Helen Mining Company (ALJ decision, May 27, 1987)

Helen Mining Company (FMSHRC PENN 87-104): Coal-dust settlement approved at $500

Decision type
ALJ decision
Docket
PENN 87-104
Decided
May 27, 1987
Presiding judge
Outcome
Settled
Precedential status
Final order, not precedent
Checked against source
2026-08-21
Cited standards

Apply this to your situation

This order from 1987 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current MSHA standards and Commission precedent say, with citations.

Currency note: this decision dates from 1987
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final ALJ decision, not Commission precedent
This decision became final under the 40-day rule in 30 U.S.C. § 823(d)(1) because no later Commission review appears in the official index. It binds the parties but is not Commission precedent. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the agency's own release.
Read the official release (fmshrc.gov)

Plain-English summary

Helen Mining was cited after combustible material, loose coal, and float coal dust accumulated along a belt conveyor at the Homer City Mine. The Secretary explained that later investigation showed much of the material was damp and that no hot rollers or electrical violations were found, reducing the likelihood of fire or explosion. Judge Paul Merlin approved the settlement and reduced the assessment from $1,000 to $500.

Decision snapshot

  • Cited standard: 30 C.F.R. § 75.400
  • Outcome: The settlement was approved and the operator was ordered to pay $500.
  • Key point: The penalty reduction was supported by later evidence that the accumulations were generally damp and did not present the originally assessed fire or explosion risk.

Full text (FMSHRC public release)

CCASE:
SOL (MSHA) V. HELEN MINING
DDATE:
19870527
TTEXT:


Page 2

~972

Federal Mine Safety and Health Review Commission Office of Administrative Law Judges

SECRETARY OF LABOR,
CIVIL PENALTY PROCEEDING
MINE SAFETY AND HEALTH
ADMINISTRATION (MSHA),
Docket No. PENN 87-104
PETITIONER A.C. No. 36-00926-03671

v. Homer City Mine

HELEN MINING COMPANY,
RESPONDENT

DECISION APPROVING SETTLEMENT

ORDER TO PAY

Before: Judge Merlin

The Solicitor has filed a motion to approve settlement of the violation involved in this case. The originally assessed amount was $1,000 and the proposed settlement is for $500.

The subject order was issued for a violation of 30 C.F.R.
75.400 because combustible materials, float coal dust and loose coal, were permitted to accumulate along the Number 4 belt conveyor. The loose coal had accumulated under the belt and belt roller for a distance of approximately 600 feet and was 4 to 18 inches deep. Float coal dust in the belt entry extended a distance of approximately 1,700 feet. The Solicitor represents that a reduction from the original assessment is warranted for the following reasons:

The special assessment of this violation indicated that this violation could have contributed to the propagation of a fire or an explosion. Float coal dust in the belt entry extended a distance of approximately 1,700 feet. The bottom belt rollers could have become overheated and provided an ignition source for the accumulations. Further investigation into the matter revealed that the Assessment Office did not take into account the modification MSHA Inspector William McClure made with reference to the description of the condition. Further conversations with this inspector have revealed that the condition was not as grave as it has been assessed. The modification and the inspector have revealed that approximately 600 feet of


Page 3

~973 the 1,750 feet of the loose coal accumulations between Number 20 to Number 22 marker and from the Number 1 marker to Number 18 marker was [sic] damp to wet. Additionally, 70 feet of the 150 feet of float coal dust outby the Number 18 marker was [sic] damp to wet. Inspector McClure has stated that the remainder of the accumulations was not completely dry but in a damp to dry condition. He also checked for hot rollers and found not [sic] hot rollers. He checked for electrical violations and found no electrical violations in the area. He believed that the conditions in the belt entry were generally of a damp nature.
Accordingly, the propagation of a fire or an explosion was not probable.

The Solicitor is to be commended for her comprehensive explanation.

In light of the foregoing, I accept the Solicitor's representations and approve recommended settlement. I further note that the settlement amount remains substantial.

Accordingly, the motion to approve settlement is GRANTED and the operator is ORDERED TO PAY $500 within 30 days of the date of this decision.

Paul Merlin
Chief Administrative Law Judge

What applies to your situation today?

This order bound one employer. Ezel checks the current MSHA standards and Commission precedent against your facts, with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace