FMSHRC Commission decision Docket PENN 89-277-R, PENN 89-278-R Decided June 29, 1993 Citations vacated

BethEnergy Mines, Inc.

BethEnergy Mines, Inc. (FMSHRC PENN 89-277-R and PENN 89-278-R): Conveyor-belt citations vacated

Apply this precedent to your situation

This is citable Commission precedent from 1993, and it may have been appealed since. Ezel checks how it stands today and answers your situation, with citations.

Currency note: this decision dates from 1993
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Decision of the Commission
This is a decision of the Federal Mine Safety and Health Review Commission, the highest level of agency review, citable as Commission precedent. It may have been appealed to a U.S. Court of Appeals after issuance under 30 U.S.C. § 816; check subsequent history before relying on it. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the agency's own release.
Read the official release (fmshrc.gov)

Plain-English summary

BethEnergy's underground Mine No. 60 received a safeguard notice requiring 24-inch clear travelways on both sides of belt conveyors. Inspectors later cited obstructions along the No. 3 and No. 4 belts, but the ALJ vacated the citations after finding that the evidence did not establish the required clearance violation and that the cited obstructions fell outside the safeguard's narrow scope. The Commission held that the judge used too strict a proof standard, but affirmed the vacation because the safeguard did not clearly cover coal sloughage, concrete blocks, and cribbing material. The citations therefore remained vacated.

Decision snapshot

  • Cited provisions: 30 C.F.R. §§ 75.1403 and 75.1403-5(g); 30 U.S.C. § 874(b)
  • Outcome: The Commission affirmed the ALJ's vacation of both conveyor-belt citations.
  • Key point: A Mine Act safeguard must identify the hazard and required corrective conduct specifically enough to give the operator fair notice.

Full text (FMSHRC public release)

CCASE:
BETHENERGY MINES V. SOL (MSHA)
DDATE:
19930629
TTEXT:

                                 June 29, 1993

BETHENERGY MINES, INC. :
:
v. : Docket Nos. PENN 89-277-R
: PENN 89-278-R
SECRETARY OF LABOR, :
MINE SAFETY AND HEALTH :
ADMINISTRATION (MSHA) :

BEFORE: Holen, Chairman; Backley, Doyle, and Nelson, Commissioners

                                    DECISION

BY THE COMMISSION:

  This contest proceeding arises under the Federal Mine Safety and Health

Act of 1977, 30 U.S.C. 801 et seq. (1988)("Mine Act" or "Act"), and raises
the question of whether BethEnergy Mines, Inc. ("BethEnergy") violated a
notice to provide safeguards applicable to its belt conveyors. The safeguard
notice was issued by an authorized representative of the Secretary of Labor
pursuant to 30 C.F.R. 75.1403 and was based upon the safeguard criterion set
forth at 30 C.F.R. 75.1403-5(g).(Footnote 1) In an earlier decision,
BethEnergy Mines, Inc., 14 FMSHRC 17 (January 1992)("BethEnergy I"), the
Commission vacated Administrative Law Judge William Fauver's determination
that the safeguard was valid as well as his affirmance of the two citations
alleging violations of the safeguard, and remanded to the judge for
reconsideration pursuant to the principles discussed by the Commission in its
opinion and in Southern Ohio Coal Co., 14 FMSHRC 1 (January 1992)("SOCCO
II"), one of four


1 30 C.F.R. 75.1403 has language identical to section 314(b) of the Mine
Act, 30 U.S.C. 874(b), and states:

                 Other safeguards adequate, in the judgment of an
            authorized representative of the Secretary, to
            minimize hazards with respect to transportation of men
            and materials shall be provided.

30 C.F.R. 75.1403-5 is entitled "Criteria-Belt conveyors," and section
75.1403-5(g) states, in pertinent part, that a "clear travelway at least 24
inches wide should be provided on both sides of all belt conveyors...."

other safeguard decisions issued the same date.(Footnote 2)

  On remand, Judge Fauver again determined that the safeguard was valid,

but found that the Secretary had not established the alleged violations of the
safeguard. 14 FMSHRC 894 (May 1992)(ALJ). The Commission granted the
Secretary's petition for discretionary review challenging the judge's vacation
of the citations. We affirm the judge's conclusion but on grounds different
from those relied upon by the judge.

                                    I.

                 Factual Background and Procedural History

  A.      Factual Background

  On June 13, 1984, Francis Weir, an inspector of the Department of

Labor's Mine Safety and Health Administration ("MSHA"), issued a notice to
provide safeguards to BethEnergy at its Mine No. 60, an underground coal mine
in Pennsylvania. The notice states:

                A clear travelway of at least 24 inches wide was
          not provided on both sides of the belt conveyor in the
          longwall section MMUU 031. Starting at the tipple and
          extending inby for approximately 400 ft. For the
          first 200 ft. the clearance changed from the left
          sid[e] back to right and management had the area
          fenced of[f] and a crossunder had been provided. The
          second area was approximately 300 ft. inby the tipple
          was on the left sid[e] and clearance was between 23
          inches and 15 inches for approximately 10-15 ft. in
          two different locations.

                This is a notice to provide safeguard that
          requires at least 24 inches of clear travelway be
          provided on both sides of all belt conveyor[s]
          installed after March 30, 1970 at this mine.

Jt. Exh. 3.

  On September 7, 1989, some five years later, MSHA Inspector John Mull

inspected the Livingston portal in BethEnergy's Eighty-Four Complex, a mine
that includes former Mine No. 60. Inspector Mull observed that 24 inches of
clearance had not been provided along both sides of the No. 3 and 4 conveyor
belts, and issued two citations, alleging violations of Inspector Weir's
safeguard notice.


2 The other decisions are: Mettiki Coal Corp., 14 FMSHRC 29 (January 1992);
Rochester & Pittsburgh Coal Co., 14 FMSHRC 37 (January 1992); and Green River
Coal Co., 14 FMSHRC 43 (January 1992).

  The citation alleging a violative condition along the No. 3 belt

states:

                At least 24 inches of a clear travelway was not
          provided on both sides of the entire No. 3 belt, as
          the side not normally walked was obstruct[ed] with rib
          material, crib, block and other material at numerous
          locations.

Jt. Exh. 1. The citation alleging a violative condition beside the No. 4 belt
states:

                At least 24 inches of a clear travelway was not
          provided on both sides of the No. 4 belt ... as the
          side not normally walked was obstruct[ed] with
          material from the ribs and other material at numerous
          locations.

Jt. Exh. 2.

  The two citations were terminated after miners removed the obstructions

along the belt lines over the course of ten shifts. 14 FMSHRC at 896.
BethEnergy contested both citations, and the matter was heard by Judge Fauver.

   B.     Procedural History

  In his original decision, Judge Fauver determined that, because the

safeguard was based on a published safeguard criterion, it was valid even if
it addressed a general rather than a mine-specific hazard and should be
interpreted in the same manner as a promulgated mandatory standard. 12 FMSHRC
761, 769 (April 1990)(ALJ). Construing the safeguard broadly, the judge found
that the safeguard provided reasonable notice that the walkways beside the
conveyor belts should be clear, and he affirmed both citations. 12 FMSHRC at
769-70.

   On review, the Commission noted its holding in SOCCO II that the

Secretary may properly issue a safeguard that addresses a commonly encountered
hazard so long as it is based on a determination by the inspector that the
specific hazard exists in the mine. BethEnergy I, 14 FMSHRC at 21-22, citing,
SOCCO II, 14 FMSHRC at 15-16. The Commission held that the fact that a
safeguard is based on a published safeguard criterion neither affects its
validity nor the narrow manner in which it is to be construed. 14 FMSHRC at
22-25. Accordingly, the Commission vacated the judge's determination that the
safeguard was valid, and remanded for consideration of whether the safeguard
was based on Inspector Weir's determination that the conditions at
BethEnergy's Mine No. 60 created a transportation hazard requiring the
corrective action prescribed in the safeguard. 14 FMSHRC at 27. If the judge
concluded that the safeguard had been validly issued, he was to determine,
pursuant to the principles announced in Southern Ohio Coal Co., 7 FMSHRC 509
(April 1985)("SOCCO I"), whether BethEnergy had violated it. 14 FMSHRC at 25,
27-28.

  On remand, the judge determined that the safeguard was valid but that

the Secretary had not proven that BethEnergy had violated it. 14 FMSHRC at
897, 899-900. Applying a narrow construction of the safeguard as discussed in
SOCCO I, 7 FMSHRC at 512, the judge reasoned that a violation of the safeguard
exists "only if (1) a travelway between the rib and the conveyor belt has a
width below 24 inches or (2) a fence obstructs the travelway." 14 FMSHRC at
899-900 (footnote omitted). He determined that the first condition could be
met "by proof that obstructions reduced the safe, usable width of a travelway
to below 24 inches." 14 FMSHRC at 900. He concluded that, because Inspector
Mull had not measured but had only estimated the clearance along the
travelways, the Secretary had failed to prove that obstructions reduced the
width of the travelways to less than 24 inches. Id. Accordingly, he vacated
the citations. 14 FMSHRC at 901.

                                  II.

                         Disposition of Issues

  The Secretary sought review of "[w]hether the ... judge erred in

concluding that the Secretary failed to establish violations of a safeguard
notice ... because the inspector failed to measure the distance between the
belts and the obstructions...." PDR at 1. We conclude that the judge erred
in relying upon the inspector's failure to take measurements as the basis for
finding no violation of the safeguard but, nevertheless, affirm in result his
vacation of the citations.

  In determining whether the Secretary had established a violation of the

safeguard notice, the judge imposed upon the Secretary, in effect, a stricter
burden of proof than preponderance of evidence, which is the appropriate
standard of proof in proceedings before Commission administrative law judges.
See, e.g., Kenny Richardson, 3 FMSHRC 8, 12 n.7 (January 1981). Inspector
Mull testified that he issued the citations because material was obstructing
the travelways beside the conveyor belts and, as a result, 24 inches of
clearance had not been provided. Tr. 45, 47. He stated that he had to cross
over the No. 4 belt because the rib sloughage beside the belt was too high for
him to walk over. Tr. 49-50. Inspector Mull also testified that "the reason
[he] didn't measure it [the width of the walkway] was because there were
obstructions from the belt structure ... in most cases clear to the rib." Tr.

  1. BethEnergy offered no evidence in contradiction of Inspector Mull's
    testimony that 24 inches of clearance had not been provided. The judge did
    not question Inspector Mull's general credibility and, in fact, accepted his
    observed estimates as to the size of the obstructions and the distance between
    the belt and the floor and the roof. 14 FMSHRC at 895-96; Tr. 49-50, 75-76.
    Thus, a preponderance of the evidence presented to the judge established the
    cited lack of clearance.

    We conclude, therefore, that substantial evidence does not support the
    judge's rejection of the Secretary's case on the basis of the inspector's

failure to take measurements.(Footnote 3) SOCCO I does not require the
application of a burden of proof stricter than a preponderance of the evidence
in determining whether a safeguard was violated. Rather, SOCCO I requires the
Commission and its judges to construe narrowly the terms and intended reach of
a safeguard. Accordingly, we reverse the judge's determination that the
Secretary failed to prove the cited lack of clearance.

  BethEnergy argues that, even assuming the cited lack of clearance, the

citations were properly vacated because the obstructions alleged in the
citations were not encompassed by the safeguard's prohibitions.(Footnote 4)
We agree.

  In SOCCO I, the Commission concluded that a safeguard notice must

identify with specificity the nature of the hazard against which it is
directed and the conduct required to abate the hazard, and held that "a narrow
construction of the terms of the safeguard and its intended reach is
required." 7 FMSHRC at 512. The Commission explained that strict
construction was necessary in order to balance the unusually broad grant to
the Secretary of authority to issue safeguards with the operator's right to
notice of the conduct required of him. Id. The Commission concluded that the
safeguard, which referred to physical obstructions in a travelway, fallen rock
and cement blocks, did not provide the operator with adequate notice that wet


3 The Commission is bound by the terms of the Mine Act to apply the
substantial evidence test when reviewing an administrative law judge's
decision. 30 U.S.C. 823(d)(2)(A)(ii)(I). The term "substantial evidence"
means "such relevant evidence as a reasonable mind might accept as adequate to
support a conclusion." See, e.g., Rochester & Pittsburgh Coal Co., 11 FMSHRC
2159, 2163 (November 1989), quoting Consolidated Edison Co. v. NLRB, 305 U.S.
197, 229 (1938).


4 Although the Secretary narrowly tailored the issue presented for review, we
conclude that BethEnergy is not precluded from interjecting this argument in
its response brief, rather than in a cross-petition for review. In Secretary
on behalf of Price & Vacha v. Jim Walter Resources, Inc., 12 FMSHRC 1521
(August 1990), the Commission determined that:

        the "appellee" may urge in support of the judgment
        below any matter or issue appearing in the record,
        even if it involves an objection to some aspect of the
        judge's reasoning or issue resolution, so long as the
        appellee does not seek to attack the judgment itself
        or to enlarge its rights thereunder, in which case it
        would be obliged to file a cross-petition for
        discretionary review.

12 FMSHRC at 1529 (emphasis in original; citations omitted). The Commission
reaffirmed this determination on subsequent review of the judge's decision on
remand. Secretary on behalf of Price & Vacha v. Jim Walter Resources, Inc.,
14 FMSHRC 1549, 1552 n.2 (September 1992). Here, the appellee does not seek
to attack the judge's conclusion that the citations should be vacated or to
enlarge its rights under that judgment. Thus, we consider the argument.

ground conditions resulting in an accumulation of water fell within the
safeguard's prohibitions. 7 FMSHRC at 513.

  In Green River Coal Co., 14 FMSHRC 43, 47 (January 1992), the Commission

affirmed the judge's determination that a safeguard, which addressed a
hazardous narrowing of a travelway caused by the erection of roof supports
near a conveyor belt, did not give the operator adequate notice that it also
prohibited the loose rock obstructing a travelway. The Commission explained
that "[o]bstructions in travelways caused by the deliberate placement of roof
supports differ fundamentally in nature, cause, and remedy from those that
occur due to roof falls." Id.

  Here, the impediments to travel described in the safeguard differ

substantially in nature from the cited obstructions. The lack of clearance
described in the safeguard was caused by the operator's erection of a fence
across the travelway and by placement of the belt too close to the rib. In
contrast, the cited coal sloughage, concrete blocks and cribbing material
resulted from unintended accumulations in the travelways. The fence, although
erected as a safety measure, impeded travel, and the proximity of the belt to
the rib narrowed the passageway. The cited obstructions presented primarily
slipping, tripping, and falling hazards. See Tr. 45-46. Unlike abatement for
lack of clearance caused by the belt being too close to the rib, abatement of
these citations required removal of the coal sloughage, concrete blocks, and
crib material. Thus, for the reasons discussed in SOCCO I and Green River, we
conclude that the lack of clearance described in Inspector Weir's safeguard
did not provide BethEnergy with adequate notice that the safeguard prohibited
the cited conditions. Accordingly, we affirm, in result, the judge's vacation
of the citations.

                                 III.

                              Conclusion

  For the reasons discussed above, we affirm the judge's vacation of the

citations.

                                Arlene Holen, Chairman


                                Richard V. Backley, Commissioner


                                Joyce A. Doyle, Commissioner


                                L. Clair Nelson, Commissioner