FMSHRC Commission decision Docket LAKE 2025-0315 Decided December 18, 2025 Procedural

Secretary of Labor v. U.S. Aggregates, Inc.

Secretary of Labor v. U.S. Aggregates, Inc. (FMSHRC LAKE 2025-0315): Five-month reopening delay denied

Apply this precedent to your situation

This is citable Commission precedent from 2025, and it may have been appealed since. Ezel checks how it stands today and answers your situation, with citations.

Decision of the Commission
This is a decision of the Federal Mine Safety and Health Review Commission, the highest level of agency review, citable as Commission precedent. It may have been appealed to a U.S. Court of Appeals after issuance under 30 U.S.C. § 816; check subsequent history before relying on it. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the Commission's own document.
Read the official release (fmshrc.gov)

Plain-English summary

U.S. Aggregates timely contested two citations issued after a miner was fatally electrocuted but did not separately contest the later proposed penalties. The company discovered the final penalties in MSHA's database, attempted an untimely email contest, and acknowledged the need for a Commission reopening motion in May. It did not file that motion until July, more than five months after first discovering the problem. Its filing also gave only a general personnel-change explanation and omitted details about its normal process, the departing president's role, and corrective measures. The Commission held that contesting the citations did not excuse the separate penalty default and denied reopening.

Decision snapshot

  • Cited authority: 30 U.S.C. §§ 815(a) and 815(d)
  • Outcome: The motion to reopen the final penalty assessment was denied.
  • Key point: A citation contest is separate from a penalty contest, and months of unexplained delay after discovering final penalties strongly defeats reopening.

Full text (FMSHRC public release)

FEDERAL MINE
SAFETY AND HEALTH REVIEW COMMISSION

1331
PENNSYLVANIA AVE., N.W., SUITE 520N

WASHINGTON,
DC 20004-1710

|
SECRETARY OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION (MSHA),
v.
U.S. AGGREGATES, INC., |
|
|
Docket No. LAKE 2025-0315 A.C. No. 12-00016-611533
|

BEFORE:
[Rajkovich, Jr., Chair; Jordan, Baker and Marvit,
Commissioners]

ORDER

BY: Rajkovich, Jr., Chair; Jordan and Baker, Commissioners

This case arises under the Federal Mine Safety and Health Act of 1977, 30 U.S.C. § 801 et seq. (2024) (“Mine Act”). On July 31, 2025, the Commission received from U.S. Aggregates, Inc., a motion seeking to reopen a penalty assessment that had become a final order of the Commission pursuant to section 105(a) of the Mine Act, 30 U.S.C. § 815(a).

Under section 105(a) of the Mine Act, an
operator who wishes to contest a proposed penalty must notify the Secretary of
Labor no later than 30 days after receiving the proposed penalty assessment. If
the operator fails to notify the Secretary, the proposed penalty assessment is
deemed a final order of the Commission. 30 U.S.C. § 815(a). We have held,
however, that in appropriate circumstances, we possess jurisdiction to reopen
uncontested assessments that have become final Commission orders under section
105(a). Jim Walter Res., Inc., 15 FMSHRC 782, 786-89 (May 1993) (“JWR”).
In evaluating requests to reopen final section 105(a) orders, the Commission
has found guidance in Rule 60(b) of the Federal Rules of Civil Procedure under
which, for example, a party could be entitled to relief from a final order of
the Commission on the basis of mistake, inadvertence, or excusable neglect. See
29 C.F.R. § 2700.1(b) (“the Commission and its Judges shall be guided so far as
practicable by the Federal Rules of Civil Procedure”); JWR, 15 FMSHRC at
787.

We have also observed that default is a
harsh remedy and that, if the defaulting party can make a showing of good cause
for a failure to timely respond, the case may be reopened and appropriate
proceedings on the merits permitted. See Coal Prep. Servs., Inc., 17
FMSHRC 1529, 1530 (Sept. 1995).

This proceeding concerns the proposed civil
penalty for two citations issued to U.S. Aggregates by the Secretary of Labor’s
Mine Safety and Health Administration (“MSHA”) following an investigation into a
fatal accident at the mine. The operator timely contested these two citations
pursuant to section 105(d) of the Mine Act. 30 U.S.C. § 815(d).[1]

Separately, under section 105(a) of the
Mine Act, the Secretary notified the mine operator of the proposed civil
penalty for these two citations. 30 U.S.C. § 815(a). To contest the penalties
the operator must file a contest form with the Secretary within 30 days. If the
operator fails to timely contest, the proposed penalty becomes a final order of
the Commission.[2]
Id. Here U.S. Aggregates did not separately file to contest the penalty within
the 30-day period. MSHA’s records indicate that the proposed assessment penalty
was delivered on December 18, 2024, and became final orders of the Commission
on January 17, 2025.[3]
MSHA sent the operator a delinquency notice on March 4, 2025.

U.S. Aggregates states that it discovered the outstanding penalties on February 14, 2025, while reviewing MSHA’s Mine Data Retrieval System (“MDRS”). Thereafter, U.S. Aggregates belatedly attempted to contest the penalties through the Secretary’s email filing system. R. Ex. A. U.S. Aggregates states that it became aware that its attempt to contest had not been accepted when it received the Secretary’s delinquency notice weeks later (dated March 4, 2025). The operator represents that the departure of its president contributed to its failure to timely file.

The Secretary opposes the operator’s
motion. The Secretary states that the operator has failed to specify details to
establish that its failure to timely file was the result of a mistake,
excusable neglect or some other good cause reason. Furthermore, the Secretary
alleges that the operator has not been able to account for the signification
delay in seeking to reopen the penalties once it discovered the delinquency.[4]

When filing a motion to reopen before the
Commission the operator bears the burden of showing exceptional circumstances. Lone
Mountain Processing, Inc
., 35 FMSHRC 3342, 3345 (Nov. 2013). “[T]he
applicant for such relief must provide all known details, including relevant
dates and persons involved, and a clear explanation that accounts, to the best
of the operator’s knowledge, for the failure to submit a timely response and
for any delays in seeking relief once the operator became aware of the
delinquency or failure….” Lone Mountain, 35 FMSHRC at 3345 (citing Higgins
Stone Co
., 32 FMSHRC 33, 34 (Jan. 2010)).

We conclude that the operator has failed to establish its burden of proof. The motion fails to provide relevant dates, specify the operator’s regular penalty contest procedures, the role of the president within that process, or how the operator plans to prevent similar problems in the future. Additionally, the motion completely omits mention of its employee to whom the assessment was addressed. S. Ex. A.

A general assertion that there was a
personnel change at the mine is insufficient to support reopening. See
Southwest Rock Prods., Inc
., 45 FMSHRC 747, 748 (Aug. 2023) (“a grant of
relief under Rule 60(b) requires more than “general assertions or conclusory
statements as to why an operator failed to timely contest”’); Tintic Consol.
Metals, LLC
, 46 FMSHRC 652 (Aug. 2024) (denying the operator’s motions
because it “provides no explanation for its failure to timely contest the proposed
penalty assessment beyond a general description of personnel changes and fails
to describe actions it will take to ensure timely filing in the future.”).

Moreover, the operator did not explain why
it waited more than five months to file the motion to reopen once it discovered
its initial error. See, e.g., Staker & Parson Cos., 47 FMSHRC 271,
272 (Apr. 2025) (motions to reopen filed more than 30 days after an operator
discovers that it failed to timely file a notice of contest are presumptively
not filed within a reasonable amount of time). On February 14, 2025, U.S.
Aggregates discovered the outstanding penalties in the Secretary’s MDRS, which
specified that these particular penalties became final orders of the Commission
on January 17, 2025. Inexplicably, counsel for U.S. Aggregates then emailed the
Secretary an untimely contest of the penalties, rather than immediately filing
a motion to reopen with the Commission. On March 4, 2025, the Secretary mailed
a delinquency notice to the operator. On May 5, 2025, the operator acknowledged
the pending need to file a motion to reopen with the Commission in an email to
the Secretary. Nevertheless, the operator waited about three additional months
before filing the motion to reopen on July 31, 2025. We find the operator’s
delay in filing a motion with the Commission to strongly militate against
reopening.

While the filing of a contest of an
underlying citation is an indication of an initial intent to also contest the
penalty, simply contesting the citation does not in of itself excuse a
subsequent failure to contest a proposed penalty. Lone Mountain, 35
FMSHRC at 3346-47.

Here, when considering all the factors, we determine that the operator has not demonstrated that there was a good cause reason for its failure to timely file to contest the Secretary’s proposed penalty.

Accordingly, U.S. Aggregate’s motion to
reopen is hereby DENIED.

/s/
Marco M. Rajkovich, Jr

Marco M. Rajkovich, Jr., Chair

/s/ Mary Lu Jordan

Mary Lu Jordan, Commissioner

/s/ Timothy J.
Baker

Timothy J. Baker, Commissioner

Commissioner Marvit, concurring,

I write to agree with the Majority in this case for the reasons set forth below.

In Explosive Contractors, 46 FMSHRC
965 (Dec. 2024), I dissented and explained that Congress did not grant the
Commission the authority to reopen final orders under section 105(a) of the
Mine Act. The Commission’s repeated invocation of Federal Rule of Civil
Procedure 60(b) cannot overcome the statutory language. However, in Belt
Tech
, I explained in my concurrence that “the Act clearly states that to
become a final order of the Commission, the operator must have received the
notification from the Secretary.” 46 FMSHRC 975 (citing Hancock Materials,
Inc.
, 31 FMSHRC 537 (May 2009)). Taken together, these opinions stand for
the proposition that the Commission may not reopen final orders under its
statutory grant, but an operator may proceed if it has not properly received a
proposed order.

In the instant case, as the Majority recounts, the operator received the final order. The Majority denies reopening in its opinion because the operator has not alleged good cause or provided a factual accounting for its failure to timely contest the penalties. Though I believe the Commission lacks the authority to consider motions to reopen, I concur with the Majority in denying reopening in this matter.

/s/ Moshe Z.
Marvit

Moshe Z. Marvit, Commissioner

Distribution:

Adele L. Abrams, Esq., ASP, CMSP

Little Mendelson PC

815 Connecticut Ave NW, Suite 400

Washington, DC 20006

Susannah M. Maltz

Attorney

U.S Department of Labor,

Office of the Solicitor

Division of Mine Safety & Health

200 Constitution Ave NW, Suite N4420-N4430

Washington, DC 20210

Thomas A. Paige, Esq.

Office of the Solicitor

U.S. Department of Labor

Division of Mine Safety and Health

200 Constitution
Avenue NW, [Suite N4420-N4430]

Washington, DC 20210

Melanie Garris

US Department of Labor/MSHA

Office of Assessments, Room N3454

200 Constitution Ave NW

Washington, DC 20210

Chief Administrative Law Judge Glynn F. Voisin

Federal Mine Safety Health Review Commission

1331 Pennsylvania Avenue, NW Suite 520N

Washington, DC 20004-1710

[1] On November 19,
2024, the Commission docketed the contest of the citations as Docket Nos. LAKE
2025-0062 and LAKE 2025-0063.

[2] Commission
Procedural Rule 21 explicitly states that the filing of a notice of contest of
an underlying citation does not constitute a challenge to a subsequently issued
proposed penalty assessment, which must be filed as a separate notice of
contest. 29 C.F.R. § 2700.21; see Marfork Coal Co., 29 FMSHRC 626, 636
(Aug. 2007).

[3] United States
Postal Service records provided by the Secretary demonstrate that the
assessment was delivered to the operator on December 18, 2024, and was signed
for by a “D. Hairston.” S. Ex. B.

[4] The Secretary’s
opposition also relies on the seriousness of the incident; these penalties
relate to citations issued after a miner was fatally electrocuted. The
Secretary additionally maintains that the operator should have identified its
error within its processing system with more specificity and then explained how
it would remediate moving forward.