Solar Fuel Company, Inc. (ALJ decision, February 13, 1987)

Solar Fuel Company, Inc. (FMSHRC PENN 86-288): One citation vacated, one modified, and $205 assessed

Decision type
ALJ decision
Docket
PENN 86-288
Decided
February 13, 1987
Presiding judge
Outcome
Mixed result
Precedential status
Final order, not precedent
Checked against source
2026-08-22

Apply this to your situation

This order from 1987 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current MSHA standards and Commission precedent say, with citations.

Currency note: this decision dates from 1987
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final ALJ decision, not Commission precedent
This decision became final under the 40-day rule in 30 U.S.C. § 823(d)(1) because no later Commission review appears in the official index. It binds the parties but is not Commission precedent. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the agency's own release.
Read the official release (fmshrc.gov)

Plain-English summary

MSHA cited Solar Fuel Company at the Solar No. 10 Mine for electrical equipment near pillar workings, inadequate airflow, and other conditions. Judge Roy J. Maurer vacated Citation No. 2694689, modified Citation No. 2694571 to remove its significant-and-substantial designation, and affirmed the violations in Citations Nos. 2694572 and 2694573. The judge assessed $25, $126, and $54 for the three remaining citations, for a total of $205. The operator stipulated that the violations had been abated timely and had no prior violations at the newly operating mine.

Decision snapshot

  • Cited standards: 30 C.F.R. §§ 77.0516, 75.1002-1(a), and 75.301
  • Outcome: One citation was vacated, one was modified, two were affirmed, and $205 in civil penalties was assessed.
  • Key point: Unrebutted evidence supported the electrical-equipment and airflow violations, while the Secretary's motion to vacate one citation was granted.

Full text (FMSHRC public release)

CCASE:
SOL (MSHA) V. SOLAR FUEL COMPANY
DDATE:
19870213
TTEXT:


Page 2

~299

Federal Mine Safety and Health Review Commission Office of Administrative Law Judges

SECRETARY OF LABOR,
CIVIL PENALTY PROCEEDING
MINE SAFETY AND HEALTH
ADMINISTRATION (MSHA),
Docket No. PENN 86-288
PETITIONER
A.C. No. 36-06289-03513

v. Solar No. 10 Mine

SOLAR FUEL COMPANY, INC.,
RESPONDENT

DECISION

Appearances: Susan M. Jordan, Esq., Office of the Solicitor, U.S. Department of Labor, Philadelphia, Pennsylvania, for Petitioner; David C. Klementik, Esq., President, Solar Fuel Company, Inc., Friedens, Pennsylvania, for Respondent.

Before: Judge Maurer

This case is before me upon the petition for civil penalty filed by the Secretary of Labor pursuant to section 105(d) of the Federal Mine Safety and Health Act of 1977, 30 U.S.C. 801 et seq., the "Act," for alleged violations of regulatory standards. The general issues before me are whether the Solar Fuel Company (Solar) has violated the cited regulatory standards and, if so, what is the appropriate civil penalty to be assessed in accordance with section 110(i) of the Act. Additional issues are also addressed in this decision as they relate to specific citations.

The case was heard in Pittsburgh, Pennsylvania, on January 8, 1987. Both parties waived the filing of post-hearing briefs.

STIPULATIONS

The parties stipulated to the following (Tr. 7×8):

1. The Solar No. 10 Mine is owned and operated by the respondent, Solar Fuel Company, Inc.

2. The Solar No. 10 Mine is subject to the jurisdiction of the Federal Mine Safety and Health Act of 1977.

3. The presiding Administrative Law Judge has jurisdiction pursuant to section 105 of the Act.


Page 3

~300

  1. The citations and their terminations involved herein were
    properly served by a duly authorized representative of the Secretary of Labor upon an agent of the respondent at the dates, times, and places stated therein and may be admitted into evidence for the purpose of establishing their issuance.

    1. The parties stipulate to the authenticity of their
      exhibits but not to the relevancy of the truth asserted therein.

    2. All of the alleged violations have been abated within a
      timely fashion.

    3. The total production of Solar No. 10 Mine is between
      50,000 and 100,000 tons of coal per year.

    4. The Solar No. 10 Mine began operations in March of 1986.
      The three violations at issue were the first violations cited at the mine. There are no previous violations.

Citation No. 2694689

The Secretary, by counsel, has moved to vacate this citation and withdraw the civil penalty assessed thereon. I granted this motion on the record at the hearing of this case (Tr. 5).

Citation No. 2694571

At the hearing and on the record, the Secretary moved to modify this citation to remove the "significant and substantial" allegation and the respondent, of course, did not object. I granted the motion (Tr. 9). This section 104(a) citation alleged a violation of 30 C.F.R. 77.0516 and the respondent later admitted the violation (Tr. 60). Under the circumstances, I conclude that a civil penalty in the amount of $25 is appropriate under the criteria set forth in section 110(i) of the Act.

Citation No. 2694572

This citation alleges a "significant and substantial" violation of the regulatory standard at 30 C.F.R. 75.1002×1(a) and alleges as follows:

Two pieces of non-permissible electric equipment were found to be located within 150 feet from pillar workings (cave). A G.E. safety switch manual control on/off breaker box used to supply power to the conveyer head and an Allen Bradley metal control box used to supply power to the JABCO box which is used to start and stop the pan


Page 4

~301
line and conveyor head automatically were found to be in a non-permissible condition in that openings in excess of .009 of an inch were found in both boxes. Both of these non-permissible boxes were located in the No. 14 room of the 2 right section off of the 1st South mains (003) section. These boxes were found to be located approximately 82 feet from pillar workings. The pillared area was located in the No. 2 room and such measurements were taken from the toe of the fall to the non-permissible boxes. Line brattice was being used to separate the No. 13 room from the No. 14 room.

The cited standard requires as relevant hereto that electrical equipment must be permissible and maintained in a permissible condition when located within 150 feet of pillar workings. The factual testimony of MSHA Inspector Joseph Trybus to the effect that two pieces of nonpermissible electrical equipment were located approximately 82 feet from such pillared workings is not disputed.

The two pieces of equipment cited by the inspector were safety switch control boxes and he testified that the hazard he was concerned with would be methane entering these nonpermissible boxes and a random spark causing an explosion. He further testified that although he detected no methane at the time of his inspection, there is always the possibility of the air reversing itself in the mine or the possibility of the air not getting to a certain area which could cause a methane build-up and which could in turn enter the nonpermissible equipment.

In the event of a methane explosion, he would expect it to be reasonably likely that serious to fatal injuries would occur to persons working in that area. There were approximately seven men working on this section at the time.

I find that the facts of this violation are not seriously in dispute and the violation is accordingly proven as charged. Within this framework of unrebutted evidence it may also reasonably be inferred that this condition constituted a "significant and substantial" violation of the cited standard. See Secretary v. Mathies Coal Company, 6 FMSHRC 1 (1984). The violation was accordingly also of a serious nature. Moderate negligence may also reasonably be inferred from the circumstances. The area of the mine is frequently examined and management knew or at least should have known of the non-permissible condition of these boxes and their distance from the pillar workings.


Page 5

~302
Considering the statutory criteria contained in section 110(i) of the Act, I find that a civil penalty of $126, as proposed, is warranted.

Citation No. 2694573

This citation alleges a "significant and substantial" violation of the regulatory standard at 30 C.F.R. 75.301 and alleges as follows:

The quantity of air reaching the last open crosscut between the Nos. 2 and 1 rooms of the 3 right butt off of 1st South (005) section as measured with a Taylor anenometer and watch was found to be only 7,200 cubic feet a minute. The law requires that the minimum quantity of air reaching the last open crosscut in any pair or set of developing rooms shall be 9,000 cubic feet a minute.

Once again, the respondent does not dispute the facts alleged in the citation (Tr. 44) and since those facts, if true, amount to a violation of the cited standard, I find that the violation, as charged, is proven.

The inspector marked this as a "significant and substantial" violation because of the possibility of fumes, gases, respirable dust, methane and smoke entering the intake air and the further possibility of an ignition source from non-permissible equipment operating on the section. The result, he testified, could be an explosion. There were three men working on the section at that time.

The respondent doesn't believe that the violation should be classified "S & S" because their position is that the drop in airflow was of a temporary nature, caused by a displaced line brattice. However, I note Mr. Klementik had no knowledge of when it was dislodged or how long it had been out of place prior to the inspector's writing the citation.

I fully credit the factual and opinion testimony of Inspector Trybus on the significance of this violation and in light of the seriousness of the injuries that could reasonably have been caused by the lack of air reaching the last open crosscut between the rooms cited, I find the violation was "significant and substantial." Mathies, supra.

I have considered the criteria in section 110(i) of the Act and I conclude that the proposed civil penalty of $54 is appropriate.


Page 6

~303
ORDER

Solar Fuel Company, Inc., is hereby ordered to pay the following civil penalties within 30 days of the date of this decision:

Citation No. Amount

2694571
$ 25
2694572
$126
2694573
$ 54
2694689
Vacated

Total: $205

Roy J. Maurer
Administrative Law Judge

What applies to your situation today?

This order bound one employer. Ezel checks the current MSHA standards and Commission precedent against your facts, with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace