Mathies Coal Company (ALJ decision, December 30, 1980)

Mathies Coal Company (FMSHRC PENN 80-277 and PENN 80-121-R): Roof control order vacated

Decision type
ALJ decision
Dockets
PENN 80-277, PENN 80-121-R
Decided
December 30, 1980
Presiding judge
Outcome
Citations vacated
Precedential status
Final order, not precedent
Checked against source
2026-10-22
Cited standards

Apply this to your situation

This order from 1980 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current MSHA standards and Commission precedent say, with citations.

Currency note: this decision dates from 1980
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final ALJ decision, not Commission precedent
No later Commission review appears in the official index, so this ALJ decision became final under the 40-day rule in 30 U.S.C. § 823(d)(1). It binds the parties but is not Commission precedent. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the agency's own release.
Read the official release (fmshrc.gov)

Plain-English summary

MSHA alleged that a continuous miner operator at Mathies Coal's mine had worked under unsupported roof while cutting a track area. Judge Charles C. Moore, Jr., found that the inspector's measurement overlooked the position of the miner's controls. A scale drawing, model, and the operator's testimony showed that the machine could not be placed in the cut with its operator under unsupported roof. The judge found no violation of the roof control plan, vacated the order, and dismissed both the contest and penalty case without assessing a penalty.

Decision snapshot

  • Cited standard: 30 C.F.R. § 75.200.
  • Outcome: Roof control order vacated and both proceedings dismissed; no penalty assessed.
  • Key point: Measurements of the cut and the machine's controls did not support the alleged exposure to unsupported roof.

Full text (FMSHRC public release)

CCASE:
SOL (MSHA) V. MATHIES COAL
DDATE:
19801230
TTEXT:
~3740

Federal Mine Safety and Health Review Commission Office of Administrative Law Judges

SECRETARY OF LABOR,
Civil Penalty Proceeding
MINE SAFETY AND HEALTH
ADMINISTRATION (MSHA),
Docket No. PENN 80-277
PETITIONER A/O No. 36-00963-03096V v.
Mathies Mine
MATHIES COAL COMPANY,
RESPONDENT

MATHIES COAL COMPANY,
Contest of Order
CONTESTANT
v. Docket No. PENN 80-121-R
Order No. 836843 12/13/79
SECRETARY OF LABOR,
MINE SAFETY AND HEALTH
Mathies Mine
ADMINISTRATION (MSHA),
RESPONDENT

DECISION

Appearances: James H. Swain, Esq., Office of the Solicitor, U.S.
Department of Labor, for Petitioner-Respondent;
William H. Dickey, Jr., Esq., Consolidation Coal Company, Pittsburgh, Pennsylvania, for Respondent- Contestant

Before: Judge Charles C. Moore, Jr.

Mathies Coal Company was served with an order alleging a violation of its roof control plan because it seemed obvious to the inspector that the operator of the continuous miner in a particular cut had been operating under unsupported roof. When the inspector first noticed the unusually large unsupported area where Mathies had been constructing a track shoot (for its rail car haulage system) his eyeball measurement indicated to him that the depth of the cut was greater than the distance from the front of the continuous mining machine to the operator's controls on that machine. He then had the area supported and took measurements. One of his measurements showed it was 28 feet from the deepest cut to the nearest roof bolt. Since it was only some 22 feet 7 inches from the front of the continuous miner to the operator's controls, he assumed there had been a violation because the operator of necessity had been under unsupported roof.
~3741
After the issuance of the citation the representatives of Mathies were somewhat perplexed by the measurements but rather than accept the fact of violation they brought the continuous miner back into the track shoot area and found that they could not position the miner in the track shoot in such a way that the operator would be under unsupported roof. One of their discoveries was that it was 28 feet from the far left-hand corner of the cutting blade to the miner's controls which were located on the right rear of the machine.

At the hearing Mathies produced scale drawings of the track shoot showing the last line of roof bolts and a scale model of the continuous miner. The miner would not fit in the track shoot in any area in any way which would expose the operator of the machine to unsupported roof. Furthermore, Mathies produced the continuous miner operator who cut the track shoot in question, and he testified as to how he cut this track shoot and that at no time was he under unsupported roof.

While I can sympathize with the inspector's action, it is nevertheless true and I find it as a fact that no violation of the roof control plan or of 30 C.F.R. 75.200 occurred in this track shoot. The order is accordingly vacated and these cases are dismissed.

Charles C. Moore, Jr.
Administrative Law Judge

What applies to your situation today?

This order bound one employer. Ezel checks the current MSHA standards and Commission precedent against your facts, with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace