8) lead limits; and (9) the Preventative Maintenance
Plan requirement. Union Pet’n at 42-61; COW Pet’n at 13-15. Petitioners take the
position that “[t]he heart of the PSD permitting process is establishing enforceable
limits to ensure that BACT determinations are implemented and compliance with
permitted emission levels may be adequately determined.” COW Pet’n. at 13; see
Union Pet’n at 41. “Without enforceable limits,” petitioners continue, “the permit
is a hollow promise.” Union Pet’n at 41.

   Amici echo many of petitioners’ concerns, contending that “if the Board

finds the permit limits cannot be enforced as a practical matter to ensure compli-
ance on a continuous basis at all levels of operation, remand is required. Amici
believe IDEM is entitled to discretion in formulating the mechanisms by which it
will achieve these requirements. The failure to include any adequate mechanisms,
however, is an abuse of discretion and should be held to be clear error.” Amicus
Reply at 22; see Amicus Br. at 32 n.19 (referencing EPA guidance on practical
enforceability and maintaining that “the very definition of ‘emission limitation’ in
section 302(k) of the [CAA] refers to a requirement ‘[that] limits the quantity,
rate, or concentration of emissions of air pollutants on a continuous basis.’ * * *
This subsumes the practical ability to determine whether a limit is being met on a
continuous basis.”) (quoting CAA § 302(k), 42 U.S.C. § 7602(k)).

 With this as background, we address each of petitioners’ nine contentions

below.

  1. Venting Multiple Emission Units Through a Single Stack

   First, petitioners identify several emissions units that, as presently con-

figured, will vent through a common stack but purportedly without provision for
separate emissions limits or compliance procedures for the differing units. Specif-
ically, the ladle metallurgical station (“LMS”), continuous caster, and EAF will all
vent to the EAF baghouse stack, while four ladle preheaters, one ladle dryer, one
tundish nozzle preheater, two tundish preheaters, and one tundish dryer (“heat-
ers/dryers”) will vent to the melt shop roof monitor. Permit §§ D.2-.4. In the per-
mit, IDEM limits SDI’s emissions of filterable PM from each of the LMS and the
caster to 58.5 pounds per hour, whereas SDI’s emissions of NOx from each of the
nine heaters/dryers is limited to 0.1 pounds per MMBtu. Id. §§ D.2.2, D.3.1,
D.4.2. Petitioners claim, however, that the permit contains “no compliance proce-

VOLUME 9
STEEL DYNAMICS, INC. 217

dures whatsoever” for either the LMS or the caster individually.57 Union Pet’n at

  1. Petitioners also note that the permit “boldly proclaims that ‘[t]esting of the
    [heaters/dryers] is not required.’” Id. Thus, petitioners conclude that IDEM has
    erroneously failed to establish enforceable permit limits for these eleven emis-
    sions units. Id.; see COW Pet’n at 13.

            a. LMS/Continuous Caster
    

    To establish that the LMS/caster issue was raised during the public com-
    ment period (and thus may be reviewed as part of this appeal), the Union quotes a
    comment submitted by EPA: “Since the continuous caster, [LMS,] and the EAF
    are all emitting through one stack, a compliance limit needs to be established
    based upon the tightest emissions limitation of the three.” ATSD at 27. The Union
    then claims that IDEM “wholly ignored” this EPA comment in its response-to-
    comments document. Union Pet’n at 43.

    IDEM protests that it did not ignore EPA’s comment but rather contacted
    the Agency, which purportedly explained that its concern hinged on the selection
    of a pounds-per-hour limit rather than a pounds-per-ton limit (a limit potentially
    more effective at controlling emissions when the mill runs at less than full capac-
    ity).58 IDEM Resp. at 35. IDEM asserts that it responded to EPA’s comment by
    amending Section C.5 of the permit to require SDI’s consistent implementation of
    air pollution controls, operating practices, and raw material quality standards re-
    gardless of facility production rate.59 Id.; see Permit § C.5. IDEM goes on to claim
    that any establishment of separate operational or fuel input limitations or other
    monitoring procedures for the EAF, LMS, and caster “would be tantamount to
    IDEM redefining the SDI source[,] which is inconsistent with the PSD rules and

    57
    The compliance provisions for the LMS and caster both refer to Section D.1 of the permit,
    which addresses the EAF only. See Permit §§ D.1, D.2.2, D.4.2.
    58
    We note that none of this information is presented in the response-to-comments document.
    See ATSD at 27-29.
    59
    Section C.5 states, with respect to operation of equipment throughout the steel mill:

    Except as provided otherwise, all air pollution control equipment listed in section D of
    this permit and used to comply with an applicable requirement shall be operated at all
    times that the emission units vented to the control equipment are in operation. The air
    pollution controls, operating practices, and quality of the raw materials shall be consist-
    ently implemented so as to not reduce the effectiveness of air pollution controls as
    required in [s]ection D regardless of the production rate of the facilities regulated by
    this permit. This includes, but is not limited to, the sulfur content of raw materials, the
    operation of the thermal oxidation and negative pressure at the DEC air gap, the oil
    content and other quality control parameters of the scrap management program, fan
    amperage consistent with furnace operating mode, and burner operation.

Permit § C.5.

                                                                                        VOLUME 9

218 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

the NSR Manual.”60 IDEM Resp. at 35 (citing In re Hawaiian Commercial &
Sugar Co., 4 E.A.D. 95, 99 (EAB 1992)). Finally, IDEM argues that nothing in
the NSR Manual suggests that specific permit limits (here, 0.0018 gr/dscf for fil-
terable PM and 0.0052 gr/dscf for total PM from the EAF stack), accompanied by
periodic stack tests using EPA-sanctioned measurement methods (here, one initial
test and then one repeat test at least once every five years), are unenforceable
permit conditions. Id. at 36; see Permit §§ D.1.6, D.1.15(c), D.2.1-.2, D.4.1-.2.

   SDI and Amici take a different tack, arguing that petitioners failed to estab-

lish that this issue was raised during the public comment period. SDI Resp. at 60;
Amicus Br. at 35. SDI also contends that petitioners have not demonstrated clear
error in IDEM’s handling of this issue. SDI Resp. at 60. Amici, however, do not
echo this latter point. Instead, Amici explain in a footnote that, but for the fact that
this issue has not been preserved for appeal, they otherwise

   agree with Petitioners that the PM limits do not appear to be enforcea-
   ble. Nothing in the permit would allow the source or an inspector to
   assure that emissions are effectively captured by the EAF baghouse.
   The general condition in C.5 requiring SDI to consistently implement
   controls would be of no help in determining compliance. Likewise,
   testing of the EAF baghouse stack, without the establishment of pa-
   rameters on operation of the LMS and Continuous Caster, are inade-
   quate to demonstrate continuous compliance.

Amicus Br. at 35 n.21.

   We are not persuaded that the issues have been preserved for review. EPA’s

comment, upon which petitioners rely to raise this challenge, pertains to establish-
ing a single compliance marker for the three units that jointly vent to the EAF
baghouse stack. See ATSD at 27. Petitioners’ arguments on appeal, however, are
focused on establishing separate conditions for each of the units that can be en-
forced if they are violated. A thread of commonality exists between the two con-
cepts, in that LMS/caster/EAF emissions limits are in play in both instances, but
the thread is not strong enough to carry the weight of petitioners’ new arguments.
We must deny review because the issue of separate, independent compliance con-
ditions was not raised during the public comment period and may not be raised for
the first time on appeal. See 40 C.F.R. § 124.19(a).

     60 “Redefining the source” is a term of art described in the NSR Manual. The Manual states that

it is legitimate to look at inherently lower-polluting processes in the BACT analysis, but EPA has not
generally required a source to change (i.e., redefine) its basic design. For example, substitution of a
gas-fired power plant for a planned coal-fired plant would amount to redefining the source.

VOLUME 9
STEEL DYNAMICS, INC. 219

          b. Heaters/Dryers

   To establish that the heater/dryer issue was raised during the public com-

ment period, the Union mentions a Sierra Club comment that questioned how
compliance for each of the units would be established. Union Pet’n at 42-43. The
Sierra Club asked, “Is there some operational parameter that can be measured on a
continuous basis to ensure these units are operating as required?”61 ATSD at 70.
IDEM responded that the projected emissions are very small relative to other NOx
emissions from the proposed mill and thus it was not necessary to require stack
tests to demonstrate compliance. Id. IDEM also observed that there are no opera-
tional parameters that could be measured to demonstrate continuous compliance
but that it is in SDI’s best economic interest to ensure proper operation of the low-
NOx burners to minimize their consumption of natural gas. Id.

   In its response to petitioners on appeal, IDEM repeats these arguments and

also claims that it can require stack testing at any time, if it deems such testing
necessary. IDEM Resp. at 36. Moreover, IDEM explains that the NOx limit for
each of these nine units “is an expression of the emission factor used in the calcu-
lation of each unit’s potential to emit when the low-NOx burners are in use.” Id.
SDI agrees with IDEM’s position and contends further that petitioners have not
shown abuse of discretion or clear error in IDEM’s treatment of these emissions
units. SDI Resp. at 61-62.

   Amici agree with petitioners that the 0.1 pound per MMBtu limits are not

enforceable as a practical matter because the permit does not include a mechanism
for SDI to demonstrate the limits are being met on a continuous basis. Amicus Br.
at 35. Amici, however, also contend that petitioners have not adequately shown
how IDEM erred or abused its discretion in finding that the use of low-NOx burn-
ers alone adequately demonstrates compliance. Id.; see Amicus Reply at 23. Ac-
cording to Amici, the relatively small quantities of NOx emitted by these nine
units and “the general understanding that low-NOx burners should easily achieve
the BACT limit for these sources” are reasons to uphold IDEM’s permit decision
in this instance.62 Amicus Br. at 36.

   61 The Union suggests that several operating parameters, such as fuel flow, firing rate, or fur-

nace temperature, could be monitored. Union Pet’n at 43.
62 In rebuttal, the Union asserts in strong terms that “BACT without compliance conditions

turns the entire BACT regulatory program on its head and is clearly erroneous. Limits without compli-
ance demonstration cannot be enforced and are no different than no limits at all.” Union Reply at 34.
As to the mandatory use of low-NOx burners, the Union argues:

   The mere use of any control technology does not guarantee compliance with emission
   limits because the world is not a perfect place. Low-NOx burners control NOx by care-
   ful mixing of fuel and air to keep flame temperature low and dissipate heat quickly.
   Low-NOx burners are not off-the-shelf technology and are individually designed and
                                          Continued



                                                                                      VOLUME 9

220 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

   In this case, IDEM made a decision with respect to NOx emissions from

these nine units after considering all public comments thereon. Given the unrebut-
ted general understanding that low-NOx burners should easily achieve the BACT
limit for these sources, we find that petitioners failed to demonstrate clear error or
abuse of discretion in IDEM’s decision to require low-NOx burners for the nine
units without requiring any specific testing to demonstrate compliance with the
0.1 pound per MMBtu emissions limits. Cf. In re Encogen Cogeneration Facility,
8 E.A.D. 251-52 (EAB 1999) (review denied where petitioners failed to show
permit agency’s response to comments was inadequate); In re Maui Elec. Co.,
8 E.A.D. 1,13-16 (EAB 1999) (same).

   2. Assurance That BACT Limits Are Met Continuously and at All
      Levels of Operation (Dual Limits)

   Second, petitioners challenge the form of the permit limits selected for the

EAF, reheat furnace, and heaters/dryers. Union Pet’n at 45; COW Pet’n at 13.
IDEM imposed emissions limits reflecting pollutant mass per unit of time (in
pounds per hour) or pollutant mass per unit of process (in pounds per MMBtu),
but not both. See Permit §§ D.1.2, D.1.7-.8 (EAF NOx, SO2, and CO limits in
lbs/hr), D.3.1 (heater/dryer NOx limits in lbs/MMBtu), D.5.1-.2 (reheat furnace
NOx and CO limits in lbs/MMBtu). Petitioners argue that, by themselves, these
types of limits do not assure compliance with BACT at all levels of operation.
Union Pet’n at 45-46; COW Pet’n at 13. The Union cites numerous provisions of
the NSR Manual that suggest pollutants should be regulated under the PSD pro-
gram using both mass-per-unit-time and mass-per-unit-process limits. Union Pet’n
at 45-46 (citing NSR Manual at B.56, H.2, H.5, I.2, I.4). One typical provision,
entitled “Effective Permit Writing,” states:

(continued)
manufactured for each application on a case-by-case basis. On installation, they must
be tuned to achieve the proper blend of fuel and air. Their performance must always be
verified after tuning to assure that vendor-guaranteed emission limits are met. Thereaf-
ter, they require periodic maintenance and retuning because their performance degrades
with use due to plugging, corrosion and deposit formation. Therefore, performance
must be periodically confirmed after initial startup to assure that the burners continue to
operate properly. The Permit does not require any compliance demonstration whatso-
ever, not even an initial source test to confirm vendor guarantees.

Union Reply at 35.

    The Union’s argument in rebuttal comes too late. Unlike the case of NOx BACT for the reheat

furnace (discussed in Part II.B.3 above), where the bulk of the relevant information was compiled and
considered after the close of the public comment period, here we find no reason why petitioners could
not have raised this rebuttal argument earlier (i.e., in their petitions in response to IDEM’s conclusions
on this issue in the ATSD). See In re Knauf Fiber Glass, GmbH, 8 E.A.D. 121, 126 n.9 (EAB 1999)
(“[n]ew issues raised for the first time at the reply stage of these proceedings are equivalent to late-
filed appeals and must be denied on the basis of timeliness”).

VOLUME 9
STEEL DYNAMICS, INC. 221

  In general, it is best to express the emission limits in two different
  ways, with one value serving as an emissions cap (e.g., lbs/hr.) and
  the other ensuring continuous compliance at any operating capacity
  (e.g., lbs/MMBtu). The permit writer should keep in mind that the
  source must comply with both values to demonstrate compliance.

NSR Manual at H.5, quoted in Union Pet’n at 46. Accordingly, petitioners contend
that the limits cited above for the EAF, reheat furnace, and heaters/dryers fail to
comply with EPA guidance and thus constitute error.

  IDEM argues that petitioners did not preserve for review their arguments

with respect to the reheat furnace and the heaters/dryers. IDEM Resp. at 38. As
for the EAF issues, IDEM contends that it considered but rejected dual limits
because, for batch steel operations such as those proposed for SDI’s new mill, a
production limit in lbs/ton or lbs/MMBtu could be exceeded in the apparently not-
uncommon situation where molten steel must be held in the EAF longer than nec-
essary simply for processing. IDEM explains, “Because the proposed SDI facility
is designed to make many different structural steel products of varying size and
shape, a batch of molten steel may be held in the EAF until the [LMS] and reheat
furnace are ready to accept the steel.”63 IDEM Reply at 9; accord SDI Reply at
18-19. IDEM also points to existing and new provisions in the permit that, it con-
tends, ensure continuous compliance of the type petitioners advocate. One such
provision is Section C.5, discussed in Part II.C.1.a above, while other provisions
impose stack testing and low-NOx burner requirements, mandate continuous mon-
itoring of EAF CO emissions, and limit the sulfur content of raw materials. IDEM
Resp. at 37-38. In IDEM’s view, petitioners have failed to identify any clear error
on its part regarding these issues. Id. at 39; accord SDI Resp. at 64.

  63
       SDI’s explanation of its steelmaking process is as follows:

  An EAF melts steel scrap using an electrode arc and low-NOx/oxyfuel burners. Melted
  steel can then be tapped into a ladle. After steel chemistry is homogenized to meet
  product specifications at the [LMS], molten steel is poured into the caster, which makes
  the various solid product shapes. The shapes are then sent to the reheat furnace or are
  stored temporarily, depending on production needs and capabilities at that time. The
  reheated steel is rolled into various final products using product-specific sets of rolls.
  Unlike most mills, SDI is designed to make over 250 different structural steel products,
  varying in size and shape. The actual production capacity during a given period of time
  depends on the product being made. For example, the caster takes longer to cast small
  structural shapes than bigger ones. This means that sometimes SDI will have to hold
  molten steel in the EAF until equipment downstream is ready to accept it. Also, be-
  cause steel-making today is highly equipment-dependent and operates within stringent
  parameters, there are invariably daily unplanned delays from a few minutes to many
  hours. Thus, heats are not always the same length and production can vary signifi-
  cantly, subject to the Permit maximums.

SDI Reply at 18-19 n.26.

                                                                                      VOLUME 9

222 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

   In their initial brief, Amici focus principally on the three EAF limits. See

Amicus Br. at 36-40. With respect to the SO2 limit, Amici contend that a produc-
tion limit (e.g., in lbs/ton or lbs/MMBtu) is not needed in addition to the hourly
limit, contrary to petitioners’ arguments. Amici observe that BACT for SO2 is no
control and that compliance with the hourly emissions limit will be demonstrated
through annual stack tests and vendor certifications that raw materials fed into the
EAF meet specified limits on sulfur content.64 Id. at 38 (citing Permit §§ D.1.15,
D.1.22). Amici conclude that petitioners have failed to establish as clearly errone-
ous IDEM’s treatment of the EAF’s SO2 emissions.

   Amici are of a different mind regarding the emissions limits for NOx and

CO. In these instances, Amici argue that IDEM’s failure to require dual limits
warrants a remand. As support, Amici quote the NSR Manual provisions petition-
ers raise and then rebut each of IDEM’s arguments in support of hourly emissions
limits alone. For example, Amici argue that Section C.5 of the permit, which re-
quires SDI’s consistent implementation of pollution controls and operating prac-
tices, is not practically enforceable because its requirements are not easily and
objectively measurable. See Amicus Br. at 39. Amici also contend that neither the
stack testing requirement nor the continuous emissions monitoring requirement
IDEM touts are answers to petitioners’ concerns because production still could be
manipulated to meet the existing pound-per-hour limits. Id. at 40. Amici stress
that the purpose of requiring dual limits is to ensure emissions are controlled re-
gardless of the production rate or operational conditions of the facility. Id. at 39.

  IDEM and SDI respond by pointing out that petitioners and Amici have not

provided “any plausible scenario” in which SDI might manipulate its operations in
ways those parties fear. IDEM Reply at 10; see SDI Reply at 17. They also criti-
cize petitioners’ and Amici’s use of the NSR Manual, claiming that the parties
place reliance on portions of the Manual that are not relevant to the PSD program.
IDEM Reply at 10; SDI Reply at 16, 19. Finally, IDEM contends that Amici are
attempting improperly to establish new policy (or even law, as SDI argues) by
means of arguments in its briefs. IDEM Reply at 11; see SDI Reply at 20.

  In our view, petitioners and Amici have supplied several plausible scenarios

describing ways in which SDI could potentially conduct its operations to comply

  64   Amici explain:

  Because controls are not applied to reduce SO2, production limits [e.g., lb/ton or
  lb/MMBtu] are not necessary to prevent the source from attempting to meet the hourly
  limit by reducing production while using a less effective control. Likewise, the raw
  content limits prevent the source from gaming production levels to allow burning of
  high sulfur-content raw materials.

Amicus Br. at 38.

VOLUME 9
STEEL DYNAMICS, INC. 223

with an hourly emissions, but not a production, limit. In comments on the pro-
posed permit, the Union stated:

   Because permit limits are expressed in terms of pounds per hour,
   rather than pounds per ton, the more usual metric, a 1-hr source test
   could be conducted over a low-emitting heat. Alternatively, the source
   test could be conducted over a long time period, averaging out routine
   spikes and excursions. Both situations would bias the results, making
   it appear that the EAF is in compliance when it is not.

Union/Fox Cmts at 31, quoted in ATSD at 28. In their reply brief, Amici further
explain:

   IDEM first determined that BACT for NOx emissions from the EAF
   was the ‘use of low-NOx burners with a limit of 0.35 lbs/ton.’ This
   BACT limit was multiplied by the production rate limit of 200 tons
   per hour to derive the emission rate of 70 pounds per hour. * * *
   [However], if the production rate were to fall to 100 pounds per hour,
   the hourly equivalent to the 0.35 lb/ton BACT limit would be 35
   pounds per hour. If the production rate slows, the ‘finely tuned’ opera-
   tional practices [which SDI will have 540 days to develop under the
   permit] may no longer be necessary to meet the 70 pound per hour
   limit. If the source continues to emit at 70 pounds per hour despite the
   lowered production rate, it is clear that the source is no longer meet-
   ing BACT. Yet the permit would not deem such operations to consti-
   tute a violation, assuming they could be detected in the first place.65

Amicus Reply at 30 (citations omitted).

 In addition, the Union notes that in the TSD, IDEM listed EAF permit limits

for CO at fourteen other steel mills and for NOx at fifteen other steel mills.66See
TSD app. B at 4-5, 10-11. The Union observes, correctly, that “[e]very single one

   65 Amici further observe that:
   IDEM has noted on several occasions that the CO emissions are related to the carbon
   content of the materials charged into the EAF and that the carbon content of the
   charged material is driven by the particular steel product being made. In certain situa-
   tions when using particularly high carbon-containing charge materials, it might be eas-
   ier for the source to meet a pounds per hour limit by slowing production rates than by
   improving the efficiency of the control devices.

Amicus Reply at 33 (citation omitted).
66 These mills produce a variety of products, including coiled strip, coiled plate, and discrete

plate at IPSCO Steel in Iowa; thin slabs and structural coils at Trico Steel in Alabama; blooms and
beams at NUCOR-Yamato Steel in Arkansas; structural steel at Roanoke Electric Steel Company in
Virginia; and round bars at Mac Steel in Arkansas. TSD app. B at 4-5, 10-11.

                                                                                       VOLUME 9

224 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

of these other permits established emission limits for CO and NOx from the EAF
as either lb/ton and lb/hr or lb/ton alone. The majority of the permits (62%) cor-
rectly established both lb/ton and lb/hr limits.” Union Reply at 37. The Union
argues that these data — IDEM’s own — prove the opposite of IDEM’s position
that continuous limits in lbs/ton are not appropriate for batch steelmaking
processes such as EAFs. Id. The Union also argues that if there is truth in IDEM’s
contention that production limits will be exceeded because of potential false emis-
sions increases caused by nonstandard molten-steel holding times in the EAF,
then IDEM failed to establish BACT for SDI’s EAF. Id. at 38. This is because
IDEM based the BACT limits for the EAF on lbs/ton limits achieved in practice at
other facilities, and then simply converted the lbs/ton figures to lbs/hour figures
when SDI commented that it could not meet lbs/ton limits. Id.

  IDEM does not dispute that, under the PSD program, BACT limits must be

established to ensure compliance on a continuous basis at all levels of operation.
Indeed, IDEM states in the ATSD that it “agrees with the concern that BACT
limitations must be established to ensure compliance on a continual basis at all
[levels] of operation. [IDEM] understands that the permit must prevent situations
where control devices may be used less efficiently than intended because produc-
tion has decreased.” ATSD at 28; see also CAA § 302(k), 42 U.S.C. § 7602(k)
(emissions limits (such as BACT) are designed to restrict air pollutant emissions
“on a continuous basis”); cf. In re Genesee Power Station, 4 E.A.D. 832, 856-57
(EAB 1993) (“because it contains neither numerical limits on the lead content of
wood being burned at the facility nor work practice standards, the permit does not
provide a means of determining compliance with the fuel cleaning requirements”).

  Moreover, of fifteen other EAFs at steel mills across the country (which

presumably are similar enough to SDI’s proposed mill to warrant their use in es-
tablishing BACT limits for SDI), none have CO or NOx emissions limits in
pounds per hour only. See TSD app. B at 4-5, 10-11. As the Union points out, the
majority of these mills have lbs/hr and lbs/ton limits for these pollutants, and the
minority have lbs/ton limits only.

   These facts are compelling. IDEM clearly drew its BACT limits for SDI

from the experiences of these other mills, but we have found no adequate explana-
tion in the record explaining why the forms of the limits deviate from those of the
other mills. It may be that SDI’s proposed mill is dramatically different, in rele-
vant respects, from the fifteen comparative mills, but if that is so, that fact must be
clearly documented in the record to a greater degree than heretofore. See In re
Knauf Fiber Glass, GmbH, 8 E.A.D. 121, 131 (EAB 1999) (“The BACT analysis
is one of the most critical elements of the PSD permitting process. As such, it
should be well documented in the administrative record.”); In re Ash Grove Ce-
ment Co., 7 E.A.D. 387, 431 (EAB 1997) (interested parties must be given full
notice of the basis for final permit decisions); In re Austin Powder Co., 6 E.A.D.
713, 718-20 (EAB 1997) (administrative record must reflect “considered judg-

VOLUME 9
STEEL DYNAMICS, INC. 225

ment” necessary to support permit issuer’s decisions); In re GSX Servs. of S.C.,
Inc., 4 E.A.D. 451, 453-54 (EAB 1992) (same); cf. NSR Manual at B.19 (when
comparing sources for technical feasibility purposes, applicant must describe unu-
sual circumstances or significant differences between its facility and others to es-
tablish infeasibility).

  We conclude that the BACT limitations for NOx and CO emissions from the

EAF must be remanded to IDEM for reconsideration. We find that IDEM clearly
erred in choosing, without adequate explanation, CO and NOx limits of a type
completely different from those of the fifteen representative steel mills used to
determine BACT limits in this case. IDEM is ordered to explain why the limits it
imposed are in lbs/hr (rather than in lbs/hr and lbs/ton, or lbs/ton alone), in partic-
ular explaining in detail the specific differences (if any) between SDI’s proposed
mill and the fifteen polled mills that would justify exclusive lbs/hr limits for CO
and NOx. Even if IDEM is able to make such a demonstration, it must incorporate
other provisions in the permit that would fully address and protect against the
types of permit abuses described above by the Union and Amici. Alternatively,
IDEM is ordered to impose production limits in addition to the hourly limits for
these pollutants.

   As for the other pending issues here, we agree with IDEM that petitioners

have not preserved the reheat furnace and heater/dryer compliance issues for re-
view. We can find no reference to these issues in the comments on the proposed
permit, and none have been pointed out to us. Thus, review of these issues is
denied. See 40 C.F.R. §§ 124.13, .19(a). Review of the permit conditions per-
taining to SO2 emissions from the EAF is also denied. The sulfur-related condi-
tions in the permit (i.e., vendor certifications, stack tests) and the fact that BACT
for SO2 is no control alleviate any concerns about SO2 emissions exceeding the
BACT limit at any given rate of production. See supra note 64 and accompanying
text.

  3. Raw Material Sulfur Limits

   Third, in its comments on the proposed permit, the Union explained that

“[s]teel is made by adding direct reduced iron (”DRI“) and carbon to scrap steel.”
Union/Fox Cmts at 33. Here, petitioners challenge the sulfur-content limit IDEM
selected for DRI (0.2% sulfur), claiming the limit is so high as to allow the EAF
emissions ceiling for SO2 (50 lbs/hr) to be continually exceeded. Union Pet’n at
47; COW Pet’n at 14; see Permit §§ D.1.7, D.1.22(a). According to the Union, a
DRI sulfur limit of 0.2% corresponds to 88 lbs/hr of SO2 emissions, or 38 lbs/hr in
excess of the 50 lbs/hr SO2 limit. Union Pet’n at 47-48; Union/Fox Cmts at 33.
The Union also points out that scrap steel is responsible for 37% of the sulfur
introduced into the EAF, and yet IDEM did not add any permit condition to limit
the sulfur content of scrap. Union Pet’n at 48. Finally, the Union complains that
IDEM replaced (in response to SDI comments) a raw material monitoring require-

                                                                        VOLUME 9

226 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

ment with a condition requiring only that SDI obtain vendor verification of the
sulfur content of raw materials. Id. Petitioners argue that these conditions are not
enforceable and should be remanded.

  In its response to comments, IDEM stated that it did not believe it was “fea-

sible to require a lower sulfur content in the DRI” than that proposed in SDI’s
permit. ATSD at 15. IDEM elaborated on this assertion by reciting and distin-
guishing examples from two steel mills that have SO2 limits lower than 0.2 lbs/ton
(Roanoke Electric Steel in Virginia, at 0.168 lbs/ton, and Nucor-Yamato Steel in
Arkansas, at 0.15 lbs/ton). Id. at 16-17. IDEM also distinguished the circum-
stances of eight other facilities with low SO2 limits and provided further detailed
information in response to comments. Id. at 17-18. For instance, IDEM addressed
the scrap issue, explaining that a scrap management plan, such as the one required
in SDI’s permit, is the only means it is aware of to assure low sulfur content in
scrap. Id. at 15. IDEM also addressed the issue of raw material monitoring versus
vendor certification. After laying out SDI’s reasons for requesting the change,
IDEM acted to allay concerns about fluctuations in SO2 emissions by changing
the once-every-five-year stack test requirement to an annual stack test require-
ment, and by requiring SDI to submit data showing the sulfur content of raw
materials used during each stack test as compared to the sulfur content of raw
materials used over the past year of operation. Id. at 24, 84.

  On appeal, petitioners repeat the charges they made during the comment

period, but they have not supplied any information or argument to rebut the expla-
nations provided in IDEM’s detailed response to comments. See Union Pet’n at
47-48; COW Pet’n at 14. We have repeatedly held that where petitions merely
restate previously submitted comments without indicating why the permit
agency’s responses thereto were clearly erroneous or otherwise warranted review,
review will be denied. See, e.g., In re Maui Elec. Co., 8 E.A.D. 1, 8 (EAB 1999);
In re SEI Birchwood, Inc., 5 E.A.D. 25, 27 (EAB 1994). Because the circum-
stances surrounding these sulfur issues fall into this category, review of the issues
must be denied.

  4. Continuous Emissions Monitoring for SO2 and NOx

  Fourth, petitioners challenge IDEM’s decision not to require continuous

emissions monitors (“CEMs”) for SO2 and NOx emissions from the EAF and for
NOx emissions from the reheat furnace. Petitioners argue that without CEMs, the
emissions limits IDEM established as BACT for these pollutants — i.e., SO2 # 50
lbs/hr and NOx # 70 lbs/hr from the EAF, and NOx # 0.11 lbs/MMBtu from the
reheat furnace — cannot be enforced. Union Pet’n at 48; COW Pet’n at 14; see
Permit §§ D.1.2, D.1.7, D.5.1. Petitioners contend, on the basis of guidance in the

VOLUME 9
STEEL DYNAMICS, INC. 227

NSR Manual,67 that CEMs must be required unless they are demonstrated to be
infeasible. Union Reply at 41; COW Pet’n at 14. Amici agree with petitioners’
contention and assert that IDEM clearly erred by rejecting CEMs without finding
them infeasible.68 Amicus Br. at 42.

  IDEM argues that CEMs are generally required only in cases where (1) an

add-on pollution control device is used; (2) there is a limited amount of informa-
tion available to document compliance; and (3) emissions could adversely affect
air quality if not accurately monitored. IDEM Resp. at 41; ATSD at 50. IDEM
takes the position that none of these factors is in play here, so CEMs are not
needed. IDEM and SDI also argue that because there is no legally binding PSD
requirement that CEMs be employed for NOx and SO2 emissions from steel mills,
IDEM did not err in choosing not to mandate their use as part of SDI’s construc-
tion permit. IDEM Resp. at 41; SDI Resp. at 67-68; SDI Reply at 22. IDEM and
SDI accordingly charge that petitioners and Amici are improperly attempting to
extract legal requirements from the NSR Manual, which is interpretive guidance
only and not law.69 See IDEM Reply at 12-13; SDI Resp. at 67-68; SDI Reply at

    67 As discussed below, petitioners’ reference to the NSR Manual appears for the first time in

their petitions; the comments on which the petitioners predicate their challenge here did not include
such a reference.
68 As support for their position, petitioners and Amici rely on the following EPA guidance:

   The construction permit should state how compliance with each [BACT] limitation will
   be determined[.] * * * These permit compliance conditions must be very clear and
   enforceable as a practical matter[.] * * * Where continuous, quantitative measurements
   are infeasible, surrogate parameters must be expressed in the permit.

NSR Manual at H.6, quoted in part in Amicus Br. at 42.

   Continual and continuous emissions performance monitoring and recordkeeping (direct
   and/or surrogate) should be specified where feasible.

Id. at H.10, tbl. H.2, quoted in Union Pet’n at 49.

   Emissions limits should reflect operation of the control equipment, be short term, and,
   where feasible, the permit should require a continuous emissions monitor.

Id. app. C at c.4, quoted in part in Union Pet’n at 49. Notably, as discussed below, Region V’s com-
ments to IDEM on this issue did not reference the NSR Manual.
69 In related fashion, IDEM argues in its reply brief that:

   Amici now, and without previous warning to the state permitting agency (in this case
   IDEM), seem to suggest that the NSR Manual requires the use of CEMs on facilities
   that have no add-on control devices * * *. Amici not only seek to have the [Board]
   establish a new policy on their behalf, but ask the [Board] to read more into the NSR
   Manual language than is there. * * * Amici take a position that would result in requir-
   ing CEMs for all emission units for all future proposed major sources because it is
   unlikely that the source or permitting authority could ever demonstrate the “in-
   feasibility” of installing CEMs.
                                         Continued



                                                                                    VOLUME 9

228 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

22-23.

  IDEM and SDI argue further that SDI’s permit does not lack enforcement

provisions for these pollutants. As IDEM explained in its response to comments
and as SDI reiterates in part on appeal, the permit contains process control, oper-
ating practice, and testing requirements for NOx and SO2 emissions from the EAF
and reheat furnace. See ATSD at 50-51; SDI Resp. at 67-68. These requirements
include: (1) annual stack tests for EAF emissions; (2) a stack test at least once
every five years for reheat furnace emissions; (3) certifications from vendors of
all materials fed into the EAF (except scrap steel) that the sulfur content of those
materials is beneath a prescribed limit; and (4) use of ultra-low-NOx burners on
the reheat furnace and of low-NOx/oxyfuel burners as the EAF auxiliary burners.
Permit §§ D.1.15(a)-(b), D.1.22, D.5.1, D.5.3. In addition, the permit gives SDI a
540-day period in which to experiment with EAF operating practices that affect
NOx generation (e.g., controlling oxygen levels, temperature variations, slag for-
mation, and other factors) so that it can achieve its NOx BACT limit of 70 lbs/hr.
Permit § D.1.15(a)(2); see ATSD at 21. These requirements, IDEM and SDI sug-
gest, are legitimate surrogates to CEMs, even by the lights of the NSR Manual.
See IDEM Resp. at 40-41; SDI Resp. at 66-68. Thus, they argue, petitioners’ and
Amici’s arguments on this ground are baseless.

   As one final argument, SDI posits that these issues have not been preserved

for review. SDI Resp. at 66-67. SDI points to each of the two comments on which
petitioners base their appeal.70 The first comment, submitted by EPA, stated:

   A NOx CEM will develop more detailed information regarding impact
   of these new emissions with the ambient Ozone levels. The USEPA
   would like to discuss the potential benefits of this device for possible
   NOx trading opportunities.

ATSD at 29. IDEM responded to this comment by remarking that it believed
“more frequent stack testing [(i.e., annual as opposed to once per five years)]
would provide adequate information for PSD compliance as well as information
for possible NOx trading opportunities.” Id. The second comment, submitted by
“several concerned citizens,” stated:

   The applicant is required to install [CEMs] for only CO and VOC
   emissions. The applicant should be required to provide continuous

(continued)
IDEM Reply at 12-13 (footnote omitted).

  70 COW also cites comments that address compliance monitoring for SO . See COW Pet’n at
                                                                          2
  1. While those comments discuss recordkeeping, vendor analysis, and other proposed requirements,
    we can find no mention of CEMs therein. See ATSD at 23-24.

VOLUME 9
STEEL DYNAMICS, INC. 229

   monitoring for any pollutant where feasible, including opacity, SO2,
   NOx, PM10, and lead. In addition, the monitoring should be required to
   be performed by an outside agent for the life of the plant with lan-
   guage that specifically forbids the applicant from petitioning in the
   future to have the monitors removed. Also, the results should be pub-
   licly disclosed.

Id. at 50. IDEM responded at length to this comment, explaining many of the
factors discussed above about its perceived lack of need for SO2 and NOx CEMs
and its imposition on SDI of alternative compliance conditions. See id. at 50-51.
On appeal, SDI argues the issues raised in the petitions and the Amicus Brief are
not on all fours with these comments and may not be reviewed for the first time
by the Board. SDI Resp. at 66-67.

   On balance, we agree that the CEMs issue, as framed in the petitions and in

Amici’s briefs, was not adequately preserved for review. The linchpin of petition-
ers’ and Amici’s arguments is the language in the NSR Manual calling for CEMs
if feasible, with each maintaining that IDEM is required to engage in CEMs feasi-
bility analysis or be remanded on clearly erroneous grounds. This reference to the
NSR Manual as an authority requiring CEMs feasibility analysis is nowhere
presented in the comments on the proposed permit, and IDEM therefore had no
opportunity to grapple with it during its permit decisionmaking process.71 As we
have observed in the past, the purpose of rules requiring parties to have properly
preserved issues for appeal is

   to ensure that the permitting authority * * * has the first opportunity
   to address any objections to the permit, and that the permit process
   will have some finality. See [In re] Encogen [Cogeneration Facility,
   PSD Appeal Nos. 98-22 to -24,] slip op. at 8 [(EAB, Mar. 26, 1999)],
   8 E.A.D. [249-50] (“The effective, efficient, and predictable adminis-
   tration of the permitting process demands that the permit issuer be
   given the opportunity to address potential problems with draft permits
   before they become final.”). “‘In this manner, the permit issuer can
   make timely and appropriate adjustments to the permit determination,
   or, if no adjustments are made, the permit issuer can include an expla-
   nation of why none are necessary.’” In re Essex County (N.J.) Re-
   source Recovery Facility, 5 E.A.D. 218, 224 (EAB 1994) (quoting In
   re Union County Resource Recovery Facility, 3 E.A.D. 455, 456
   (Adm’r 1990)).




    71 Instead, IDEM appears to have construed the comment advocating the use of CEMs where

“feasible” in the general sense of that word (i.e., as “possible,” “capable of being done”), and not in the
sense that is urged on appeal (i.e., that feasibility is the legal linchpin to CEM’s mandatory use).

                                                                                         VOLUME 9

230 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

In re Sutter Power Plant, 8 E.A.B. 680, 687 (EAB 1999). Moreover,

  [w]hile it is appropriate to hold permitting authorities accountable for
  a full and meaningful response to concerns fairly raised in public
  comments, such authorities are not expected to be prescient in their
  understanding of * * * imprecise comments * * *. “At a minimum,
  commenters must present issues with sufficient specificity to apprise
  the permit issuing authority of the issues being raised. Absent such
  specificity, the permit issuer cannot meaningfully respond to
  comments.”

Sutter, slip op. at 19 (quoting In re RockGen Energy Center, 8 E.A.D. at 694
(EAB 1999)).

   In our decisions, we have often emphasized that “all reasonably available

arguments” supporting a position must be raised by the close of the public com-
ment period. 40 C.F.R. § 124.13. Moreover, petitioners must demonstrate “that
the issue to be reviewed on appeal was specifically raised during the public com-
ment period.” In re Maui Elec. Co., 8 E.A.D. 1, 9 (EAB 1999). On this basis, we
have often denied review of specific issues that were raised in a general manner
during the public comment period. See In re Florida Pulp & Paper ass’n.,
6 E.A.D. 49, 54-55 (EAB 1995) (comment regarding sludge testing being unnec-
essary is not sufficient to preserve for appeal the question of legal authority to
require any sludge testing); In re Pollution Control Indus. of Ind., Inc., 4 E.A.D.
162, 166-69 (EAB 1992) (comments on two aspects of testing requirement in per-
mit are not sufficient to raise, on appeal, general objection to any testing require-
ment); see also Maui, 8 E.A.D. at 11-12 (comments raising general issue of
whether particular fuel is available from fuel suppliers not sufficient to preserve
objection raised on appeal that permit issuer had found this fuel to be available in
recent permit decision).

  In this case, the comments on this issue did not reference the NSR Manual,

which effectively deprived IDEM of the opportunity to respond to the particular
issue now before us. Not surprisingly then, there is no discussion in the response-
to-comments document of the NSR Manual’s “legal requirements” for a CEMs
feasibility analysis. Accordingly, we will not reach the merits of an issue IDEM
was not presented with during the public comment period with sufficient clarity to
enable a meaningful response. See, e.g., In re Encogen Cogeneration Facility,
8 E.A.D. 244, 251 n.12 (EAB 1999) (where “an issue is raised only generically
during the public comment period, the permit issuer is not required to provide
more than a generic justification for its decision, and the petitioners cannot raise
more specific concerns for the first time on appeal”); In re Knauf Fiber Glass,
GmbH, 8 E.A.D. 121, 146 (EAB 1999) (issues raised in general manner warrant

VOLUME 9
STEEL DYNAMICS, INC. 231

general justifications from permit issuer).72

   5. Slag Production and Emissions Limits

  Fifth, petitioners contend that IDEM erred by not including in SDI’s permit

daily slag production limits, daily slag recordkeeping requirements, continuous
fenceline opacity monitoring, limitations on the slag area’s potential to emit PM,
and a condition requiring the submittal and public review of design specifications
for the slag processing enclosure. Union Pet’n at 52-56; COW Pet’n at 14.

   IDEM responds by pointing out that the opacity monitoring and potential-

to-emit issues were not raised during the public comment period and thus were
not properly preserved for review by this Board. IDEM Resp. at 43-45. The Union
cites an EPA e-mail to the IDEM permit writer sent during the comment period as
the record source for the opacity issue, but EPA did not later incorporate that
issue into its formal comments on the draft permit. See COW Pet’n ex. 2 (EPA
Cmts). Thus, IDEM argues, the issue may not be raised here for the first time.73
Id. at 43-44; accord SDI Resp. at 69. With respect to the purportedly deficient
slag production and recordkeeping requirements, IDEM explains that neither the
annual production limit it placed in the final permit (i.e., 262,800 tpy) nor even
petitioners’ proposed daily limit is necessary to enforce BACT, which consists of
the use of skull slag, water suppression, minimal drop heights, and visible emis-
sions limits for various points in the slag processing operations. IDEM Resp. at
42-43; see TSD app. B at 27-28. Moreover, IDEM points out that it included a
recordkeeping requirement in the permit that will ensure SDI’s compliance with
the annual production limit, and IDEM may inspect the supporting documentation
if need be. IDEM Resp. at 43. Finally, IDEM notes that it did not include specific
design parameters for the slag enclosure because this is not the type of compli-
cated structure that would require conditional design plans. Id. at 45.

    72 In their reply brief, in addition to their concerns about the lack of a feasibility analysis for

CEMs and their concerns about dual limits, Amici forcefully argue the issue of practical enforceability
as it pertains to the limitations on NOx emissions from the EAF and reheat furnace. See, e.g., Amicus
Reply at 24-26, 28-30. Amici are complaining here not about the form of the limits but about whether
compliance with the limits can be demonstrated at any time (e.g., whether a five-year stack test for the
reheat furnace is sufficient to verify compliance). We cannot find this complaint in the comments on
the draft permit, however, see ATSD at 23-24, 27-30, 46, 50-51, 58-59, 69-70, and if it exists, the
parties have not brought it to our attention. Thus, although we generally agree that permit emissions
limits must be enforceable, see CAA § 302(k), 42 U.S.C. § 7602(k); In re Genesee Power Station,
4 E.A.D. 832, 856-58 (EAB 1993), we cannot reach the merits of the specific concerns now raised on
appeal. See Encogen, 8 E.A.D. 251 n.12 (EAB 1999); Knauf, 8 E.A.D. at 00.
73
IDEM suggests the issue was subsequently discussed with Region V by telephone and there-
after not pursued by the Region in its final comments or otherwise. IDEM Resp. at 43-44.

                                                                                         VOLUME 9

232 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

  The Union insists that the opacity issue is preserved for review, citing In re

Masonite Corp., 5 E.A.D. 551 (EAB 1994), to support its position. In that case,
the Board ruled that an issue raised by a citizen group in a meeting with EPA held
during the public comment period was properly preserved for review. Masonite,
5 E.A.D. at 560. The Union notes that the permit regulations require only that
issues be raised during the comment period, not that they be submitted as part of
formal comments. Union Reply at 42 (citing 40 C.F.R. § 124.13).

   We do not believe this case, involving a distinction between formal and

informal comments submitted by EPA, is controlled by Masonite, but in any event
find it unnecessary to decide the issue. On appeal, petitioners have not met their
burden of demonstrating clear error or abuse of discretion in IDEM’s treatment of
this opacity issue. Petitioners argue only that the six-minute opacity average “is
clearly inadequate to enforce the BACT determination,” Union Pet’n at 54, pre-
sumably (for they do not say so expressly) for the reasons expressed in Region
V’s original e-mail. That e-mail stated:

  [Region V] feel[s] that a 6-minute average is a very large averaging
  time. This process is instantaneous, in other words, one second there
  might be a large plume of smoke at 60% opacity, while at the next
  second, there is 0% opacity. If you average these opacities out, you
  don’t get a valid characterization of the emissions during that whole 6-
  minute period. We would like to discuss a shorter averaging time.

Union Pet’n ex. 6-7 (Electronic Mail from Kushal Som, EPA Region V, to IDEM
(Apr. 6, 1999)).

   This is simply not enough to justify sending the opacity issues back to

IDEM. To demonstrate clear error or abuse of discretion on IDEM’s part in this
instance, petitioners would have had to supply us with sufficient evidence that a
six-minute average is out of the ordinary as compared to other similarly situated
steel mills, and/or that, for specific reasons, a lower particular average (e.g., three-
minute, four-minute, or only continuous monitoring) would validly characterize
emissions and be practicable for this facility. We have no supportable reason, on
this record, to question IDEM’s technical judgment in this regard, and as a result,
review of this issue is denied. Review of the potential-to-emit issue is also denied,
in that instance because it was not raised during the public comment period and
thus was not preserved for review on appeal.

   We agree, moreover, that petitioners have failed to identify clear error or

abuse of discretion on IDEM’s part with respect to the other three slag-handling
matters (i.e., daily slag production limits, daily slag recordkeeping, and public
review of design specifications for the roofed enclosure). IDEM provided rea-
soned responses to the slag-related issues raised during the public comment pe-
riod, and it provided reasonable explanations on appeal of new slag-related condi-

VOLUME 9
STEEL DYNAMICS, INC. 233

tions added to the final permit. See ATSD at 12-13; Permit att. A (Fugitive Dust
Control Plan); IDEM Resp. at 42-45. We therefore deny review on these grounds.

  6. Transportation Fugitive Dust Conditions

   Sixth, petitioners challenge IDEM’s selection of compliance conditions for

fugitive dust emissions from vehicles traveling on paved and unpaved road sur-
faces at the proposed facility. IDEM notes that, in addition to establishing visible
emissions limits for transportation activities, it included a Fugitive Dust Control
Plan (“FDCP”) as part of SDI’s permit. That plan mandates regularly scheduled
maintenance of paved surfaces by use of vehicular vacuum sweepers, wet sweep-
ers, or water flushing; the keeping of a daily journal of the frequency and amount
of vacuum sweeping, dust suppressant, and spill control activities SDI performs;
and direct measurement of opacity and surface silt loadings upon request. IDEM
Resp. at 45-46; see Permit att. A at 1-4 (FDCP). SDI adds that the FDCP also
provides for unscheduled inspections by IDEM personnel to ensure the visible
emissions limits are not exceeded. SDI Resp. at 72; see Permit § D.8.1 (setting
forth visible emissions limits for paved and unpaved surfaces at proposed mill);
ATSD at 55, 70 (visible emissions testing will be conducted during unannounced
visits to the source).

   In response to comments on these issues, IDEM explained that it had de-

cided monitoring and recordkeeping provisions other than those it had already
included in the FDCP would not be needed to ensure SDI’s compliance with its
visible emissions limits. ATSD at 71. The Union contends this decision is errone-
ous because EPA guidance purportedly requires continuous, quantitative emis-
sions monitoring and recordkeeping where feasible, and here IDEM made no ef-
fort to establish that such conditions were infeasible. Union Pet’n at 57 (citing
NSR Manual at H.6 & tbls. H-2, I-1).

  Here, Amici disagree with the Union view, finding IDEM’s conclusion ap-

propriate. Amici state:

  [R]egular monitoring of compliance activities under the [FDCP] ade-
  quately ensures compliance with the BACT limit for transportation-
  related emissions. The [NSR] Manual expresses a preference for con-
  tinuous, direct monitoring but also recommends surrogate parameter
  monitoring “where direct monitoring is impractical or in conjunction
  with tested data.” [NSR] Manual at H.6, I.7. IDEM has adopted a
  compliance approach that includes parametric monitoring with peri-
  odic direct measurement of opacity. IDEM’s approach appears consis-
  tent with the approach recommended in the [NSR] Manual. Petition-
  ers do not suggest that there is a continuous monitoring option
  available, but instead assert that direct measurement should be more
  frequent and used in place of the parametric monitoring. This ap-



                                                                     VOLUME 9

234 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

  proach is not clearly required by the [NSR] Manual, and Petitioners
  have not demonstrated why a “non-continuous” direct measure, on its
  own, would better ensure compliance with the BACT limit.

Amicus Br. at 44.

  We agree that petitioners have failed to demonstrate that their monitoring

proposal is preferable to that selected by IDEM or that IDEM clearly erred or
abused its discretion in its treatment of compliance conditions for fugitive trans-
portation emissions. The FDCP, with its requirements for daily journal entries and
biweekly street cleanings, along with other provisions for direct opacity measure-
ments upon request and unscheduled inspections, seems to us adequate to assure
compliance with visible emissions limits. Thus, review of these issues is denied.

  7. Permit Limits for EAF Emissions of NOx, SO2, and PM

  Seventh, petitioners argue that IDEM failed to provide sufficient specificity

in delineating the stack testing requirements for SDI’s NOx, SO2, and PM emis-
sions from the EAF, and thus the BACT limits for these pollutants are unenforce-
able. Union Pet’n at 57-59; see COW Pet’n at 14. In particular, the Union con-
tends that IDEM did not consider or specify averaging times for the pollutants,
did not require specific stack test methods for NOx or SO2, and did not specify the
conditions under which the source tests would be performed for any of the three
pollutants. Union Pet’n at 58-59.

  IDEM had explained in the response-to-comments document that SDI

would be required to prepare a stack testing protocol that ensures tests are run
during normal operating periods and are at least one hour in duration. IDEM ex-
plained further that if it were to deem the protocol, once it is developed, to be
deficient in any way, it would require SDI to amend the protocol. ATSD at 29;
see IDEM Resp. at 47. On appeal, the Union expresses concern about this deci-
sion by stating, among other things:

  [T]he PSD Permit does not establish the conditions required to deter-
  mine compliance, but rather leaves the establishment of such provi-
  sions to the future discretion of IDEM in approving a source test pro-
  tocol. * * * There is no assurance that the establishment of a
  “protocol” [in accordance with State of Indiana regulations] would be
  subject to the public notice and review requirements of
  40 C.F.R. § 52.21 & Part 124. Therefore, relying on a future source
  test protocol is clearly erroneous as it allows for specification of the
  terms of the PSD permit outside of the PSD permitting process.

Union Pet’n at 59.

VOLUME 9
STEEL DYNAMICS, INC. 235

   Petitioners’ concern that the test protocol provision may evade the public

notice and comment requirements of the federal PSD regulations was not men-
tioned in the comments on the draft permit, despite the presence of a clear provi-
sion in section C.7 of that permit specifying that a test protocol should be submit-
ted to IDEM no later than thirty-five days prior to the scheduled test date. See
Draft Permit § C.7. A concern about public review of protocols submitted pursu-
ant to this provision was reasonably ascertainable during the public comment pe-
riod, and therefore it should have been raised then. See 40 C.F.R. § 124.13 (com-
menters “must raise all reasonably ascertainable issues and submit all reasonably
available arguments supporting their position by the close of the public comment
period”). Because it was not, it will not be considered on appeal. Id. § 124.19(a).

   Moreover, IDEM notes in response to the petitions that the issues regarding

specific stack test methods and source test conditions were not raised in the com-
ments and thus were not preserved for review. IDEM Resp. at 46-47. We agree
that this is the case. The Union’s comments on this subject were focused on aver-
aging times and sampling durations, not on specific test methods or conditions
under which stack tests would be conducted. See Union/Fox Cmts at 31 (in sec-
tion titled “No Averaging Times Specified for EAF Emission Limits,” stating,
“The Permit as currently drafted does not specify any averaging times for the
emission limits proposed for the EAF for NOx, SO2, and PM10. The permit also
does not specify any sampling durations for the source tests required in the com-
pliance demonstration sections for these three pollutants.”); see ATSD at 28 (quot-
ing same). The Union contended in its comments that the variability of EAF emis-
sions rates made it essential that averaging times be used “to assure that the full
range of variability in emissions is captured during the source test.” Union/Fox
Cmts at 31. The Union cannot now parley this specific concern into broader re-
marks about test methods and test conditions, and, thus, review of these matters is
denied. See, e.g., In re Florida Pulp & Paper ass’n., 6 E.A.D. 49, 54-55 (EAB
1995) (comment regarding one aspect of sludge testing required by permit is not
sufficient to preserve for appeal the general question of authority to require any
sludge testing); In re Pollution Control Indus. of Ind., Inc., 4 E.A.D. 162, 166-69
(EAB 1992) (comments on two aspects of testing requirement in permit are not
sufficient to raise, on appeal, general objection to any testing requirement).

  This leaves the question of whether IDEM’s failure to include in the permit

specific averaging times or sampling durations constituted clear error or an abuse
of discretion. In its response to comments on these issues, IDEM stated:

  The Department’s stack testing rules, under 326 IAC 3-6, provide that
  the source must prepare a protocol [that] will allow testing of emis-
  sions during normal operating periods. In any case, this period cannot
  be less [than] one hour for each stack test run. Historically, steel mills
  have used tap to tap testing runs, which can last up to ninety minutes.




                                                                       VOLUME 9

236 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

ATSD at 29. Petitioners offer no evidence that stack test durations of at least one
hour or tap-to-tap runs of ninety minutes are inadequate to obtain reasonable as-
sessments of facility performance. Instead, they argue only that the “conditions” of
source tests should be specified in the permit because “high variability of emis-
sions has been alleged” due to the diversity of products to be manufactured by this
mill. Union Pet’n at 58. This is not a sufficient showing of clear error or abuse of
discretion to warrant a grant of review. Accordingly, review of these issues is
denied.

  8. Lead Permit Limits

   Eighth, petitioners contend that the permit limit IDEM placed on EAF lead

emissions, 0.134 pounds per hour, is not enforceable. Union Pet’n at 59-60; COW
Pet’n at 14. IDEM added this limit to the final permit in response to comments,
and the Union believes the limit is unenforceable because the permit does not
specify a stack test method, test frequency or conditions, averaging time, or detec-
tion limit. Union Pet’n at 59-60; see Permit § D.1.15(d) (establishing speciation
tests for HAPs emissions from EAF). The Union also objects, as it did in the
foregoing section, to the provision allowing SDI to develop a testing protocol and
submit it to IDEM prior to the stack test. The Union argues that such establish-
ment of a testing protocol would circumvent public notice and comment require-
ments of the federal PSD program. Union Pet’n at 60.

  Amici take the position (as they did in Part II.A above) that the hourly emis-

sions limit for lead is not needed to ensure that the proposed mill remains below
the significance level for lead. Amicus Br. at 45. Accordingly, Amici contend that
review of the limit’s enforceability should be denied. Id.

   For the reasons expressed in Part II.A above, we have remanded the lead

BACT determination to IDEM. The materiality of the enforceability of a lead
limit in this permit is entirely dependent on IDEM’s conclusion on whether the
proposed mill’s potential to emit lead is below the PSD significance level for lead.
We cannot predict at this point the outcome of IDEM’s deliberations in this re-
gard. Because the lead BACT determination has been remanded and the enforce-
ability issues argued here may as a result of that remand become moot, we decline
to review these issues.

  9. Preventative Maintenance Plan Requirements

  Ninth, petitioners contend that the EAF Preventive Maintenance Plan

(“PMP”) required by sections B.8 and D.1.14 of the permit is essential to ensure
SDI complies with its BACT limits for that emissions unit. Union Pet’n at 60-61;
COW Pet’n at 14; see Union/Fox Cmts at 34; ATSD at 30. Because IDEM has
chosen to allow SDI to develop the PMP after the permit is issued, petitioners
argue that the opportunity for public review and comment on this important ele-

VOLUME 9
STEEL DYNAMICS, INC. 237

ment of SDI’s permit has been erroneously foreclosed. Union Pet’n at 61; COW
Pet’n at 14.

  IDEM argues that it responded to all comments on this issue, explaining

that the portions of the PMP critical to ensuring continuous compliance are al-
ready incorporated in the permit and that the PMP will contain maintenance pro-
cedures based on vendor specifications and suggestions that may not yet be avail-
able to SDI. IDEM Resp. at 48-49 (citing ATSD at 30-31). IDEM also claims that
the PMP is not a PSD requirement but rather a Title V operating permit program
requirement. Id. at 49; accord SDI Resp. at 75-76. Thus, IDEM argues that review
should be denied.

  In our view, petitioners have failed to carry their burden of demonstrating

clear error or abuse of discretion on IDEM’s part with respect to this issue. In
response to the comments, IDEM added a new condition that SDI keep at least
100 fresh bags on hand to ensure timely replacement of any failed bags in the
EAF baghouse. ATSD at 30; see Permit § D.1.21. IDEM also explained that it did
not “believe it [to be] possible or necessary to circulate the PMP for public review
before the permit is finalized” because the PMP will contain “many maintenance
procedures that are based on vendor specifications and suggested maintenance
that may not be available to the company at this time.” ATSD at 30-31. Petitioners
do not provide any evidence or argument to contradict this assertion, which ap-
pears on its face to be reasonable. Petitioners also provide no reply to IDEM’s and
SDI’s claim that the PMP is a Title V, and not a PSD, requirement. Thus, review
of this issue is denied.

D. Miscellaneous Issues

  We deal finally with several miscellaneous issues raised by petitioners, in-

cluding challenges to IDEM’s soil and vegetation analysis, to the adequacy of the
public review and comment procedures, and to a number of other issues.

  1. Soil and Vegetation Analysis

 Petitioners challenge the soil and vegetation impact analysis conducted,

pursuant to 40 C.F.R. § 52.21(o), in support of the permit in this case.74 They

  74   The PSD regulations require that the owner or operator of a proposed major source must

  provide an analysis of the impairment to visibility, soils and vegetation that would oc-
  cur as a result of the source * * * and general commercial, residential, industrial and
  other growth associated with the source * * *. The owner or operator need not provide
  an analysis of the impact on vegetation having no significant commercial or recrea-
  tional value.

40 C.F.R. § 52.21(o).

                                                                                    VOLUME 9

238 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

criticize IDEM for purportedly failing to document and explain the analysis ade-
quately, including neglecting to identify the model used or the data relied on to
estimate deposition, to identify whether the reported Fg/m3 measurements refer to
air or soil, to explain how deposition rates were converted into soil and vegetation
concentrations, and to reveal whether bioaccumulation was considered. Union
Pet’n at 61-62; COW Pet’n at 5-6. Petitioners also allege that the analysis is tech-
nically flawed and has not been subject to public review. Union Pet’n at 62; COW
Pet’n at 5-6.

   IDEM contends that very little guidance is available to instruct permit appli-

cants and issuers on how soil and vegetation impairment analyses should be con-
ducted. IDEM Resp. at 49. SDI echoes IDEM’s sentiment, noting that the PSD
regulations do not prescribe use of a particular analytical method or even specify
a requisite level of detail. SDI Resp. at 77. IDEM explained this point in its re-
sponse to comments, stating, “Deposition modeling is not required under PSD
regulations, however IDEM has performed deposition modeling for lead and me-
tallic hazardous air pollutants as a result of comments received.” SDI Resp. at 77;
ATSD at 62. IDEM consulted with EPA Region V to conduct its deposition mod-
eling and with a dairy cow expert from Purdue University to analyze bioaccumu-
lation issues. IDEM Resp. at 50-51; see ATSD at 38-40. As a consequence, both
IDEM and SDI argue that IDEM went well beyond the regulatory requirements to
ensure that the proposed steel mill would not have an adverse environmental im-
pact on soils or vegetation. IDEM Resp. at 51; SDI Resp. at 76. Both parties also
contend that petitioners have failed to demonstrate that IDEM’s analysis is clearly
erroneous or otherwise warrants review. IDEM Resp. at 50-51; SDI Resp. at 77.
Amici agree on this issue with IDEM and SDI. Amicus Br. at 46-47.

  The NSR Manual provides the following assistance in this context:

  The analysis of soils and vegetation air pollution impacts should be
  based on an inventory of the soils and vegetation types found in the
  impact area. This inventory should include all vegetation with any
  commercial or recreational value. * * *

  For most types of soils and vegetation, ambient concentrations of cri-
  teria pollutants below the secondary national ambient air quality stan-
  dards (NAAQS) will not result in harmful effects. However, there are
  sensitive vegetation species (e.g., soybeans and alfalfa) [that] may be
  harmed by long-term exposure to low ambient air concentrations of
  regulated pollutants for which there are no NAAQS.

NSR Manual at D.4-.5. IDEM reports that SDI’s soils and vegetation analysis ex-
amined the secondary NAAQS and found that estimated ambient concentrations

VOLUME 9
STEEL DYNAMICS, INC. 239

from the proposed mill were below those standards.75 IDEM Resp. at 49-50 &
ex. H.

   Petitioners have provided no information that contradicts IDEM’s conclu-

sion that the steel mill will not adversely affect soils and vegetation in the area.
Petitioners have not shown that there are sensitive plant species that would be
harmed by exposure to concentrations of pollutants below the secondary NAAQS,
nor, indeed, have they proffered any rebuttal evidence whatsoever. Instead, they
now claim that IDEM’s analysis overlooked visibility impairment issues as well
as indirect impacts from truck and commuter traffic associated with the proposed
mill, contrary to the dictates of 40 C.F.R. § 52.21(o). Union Reply at 45. These
new arguments were fully ascertainable at the petition stage of these proceedings
and should have been raised at that time; they will not be entertained for the first
time here. See 40 C.F.R. § 124.19(a). For the foregoing reasons, review on the
basis of these issues must be denied. See In re Kawaihae Cogeneration Project,
7 E.A.D. 107, 130 (EAB 1997) (petitioners fail to meet burden of demonstrating
clear error or other basis for granting review if they fail to proffer at least some
soils or vegetation evidence calling into question permit issuer’s conclusion that
no adverse impacts exist).

   2. Public Comment Period

  Petitioners next argue that the legion of new information submitted during

and after the close of the public comment period has not been subject to public
review and that, apparently, IDEM erred by choosing not to reopen the public
comment period to allow public review of this information. Union Pet’n at 63-65;
COW Pet’n at 3. IDEM counters by explaining that it extended the public com-
ment period for thirty days, provided for a public hearing, and considered com-
ments submitted by the Union after the comment period closed, all of which it had
the discretion, but not a legal responsibility, to do. IDEM Resp. at 52-53 (citing
40 C.F.R. §§ 124.10(b), .12(a), .14(b)). IDEM points out that the permitting reg-
ulations anticipate that changes will occur between the draft and final permits and
argues that petitioners have failed to demonstrate clear error, abuse of discretion,
or other grounds for review of this issue. Id. (citing 40 C.F.R. § 124.19(a)); ac-
cord SDI Resp. at 78-81.

 Where this issue has been specifically raised in the context of a particular

emissions unit and/or pollutant, we have discussed it. See, e.g., supra Part II.B.3.b
(NOx BACT for the reheat furnace); Part II.B.4.b (PM BACT for slag-handling

   75 While the primary NAAQS “define levels of air quality [that] the Administrator judges are

necessary, with an adequate margin of safety, to protect the public health,” the secondary NAAQS
“define levels of air quality [that] the Administrator judges necessary to protect the public welfare
from any known or anticipated adverse effects of a pollutant.” 40 C.F.R. § 50.2(b).

                                                                                    VOLUME 9

240 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

operations). We are not inclined to deal with it in those contexts again here, nor
are we able to examine it in the broader generic sense petitioners urge. See Union
Pet’n at 64 (“sheer number of instances of faulty findings of fact and conclusions
of law and their seriousness * * * warrant recirculating a revised draft Permit for
public review”). The latter option lacks sufficient specificity to merit our atten-
tion. See, e.g., In re Envotech, L.P., 6 E.A.D. 260, 267-69 (EAB 1996) (under
40 C.F.R. § 124.19(a), petition for review must contain clear identification of the
permit conditions at issue and argument that the conditions warrant review); In re
Beckman Prod. Servs., 5 E.A.D. 10, 18-19 (EAB 1994) (same). Accordingly, re-
view on this ground is denied.

  3. Other Issues Raised in COW Petition

  COW raises a series of issues that do not appear in the Union’s petition.

These issues touch on: (1) emissions of manganese, a HAP regulated under Sec-
tion 112 of the CAA; (2) use of 1996 rather than 1997 NOx emissions data;
(3) baghouse inspection frequency; (4) changes in the proposed steel mill’s line
of products; (5) changes in the steel mill’s building location and orientation;
(6) typographical errors in the permit and ATSD; (7) alleged misinterpretation
and misapplication of the holding in American Trucking Assocs., Inc. v. U.S. EPA,
175 F.3d 1027 (D.C. Cir. 1999), cert. granted sub nom. Browner v. American
Trucking Assocs., Inc., 120 S. Ct. 2003 (May 22, 2000) & American Trucking
Assocs., Inc. v. Browner, 68 U.S.L.W. 3566 (U.S. May 30, 2000); (8) public ac-
cess to SDI’s monitoring data; (9) construction of “cause or contribute” language
in regulations; (10) ozone air quality impact analysis; and (11) notice to the State
of Ohio. See COW Pet’n at 4, 6-9, 15, 17, 18-19. After reviewing all arguments
and relevant portions of the administrative record pertaining to these issues, we
find that none of the issues has merit.

   First, review of issue numbers (4), (5), (8), and (11) is denied because COW

did not demonstrate that these matters were raised during the public comment
period and thereby preserved for review by this Board. See, e.g., In re City of Port
St. Joe, 7 E.A.D. 275, 305 & n.48 (EAB 1997); In re EcoEléctrica, L.P.,
7 E.A.D. 56, 75 (EAB 1997). Second, issue number (7) has not been presented
with sufficient specificity to warrant review. See, e.g., In re Puerto Rico Elec.
Power Auth., 6 E.A.D. 253, 255-59 (EAB 1995); In re Inter-Power of New York,
Inc., 5 E.A.D. 130, 153 (EAB 1994). Third, review of issue numbers (1), (2), (3),
(6), (9), and (10) is denied because COW failed to demonstrate clear error in
IDEM’s treatment of these issues. Accordingly, these issues will not be consid-
ered further in this appeal.

VOLUME 9
STEEL DYNAMICS, INC. 241

                                    III. CONCLUSION

  For the foregoing reasons, we remand three components of the permit, as

summarized below, for further proceedings consistent with this opinion. First, we
remand the permit for IDEM to reconsider its analysis of the proposed steel mill’s
potential to emit lead. IDEM must provide in the administrative record a clear
rationale for its treatment of the condensible fraction of lead, including documen-
tation of its decisionmaking process and the data upon which its decisions are
based. IDEM also must consider and respond to the Union’s alternative calcula-
tion of a PTE lead of 4.03 tpy.76 See supra Part II.A.

  Second, we remand the permit for IDEM to perform a complete analysis of

SCR’s cost-effectiveness as applied to SDI’s reheat furnace (including compari-
sons of costs to other facilities and to other technologies), document its findings,
submit those findings to public review, and consider and respond to significant
public comments in its documentation of the final permit decision. 77 See supra
Part II.B.3.c.

   Third, we remand the permit for IDEM to reconsider the BACT limitations

chosen for NOx and CO emissions from the EAF. IDEM must explain why the
limits it imposed are in lbs/hr (rather than in lbs/hr and lbs/ton, or lbs/ton alone),
in particular explaining the differences (if any) between SDI’s proposed mill and
the fifteen similar mills discussed above in Part II.C.2 that would justify exclusive
lbs/hr limits for CO and NOx. 78 Alternatively, IDEM is ordered to impose produc-
tion limits in addition to the hourly limits for these pollutants. See supra Part
II.C.2.

    76 Moreover, if SDI’s proposed mill is found to have a potential to emit lead in excess of the

significance level, then IDEM must conduct a BACT analysis for lead emissions from the mill. In such
a case, IDEM must issue its BACT determination in draft form and provide for public notice of and
comment on the BACT decision.
77 If IDEM decides to base its decision on the ground that SCR is technically infeasible, and

thus an economic infeasibility analysis is unnecessary, the Department must nonetheless consider and
respond to all significant technical feasibility-related comments currently in the record in the docu-
mentation of its final permit decision.
78 Even if IDEM is able to make such a demonstration, it must incorporate other provisions in

the permit that would fully address and protect against the types of permit abuses described by the
Union and Amici in Part II.C.2 above.

                                                                                     VOLUME 9

242 ENVIRONMENTAL ADMINISTRATIVE DECISIONS

  Any party who participates in the remand process and is not satisfied with

the Region’s decision on remand may file an appeal with the Board pursuant to
40 C.F.R. § 124.19. Any such appeal shall be limited to issues within the scope
of the remand. Review of all other issues is denied.

  So ordered.

VOLUME 9

Get today's answer for your situation

You just read Board precedent from 2000. Ezel checks whether it still stands, including any court review since, and answers your specific situation, with citations.

Opens in Ezel Pro. Every answer cites the authority it relies on.