Secretary of Labor v. U.S. Steel Mining Co., Inc. (ALJ decision, May 30, 1985)
Secretary of Labor v. U.S. Steel Mining Co., Inc. (FMSHRC PENN 84-164): Track switch and cable citations settled
Apply this to your situation
This order from 1985 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current MSHA standards and Commission precedent say, with citations.
Plain-English summary
MSHA cited U.S. Steel Mining at its Maple Creek No. 2 Mine for an inoperable track switch signal and a damaged cable serving an energized crusher. The Secretary proposed reducing the original combined $349 assessment because the track was one-way and the exposed cable conductors remained insulated. Chief Administrative Law Judge Paul Merlin accepted those lower gravity assessments while finding that routine checks should have detected both conditions. He approved settlements of $160 and $100 and ordered the operator to pay $260 within 30 days.
Decision snapshot
- Cited standards: 30 C.F.R. §§ 75.1403 and 75.517, concerning haulage safety and electrical equipment.
- Outcome: Two citations settled for $260 total, reduced from $349.
- Key point: The judge approved lower penalties because the particular track and cable conditions posed less risk than first assessed.
Full text (FMSHRC public release)
CCASE:
SOL (MSHA) v. U.S STEEL MINING
DDATE:
19850530
TTEXT:
~776
Federal Mine Safety and Health Review Commission Office of Administrative Law Judges
SECRETARY OF LABOR,
CIVIL PENALTY PROCEEDING
MINE SAFETY AND HEALTH
ADMINISTRATION (MSHA),
Docket No: PENN 84-164
PETITIONER
A.O. No. 36-03425-03561
v. Maple Creek No. 2 Mine
U.S. STEEL MINING CO., INC,
RESPONDENT
DECISION APPROVING SETTLEMENT
ORDER TO PAY
Before: Judge Merlin
The Solicitor has filed a motion to approve settlements for the two violations involved in this matter. The originally assessed amounts were $349 and the proposed settlements are $260. Citation No. 02252007 (30 C.F.R. 75.1403), originally assessed at $213 was issued when the inspector found there was no means to determine the alignment of a haulage track switch. The electric signal light was disconnected and was not operable. The operator was negligent because this condition should have been detected during the pre-shift examination. However, gravity was not as high as originally believed. The haulage track in question was designated as one-way, substantially reducing the possibility of accident. I accept the Solicitor's representations and approve the recommended settlement of $160.
Citation No. 2252826 (30 C.F.R. 75.517) originally assessed at $136 was issued when the inspector found that a trailing cable serving 540 volts to a stamp crusher was not fully protected due to damage to the outer jacket of the cable exposing the power conductors. The crusher was energized.
The operator was negligent because this condition should have been detected during the routine electrical examination. However, gravity was not as high as was originally believed. Although the outer jacket of the cable was damaged, the exposed power conductors were insulated and there was no bare wiring present. I accept the Solicitor's representations and approved the recommended settlement of $100.
~777
The operator is Ordered to Pay $260 within 30 days from the date of this decision.
Paul Merlin
Chief Administrative Law Judge
What applies to your situation today?
This order bound one employer. Ezel checks the current MSHA standards and Commission precedent against your facts, with citations.
Opens in Ezel Pro.
- Checks the law as it stands today, not only this page
- Cites every source it relies on, so you can verify it
- Chat, drafting and research in one workspace