Cumberland Coal Resources, LP
Cumberland Coal Resources, LP (FMSHRC PENN 2004-73-R): Ventilation orders partly vacated
Apply this to your situation
This order from 2005 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current MSHA standards and Commission precedent say, with citations.
Plain-English summary
Cumberland Coal Resources operated the Cumberland Mine's No. 49 longwall panel. MSHA alleged that the panel's bleeder ventilation system was ineffective and issued imminent-danger orders and citations involving methane and ventilation conditions. After a hearing, the judge affirmed three citations and two orders, vacated two citations and two orders, and assessed $2,496 in penalties instead of the $3,874 proposed. The judge's findings addressed whether the ventilation system met the Mine Act and MSHA standards and whether the inspector's imminent-danger orders were supported by the conditions known at the time.
Decision snapshot
- Cited standard(s): 30 C.F.R. § 75.334(b)(1); 30 C.F.R. § 75.370(a)(1), (d); 30 C.F.R. § 75.340(a)(1)(i)
- Outcome: Three citations and two orders were affirmed, two citations and two orders were vacated, and $2,496 in penalties was assessed.
- Key point: The validity of an imminent-danger order depends on the facts known to the inspector when the order was issued.
Full text (FMSHRC public release)
FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION
OFFICE OF ADMINISTRATIVE LAW JUDGES
601 New Jersey Avenue, NW, Suite 9500
Washington, DC 20001
March 28, 2005
CUMBERLAND COAL RESOURCES, LP, : CONTEST PROCEEDINGS
Contestant :
: Docket No. PENN 2004-73-R
: Order No. 7067355; 1/24/2004
v. :
: Docket No. PENN 2004-74-R
SECRETARY OF LABOR, : Citation No. 7067356; 1/24/2004
MINE SAFETY AND HEALTH :
ADMINISTRATION (MSHA), : Docket No. PENN 2004-75-R
Respondent : Citation No. 7083200; 1/16/04
:
: Docket No. PENN 2004-85-R
: Order No. 7066999; 2/4/2004
:
: Docket No. PENN 2004-86-R
: Citation No. 7067000; 2/4/2004
:
: Docket No. PENN 2004-87-R
: Order No. 7067001; 2/7/2004
:
: Docket No. PENN 2004-88-R
: Citation No. 7067003; 2/7/2004
:
: Docket No. PENN 2004-104-R
: Order No. 7069906; 2/14/2004
:
: Docket No. PENN 2004-105-R
: Citation No. 7069907; 2/14/2004
:
: Cumberland Mine
: Mine ID 36-05018
:
SECRETARY OF LABOR, : CIVIL PENALTY PROCEEDINGS
MINE SAFETY AND HEALTH :
ADMINISTRATION (MSHA), : Docket No. PENN 2004-181
Petitioner : A. C. No. 36-05018-29162
:
v. :
: Docket No. PENN 2005-8
: A. C. No. 36-05018-38538
CUMBERLAND COAL RESOURCES, LP, :
Respondent : Cumberland Mine
DECISION
Appearances: Leon E. Pasker, Esq., U.S. Department of Labor, Office of the Solicitor, Philadelphia, Pennsylvania, and James B. Crawford, Esq., U.S. Department of Labor, Office of the Solicitor, Arlington, Virginia, on behalf of Petitioner;
R. Henry Moore, Esq., Jackson Kelly, PLLC, Pittsburgh, Pennsylvania, on behalf of Respondent.
Before: Judge Zielinski
These cases are before me on Notices of Contest filed by Cumberland Coal Resources,
LP ("Cumberland"), and Petitions for Assessment of Civil Penalties filed by the Secretary of
Labor ("Secretary"), pursuant to section 105 of the Federal Mine Safety and Health Act of 1977
("Act"), 30 U.S.C. § 815. At issue are four imminent danger orders, and five citations charging
that the bleeder system on Cumberland's No. 49 longwall panel was ineffective.1 A hearing was
held in Pittsburgh, Pennsylvania. The parties entered into 51 stipulations prior to the hearing,
and submitted briefs following receipt of the transcript. The Secretary proposes civil penalties
totaling $3,874.00 for the violations. For the reasons set forth below, three citations and two
orders are affirmed, two citations and two orders are vacated, and civil penalties totaling
$2,496.00 are imposed.
Findings of Fact - Conclusions of Law
Background
Cumberland Coal Resources, LP, formerly RAG Cumberland Resources, LP, operates a
large underground coal mine, the Cumberland mine, in Greene County, Pennsylvania.
Cumberland uses the longwall as its primary mining method, and has successfully completed
nearly fifty longwall panels. Toward the latter part of 2003, it was preparing to commence
mining on a new panel, No. 49 ("LW49"), which was located in a new district of the mine,
i.e., there were no other panels adjoining the new panel. Over the years, Cumberland's longwall
panels had increased in size. LW49 was to be over 12,000 feet long and 1,250 feet wide, at the
time, the largest panel ever mined by Cumberland.
An important aspect of ventilating any longwall panel is its bleeder system. Bleeder
systems, pursuant to regulation, must effectively and "continuously, dilute and move methane-air
mixtures and other gases, dusts, and fumes from the worked-out area away from active
workings." 2 Bleeder systems have evolved over time, as panels have grown larger. Most earlier
panels used "wraparound" bleeder systems, in which fans located outby produced air flow for
both face ventilation and the bleeder system. In wraparound bleeder systems, a portion of the
main air flow moving inby in the headgate entries is split off at the face and routed into and
around the worked-out area. Through a system of ventilation controls, a negative pressure
differential is created at the back, most inby, corner of the tailgate side of the longwall, and
methane in the worked-out area, the gob,3 is drawn inby, away from the face, into bleeder entries
which transport it to the surface. The methane is diluted as it moves out of the gob, such that by
the time it enters the travelable bleeder entries, the outermost entries that surround the panel, its
concentration is reduced to less than 4.5%. In more recent years, Cumberland and other
operators have used bleeder fan systems, in which the bleeder entries are connected to a bleeder
fan shaft located inby, or behind, longwall panels. Cumberland planned to use such a bleeder
system for LW49. However, it encountered delays in developing the bleeder fan shaft, and
anticipated a significant "problem," i.e., the longwall would be ready to begin production, but the
bleeder shaft would be weeks or months away from being operational. Tr. 1308-09.
In October 2003, Cumberland abandoned development of the bleeder fan shaft, and
determined to use a wraparound bleeder system for LW49. Air flow would be generated by
existing fans located a considerable distance from the mouth of the panel. It performed computer
simulations of the wraparound system and determined that it would be acceptable for mining the
first 10,000 feet of the panel. Tr. 1317. Another ventilation shaft was scheduled to come on line
in April of 2004, which was expected to enhance ventilation flow both at the face and in the
bleeder system. Tr. 1318-21. It was proposed that the new shaft be connected to the LW49
ventilation system by a six-foot diameter shaft, referred to as the "shaft within a shaft."
Cumberland prepared an addendum to its general ventilation plan, describing provisions specific
to LW49, and notified miners' representatives of its plan to use a wraparound bleeder system.
On November 7, 2003, it submitted the addendum to the Secretary's Mine Safety and Health
Administration ("MSHA"). On December 9, 2003, MSHA approved the proposed ventilation
plan addendum for mining the first 8,000 feet of the panel, by which time the additional
ventilation from the new shaft was expected to be available.4
When notified about the proposed change to a wraparound bleeder system, officials of the
United Mine Workers of America ("UMWA") expressed concerns. Timothy Hroblak, chair of
the union's safety committee, had worked at Cumberland for 25 years, primarily on longwalls.
He was concerned that the wraparound system would not have sufficient capacity. In his
experience, earlier panels that had successfully used a wraparound system had been considerably
smaller, 5,000 - 6,000 feet long and 600 - 700 feet wide. They also had been mined with four
entries on the headgate and tailgate sides, whereas LW49 had been set up for use with a bleeder
fan system using three entries. Jeffrey Mihalik, a safety committeeman, had similar concerns.
The union's concerns were raised in meetings with Cumberland officials, but did not prompt a
change in the plan.
LW49 was laid-out as a large rectangle, 12,000 feet long by 1,250 feet wide, oriented
generally in an east-west direction. The panel connected with the main mine entries on its west
side. Ex. R-1. Three headgate entries, including one each for the track haulage and conveyor
belt, extended along the south side, which was also referred to as "40 butt." Three tailgate
entries were on the north side, which was also referred to as "48 butt." The outermost of those
entries, the #1 tailgate entry and the #3 headgate entry inby the face, were the travelable bleeder
entries. At the east, or most inby, side of the panel, the headgate and tailgate entries were
connected by two pairs of crosscuts, #86 and #87, and #88 and #89, which were referred to as the
"ladders." The most inby of those entries, crosscut #89, was part of the travelable bleeder
system, and connected with the #1 tailgate entry and the #3 headgate entry. The two outby
entries, crosscuts #86 and #87, were referred to as the set-up ladder, i.e., longwall equipment was
set up in crosscut #86 prior to the start of mining.
Mining of LW49 commenced on December 28, 2003. Stip. 15, 17. On December 30,
2003, the roof had not yet fallen behind the shields, and it was necessary to place canvas along
the shields to channel the ventilation along the face, an occurrence that is not unusual. Stip. 18.
In early January 2004, the panel experienced a number of "gas-outs," i.e., mining was halted
because of a high methane level at some monitoring point. Monitors on the face were set to
deenergize the longwall when the methane concentration reached 2%. Most of the gas-outs were
caused by high methane readings at a monitor on the tailgate. Ex. R-43. Cumberland's mine,
like others located in the "Pittsburgh Coal Seam," is a very "gassy" mine and liberates large
amounts of methane. It is subject to spot inspections every five days, pursuant to section 103(i)
of the Act. Tr. 135.
On January 4, 2004, Cumberland made a change to the LW49 ventilation system,
coursing return air out the #3 entry on the tailgate, which had been on intake. The #3 tailgate
entry was the entry immediately adjacent to the block of coal being removed. Cumberland did
not seek, or obtain, MSHA's approval before implementing the change. Stip. 19. On January 7,
2004, another air change was made. The belt entry, the #1 entry on the headgate side, which had
been an intake air course, was changed to neutral or outby air flow, and the #3 headgate entry
was switched from return air to intake air.5 Cumberland did not seek, or obtain, MSHA's
approval before implementing the change. Stip. 20. On January 8, Cumberland sent a letter to
MSHA requesting approval of the changes. The request was eventually withdrawn because of
intervening events. Stip. 21.
A third air change was made on January 11. A regulator was moved on the tailgate side
to move pressure from outby to inby. Cumberland did not seek, or obtain, MSHA's approval
before implementing the change. Stip. 22. On January 12, Cumberland submitted a proposed
addendum to its ventilation plan, incorporating the changes that had been made. Stip. 23;
ex. Jt-4. The proposed addendum was eventually withdrawn because of intervening events.
Stip. 23. On January 12, Robert Kimutis, Cumberland's senior mine engineer, was told that
MSHA planned to conduct an evaluation of the bleeder system. Stip. 23. After January 12,
methane delays were significantly reduced and production was significantly increased. Ex. R-43.
As a new longwall starts up, it is not unusual to experience ventilation problems,
particularly until there is a substantial roof fall behind the shields. The system is dynamic, and
may remain so until mining "completes a square," i.e., mining proceeds as far as the panel is
wide, here 1,250 feet. Tr. 1654-55, 1912-14. However, the number of air changes made to
LW49 was unusual.
Because of concerns expressed by miners' representatives, MSHA inspector Anthony R.
Guley, Jr., and assistant district manager Thomas E. Light, Jr., inspected LW49 on January 13,
2004. They were accompanied by Robert Bohach, Cumberland's manager of safety, and miners'
representative Hroblak. Guley and Light were not aware of the ventilation changes that had been
made by Cumberland, or the revisions to the ventilation plan that had been submitted. They
reviewed records and were surprised to learn that a methane concentration of 4.2% had been
recorded at one of the bleeder evaluation points. After going underground, they found the
changes that had been made to the ventilation system, and realized that the December 9
ventilation plan that they had reviewed prior to coming to the mine was no longer being
followed. Cumberland's failure to obtain approval before implementing the changes was a
violation of a safety standard, for which a citation was issued by Guley.6 Stip. 24; ex. Jt-5.
That citation is not at issue in these proceedings.
Other conditions encountered in their travels concerned Guley and Light. A battery
charging station near the #80 crosscut on the headgate was being ventilated by air from the #3
entry, which then flowed into the #2 entry, an intake entry. This violated a ventilation standard
that required venting to a return entry.7 The air flow had been reversed because a ventilation
curtain had been taken down. Guley became concerned that the wraparound bleeder ventilation
system was not working correctly. In his experience, systems operated with a bleeder fan
developed large enough pressure differentials that ventilation of a battery charging station would
have been routine.8 He then traveled to the face, and found that the volume of air was
considerably less than had been recorded on the preshift book that he had examined on the
surface. He measured methane concentration near the third shield, i.e., at the beginning of the
longwall face, and was surprised to find it was 0.3%. He was again surprised to find a higher
than expected methane concentration, 0.9%, near the tailgate side of the longwall.
When the face ventilation air reached the tailgate entry, the #3 entry on the tailgate side, a
portion of it was supposed to flow outby into the return, and a portion was supposed to flow
inby. This was referred to as the "T-split." The flow into the gob along the #3 entry was very
important, because it kept methane in the #3 entry from flowing out onto the face. It also played
a significant roll in diluting methane within the bleeder system. The inby T-split flow proceeded
along the #3 entry to the first crosscut, entered it and flowed into the #2 entry. At that point it
split again. Part of it flowed outby through a regulator designated as bleeder evaluation point
30A ("BEP 30A"), into the travelable bleeder entry. The remainder of the T-split air flowed inby
in the #2 entry, and mixed with air flowing out of the #3 entry and adjoining rubble zone through
crosscuts inby the face. That air eventually passed through a bleeder evaluation point at the inby
corner of the panel, BEP 30, into the travelable bleeder entry, crosscut #89.9 On the headgate
side, some of the intake air was routed into the #1 and #2 entries, and eventually flowed into the
travelable bleeder entry through BEP 31, located at the most inby corner of the panel.10
When Guley and Light reached the tailgate, they were unable to determine whether the
T-split was working properly, because there was limited flow inby. Tr. 348. They proceeded to
BEP 30A, then into the #1 tailgate entry, and discovered another of the ventilation changes that
had been made, i.e., the air in the bleeder entry flowing in a direction opposite to that shown in
the December 9 ventilation plan.
They proceeded inby to the back corner of the panel and entered the #2 entry at BEP 30.
Just outby BEP 30 in the #2 entry, they used a smoke tube to determine the direction of air flow,
and found that it was flowing outby, toward the face, the opposite direction that they felt it
should have been flowing. They took methane readings and proceeded outby in the #2 entry to
the area of the face, where they were able to determine that there was air flowing from the #3
entry into the #2 entry and then outby to BEP 30A, which demonstrated that the T-split was
working.
Guley questioned the adequacy of the bleeder system. He did not feel that the pressures
were sufficient to generate adequate air flow, and he sensed similarities between the LW49
system and ineffective bleeder systems that he had seen in the past, especially wraparound
systems. Tr. 354. Bohach disagreed with his concerns, noting that there were no excessive
methane concentrations at the face, and that the ventilation plan did not specify particular
pressure differentials or volumes of air flow within the bleeder system or at BEPs.
On January 14, 2004, a meeting was held at the mine. Officials from Cumberland,
MSHA and the UMWA participated. Stip. 25; ex. Jt-6. The meeting had been scheduled
previously, but the agenda was expanded to include the LW49 ventilation system. MSHA
decided to conduct a comprehensive ventilation survey of LW49. A ventilation survey involves
a considerable amount of data collection. Three or four person teams, each comprised of at least
one representative of MSHA, Cumberland and the union, took various instruments into the mine
and measured altitude, pressure differentials, air flow and methane and oxygen content at
numerous points. Despite the logistics involved, the survey was scheduled for January 16.
On January 15, Cumberland performed its own evaluation of the LW49 bleeder system,
with the assistance of UMWA officials Hroblak and Mihalik. The results of that ventilation
survey were recorded on a map of LW49. Ex. R-2. Cumberland contends that its survey showed
that the LW49 bleeder system was working effectively on January 15, because there was an
ample volume of face ventilation, 53,000 cubic feet per minute ("CFM"), methane
concentrations at the face were low, 0.5%, there was air flow out the BEPs at the back of the
panel, and methane concentrations in the walkable bleeder entries were less than 4.5%. Tr. 1350.
The participants in the January 16 survey included MSHA inspectors and technical
support personnel, Cumberland management officials and officials of the UMWA. Stip. 27;
ex. Jt-7. Information collected by the various teams was noted on a map of the longwall panel.
Ex. G-26. MSHA's representatives determined that the bleeder system was ineffective. Robert
Penigar, an MSHA inspector who participated in the survey, issued Citation No. 7083200,
pursuant to section 104(a) of the Act, 30 U.S.C. § 814(a). It alleged that Cumberland was in
violation of 30 C.F.R. § 75.334(b)(1), which requires that a bleeder system effectively and
"continuously, dilute and move methane-air mixtures and other gases, dusts, and fumes from the
worked-out area away from active workings."
Cumberland agreed not to operate LW49 until the ventilation issues were resolved.
Stip. 30. On January 18, Cumberland officials, MSHA personnel and UMWA personnel met at
the MSHA field office to discuss changes to Cumberland's ventilation plan. Stip. 31; ex. Jt-8.
On January 19, MSHA inspectors and technical support personnel again evaluated the LW49
ventilation and bleeder system. Stip. 32. The system was improved, with an increased pressure
differential at the back tailgate corner and positive inby air flow in the #2 entry. Ex. G-28.
However, MSHA believed that the bleeder system remained ineffective. Stip. 33. Additional
changes were made, and another evaluation was performed on January 20. Air flows and
pressure differentials were markedly improved. Ex. G-30. However, MSHA believed that the
system was still fragile and had limited capacity. The results of the survey were discussed at a
meeting that lasted until approximately 1:15 a.m., on January 21. Stip. 34, 35; ex. Jt-9.
Cumberland had not operated LW49 since the initial ventilation survey on January 16,
and changes to the ventilation plan had to be approved to terminate outstanding citations. During
the lengthy meeting on January 21, MSHA officials made clear that in order to secure approval,
any ventilation plan would have to contain certain provisions. MSHA believed that the air flows
measured in the ventilation surveys indicated that the BEPs on the tailgate did not provide
accurate information on conditions in the #2 entry. Consequently, they insisted that additional
monitoring points be established at crosscuts #82 and #85. MSHA wanted steel pipes installed
through the stoppings between the #1 and #2 entries at those locations, extending into the middle
of the #2 entry. Sampling of the air in the #2 entry could then be done by testing the methane
content of the air flowing out of the pipes into the #1 entry. A methane limit of 4.5% was
specified for those monitoring points. MSHA also sought to establish a monitoring point with a
2% methane limit in the #1 tailgate entry between the #73 and #74 crosscuts.
Cumberland objected strenuously to those provisions, and continues to maintain that they
were unprecedented and unreasonable. It considered that the #2 tailgate entry was part of the gob
where high methane concentrations are to be expected, and that the bleeder system performed
effectively if methane in the gob was diluted by the time it passed through any of the previously
established bleeder evaluation points into the travelable bleeder entries. As to the #73/74
monitoring point, it argues that that was an inappropriate location to apply a 2% methane
limitation, because the air in that entry did not enter another split of air until it reached the mouth
of the panel, over 10,000 feet further outby. The regulations do not impose any required
methane content for a bleeder split of air until it joins another split of air, at which point a
maximum concentration of 2% methane is allowed. 30 C.F.R. § 75.323(e). Cumberland asserts
that imposing a 2% limit some 10,000 feet further inby was overly restrictive, in that it failed to
take into consideration that leakage would occur through stoppings along the route, resulting in
considerable additional dilution of the air flow before it joined another split of air.11
There is no question that the conditions MSHA insisted upon were highly unusual.
Virtually all of Cumberland's witnesses, many with extensive mining experience, and most of
MSHA's witnesses testified that they were not aware of any other ventilation plan that included a
monitoring point in the #2 tailgate entry or anything similar to the 2% monitoring point at the
73/74 crosscuts. Tr. 296-97, 380-81, 1035-37. MSHA's inspectors also stated that they
normally would not enter the #2 tailgate entry inby the face, but indicated that they would do so,
if necessary to evaluate a bleeder system, and it were safe.12 Tr. 192-93, 410-11, 679, 717-18,
897-98, 910, 1054, 1062-63. Several MSHA personnel also agreed that methane concentrations
of 4.5% or higher could be expected in or near the #2 entry, particularly in the crosscuts from the
3 to the #2 entry. Tr. 211-12, 710, 1032-33, 1062-63.
MSHA's position remained firm, and on January 21, Cumberland reluctantly submitted a
proposed ventilation plan incorporating the changes required by MSHA. It was approved that
same date. The newly revised plan consisted of a narrative that included the various conditions
and a map of the panel depicting the various monitoring points and directions of intended air
flow. Stip. 36; ex. Jt-10, Jt-10A. The plan provided, in pertinent part:
Additional safeguards have been included to ensure approval of the plan per
discussions taken place at Cumberland mine #6 Portal on 1-19-2004. They are as
follows:
. . . .
B- Continuous monitoring will take place in the [tailgate] at BEP30, BEP30A,
BEP30B, 85xcut #2 to #1 entry, 82xcut #2 to #1 entry. The monitoring will be on
a "roving" basis and the quality, quantity and airflow direction will be recorded in
a designated book at the end of each shift, until a history has been established. A
(15 second or more) methane reading of 4.5% at the continuously monitored
locations will cause power to be deenergized on the longwall face and immediate
corrective action to be taken. MSHA will be notified if this condition occurs.
. . . .
. . . .
E- Steel pipes will be installed, extending from rockdust ports in 82 and 85 crosscuts
of No. 1 to the center of No. 2 entry of [the tailgate].
F- A Bleeder Monitoring Point will be established in the No. 1 entry of [the tailgate]
between the No. 73 & 74 crosscuts. A methane reading of 2.0% or greater will
cause the longwall to cease production. Longwall mining will resume once the
methane level at this Bleeder Monitoring Point reduces below 2.0%.
Ex. Jt-10.
MSHA assigned inspectors to monitor the LW49 bleeder system on rotating shifts,
24 hours per day. Inspectors took measurements at the established monitoring points
approximately every two hours. Ronald Hixon, an MSHA inspector and ventilation specialist,
was assigned to conduct the monitoring on the second shift. On January 24, he decided to enter
the #2 tailgate entry in order to verify the accuracy of the readings that he had been getting at the
82 and #85 crosscut monitoring points. He measured methane concentrations in excess of 5%
at the intersections of crosscuts #83 and #84 within the #2 entry, and issued an imminent danger
order pursuant to section 107(a) of the Act. Tr. 752. He also issued a citation for an ineffective
bleeder system, a violation of 30 C.F.R. § 75.334(b)(1). Tr. 760.
On January 25, MSHA technical support personnel and inspectors again evaluated the
LW49 bleeder and ventilation systems. They were accompanied by Cumberland management
and hourly personnel. Stip. 41. The results of that ventilation survey were recorded on a map of
the panel, and were discussed with Cumberland officials. Ex. G-32.
MSHA inspector Ronald Tolliver began monitoring the LW49 bleeder system on
January 31, 2004. On February 4, he detected 4.8% methane at the #85 crosscut monitoring
point, and issued an imminent danger order and a citation alleging a violation of 30 C.F.R.
§ 75.334(b)(1). Stip. 45. Tolliver also issued an imminent danger order and citation on
February 7, 2004, when he found a methane concentration of 5.0% at the #85 crosscut
monitoring point. Stip. 50, 51.
MSHA inspector James Conrad, Jr., was monitoring the LW49 bleeder system on
February 14, 2004. On his second tour of the monitoring points, he discovered 5.0% methane
coming through the regulator at BEP 31, at the back corner of the headgate entries. Tr. 993. He
issued an imminent danger order and a citation alleging a violation of 30 C.F.R. § 75.334(b)(1).
Stip. 54, 56. He spoke with the foreman, who explained that a temporary disruption to the
headgate air flow had been caused by the erection of a check curtain, while a regulator was being
moved. He then returned to BEP 31, measured a methane concentration of 2.3%, and terminated
the order and citation. Tr. 1042-44.
Cumberland had become increasingly concerned about production interruptions mandated
by provisions in the plan and caused by the issuance of imminent danger orders and citations. It
continued to view the #73/74 2% monitoring point and the monitoring in the #2 tailgate entry at
crosscuts #82 and #85 to be unprecedented and unjustified. It pressed for a meeting with the
Assistant Secretary of Labor for Mine Safety and Health, David Lauriski. That meeting was held
on January 29, 2004, but did not result in the resolution of any of Cumberland's concerns.
Stip. 42. It then sought assurances from MSHA that monitoring in the #2 tailgate entry would no
longer be required if the wraparound system was converted to a bleeder fan system. Tr. 1911-12.
It developed a plan to mine back to, and make operational, the previously planned #4 bleeder
shaft. That plan was approved by MSHA on February 7, 2004. Stip. 47, 48. On February 13,
2004, Cumberland announced that it would idle LW49, until mining to the #4 bleeder shaft was
completed. Stip. 58. That process consumed over one month, after which production resumed,
and no further unusual delays or problems were experienced.
At issue in these cases are the ineffective bleeder system citations issued on January 16
and 24, and February 4, 7 and 14, 2004, and the related imminent danger orders. Cumberland
filed Notices of Contest as to those enforcement actions. The Secretary filed Petitions for
Assessment of Civil Penalties for the citations, proposing that a total of $3,874.00 in penalties be
imposed.
Citation No. 7083200
Citation No. 7083200 was issued by Penigar at the completion of the January 16, 2004,
ventilation survey, and alleges that the LW49 bleeder system was ineffective, in violation of
30 C.F.R. § 75.334(b)(1).13 The violation was described in the "Condition or Practice" section of
the citation as follows:
The bleeder system for the active LW49 longwall section, MMU 0011,
was determined to be ineffective in controlling the flow of air through the bleeder
system to continuously dilute and move methane-air mixtures from the gob and
away from the active workings. A ventilation survey conducted by MSHA
inspectors and engineers from MSHA Technical Support on 01/16/2004 showed
that the bleeder system was not adequate to move methane out of the gob and
away from the face. The operator was cited on 01/13/2004 for not complying
with the ventilation plan approved on December 9, 2003, when it was found the
longwall was not being ventilated in a manner approved in the plan. Coal will not
be mined with the longwall until ventilation changes are made to correct the
bleeder system deficiencies and a plan submitted and approved by the District
Manager showing the revised bleeder system.
Stip. 28, 29; ex. G-1.
MSHA determined that it was reasonably likely that the violation would result in a
fatality, that it was significant and substantial, that seven persons were affected, and that
Cumberland's negligence was moderate. A penalty of $1,238.00 is proposed for this violation.
The Violation
The results of the January 16 ventilation survey were recorded on two maps of LW49.
One showed air flow directions. Ex. G-25. Pressure differentials, methane readings, air flow
quantities and other data were recorded on the second. Ex. G-26. The involved MSHA
personnel collectively determined that the LW49 bleeder system was not functioning effectively.
Tr. 713. Penigar was assigned to write the citation, which reflects his wording. Tr. 713. As
Penigar explained the survey results, there were many significant concerns, including, air flow
reversals, weak pressure differentials, and excessive methane in the #2 tailgate entry close to the
face. Tr. 666-69. Methane at an explosive level, 5% - 15%, was found in the #2 tailgate entry
near the #85 and #86 crosscuts, which was compounded by the fact that air flow at those
locations was reversed, i.e., flowing outby toward the face. Air in that area should have been
flowing inby, toward BEP 30 at the back corner of the panel, where it would pass into the
travelable bleeder entries. There was no perceptible air movement in the #2 entry between
crosscuts #87 and #88, and there was very limited flow in the opposite direction (outby) between
crosscuts #87 and #86. There was limited, perceptible air movement from the #3 entry to the #2
entry in crosscuts #84 and #86. A methane concentration of 4.3% was detected between
crosscuts #83 and #84, which was 300 - 400 feet from the face. Air at that location in the #2
entry was flowing outby, toward BEP 30A. Penigar felt that there was a substantial amount of
methane too close to the face, where people were working, and would have issued an order
shutting down the longwall if Cumberland had not agreed to cease production. Tr. 669, 673,
683-84.14
Dennis Beiter, a supervisory mining engineer, chief of MSHA's mine emergency services
branch, ventilation division, safety and health technology center, was in charge of the survey.
Testifying as an expert in the field of mine ventilation and the conduct of surveys, he cited other
concerns, including pressure differentials across temporary ventilation controls on the headgate
side that were very large in comparison to the pressure differentials that created air flow in the
primary internal air flow paths in the gob on the tailgate side, i.e., entries #3 and #2 inby the face.
Tr. 504. The pressure differential in the #2 entry from the #87 crosscut to the #83 crosscut was
only 0.02 inches of water, and it was in an outby direction. In comparison, the pressure
differential across ventilation curtains in the #2 entry on the headgate side was .59 inches of
water. Those curtains had to be moved as the face advanced, and Beiter was concerned that the
moving process would produce changes in pressure that would have an adverse impact on the
tailgate side. Tr. 519-23. Smoke tube indicators had shown changing air velocity in the #2
tailgate entry, possibly as a result of inadvertent changes to ventilation controls, e.g., a miner
passing through a ventilation curtain. Methane concentrations in the #2 entry had risen
considerably during the survey. Tr. 505, 507. Beiter was concerned that, with the air flowing
outby in the #2 entry, the limited flow through BEP 30 was from the headgate side by way of the
ladders, and did not provide any indication of conditions in the tailgate's #2 entry or the gob.
Tr. 510-11. Because gas in the #3 entry and the adjoining rubble zone is subject to the same
pressure differential as the air in the #2 entry, it flows in the same direction, and he believed that
methane in the gob adjacent to crosscuts #85 to #83 was moving toward the face. Tr. 511-12.
John Urosek, chief of MSHA technical support's ventilation division, did not participate
in the survey, but concurred in Beiter's analysis of the survey data and the conclusion that the
bleeder system was ineffective. Urosek had unique qualifications to testify as a mine ventilation
expert.15 In his capacity with MSHA he participated in over 50 investigations of various mine
incidents involving ventilation issues. In the early 1990's he was selected as chairman of an
educational project and charged with developing a course on bleeder and gob ventilation systems
to ensure that MSHA personnel, operators, and other interested persons understood the
requirements of MSHA's regulations on the subject. The project team performed ventilation
surveys at a large number of mines throughout the country, examining different types of bleeder
systems. That information was analyzed and a bleeder and gob ventilation course was
developed. After development, the course was reviewed by industry leaders, academia and other
MSHA personnel. Appropriate changes were made, and the course was administered to all
MSHA inspectors during one-week sessions at MSHA's training academy. It was also
administered at mining companies and at MSHA district offices where interested parties could
attend. Urosek believes that the course book is accepted as authoritative in the industry.
Tr. 1072. There were no other publications, or similar sources of authority on mine ventilation
cited by any other witness.
Urosek explained that a wraparound bleeder system, like other bleeder systems, is
designed to create a pressure differential from the front of a longwall panel to the back, or inby,
end of the bleeder system. Wraparound systems can work well, but have some "inherent flaws."
Tr. 1074. The pressure differential is created by exhaust fans that are located outby the mouth of
the panel. Ventilation controls are used to transfer part of that pressure differential to the most
inby corner of the tailgate entries, and the ability to create a sufficient pressure differential and
air flow depends upon a number of factors. It is necessary to support the entries, and the
supports create resistence to air flow. The distance from the ventilation fans to the mouth of the
panel, as well as the length, number and size of entries can affect the ability of a wraparound
system to generate a sufficient pressure differential at the back of the gob. Tr. 1074-75. In
contrast, bleeder fan systems are not impacted at all by some of those considerations, and to a
lesser extent by others, because the fans are typically located inby the panel, and the pressure
differential is created at the back of the gob. Tr. 1074. As noted previously, Cumberland's
LW49 was a very large panel. It had been developed with three, instead of four, entries, only one
of which was available for the bleeder system. Moreover, the ventilation fans were located a
considerable distance from the mouth of the panel. Urosek noted that other panels that
Cumberland had successfully mined using a wraparound system typically were smaller, had
multiple bleeder entries, and fans that were located closer to the panel. Tr. 1075. He believed
that the wraparound system for LW49 was "weak to start with," because there was only one
bleeder entry, which required movement of air through a single entry for over 10,000 feet, and
that roof supports in the entry would increase resistence as the panel was mined out. Tr. 1089.
In his opinion, it would have been very difficult to transfer enough of a pressure differential to
produce sufficient air flow in the #2 entry toward the back corner, even if the ventilation fans had
been located close to the mouth of the panel. Tr. 1089.
Urosek concurred with MSHA's determination that the LW49 bleeder system was
ineffective on January 16, 2004. He believed that the system had virtually no additional capacity
to improve air flow. The pressure differential across the regulator at the most inby corner, BEP
30, was "very small," only 0.015 inches of water. Tr. 1109. As the entries became longer,
resistence to air flow would increase, and there would be more methane in the gob that had to be
diluted. "To compensate for that, what the mine operator has to do is open [the BEP 30]
regulator, so you need to have enough pressure at the regulator to compensate for the longwall as
it goes out to carry that methane." Tr. 1110. However, the pressure differential at the BEP 30
regulator was so small that opening it would not provide any additional air flow. Tr. 1109-10.
Another major problem, according to Urosek, was that the air flow in the #2 tailgate entry was
outby, instead of back inby toward BEP 30. Tr. 1114. Methane liberated in the gob tends to
flow in the direction of the pressure differential across the gob. The desirable direction is toward
the back corner of the tailgate, i.e., toward BEP 30. Tr. 1114. But that was not happening in
LW49. Urosek believed that the methane was going to the T-split point, one crosscut inby the
face. The highest concentrations of methane were about two crosscuts inby from the face, which
meant that there was a very high concentration of methane from behind the longwall shields that
extended one crosscut back, that was not being carried away effectively by the bleeder system.
Tr. 1113-16. He explained that that was why it was so important to maintain methane levels
below 4.5% in the tailgate entries, i.e., to minimize the zone of explosive mixtures of methane in
the gob. Tr. 1116.
It is clear that on January 16, the BEPs on the tailgate side did not give an accurate
picture of the conditions in the #2 entry. The most important evaluation point, BEP 30 located at
the most inby corner of the tailgate entries, was receiving no air flow from the primary internal
gob air flow paths on the tailgate side. The air flowing through that BEP was low methane
content air from the headgate entries that had traveled up the ladders at the back of the panel,
crosscuts #86 and #87. Tr. 1130-31. Consequently, BEP 30 did not indicate "anything of what
was going on in the number 2 entry." Tr. 1130-32. The evaluation point at the other end of the
entry, BEP 30A, which was located outby the face, did receive some air flow from the primary
internal air flow paths. However, roughly three-quarters of the air passing through that regulator
was face ventilation air from the T-split, and the limited flow from further inby in the #2 entry
was substantially diluted before it reached that evaluation point. As noted above, most of the
methane in the #3 entry and the adjoining rubble zone was not being drawn into the #2 entry.
Rather, it was being drawn outby, to an area behind the shields. Tr. 1248-49.
Cumberland called several witnesses who testified that the bleeder system was working
effectively on January 16, 2004. Robert A. Kimutis, Cumberland's senior mining engineer, and
Robert A. Bohach, its manager of safety, have extensive experience in the design and operation
of mine ventilation systems, as well as educational qualifications, and were accepted as expert
witnesses. In their opinion, the bleeder system was operating effectively because there was good
face ventilation, the T-split was functioning properly, there was air flow in the proper directions
at the BEPs, and methane concentrations at the BEPs were well under 4.5%, MSHA's
historically applied standard for bleeder taps and travelable bleeder entries. Tr. 1355, 1425-32,
1490-92, 1627-30. Jack Trackmus, director of technical services for Foundation Coal Company,
an affiliate of Cumberland, testified to the same effect. Tr. 1680-82. Cumberland's witnesses
uniformly expressed their opinion that the #2 tailgate entry, inby the face, is part of the gob and
the dilution zone for methane emanating from the gob, and that high concentrations of methane
have been found, and can be expected to be found, in the #2 entry. They did not believe that the
outby flow in the #2 entry indicated that methane was moving toward the face. Rather, they
believed that it was being moved out through BEP 30A, away from the face.
Cumberland asserts a number of arguments, both factual and legal, in defense of this
citation. Factually, it contends that the bleeder system was functioning as it was designed to,
i.e., as reflected in the ventilation plan that had been approved by MSHA.16 It disputes the
Secretary's contention and evidence, that methane was accumulating in the #2 entry and in the
gob, extending toward the face. It also contends that methane in the #2 entry posed no danger
because it was moving away from the face and out of the system, and there were no ignition
sources in proximity to methane in the explosive range. Legally, it contends that MSHA
imposed new and unreasonable criteria for evaluating the bleeder system, and that it was not
provided fair notice of the new interpretation. It also contends that the interrelationship between
sections 75.334(b)(1), 75.334(c) and 75.370 precludes a finding that its bleeder system was
ineffective while the citation issued by Guley on January 13 remained outstanding, and its
ventilation plan was being evaluated to terminate that citation. In addition, Cumberland contends
that the January 16 citation was legally duplicative of the January 13 citation.
Fact-based Defenses
On the issue of the effectiveness of the LW49 bleeder system on January 16, I find the
testimony of the Secretary's witnesses, particularly, Urosek, to be more persuasive. There was
virtually no pressure differential or air flow from the #3 entry and the adjacent rubble zone into
the #2 entry. There was no measurable pressure differential between the #3 and #2 entries at the
84 crosscut, and there was only perceptible air movement into the #2 entry. Ex. G-26. There is
no indication that there was any pressure differential or positive air flow from the #3 to the #2
entries in crosscuts #85 and #85 1/2, and only perceptible air flow in crosscut #87. Except for
the localized effect of the T-split at crosscut #83, the bleeder system was producing almost no air
flow from the #3 entry into the #2 entry. Moreover, the overall pressure differential in the #2
entry between crosscuts #87 and #83 was very small, 0.02 inches of water, which produced
limited air flow in an outby direction. Ex. G-26. Explosive concentrations of methane were
found in the #2 entry and in a crosscut leading into it from the #3 entry, indicating that methane
was accumulating in the worked-out area. I accept Beiter's and Urosek's testimony, which is not
directly refuted by Cumberland's witnesses, that the same pressure differential that generated the
outby flow in the #2 entry would produce air flow in the #3 entry and adjoining rubble zone in the
same direction, i.e., toward the face. Tr. 511-12, 1114. The bleeder system clearly was not moving
any appreciable amount of methane out of the worked-out areas on the tailgate side of the panel.
Moreover, the methane that was in the worked-out area was being moved toward, not away from, the
active workings.17 The results of the January 16 ventilation survey indicated that the
bleeder system was ineffective, and that methane was being allowed to accumulate in the gob near
the tailgate side of the face.
I accept Cumberland's general contention that the presence of a high concentration of
methane in the #2 entry is not necessarily unusual and does not, in itself, establish that the
bleeder system was ineffective.18 See ANR Coal Co., 21 FMSHRC 531, 537 (May 1999)
(hazardous levels of methane do not necessarily represent violations of the Act or its standards).
However, MSHA's decision regarding the effectiveness of the bleeder system was not based
solely upon the fact that a high methane concentration was detected in the #2 entry. The
violation was predicated upon the whole of the survey results, principally, the virtual absence of
air flow out of the #3 entry and adjacent rubble zone, and the outby pressure differential that
would move the methane in that area toward, rather than away from, the active workings.
Cumberland also argues that the ventilation survey did not disclose any overt deviations
from the ventilation plan, except for the three, as yet unapproved, air changes. However, as
noted below, the fact that the system may have been functioning in conformance with the plan is
not a defense to the citation. The survey disclosed that the BEPs on the tailgate side, BEP 30 and
BEP 30A, were not providing reliable information about conditions in the #2 entry and the
adjacent primary gob air pathways between crosscuts #87 and #83. The survey results
demonstrated that methane was not being moved away from the active workings, and it was clear
that the December 9 ventilation plan could no longer be regarded as describing an adequate and
effective bleeder system.
Other Defenses - Compliance with Ventilation Plan Precludes Violation of Section 75.334(b)(1)
The Secretary's regulations require that the bleeder system, as well as the means for
determining its effectiveness, be specified in the operator's ventilation plan, including locations
for the taking of measurements of methane and oxygen concentrations, air quantities and air flow
directions. 30 C.F.R. '§ 75.334(c), 75.371(x)-(bb). Cumberland contends that any enforcement
action with respect to an allegedly ineffective bleeder system must be accomplished through the
ventilation plan approval process, not through the issuance of a citation alleging a violation of
section 75.334(b)(1), requiring that bleeder systems be effective. That position was rejected in
Plateau Mining Corp., 25 FMSHRC 738, 746 (Dec. 2003) (ALJ). Judge Manning's decision in
Plateau is currently on review by the Commission, and is not binding precedent. However,
I agree with his analysis.
The ventilation plan for the LW49 panel represented Cumberland's best educated
prediction of how the panel could be ventilated in conformance with applicable mandatory safety
standards. Despite MSHA's approval of the plan, there was no guarantee that it would work
effectively, or that it would continue to work effectively. As Judge Manning observed, "because
an underground coal mine is a dynamic environment, a mine operator must be constantly vigilant
when monitoring the conditions underground and must make changes to its ventilation system as
conditions warrant." 25 FMSHRC at 746. Any number of conditions can impact the
effectiveness of the bleeder system, including roof falls, water accumulation in critical air paths,
increased resistence as air flow paths grow longer or, simply, the amount of methane liberated by
mining activity. The Commission has held that section 75.334(b)(1) requires that an operator
maintain an effective and adequate bleeder system. "A bleeder system must effectively ventilate
the area within the bleeder system and protect active workings from the hazards of methane
accumulations." RAG Cumberland Resources, LP, 26 FMSHRC at 647. Cumberland was
obligated to comply with section 75.344(b)(1) independent of the ventilation plan approval
process, and could be charged with violating that provision even though it was fully complying
with its approved ventilation plan. See Utah Power & Light Co. v. Sec'y of Labor, 951 F.2d 292
(10th Cir. 1991). Compliance with ventilation plan approval requirements does not permit an
operator to shield itself from liability for violating other mandatory standards.19
Duplication
The January 16 citation, alleging an ineffective bleeder system, was not duplicative of the
citation issued by Guley on January 13, which alleged a failure to comply with the approved
ventilation plan. Citations and orders alleging violations of different standards arising out of the
same, or related, conduct are not duplicative, as long as the standards involved impose separate
and distinct legal duties on an operator. Western Fuels-Utah, Inc., 19 FMSHRC 994, 1003-05
(June 1997) (citing Cyprus Tonopah Mining Corp., 15 FMSHRC 367, 378 (Mar. 1993);
Southern Ohio Coal Co., 4 FMSHRC 1459, 1462-63 (Aug. 1982); and El Paso Rock Quarries,
Inc., 3 FMSHRC 35, 40 (Jan. 1981)). In Western Fuels-Utah, the Commission held that a charge
of violating a specific standard was duplicative of a charge of violating a more general standard.
However, the Commission made clear that its decision was not based solely upon the premise
that every violation of the more specific standard would also be a violation of the more general
one. Rather, it looked to whether the operator had been cited for more than one specific act or
omission. Had there been evidence of additional deficiencies that violated the general regulation,
such that that allegation would not have been based upon the identical evidence used to support
the violation of the more specific standard, the charges would not have been found duplicative.
Id. at 1004, n.12.
Here, the two citations allege non-compliance with different legal duties, and are not
based on the same acts or omissions. As of January 13, Cumberland had implemented three
changes to the ventilation system that had not been approved by the MSHA district manager, and
a citation was issued for the violation of its duty under section 75.370(d) to secure MSHA
approval before implementing changes to its ventilation plan. The January 16 citation was issued
because, in the collective judgment of MSHA ventilation experts, Cumberland violated its duty
under section 75.334(b)(1) to maintain an effective bleeder system. While approval of an
amended ventilation plan eventually abated both of those violations, different aspects of the
amendments were designed to address the specific deficiencies that gave rise to the respective
violations.20 Cumberland's argument that, by unilaterally implementing a change to the
ventilation system, it was relieved of its obligation to maintain an effective bleeder system, must
be rejected.
Due Process
An agency may not impose a fine based upon its interpretation of a statute or regulation
unless the respondent has received "fair notice" of the interpretation it was fined for violating.
Energy West Mining Co., 17 FMSHRC 1313, 1317-18 (Aug. 1995). An agency's interpretation
may be reasonable, but nevertheless fail to provide the notice required to support imposition of a
civil sanction. General Electric Co. v. EPA, 53 F.3d 1324, 1333-34 (D.C.Cir. 1995). The
Commission has not required that the operator receive actual notice of the Secretary's
interpretation. Instead, it employs an objective test, i.e., "whether a reasonably prudent person
familiar with the mining industry and the protective purposes of the standard would have
recognized the specific prohibition or requirement of the standard." Island Creek Coal Co.,
20 FMSHRC 14, 24 (Jan. 1998) (quoting from Ideal Cement Co., 12 FMSHRC 2409, 2416
(Nov. 1990)). In applying this test, the Commission has taken into account a wide variety of
factors, including the agency's consistency of enforcement, whether MSHA has published
notices informing the regulated community of its interpretation, whether the condition or practice
at issue affected safety, and the circumstances at the operator's mine. See Alan Lee Good,
23 FMSHRC 995, 1005 (Sept. 2001).
Cumberland was on notice of the Secretary's interpretation that section 75.334(b)(1)
required it to maintain an adequate and effective bleeder system, regardless of the state of its
compliance with its approved ventilation plan. RAG Cumberland Resources, LP, 23 FMSHRC
1241 (Nov. 2001) (ALJ), aff'd, 26 FMSHRC 639 (Aug. 2004). The Commission has determined
that the Secretary's interpretation of the regulation is reasonable. Id. For the reasons discussed
above, MSHA's determination that the LW49 bleeder system was ineffective on January 16,
2004, its application of section 75.334(b)(1) to the particular facts, also was reasonable.
The January 16 ventilation survey confirmed that neither BEP 30A, nor BEP 30, were
providing reliable or useful information as to what was occurring in a substantial and important
part of the LW49 bleeder system, the #2 entry, and the #3 entry and adjacent rubble zone, from
crosscut #87 to the second crosscut inby the face. There was virtually no air flow from the #3
tailgate entry into the #2 entry inby the #83 crosscut. The pressure differential and air flow in the
2 entry and the adjacent #3 entry was outby from the #88 crosscut, and there were high methane
concentrations in those areas. While the methane that was actually in the #2 entry would be
moved outby through BEP 30A into the bleeder entry, the flow in the #3 entry and the adjacent
rubble zone would have been toward the face, because the overall pressure differential from the
87 to the #83 crosscut was in that direction. The bleeder system was not moving methane in
that substantial portion of the worked-out area away from the active workings.
While Cumberland argues that MSHA's enforcement methodology was unprecedented,
there is no true claim that the standard has been enforced inconsistently, because there was no
evidence presented that comparable conditions had actually been considered by MSHA in the
past. Neither party points to any published notices addressing the particular types of conditions
encountered here. The overriding considerations on the fair notice question are the conditions'
effect on safety under the circumstances presented by LW49. For the reasons discussed above,
the conditions relied upon by MSHA in determining that the LW49 bleeder system was
ineffective had a substantial and critical effect on safety.
I find that a reasonably prudent person familiar with the mining industry and the
protective purposes of the standard would have recognized that the bleeder system was
ineffective on January 16, 2004.
Cumberland appears to rely on its fair notice defense, not only to challenge the actual
decision that the bleeder system was ineffective, but to challenge MSHA's methodology in
making the determination. It contends that MSHA's decision to evaluate the effectiveness of the
bleeder system based upon conditions in the #2 entry inby the face represented "new criteria" for
evaluating bleeder systems and, because it was not put on notice of the new criteria at the time
the LW49 ventilation system was being designed, the citations must be vacated.
Such a broad fair notice defense cannot succeed for a number of reasons. Taken to its
logical conclusion, it would mean that an operator could continue mining in a longwall panel
with an inadequate and ineffective bleeder system, because the specific type of data upon which
MSHA relied to determine that the system was ineffective had not been previously used to
evaluate such systems. Such a result could not be more contrary to the legislative and regulatory
scheme, and is simply unacceptable. Moreover, Cumberland cannot reasonably assert that it
could not have anticipated the possibility that data pertinent to LW49 bleeder system's
performance, including conditions in the #2 entry, would not have been used to evaluate its
effectiveness.
Each longwall panel is, in some sense, a unique undertaking. As Trackmus explained,
every longwall panel is different, and no one can "predict how much methane [will be] in that
gob [or] where it is going." Tr. 1428. That is why the shaft within a shaft was incorporated into
design, "because that was going to provide additional air flow at the back corner in case we
needed that." Tr. 1429. If each longwall panel is a unique undertaking, LW49 was more unique
than others. It was extremely large, the largest panel Cumberland had mined, and it was to use a
wraparound bleeder system, a system with "inherent weaknesses," according to Urosek.
The UMWA had raised concerns about the use of a wraparound bleeder system when first
advised of Cumberland's decision to abandon its plan to use a bleeder shaft. Problems
encountered during start-up also raised questions about the system. While Cumberland believed
that the wraparound system would be effective, there was ample reason to anticipate that
questions regarding its effectiveness would continue to be raised. It was also predictable that
when such questions were called to MSHA's attention, a ventilation survey would be performed.
Cumberland's managers did not believe that a ventilation survey was necessary, but there is no
claim that they were surprised by the decision or that it was unprecedented. A proper survey
would, of course, include collection of data pertinent to conditions in the #2 entry, and MSHA's
technical personnel would review and consider all of the data in order to evaluate the
effectiveness of the system.
MSHA was required by its statutory mandate to consider all pertinent data in evaluating
the system, and make its best judgment as to its effectiveness. It could not ignore data reflecting
conditions in the #2 entry, i.e., methane concentrations, pressure differentials and air flow
directions and quantities, even if Cumberland had no reason to anticipate that that particular type
of data would be used to evaluate the system. Cumberland's quarrel is, in reality, not so much
with MSHA's consideration of data pertinent to conditions in the #2 entry, as it is with the
reasonableness of the conclusion MSHA ultimately reached based upon that data. Cumberland's
due process, fair notice defense to MSHA's methodology is also rejected.
In an enforcement proceeding under the Act, the Secretary has the burden of proving all
elements of an alleged violation by a preponderance of the evidence. In re: Contests of
Respirable Dust Sample Alteration Citations, 17 FMSHRC 1819, 1838 (Nov. 1995), aff'd, Sec'y
of Labor v. Keystone Coal Mining Corp., 151 F.3d 1096 (D.C. Cir. 1998); ASARCO Mining Co.,
15 FMSHRC 1303, 1307 (July 1993); Garden Creek Pocahontas Co., 11 FMSHRC 2148, 2152
(Nov. 1989); Jim Walter Resources, Inc., 9 FMSHRC 903, 907 (May 1987).
I find that the Secretary has carried her burden of proof with respect to Citation
No. 7083200, and that Cumberland committed the violation, as alleged. I also concur with the
assessment that seven persons were affected, and that Cumberland's negligence was moderate.
Significant and Substantial
A significant and substantial ("S&S") violation is described in section 104(d)(1) of the
Act as a violation "of such nature as could significantly and substantially contribute to the cause
and effect of a coal or other mine safety or health hazard." A violation is properly designated
S&S "if, based upon the particular facts surrounding that violation, there exists a reasonable
likelihood that the hazard contributed to will result in an injury or illness of a reasonably serious
nature." Cement Div., Nat'l Gypsum Co., 3 FMSHRC 822, 825 (Apr. 1981); see also U.S. Steel
Mining Co., Inc., 7 FMSHRC 1125, 1129 (Aug. 1985); Mathies Coal Co, 6 FMSHRC 1 (Jan.
1984); Austin Power, Inc. v. Secretary, 861 F.2d 99, 103-04 (5th Cir. 1988), aff'g, Austin Power,
Inc., 9 FMSHRC 2015, 2021 (Dec. 1987) (approving Mathies criteria).
Accumulations of methane in the vicinity of the face, behind the shields, pose a risk of
explosion and multiple fatalities for miners working in the area. Urosek explained that, due to
the variable nature of the roof fall behind the shields, face ventilation air can flow behind the
shields, and then be forced out onto the face area, carrying methane with it. While there are
sensors on the face equipment and at the tailgate that can detect the presence of methane and
automatically deenergize the equipment, those sensors are positioned such that they would most
likely not detect the presence of methane in air flowing in from the shields. Tr. 1249. I find that
there was a reasonable possibility that the violation would have resulted in an injury and that any
injury would have been serious. Accordingly, the violation was S&S.
The January 24, February 4, and February 7, Citations and Orders
Following approval of the January 21, 2004, ventilation plan, which included monitoring
points at crosscuts #82 and #85, mining of the LW49 panel commenced. The operation of the
bleeder system was continuously monitored by MSHA and operator personnel. On the dates in
question, high levels of methane were detected in the #2 entry, and citations and imminent
danger orders were issued.
Citation No. 7067356 and Order No. 7067355 - January 24, 2004
Citation No. 7067356 and Order No. 7067355 were issued by Hixon on January 24, 2004.
The citation alleged that the LW49 bleeder system was ineffective, in violation of 30 C.F.R.
§ 75.334(b)(1). The violation was described in the "Condition or Practice" section of the citation
as follows:
The bleeder system for the No. 49 longwall panel failed to continuously
dilute and move methane-air mixtures and dust from the worked-out area away
from the active section. Methane was detected on the tailgate side, in the No. 2
entry, at the No. 83 crosscut at 5.6% and extended inby to the No. 84 crosscut.
The methane was measured 1 foot from the mine roof, in the center of the entry.
The methane was layered and when measured closer to the roof it was as high as
6.9%.
Stip. 38; ex. G-3.
Hixon determined that it was reasonably likely that the violation would result in a fatality,
that it was significant and substantial, that six persons were affected, and that Cumberland's
negligence was low.21 A penalty of $878.00 is proposed for this violation. The companion order
contained virtually identical language. Ex. G-2.
Hixon, had been an MSHA inspector since 1987, and a ventilation specialist since 1993.
Prior to joining MSHA, he worked as a miner for eight years, and had worked on one of
Cumberland's longwall panels that had a wraparound bleeder system. He had participated in the
ventilation surveys, and was assigned to monitor the LW49 bleeder system on the second shift as
of January 21, 2004. As he started his shift on January 24, Bohach told him that the #73/74
monitoring point would probably shut down mining, i.e., that methane levels were approaching
the 2% limitation established in the plan. Hixon was concerned about the rising methane. He
proceeded inby in the #1 tailgate entry and measured 1.9% methane at the #73/74 monitoring
point. He continued down the entry, measuring 1.6% methane at the sampling pipe at crosscut
82, and 2.6% at the sampling point at crosscut #85. When he got to the back corner, BEP 30,
he decided to enter the #2 entry. He had some questions about the accuracy of the readings at the
82 and #85 crosscut sampling pipes, because a large amount of coal was being produced, but
MSHA wasn't seeing anticipated increases in methane. Tr. 744. The company representative
traveling with him, Ed Yesh, declined to go with Hixon, because Cumberland had issued
instructions that personnel were not to enter the #2 entry. The union representative also declined.
Hixon proceeded out the #2 entry. He measured methane at 1.5% at crosscut #82, which
corresponded with a 1.6% reading that he had obtained earlier for that location at the other end of
the sampling pipe in the #1 entry. At crosscut #83, he discovered a methane concentration of
5.6%, took bottle samples, and continued to travel inby. Tr. 755. He measured a methane
concentration of 4.5% between crosscuts #83 and #84, 5.1% at the intersection of the #84
crosscut, 4.0% between #84 and #85, and generally declining concentrations back to #87. He
measured 3.8% methane at the #85 crosscut intersection, and had measured 2.6% for that
location at the other end of the sampling pipe in the #1 entry, approximately 30 minutes earlier.
Methane readings at the BEPs and the additional monitoring points established in the January 21
ventilation plan, were within acceptable limits. The location of the methane concentrations
found by Hixon are depicted generally on a map of the panel. Ex. G-33.
After reaching crosscut #88, Hixon decided to issue the subject imminent danger order
and citation. He felt that the methane posed an imminent danger because it was in the explosive
range and he had "no idea . . . where [it] starts and stops." Tr. 757. His primary concern was that
the methane that he found was two crosscuts, about 280 feet, from the face, where there were
"plenty of ignition sources." Tr. 756. He didn't know if the pocket of methane extended to the
shields of the longwall panel, and was concerned that the pocket would grow. Tr. 805, 812-14.
He was aware of the ventilation surveys that had been performed, and believed that they showed
that the bleeder system was fragile and had limited capacity, and that changes at one location,
e.g., a regulator door opening, might cause the air flow to reverse and push the methane back
onto the face. Tr. 816-19. He testified that he would have issued the order even if the face had
been further outby. Tr. 818.
The Imminent Danger Order
Section 3(j) of the Act defines "imminent danger" as the "existence of any condition or
practice in a coal or other mine which could reasonably be expected to cause death or serious
physical harm before such condition or practice can be abated." 30 U.S.C. § 802(j). Section
107(a) of the Act provides, in pertinent part:
If, upon any inspection or investigation of a coal or other mine which is
subject to this Act, an authorized representative of the Secretary finds that an
imminent danger exists, such representative shall determine the extent of the area
of such mine throughout which the danger exists, and issue an order requiring the
operator of such mine to cause all persons, except those referred to in section
104(c), to be withdrawn from, and to be prohibited from entering, such area until
an authorized representative of the Secretary determines that such imminent
danger and the conditions or practices which caused such imminent danger no
longer exist.
30 U.S.C. § 817(a).
"Imminent danger orders permit an inspector to remove miners immediately from a
dangerous situation, without affording the operator the right of prior review, even where the mine
operator did not create the danger and where the danger does not violate the Mine Act or the
Secretary's regulations. This is an extraordinary power that is available only when the
'seriousness of the situation demands such immediate action.'" Utah Power & Light Co.,
13 FMSHRC 1617, 1622 (Oct. 1991) (quoting from the legislative history of the Coal Act). An
imminent danger exists "when the condition or practice observed could reasonably be expected
to cause death or serious physical harm to a miner if normal mining operations were permitted to
proceed in the area before the dangerous condition is eliminated." Wyoming Fuel Co.,
14 FMSHRC 1282, 1290 (Aug. 1992) (quoting from Rochester & Pittsburgh Coal Co.,
11 FMSHRC 2159, 2163 (Nov. 1989)). Inspectors must determine whether a hazard presents an
imminent danger quickly and without delay, and a finding of an imminent danger must be
supported "unless there is evidence that [the inspector] had abused his discretion or authority."
11 FMSHRC at 2164. An inspector must make a reasonable investigation of the facts, under the
circumstances, and must make his determination on the basis of the facts known, or reasonably
available to him. An inspector may abuse his discretion if he issues a section 107(a) order
without determining that the condition or practice presents an impending hazard requiring the
immediate withdrawal of miners. 13 FMSHRC at 1622-23.
While an inspector has considerable discretion in determining whether an imminent
danger exists, that discretion is not without limits. As the Commission explained in Island Creek
Coal Co., 15 FMSHRC 339 (March 1993):
While the crucial question in imminent danger cases is whether the
inspector abused his discretion or authority, the judge is not required to accept an
inspector's subjective "perception" that an imminent danger existed. Rather, the
judge must evaluate whether, given the particular circumstances, it was reasonable
for the inspector to conclude that an imminent danger existed. The Secretary still
bears the burden of proving [her] case by a preponderance of the evidence.
Although an inspector is granted wide discretion because he must act quickly to
remove miners from a situation that he believes to be hazardous, the
reasonableness of an inspector's imminent danger finding is subject to subsequent
examination at the evidentiary hearing.
15 FMSHRC at 347-48.
The Secretary argues that Hixon, who was a ventilation specialist, reasonably determined
that an imminent danger existed based on the fact that explosive concentrations of methane were
found within an estimated 280 feet of the face where numerous ignition sources existed. The
Secretary also asserts that Hixon had participated in the surveys on January 16, 19 and 20, and
had "knowledge of the ineffectiveness of the longwall 49 bleeder system between January 16,
2004 and January 24, 2004." Sec'y Br. at 33.
Cumberland counters that there was no ignition source in the area where explosive levels
of methane were found, that the methane found in the #2 entry was not part of an accumulation
that extended to the face, that pressure differentials and air flows precluded the methane from
moving toward the face, that high methane levels found at other times did not result in imminent
danger orders, and that issuance of an imminent danger order because of methane in the #2 entry
is unprecedented and contrary to the actions required by the January 21 plan. Resp. Br. at 52-58.
The impending danger that could justify the issuance of the order was the possibility of
methane at explosive levels reaching ignition sources on the face. While an explosion ignited by
a roof fall in the area where the methane was found was considered a possibility by Hixon,
virtually all of the witnesses, including Hixon, testified, consistent with Urosek's authoritative
MSHA training materials, that a roof fall is an "unlikely" source of ignition. The Secretary does
not argue the possibility of an ignition caused by a roof fall in support of the order. Cumberland
argues that the equipment on the longwall face is permissible and that there are monitors that
automatically deenergize the equipment in the presence of methane concentrations of 2%.
However, the monitoring devices on the face are positioned in the high volume face ventilation
air flow, and they would not likely detect methane infiltrating the face from the gob area behind
the shields. Tr. 805, 1249. The working face presented sufficient ignition sources to constitute
an impending hazard if explosive levels of methane were to reach it.
There is no question that Hixon, an experienced inspector and ventilation specialist,
sincerely believed that an imminent danger existed. Whether the Secretary has sustained her
burden of proving that his belief was reasonable is a close question. However, after carefully
reviewing all of the pertinent evidence, I find that the Secretary has not carried her burden with
respect to Order No. 7067355. The most significant considerations in reaching that conclusion
are that Hixon appears to have been misinformed about the effect of ventilation changes made
following the January 16 ventilation survey, and it appears that the methane accumulation was
not extensive and that the bleeder system was diluting it and moving it away from the active
workings.
Hixon had participated in the ventilation surveys on January 16, 19 and 20, and was
present for at least portions of the meetings that followed. His understanding, as of January 24,
was that "no significant changes" to the bleeder ventilation system had been made following the
January 16 survey. Tr. 735-36. Consequently, his primary concern was that he didn't know
exactly where the methane he detected in the #2 entry extended to, and he feared that a reversal
of air flow, as occurred on January 16, could cause methane to back up onto the face. Tr. 816-18.
He testified that the determination that no significant changes had been made to the system had
been "made by someone else," and that he didn't personally know how the pertinent pressure
differentials had changed. Tr. 796.
Contrary to Hixon's belief, marked improvements had been made to the bleeder system
after the January 16 survey. Surveys on January 19 and 20 demonstrated that a significant
positive pressure differential had been established at the back corner of the panel, which
produced substantial air flows in the proper direction, inby, in the #2 tailgate entry. Changes to
the system prior to the January 19 survey produced an inby air flow in the #2 entry ranging from
4,500 to 6,000 CFM between crosscuts #83 and #86, and a pressure differential across the BEP
30 regulator of 0.14 inches of water. Ex. G-28. Despite this improvement, Beiter believed that
the system was still too fragile, did not have enough capacity, and presented a potential for
unintended changes. Tr. 542-43. Additional changes were then made to the system that resulted
in significant improvements.
The results of the January 20 survey showed that the #2 entry air flow increased to 10,331
13,812 CFM and the BEP 30 pressure differential increased to 0.29 inches of water. Ex. G-30.
Beiter described the system following the January 20 survey, while "still fragile" and subject to
unintended changes, as "markedly improved" and effective for limited production. Tr. 553, 560-
61, 603, 622. Of course, the January 20 survey results led, in part, to the approval of the January
21 ventilation plan and the resumption of production under the monitoring system. Urosek
agreed that the January 20 survey showed that the bleeder system was effective for limited
production. Tr. 1134-35. While Beiter remained of the opinion that actions on the headgate side
could have unintended consequences on the tailgate side, the nature and degree of such
unintended consequences were not explained. It was not claimed, for example, that such changes
might result in a complete reversal of the air flow in the #2 entry, as had occurred with the
considerably weaker system on January 16.
While Hixon was concerned that the methane he detected might extend back to the face,
he admittedly did not know its extent. He did not discuss the fact that he found a methane
content of only 1.5% at the #82 crosscut, the second crosscut inby the face. The various
ventilation surveys show that the second crosscut inby, like the rest of the crosscuts back to #86,
carry low volume air flow from the #3 entry and the adjoining rubble zone into the #2 entry.22
Ex. G-26, G-28, G-30, G-32. The low methane reading at the #82 crosscut appears to indicate
that more significant concentrations of methane in the #3 entry and rubble zone near the #83 and
84 crosscuts did not extend outby to the #82 crosscut. Moreover, the methane Hixon found was
being moved in the proper direction, i.e., inby, into the #2 entry and toward BEP 30. Hixon
confirmed that the air flow he observed was in the proper direction, and agreed that the air flow
in the #3 entry and adjoining rubble zone would have been in the same direction, i.e., away from
the face, inby toward the back corner. Tr. 797-98, 870-08, 813.
Thomas E. Light, Jr., MSHA's assistant district manager for District 2, had "no problem"
with Hixon's issuance of the imminent danger order based upon the conditions in the #2 entry,
because Hixon "made the determination that's where he needed to take a measurement to check
the effectiveness of the system." Tr. 184. However, he noted that inspectors monitoring the
system had to consider not only the concentration of methane and the fragility of the system, but
how extensive the methane accumulation was and where it was located. Tr. 182-83. In Urosek's
opinion, the methane found by Hixon extended to the face, because it was the outer fringes of a
methane accumulation generated by the mining that had just occurred. Tr. 1147. However, he
also noted that it was difficult to tell whether methane was coming from the cutting action at the
face or from within the system. Tr. 1148.
Neither Light, nor Urosek, directly addressed the significance of the low methane reading
at the #82 crosscut. Urosek acknowledged that in an effective system, air from the T-split
traveling inby will dilute methane coming off the rubble zone as it enters the gob's primary
internal air flow paths, the #3 and #2 entries on the tailgate side. Tr. 1232, 1245. He also
acknowledged that there could be "high spots," methane concentrations of 5% or more, in "very
small areas" of the #2 entry and the crosscuts between the #2 and #3 entries. Tr. 1228-30. A
small pocket could exist, and the system could be "just fine." Tr. 1260. However, "if you find it
too much or in too many places, it starts telling you that the system is not functioning correctly."
Tr. 1260. Hixon agreed that high methane concentrations could be expected in air flowing from
the #3 tailgate entry to the #2 entry. Tr. 776-77.
Kimutis and Bohach disagreed with Hixon's conclusions. Kimutis believed that Hixon
was in the gob and that the methane he found did not extend to the face. The methane Hixon
found in the #2 entry could not migrate to the face because the pressure differentials and air
flows were into the #2 entry from the #3 entry and were also inby, away from the face toward the
back corner and BEP 30. Tr. 1378. Bohach also noted that the pressure differentials and air
flows were inby and from the #3 entry to the #2 entry, and that the methane was traveling inby
and was being diluted exactly as it was "supposed to do." Tr. 1519-20, 1642.
I find that the conditions observed by Hixon on January 24 did not justify issuance of an
imminent danger order. There was a pocket of methane in the #3 entry and adjacent rubble zone
near the #83 and #84 crosscuts. However, it was not extensive, and did not appear to exist
further outby to the #82 crosscut, or further inby to the #85 crosscut. It was being drawn up into
the #2 entry, where it was immediately diluted to non-explosive levels. Methane concentrations
of 5% or more existed only in portions of the intersections of the #83 and #84 crosscuts with the
2 entry. The methane was being further diluted as it traveled inby in the #2 entry, until it passed
through BEP 30 into the travelable bleeder entry.
Limited areas of explosive concentrations of methane can be expected in such areas.
Notably, air with a methane content at or above 5% was found flowing into the #2 entry from
crosscut #83 during the January 25 survey. Ex. G-32. That apparently was not viewed as a
remarkable situation, and it did not generate any enforcement action. Conrad, who assisted in
taking the readings in the #2 tailgate entry during that survey, and who issued an imminent
danger order and citation on February 14, testified that methane in concentrations at or above 5%
could be expected in crosscuts like #83 in LW49 and other longwalls. Tr. 1031-32.
There were no precipitous increases in methane readings within the bleeder system as a
whole. A chart of monitoring point methane readings for January 21-25, 2004, shows that
methane concentrations in the bleeder system on January 24 were relatively stable and within
allowable limits, information that Hixon should have been aware of. Ex. G-17. That chart
shows that system-wide methane readings were decreasing at the time Hixon issued his order,
with the exception of an increase at BEP 30, which would be consistent with a moderate
concentration of methane, localized in the area of the #83 and #84 crosscuts, being diluted and
moved out of the system.
Considering the location and limited extent of the methane accumulation, the absence of
ignition sources in that area, the fact that the methane was being diluted and moved away from
the face, and that there were no other indications of a build-up of methane within the bleeder
system, I cannot find that Hixon's determination that an imminent danger existed was reasonable.
Moreover, Hixon testified that a "lot of [my] concern" was that the gob was not that large yet,
and that continued mining would cause the pocket of methane to grow. Tr. 762-64, 814. This
would not appear to be a relevant consideration for determining the existence of an imminent
danger, or the effectiveness of the bleeder system on January 24.
As noted above, given the wide discretion accorded to an inspector's decision to issue an
imminent danger order, this a difficult decision. However, I find that the Secretary has not
carried her burden of proving that the decision to issue Order No. 7067355 was reasonable. She
has not established that there was an imminent danger, as defined in Commission cases, and I
find that issuance of the order, on the particular facts of this case, was an abuse of discretion.
Citation No. 7067356
For the reasons stated above, I find that the Secretary has failed to carry her burden of
proof with respect to Citation No. 7067356, which alleged that the bleeder system was
ineffective on January 24, in violation of 30 C.F.R. § 75.334(b)(1). It appears that the bleeder
system was functioning effectively, and was diluting methane and rendering it harmless within
the bleeder system's internal air flow paths. There was no significant system-wide build-up of
methane levels within the bleeder system, and the methane content of air exiting the BEPs into
the travelable bleeder entries was well below MSHA's operational limit of 4.5%.
Citation No. 7067000 and Order No. 7069999 - February 4, 2004; and
Citation No. 7067003 and Order No. 7067001 - February 7, 2004
Citation No. 7067000 and Order No. 7069999 were issued by Tolliver on February 4,
- The citation alleged that the LW49 bleeder system was ineffective, in violation of 30
C.F.R. § 75.334(b)(1). The violation was described in the "Condition or Practice" section of the
citation as follows:The bleeder system for the active LW49 longwall section, MMU 0011,was determined to be ineffective in controlling the flow of air through the bleeder
system to continuously dilute and move methane-air mixtures from the gob and
away from the active workings. This was due to an adjustment to the ventilation
controls in the No. 2 entry of the headgate side.
Stip. 46; ex. G-4.
Tolliver determined that it was reasonably likely that the violation would result in an
injury that would require lost work days or restricted duty, that it was significant and substantial,
that seven persons were affected, and that Cumberland's negligence was moderate. A penalty of
$629.00 is proposed for this violation. The companion order contained similar language, but
added that methane had been detected on the tailgate side, in the #2 entry, at the #85 crosscut at
4.8%. Stip. 44; ex. G-5.
Citation No. 7067003 and Order No. 7067001 were issued by Tolliver on February 7,
- The citation alleged that the LW49 bleeder system was ineffective, in violation of
30 C.F.R. § 75.334(b)(1). The violation was described in the "Condition or Practice" section of
the order as follows:The bleeder system used in the No. 49 longwall panel failed tocontinuously dilute and move methane-air mixtures and dust from the worked-out
area away from the active section. Methane was detected on the tailgate side, in
the No. 2 entry, at the No. 85 crosscut at 5.0%.
Stip. 50; ex. G-6.
Tolliver determined that it was reasonably likely that the violation would result in an
injury that would require lost work days or restricted duty, that it was significant and substantial,
that seven persons were affected, and that Cumberland's negligence was moderate.23 A penalty
of $629.00 is proposed for this violation.
Tolliver, who had been an MSHA inspector for twelve years, was assigned to monitor
LW49's bleeder system on January 31, 2004. Guley and another inspector advised him that there
were instructions that a citation and imminent danger order were to be issued if methane in
excess of the allowable limits was found at the monitoring/evaluation points specified in the
January 21 ventilation plan. Tr. 829-34, 406. On February 4, he traveled the tailgate bleeder
entry, entry #1, with union representative Mihalik and a Cumberland management representative.
On the fourth monitoring pass, he detected 4.8% methane at the #85 crosscut monitoring point.
After 15-20 seconds, he repeated the sampling and got the same result. The other members of
the party had similar readings on their hand-held detectors.24 Tr. 547-48, 943. He took two
bottle samples, and issued the subject citation and imminent danger order.
He testified that he issued the order because of concern for the safety of miners. On the
first three passes, methane readings had been "pretty steady." Tr. 852. The reading at crosscut
85 had been 3% at 12:37 p.m., but had increased to 4.8% at 1:25 p.m. He "knew something had
happened," and was "afraid that gob air might be coming onto the longwall face." Tr. 851. John
Dzurino, Cumberland's superintendent, confirmed that a ventilation curtain on the headgate side
had been adjusted, which caused a temporary increase in methane flow into the #2 entry on the
tailgate side, eventually reaching BEP 30. Tr. 1741-45. Dzurino did not regard that as an
unusual occurrence. He testified that no additional actions were required to abate the citation and
terminate the order, and that the same thing would have occurred with a bleeder fan system.
Tr. 1741-45.
On February 7, Tolliver detected 5% methane at the #85 crosscut, a reading which was
confirmed by a second measurement after 15-20 seconds, and by the hand-held detectors of those
accompanying him. Tr. 871. He took bottle samples and issued the citation and imminent
danger order. Bohach confirmed that ventilation curtains on the headgate side had been moved
in order to achieve a better pressure balance. Tr. 1536. Those changes caused a temporary
increase in air flow on the headgate side of the bleeder system that continued up the set-up ladder
at the back of the panel to the tailgate side at crosscuts #86 and #87. Tolliver's evaluations of the
danger and the effectiveness of the bleeder system on February 4 and 7 were virtually the same,
i.e., he was concerned that explosive levels of methane might be coming out onto the face where
a number of ignition sources were present.25 He did not know, on either occasion, whether there
were high methane concentrations in the face area. Tr. 882, 896, 908.
The parties' respective views on the significance of Tolliver's findings and the validity of
these citations and orders closely parallel their respective positions with respect to Hixon's
citation and order. Urosek believed that the instances of sudden methane build-ups detected by
Tolliver on February 4 and 7, in conjunction with incidents at the headgate, showed that methane
was "sitting in the internal air flow paths" of the gob, extending "all the way to the face."
Tr. 1155-56.
Cumberland's witnesses, Kimutis, Bohach and Dzurino, reiterated that the #2 entry is part
of the gob where high concentrations of methane are to be expected, that there are no ignition
sources in that area, that there was no methane backed-up to the face because there were no high
methane readings at the face, and the pressure differentials and air flows were away from the face
toward the back of the gob. Tr. 1380-81, 1522-23, 1581-85, 1621-24, 1642-43, 1744-48.
The Imminent Danger Orders
As noted above, Commission precedent places considerable weight in the discretion of an
inspector who issues an imminent danger order, because he must act quickly in what may,
literally, be life and death situations. Cumberland suggests that the deferential standard should
not apply to Tolliver's decisions, because he simply followed instructions and issued the orders
solely on the basis of methane levels exceeding the limitations specified in the ventilation plan.
However, as noted in the following discussion, I find that his determinations to issue the
imminent danger orders were grounded more on his bona-fide concerns for, and evaluation of,
the safety of miners, than on a mechanical application of instructions related by other inspectors.
Consequently, they are entitled to the same degree of deference as that accorded similar decisions
by inspectors in more typical situations.
Tolliver's safety concerns arose from a number of factors. He had made three monitoring
passes on the morning of February 4, and found relatively steady methane concentrations at most
of the monitoring points, with some increases at the #82 and #85 crosscut sampling points. Just
before going to crosscut #85 for the fourth time, he found a significant increase in the methane
concentration of air exiting the BEP 30 regulator.26 Ex. G-34. Three minutes later, at 1:25 p.m.,
he reached crosscut #85, and found that the methane concentration of air flowing out of the
sampling tube had risen from 3.0% at 12:37 p.m. to 4.8%, a reading that was confirmed by the
others present. Tr. 847-48. He believed that when he "hit this spike here or this slug [of
methane] at 85 crosscut, [he] knew that something had happened." Tr. 852. As he proceeded out
of the mine, he took measurements at additional points and found that methane at the #82
crosscut sampling point had risen from 3.3% at 12:35 p.m. to 4.4% at 1:30 p.m., and the reading
at the #73/74 monitoring point had increased from 1.8% at 12:20 p.m., to 2.1% at 1:40 p.m.
Ex. G-18, G-34. The latter reading would have required shutting down production under the
plan. Shortly after he issued the order, methane levels at all monitoring points declined to
acceptable levels, and production resumed that evening. Ex. G-18.
On February 7, a similar pattern presented itself. Methane levels at the various
monitoring points were relatively steady and within acceptable limits, with the exception of the
73/74 point, which was fluctuating in the 2% range and causing interruptions to production.
Ex. G-20. Around 10:00 a.m., however, methane levels began to rise significantly. At 12:20
p.m., Tolliver measured methane at 5% at the #85 crosscut monitoring point, a substantial
increase over the previous reading of under 3%, less than two hours earlier. Ex. G-20, G-35.
Methane at the #82 crosscut monitoring point was over 4%, and the #73/74 point was well above
2%. Ex. G-20. Again, the rapid rise in methane concentrations caused him concern. He didn't
have any idea what was going on. Tr. 881.
On both dates, there was a sudden and substantial rise in methane concentrations, not just
at the #85 crosscut monitoring point, but virtually throughout the tailgate side of the bleeder
system. Cumberland argues that Tolliver issued the orders and citations solely because of the
readings at the #85 crosscut monitoring point. While he testified to that effect, Cumberland
reads too much into his responses to specific leading questions on cross-examination. Tr. 891.
I find that the better interpretation of his responses was that the crosscut #85 readings were the
precipitating factors for issuance of the orders and citations. His testimony, as a whole,
evidences that he was concerned as much about the sudden rise in methane readings within the
system, and the absence of any immediate explanation for them, as he was about the crosscut #85
readings themselves. He also considered the unfolding events with an understanding that the
bleeder system was fragile. Tr. 868.
Cumberland argues that Tolliver did not determine whether there were excessive methane
readings on the face, which was the focus of his concerns. However, as noted previously, the
methane monitors on the face are positioned in the relatively high volume flow of face air, and
will not detect buildups of methane immediately behind the shields, which might get swept out
onto the face in explosive concentrations. Cumberland also notes that air flows and pressure
differentials at BEP 30 were appropriate, and that the system was functioning as it was when the
January 20 and January 25 ventilation surveys were performed. However, there were no sudden
substantial, system-wide increases in methane concentrations on those occasions. In any event,
an inspector would be obligated to issue an order if he found an imminent danger, regardless of
the state of compliance with a ventilation plan.
I find that the Secretary has carried her burden of proof with respect to Order Nos.
706999 and 7067001. Tolliver did not act solely on the basis of a single excessive methane
reading, either on February 4 or 7. He considered the presence of excessive methane and
unexplained sudden rises in methane in the system as a whole, and reasonably determined that
the conditions he encountered on February 4 and 7 presented imminent dangers to miners. He
did not abuse his discretion in issuing the orders.
The Citations
For the reasons stated above, I find that the bleeder system was ineffective on February 4
and 7, as alleged in Citation Nos. 7067000 and 7067003. It was not effectively ventilating the
area within the bleeder system and protecting the active workings from hazardous methane
accumulations. I concur with Tolliver's assessment of the gravity of the violations and
Cumberland's negligence. I also find, for the reasons stated with respect to Citation No.
7083200, that the violations were S&S.
Citation No. 7069907 and Order No. 7069906 - February 14, 2004
Citation No. 7069907 and Order No. 7069906 were issued by Conrad on February 14,
- The citation alleged that the LW49 bleeder system was ineffective, in violation of
30 C.F.R. § 75.334(b)(1). The violation was described in the "Condition or Practice" section of
the citation as follows:Adjustments were being performed in the No. 2 entry inby the [headgate].Management was attempting to relocate a regulator and installed a canvas check
across the No. 2 entry just inby the No. 80 crosscut of the No. 2 entry and air was
forced from the No. 2 entry over into the longwall gob and inadvertently flushed
an excessive amount of methane gas back out into the No. 2 entry inby 80
crosscut which reported to the No. 31 bleeder evaluation point. Five point one
percent of methane was detected at the No. 31 bleeder evaluation point with two
different hand held methane detectors. The bleeder system was determined to be
ineffective in controlling the flow of air to continuously dilute and render
harmless methane gas away from the active workings. This was a contributing
factor to the 107-(a) order. Therefore, there was no abatement time.
Stip. 57; ex. G-8.
Conrad determined that it was reasonably likely that the violation would result in an
injury requiring lost work days or restricted duty, that it was significant and substantial, that five
persons were affected, and that Cumberland's negligence was moderate. A penalty of $500.00 is
proposed for this violation. The companion order contained similar language. Ex. G-9.
Conrad had inspected Cumberland's mine in the fall of 2003, when the entries for LW49
were being developed. He also participated in the January 25, 2004, ventilation survey. On
February 14, he was monitoring the LW49 bleeder system's compliance with the January 21
ventilation plan. He had not been instructed to issue an imminent danger order and citation if he
found non-compliance with the plan. Tr. 987, 1024, 1059. He traveled the walkable bleeder
entries around the entire panel and, on the second pass, found 5% methane coming out of the
regulator at BEP 31, located at the back, most inby, corner of the panel on the headgate side. He
decided to issue an imminent danger order, collected a bottle sample, and proceeded toward the
face to advise Cumberland officials. Tr. 993. The methane content of the air in the travelable
bleeder outside of BEP 31 was less than 1%. Tr. 1039.
Conrad proceeded outby in the #3 headgate entry in an effort to find a management
official to whom he could issue the order. Tr. 996-98. He traveled to crosscut #76 and asked a
miner where the foreman was. He was told that the foreman was inby in the #2 entry, which
surprised him because he thought everyone was working outby the face. Tr. 998-1000. As he
passed through a canvass check curtain near crosscut #78, he saw the foreman, Matthew Boback,
coming out. He did not encounter any excessive methane as he traveled the #3 and #2 entries.
His methane detector was set to alarm at a methane concentration of 1%, and it did not do so as
he looked for and found Boback. Tr. 1050. The longwall was not operating at the time, and
there was no power on the face. Conrad verbally advised Boback that he was issuing an
imminent danger order. Tr. 1003. Conrad had miners removed from the area and power
removed from a load center near the #72 crosscut. He then went to the dinner hole with Boback
and talked with him about what he had been doing.
Boback and a crew of miners had been moving a regulator in the #2 entry from just inby
crosscut #78 to just inby crosscut #80. There were some concrete blocks that had been knocked
out of a stopping in the #79 crosscut between the #1 and #2 entries, and the #80 crosscut between
the #2 and #1 entries was open. Ex. G-36. A curtain had been erected in the #2 entry just inby
crosscut #80, to serve as a temporary ventilation control while the regulator was being
constructed. Tr. 1882. That curtain changed the pressure in the #2 entry, increasing it outby and
decreasing it inby. The result was that more air passed into the #1 entry through the missing
blocks in the #79 crosscut stopping and the open #80 crosscut. It swept methane from the #1
entry into the #2 entry further inby. Boback had found 4.4% methane in the #2 entry between the
82 and #83 crosscuts, and became concerned. Tr. 1869, 1877. He instructed his men to remove
the temporary curtain a little at a time, and the methane decreased and stabilized. Tr. 1869. He
then proceeded outby, where he encountered Conrad. Tr. 1870.
After talking with Boback, Conrad believed that Boback may have already corrected the
problem. He proceeded back to BEP-31, found that the methane levels had fallen to 2.3%, and
terminated the citation and order. Tr. 1044.
Urosek testified that, in his opinion, Conrad's findings showed that there was a large
accumulation of methane in the #1 entry, a primary internal gob air flow path on the headgate
side, that extended from the back of the panel up to crosscut #80. Tr. 1159. That amount of
methane would have been capable of generating a very large explosion that would have killed or
seriously injured men working outby the face. Tr. 1160. He also interpreted a chart of methane
readings at various monitoring points on February 14, as showing that a significant amount of
methane had been put into the bleeder system about the time of Conrad's findings, and that only
the detector at the #73/74 tailgate monitoring point showed it, because its reading went up to
2.2% or 2.3%. Tr. 1168-69; ex. G-21. He felt that the chart showed that the system was "barely
effective." Tr. 1169. However, he then stated that it showed that the system was ineffective
when there was more than 2% methane detected at the #73/74 monitoring point. Tr. 1170.
Bohach testified that, in his opinion, there should have been no imminent danger order
issued, because there was no power on the face and no power or any other ignition source inby
the face in the #2 and #3 headgate entries. Tr. 1551. The other evaluation points were within
acceptable limits, and the BEP 31 reading was an isolated event, the cause of which had been
corrected by the time Conrad found Boback. Tr. 1151. He agreed, however, that there was
methane in an explosive concentration, that miners were working in the nearby area, and that
they would have been affected if there had been an ignition. Tr. 1573.
The Imminent Danger Order
Conrad was very concerned when he found the high methane concentration at BEP 31.
He had never found a high methane concentration at that location, and thought that something
must have happened. Tr. 1001-02. He didn't know how far it extended up the #2 entry, and
feared that it "might have been all the way back to the #75 crosscut," all the way to the face.
Tr. 1000. He understood that there were men and equipment working outby the face, and he
"wasn't taking any chances." Tr. 1024-25. He knew that there was power on the load centers,
and he didn't know whether other equipment was operating with power in the area of concern.
Tr. 1001. His decision to issue the order was made at the time he found the excessive methane at
BEP 31. Tr. 995-96, 998-99. However, he was unable to issue the order until he encountered
Boback near crosscut #78 in the #2 entry. He issued and implemented the order when he found
Boback, and made sure that power to the load center was turned off and that men were removed
from the area before he sat down with Boback to discuss what had happened. Tr. 1004.
Conrad had decided that he was going to issue an imminent danger order when he found
the excessive methane at BEP 31. That decision was reasonable. It was very unusual to find
such a concentration at that location, and he legitimately feared that explosive methane may have
extended outby in the #2 headgate entry to places where power was present and men were
working. However, he could not issue the order at that time, because there was no management
official present and no ready mechanism for communicating the order. By the time he found
Boback, and actually issued the order, he had acquired additional important information. He
knew that methane levels were below 1% in the #2 entry from the face inby to crosscut #78.
Also reasonably available to him, within a matter of seconds, was information from Boback that
methane in excessive concentrations had not been detected by Boback's methane detector, or the
detector in the possession of a crew member, except for methane at 4.4% that had been found
inby crosscut #82, and steps had been taken that reduced that concentration. Before actually
issuing the order, Conrad knew or should have known that the methane he found at BEP 31 did
not extend nearly as far as he had feared, and the potential ignition sources that he was concerned
about were far removed from it. He, nevertheless, issued and enforced the order, and did not
terminate it until he had returned to BEP 31 and found that the methane concentration had been
reduced to an acceptable level.
The validity of the order must be determined as of the time it was verbally issued to
Boback.27 See Wyoming Fuel Co., 14 FMSHRC at 1292 (appropriate focus is whether the
inspector abused his discretion when he issued the imminent danger order). At that time, the
facts known to Conrad or reasonably available to him, did not support the issuance of an
imminent danger order. The explosive concentration of methane that he had detected at BEP 31
did not extend outby in the #2 headgate entry for any appreciable distance, and there were no
ignition sources in the area. A methane concentration of 4.4% had been detected inby the #82
crosscut, but the temporary ventilation curtain had been adjusted and that concentration had been
reduced. Any methane concentration of concern was confined to the most inby end of the #2
entry and was being drawn by the bleeder system through BEP 31 into the bleeder entry, where
the concentration was below 1%. While Conrad's original decision regarding the an imminent
danger order was reasonable, his decision to issue the order when he encountered Boback was
not.
The Citation
Conrad was "pretty sure" that he was going to issue a citation for an ineffective bleeder
system when he found the methane at BEP 31. Tr. 1006. He eventually decided to issue the
citation because of the excessive methane that he found at BEP 31, and because he felt that a
solid curtain should never have been put across the #2 entry forcing air out of the gob. Tr. 1011.
The S&S finding was based upon the explosive concentration of methane, which presented a
danger if it encountered an ignition source. Tr. 1012. He rated Cumberland's negligence as
moderate because he didn't believe that Boback understood the effect that the temporary curtain
would have on the rest of the system, and hadn't been told exactly, step-by-step, how to move the
regulator. Tr. 1013, 1023.
I agree with Cumberland that the temporary elevation of methane concentration in the
most inby portion of the #2 headgate entry was an isolated occurrence and did not demonstrate
that the bleeder system was ineffective on February 14. The chart of methane measurements on
February 14 shows that, with the exception of the #73/74 monitoring point, all of the other
evaluation and monitoring points were operating well within allowable limits. Ex. G-21. Those
readings evidence that there was no build-up of methane in the bleeder system, as there had been
on February 4 and 7. I find unpersuasive Urosek's opinion that the relatively brief elevation of
methane content to the 2.2% - 2.3% range at the #73/74 point showed that the system was
ineffective. Methane concentrations had been running very close to the 2% limit at that
monitoring point for the whole day, and had caused termination of mining activities for a
considerable portion of the time. Ex. G-21. Methane at or above 2% at the #73/74 point had
also caused cessation of mining on other days. Ex. G-17, G-20. The system was not determined
to be ineffective on those occasions, and no enforcement action was taken with respect to them.
There obviously was some methane in and near the #1 entry on the headgate side and the
adjoining rubble zone. However, high methane concentrations can be expected in those areas,
and it does not appear that the methane was as wide-spread and prevalent as Urosek believed. If
a large accumulation of methane existed from the back corner of the gob all the way to crosscut
80, it would seem that the air being forced into the #1 entry at crosscuts #79 and #80 would
have produced high methane readings in the #2 entry beginning at crosscut #81. However, there
is no evidence of high methane readings closer to the face than the 4.4% Boback found inby
crosscut #82.
I find that the Secretary has failed to carry her burden of proof with respect to the
violation alleged in Citation No. 7069907.
The Appropriate Civil Penalties
The parties stipulated that Cumberland is a large operator, and that the proposed penalties
will not affect its ability to continue in business. A printout from an MSHA computer database
shows that Cumberland had paid 234 violations, two of which were specially assessed, over the
period January 13, 2002, to January 12, 2004. Ex. G-38. The gravity and negligence associated
with the alleged violations are discussed above.
Citation No. 7083200 is affirmed in all respects. A civil penalty of $1,238.00 was
proposed by the Secretary. I impose a penalty in the amount of $1,238.00 upon consideration of
the above and the factors enumerated in section 110(i) of the Act.
Citation No. 7067000 is affirmed in all respects. A civil penalty of $629.00 was
proposed by the Secretary. I impose a penalty in the amount of $629.00 upon consideration of
the above and the factors enumerated in section 110(i) of the Act.
Citation No. 7067003 is affirmed in all respects. A civil penalty of $629.00 was
proposed by the Secretary. I impose a penalty in the amount of $629.00 upon consideration of
the above and the factors enumerated in section 110(i) of the Act.
ORDER
Citation Nos. 7067356 and 7069907, and Order Nos. 7067355 and 7069906, are
VACATED. Citation Nos. 7083200, 7067000 and 7067003, and Order Nos. 7069999 and
7067001, are AFFIRMED in all respects. Respondent is directed to pay a civil penalty of
$2,496.00 within 45 days.
Footnotes:
1 The petition in Docket No. PENN 2005-8 was filed after the hearing. The parties
stipulated that all issues involved with respect to the alleged violations, including those related to
the amount of any civil penalty, were to be litigated at the hearing. Two citations in Docket
No. PENN 2004-181 were not at issue in the hearing and were settled. A separate Decision
Approving Settlement was issued with respect to those citations on November 29, 2004.
2 30 C.F.R. § 75.334(b)(1); RAG Cumberland Resources, LP, 26 FMSHRC 639, 647
(Aug. 2004) (appeal pending).
3 "Gob" is "[t]he space left by the extraction of a coal seam into which . . . the
immediate roof caves." Am. Geological Institute, Dictionary of Mining, Mineral and Related Terms, 239 (2d ed. 1997).
4 In addition to the panel-specific plan, Cumberland had an approved ventilation plan,
dated March 3, 2003, for the overall mine and longwall panels in general. Ex. Jt-2.
5 The January 7 change was significant because, when the belt entry was on intake air,
methane given off by the freshly cut coal on the belt and the adjoining coal block was swept inby
and along the face. Consequently, fresh air intended to ventilate the face already had as much as
0.3% methane, which substantially reduced the amount of methane that could be generated by
mining activity before production would be shut down.
6 Operators of underground coal mines are required to "develop and follow a ventilation
plan, approved by the [MSHA] district manager," and material changes to the plan must be approved before being implemented. 30 C.F.R. § 75.370(a)(1), (d).
7 30 C.F.R. § 75.340(a)(1)(i).
8 Cumberland contends that the charging station ventilation violation had little to do with
the bleeder system, which may have been the case. The incident is related only for background
purposes.
9 Another bleeder evaluation point, BEP 30B, was located immediately outby BEP 30.
However, it was of comparatively little significance to the enforcement actions at issue.
10 This description of bleeder system air flows conforms with MSHA's expectations of
the system. Cumberland disputes certain aspects of MSHA's position. Most significantly,
Cumberland points out that the December 9 ventilation plan does not specify volumes of air
flow, or the direction of air flow in the #2 tailgate entry between crosscuts #84 and #87. MSHA counters that air flow volumes are not specified on ventilation plans because the quantities
change as the panel is mined out. Tr. 1132-33.
11 The 2% monitoring point was unique, and there was considerable discussion about its
appropriateness. The UMWA, at one point, joined in suggesting that the methane limit be raised
to 2.3%. MSHA considered lowering it to 1.8%. While that particular provision resulted in
numerous interruptions to mining, it did not play a direct or substantial roll in any of the
violations at issue in these cases, and will not be addressed at length. It should be noted,
however, that MSHA has considerable discretion in imposing conditions in ventilation plans.
See RAG Cumberland Resources, LP, 26 FMSHRC at 648 n.16.
12 Normally there would be another, mined-out longwall panel on the other side of the
tailgate entries, and deteriorating roof and other conditions would preclude safe travel in the #2
entry. Since LW49 was in a new district, there was no adjacent panel. In addition, Cumberland
had spent a considerable amount of money to install pumpable concrete cribs to keep the bleeder
entries open. Consequently, the LW49 #2 tailgate entry was in very good condition and
presented no impediment to travel.
13 30 C.F.R. § 75.334(b)(1) provides:
(b)(1) During pillar recovery a bleeder system shall be used to control the air
passing through the area and to continuously dilute and move methane-air
mixtures and other gases, dusts, and fumes from the worked-out area away from
the active workings and into a return air course or to the surface of the mine.
14 Penigar impressed me as a particularly credible witness. Cumberland contends that he
indicated, during the survey, that he didn't see anything objectionable. Penigar did not recall
making such a statement, and pointed out that he would not have had access to all of the survey
data until it was recorded on the mine map. Tr. 719. I credit his testimony, and find that he was
sincerely concerned about the performance of the bleeder ventilation system, and perceived that
it posed a hazard to miners.
15 Four witnesses were accepted as experts. However, the parties were advised that little
weight would be given purely to the "expert witness" label, and that the testimony of all
witnesses would be considered in light of their education, experience and other qualifications, as
well as pertinent indicators of reliability for their particular testimony. Tr. 1306, 1464-65, 1479-
80.
16 That plan did not specify required pressure differentials or flow quantities at BEPs,
and the only flow direction indicated in the #2 entry on the tailgate side was inby flow between
crosscuts #87 and #88. The plan also did not specify any air quality or methane requirements
within the #2 tailgate entry. Ex. Jt-1, Jt-1A.
17 It is true, as Cumberland contends, that methane in the #2 tailgate entry was not
flowing such that it would actually reach the face. Rather, it was flowing to BEP 30A and into
the travelable bleeder entry. However, the methane that was of concern was located in the #3
entry and adjoining rubble zone, which was moving toward the face.
18 MSHA formally acknowledged as much when it approved the January 21 ventilation
plan, which specified that production cease and corrective action be taken if a methane
concentration of 4.5% was detected for 15 seconds or more in the #2 entry.
19 Cumberland asserts a different version of its ventilation plan defense to citations
issued following approval of the January 21 plan. It contends that the conditions imposed with
respect to the monitoring points established "action levels," for which citations could be written
only if the specified action was not taken. Although two of MSHA's witnesses agreed that the
provisions were action levels, the argument is unavailing. Tr. 206-08, 406-07. As noted above,
the effective bleeder system standard embodied in section 75.334(b)(1) can be enforced
irrespective of ventilation plan requirements. In addition, the citations that are affirmed in this
Decision were not issued solely for non-compliance with one of the ventilation plan
requirements. The argument has no relevance to the validity of the imminent danger orders,
which may be issued whether or not there is a violation of the Act or applicable regulations.
20 In fact, Cumberland was not required to obtain approval of a ventilation plan
amendment in order to abate the January 13 citation. It simply could have conformed its
ventilation system to the approved plan.
21 Hixon determined that Cumberland's negligence with respect to the violation alleged
in the citation was low because, as far as he knew, no one from Cumberland had been in the #2
entry since the approval of the January 21 plan, and the readings at the BEPs and other
monitoring points were within acceptable limits. Tr. 765.
22 Crosscut #81, which was just inby the face, was also open. However, the surveys
show that virtually all of the T-split air flows through that first crosscut into the #2 entry.
Ex. G-26, G-28, G-30, G-32. That high volume flow from the face would not reflect methane
accumulations in the gob.
23 Tolliver determined that the violations were S&S because of the potential for an
explosion, and evaluated Cumberland's negligence as moderate because it was continuously
monitoring the system, along with MSHA and union officials.
24 Cumberland emphasizes that the bottle samples taken on February 4 showed methane
concentrations below 4.5%, and that there were discrepancies of up to 0.4% in the readings of the
other persons' hand-held monitors. I find those facts of little significance because everyone
traveling with Tolliver had readings very close to his on both occasions, and Tolliver testified
that there may have been some error in the collection of the bottle samples. Tr. 891, 915.
25 Tolliver initially cited the presence of sandstone as a potential source of sparks, but
later conceded that he did not know whether sandstone was present in the face area. Tr. 861, 900,
916.
26 In less than an hour, the concentration had changed from 2.0% to 3.0% methane.
Ex. G-34.
27 Cumberland also argues that the order is invalid because, by the time it was reduced to
writing as required by the Act, any hazardous condition had ceased to exist. I reject that
argument. While section 107(d) of the Act requires that imminent danger orders be reduced to
writing, the legislative history of the Federal Coal Mine Health and Safety Act of 1969, the
forerunner of the 1977 Act, makes clear that an inspector who finds an impending danger must
eliminate miners' exposure to that danger "without waiting for any formal proceedings or
notice." S. Rep. No. 91-411, at 89 (1969), reprinted in Senate Subcomm. on Labor, Comm. on
Labor and Public Welfare, Part I, Legislative History of the Federal Coal Mine Health and Safety
Act of 1969, at 215 (1975).
Michael E. Zielinski
Administrative Law Judge
Distribution (Certified Mail):
R. Henry Moore, Esq., Jackson Kelly, PLLC, Three Gateway Center, Suite 1340, 401 Liberty
Avenue, Pittsburgh, PA 15222
Leon E. Pasker, Esq., Office of the Solicitor, U.S. Department of Labor, The Curtis Center, Suite
630E, 170 S. Independence Mall West, Philadelphia, PA 19106-3306
James B. Crawford, Esq., Office of the Solicitor, U.S. Department of Labor, 1100 Wilson Blvd.,
22nd Floor, Arlington, VA 22209-2247
/mh