Helvetia Coal Company (ALJ decision, April 6, 1982)

Helvetia Coal Company (FMSHRC PENN 82-42): Trailing-cable penalty case dismissed

Decision type
ALJ decision
Docket
PENN 82-42
Decided
April 6, 1982
Presiding judge
Outcome
Citations vacated
Precedential status
Final order, not precedent
Checked against source
2026-10-21
Cited standards

Apply this to your situation

This order from 1982 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current MSHA standards and Commission precedent say, with citations.

Currency note: this decision dates from 1982
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final ALJ decision, not Commission precedent
Under the 40-day rule in 30 U.S.C. § 823(d)(1), an ALJ decision becomes the Commission's final decision if no timely review is directed. No later Commission review of this docket appears in the official index. This ALJ decision is not Commission precedent. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the agency's own release.
Read the official release (fmshrc.gov)

Plain-English summary

MSHA alleged that a two-inch cut in a trailing cable left insulated power wires exposed at Helvetia Coal's Lucerne No. 6 Mine. The parties agreed that, if proved, the violation would have been nonserious and created no immediate foreseeable shock hazard without damage to the wire insulation. After hearing three eyewitnesses, Judge Joseph B. Kennedy found the claimed cable cut more likely than not did not exist. He confirmed his bench ruling and dismissed the penalty case.

Decision snapshot

  • Cited standard: 30 C.F.R. § 75.517.
  • Outcome: Alleged cable violation not proved; penalty case dismissed.
  • Key point: The eyewitness evidence did not establish the alleged cut in the trailing cable.

Full text (FMSHRC public release)

CCASE:
SOL (MSHA) V. HELVETIA COAL
DDATE:
19820406
TTEXT:
~477

Federal Mine Safety and Health Review Commission Office of Administrative Law Judges

SECRETARY OF LABOR,
Civil Penalty Proceeding
MINE SAFETY AND HEALTH
ADMINISTRATION (MSHA),
Docket No. PENN 82-42
PETITIONER
A/O No. 36-00917-03117
v.
Lucerne No. 6 Mine
HELVETIA COAL COMPANY,
RESPONDENT

DECISION AND ORDER

This matter came on for a confrontational hearing in Falls Church, Virginia on April 1, 1982. The sole issue presented was whether a two-inch cut in a trailing cable that exposed the undamaged insulated power wires in an abrasion repair to the cable actually existed. The parties stipulated that if the violation did occur it was a nonserious, nofault violation that created no immediate forseeable shock hazard absent damage to the dielectric strength of the insulation on the power wires. The gravamen of the violation was that the claimed two-inch cut deprived the cable of the full protection mandated by 30 C.F.R. 75.517.

After the parties and trial judge had a full opportunity to examine the three eyewitnesses the parties elected to waive the filing of post-hearing briefs and to submit the matter for a jury verdict decision.

Whereupon, the trial judge found that, without attempting to resolve in detail all of the conflicts in the testimony, the preponderance of the reliable, probative and substantial evidence showed it more probable than not that the violation charged did not, in fact, occur.

The premises considered, therefore it is ORDERED that the bench decision be, and hereby is, CONFIRMED and the penalty case DISMISSED.

Joseph B. Kennedy
Administrative Law Judge

What applies to your situation today?

This order bound one employer. Ezel checks the current MSHA standards and Commission precedent against your facts, with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace