FMSHRC ALJ decision Docket LAKE 2000-111-R, LAKE 2000-112-R Decided May 9, 2001 Citations affirmed Judge Michael E. Zielinski

American Coal Company

American Coal Company (FMSHRC LAKE 2000-111-R, LAKE 2000-112-R): Diesel engine citations affirmed

What's the rule today?

This ALJ decision was superseded by the Commission's decision in the same case. Ezel starts from the controlling decision and answers your situation under current law, with citations.

Currency note: this decision dates from 2001
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
ALJ decision, later reviewed by the Commission
This decision was issued by an FMSHRC Administrative Law Judge, but it was not the final word in the case: the Commission directed review, and the Commission's decision is the one citable as precedent.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the agency's own release.
Read the official release (fmshrc.gov)

Plain-English summary

American Coal operated the Galatia Mine, an underground coal mine in Illinois, with diesel-powered personnel carriers. MSHA cited two engines because their approval markings were made by the mine rather than supplied by the engine manufacturer, as required by 30 C.F.R. § 7.90. Judge Michael E. Zielinski held that the approval-marking requirement applied to the engines even though they were placed in service before the effective date of the newer diesel-equipment rule. He granted the Secretary's motion for summary decision, affirmed both citations, and dismissed the contests.

Decision snapshot

  • Cited standards: 30 C.F.R. § 7.90; 30 C.F.R. § 75.1909(a)
  • Outcome: Citations 7572545 and 7572546 were affirmed, and the notices of contest were dismissed.
  • Key point: The approval-marking requirement applied to the non-permissible diesel engines, and the mine's self-produced labels did not satisfy it.

Full text (FMSHRC public release)

FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION

                       OFFICE OF ADMINISTRATIVE LAW JUDGES
                                2 SKYLINE, Suite 1000
                                5203 LEESBURG PIKE
                           FALLS CHURCH, VIRGINIA 22041

                                       May 9, 2001

AMERICAN COAL COMPANY, : CONTEST PROCEEDINGS
Contestant :
v. : Docket No. LAKE 2000-111-R
: Citation No. 7572545; 6/26/2000
SECRETARY OF LABOR, :
MINE SAFETY AND HEALTH : Docket No. LAKE 2000-112-R
ADMINISTRATION (MSHA), : Citation No. 7572546; 6/26/2000
Respondent :
: Galatia Mine
: Mine ID 11-02752

  ORDER GRANTING SECRETARY’S MOTION FOR SUMMARY DECISION

     These cases are before me on Notices of Contest filed by American Coal Company under

section 105(d) of the Federal Mine Safety and Health Act of 1977 (the “Act”). 30 U.S.C.
§ 815(d). American Coal contests the issuance of two citations by an MSHA inspector charging
that diesel engines used in its underground coal mine did not comply with regulations governing
approval for such use. The parties have stipulated to certain facts and have moved for summary
decision, pursuant to Commission Procedural Rule 67. 29 C.F.R. § 2700.67. The Secretary has
supported her motion with additional factual assertions contained in affidavits and related
materials. I find that there exists no genuine issue as to any material fact and that the Secretary
is entitled to judgment as a matter of law.

                                          Facts

   The parties stipulated to the following facts:

   1. Contestant, American Coal Company, operates the Galatia Mine, a large underground

coal mine located near Harrisburg, Illinois.

   2. The Galatia Mine utilizes diesel powered personnel carriers.

    3. The Mine Safety and Health Administration published a final rule on October 25,

1996, establishing new safety standards (30 C.F.R. §§ 75.1900-1916) and new approval
regulations for diesel engines and equipment (30 C.F.R. Part 7) used in underground coal mines.

                                           505


    4. Part 7, Subpart E (30 C.F.R. §§ 7.81 through 7.92) establishes approval requirements

for diesel powered engines in areas where permissible equipment is required (permissible diesel
equipment), and for diesel powered engines used in areas where permissible equipment is not
required (non-permissible diesel powered equipment).

  5. The engines at issue in [these cases] are used in non-permissible diesel powered

equipment.

   6. As of November 25, 1999, non-permissible diesel powered equipment used in

underground coal mines must meet the requirements of 30 C.F.R. § 75.1909.

    7. Under 30 C.F.R. § 75.1909(a), non-permissible diesel powered equipment such as that

which is the subject of the citations at issue here, must be equipped with engines approved under
subpart E of 30 C.F.R. Part 7; this includes the approval marking requirement at 30 C.F.R.
§ 7.90.

 8. The engines at issue in this case were manufactured and placed in use before the

November 25, 1999 effective date for § 75.1909(a).

   9. The engines at issue in [these cases] were manufactured by American Isuzu Motors,

Inc.

   10. American Isuzu Motors, Inc. applied for and received MSHA approval under Part 7

Subpart E for diesel engine model numbers Isuzu QD 100-301 and Isuzu C240MA (QD60).1

    11. The American Coal Company and Galatia Mine do not have access to the approval

documentation submitted by American Isuzu Motors, Inc. on which the MSHA approval under
Part 7 Subpart E was based.

  12. Extensive dialogue took place between local MSHA representatives and Galatia

mine management regarding the quality of Isuzu’s markings, the cost of obtaining the approval
markings from Isuzu, and the development of an in house approval marking.

   13. Marvin Nichols, MSHA Administrator for Coal Mine Safety and Health, issued a

“Procedure Instruction Letter” (PIL) on April 1, 2000, which stated that all approval markings
must be provided by the engine manufacturer. This PIL also addressed the poor quality of the
approval marking being provided and the actions being taken to rectify this situation.

   1
          MSHA approved Isuzu’s application for engine model number QD 100-301 (also

known as 4DB1PW) on January 15, 1998. The application for engine model number C240MA
(also known as C240PW) was approved on April 28, 1999.

                                          506


   14. The American Coal Company did not obtain Part 7 approval markings from Isuzu.

Instead, the maintenance department at the Galatia Mine purchased and utilized a labeling
machine to produce what it believed to be a suitable tag, and marked its Isuzu diesel engines
with tags it produced with this labeling machine.

   15. On June 6, 2000, MSHA issued Citation No. 7572545, alleging that the Contestant’s

Isuzu 4BD1 PW diesel engine in the MT13 diesel mantrip was not being maintained in
accordance with Subpart E of 30 C.F.R., Part 7. A legible and permanent approval marking as
required by 30 C.F.R. § 7.90 was installed but it had not been supplied by the engine
manufacturer.

  16. The serial number of the diesel engine which was the subject of Citation No.

7572545 is 201526.

   17. On June 26, 2000, MSHA issued Citation No. 7572546, alleging that the

Contestant’s Isuzu C240PW diesel engine in the PV 55 diesel personnel carrier was not being
maintained in accordance with Subpart E of 30 C.F.R., Part 7. A legible and permanent approval
marking as required by 30 C.F.R. § 7.90 was installed but it had not been supplied by the engine
manufacturer.

  18. The serial number of the diesel engine which was the subject of Citation No.

7572546 is 814472.

   The following additional facts are established by Affidavits submitted by the Secretary.

    Isuzu’s 4DB1PW diesel engine has been manufactured since before 1980 and continued

in production until 1998. The C240PW engine was first manufactured prior to 1980 and has
continued to be produced to present. Over time, changes may be made in the manufacture of a
particular model engine, such as changes in parts used, settings or configuration of the engine.
Consequently, engines with the same model number are not necessarily identical. For example,
during the years that the 4DB1PW engine was manufactured a change was made to the camshaft.
Some engines with that model number have the type of camshaft upon which the MSHA
approval was based. Others do not. Only engines that have been manufactured in accordance
with the design drawings and specifications submitted to MSHA can be approved and so marked
pursuant to the regulations. For Isuzu to determine whether a particular engine was
manufactured in accordance with the design drawings and specifications upon which MSHA’s
approval was based, it must compare the serial number of the engine with records it maintains of
the design and specifications to which that engine was manufactured.

    Accurate approval markings on diesel engines are critical to MSHA’s enforcement of

health and safety provisions designed to protect miners. In order to determine whether a mine
has sufficient ventilation to dissipate emissions of a diesel engine used underground, an MSHA
inspector must rely upon the engine’s approval marking as establishing that it was manufactured
according to the design and specifications approved by MSHA and that the ventilation rate

                                          507

specified on the marking is accurate.

   As noted above, the parties have stipulated that American Coal does not have access to

the documentation submitted by Isuzu in its approval application. Nor does it appear that
American Coal has access to Isuzu’s records reflecting which engines of a particular model
number were manufactured according to the design drawings and specifications for which the
approval was obtained. The only way that American Coal could determine whether its engines
had been approved was to apply to Isuzu for an approval marking. No application was ever
submitted to Isuzu for an approval plate for either of the engines at issue in these cases and no
such approval plate was ever issued by Isuzu.

    American Coal was able to ascertain, from public records maintained by MSHA, that

Isuzu diesel engines with the same model number as its engines had been approved by MSHA.
Consequently, it fabricated its own approval marking and affixed it to the engines. MSHA
determined that the approval markings did not comply with the regulatory requirement and the
instant citations were issued. While the markings included the categories of information
required by the regulation, MSHA enforced its interpretation of the regulation that the approval
marking must be supplied by the manufacturer, and in the absence of such a marking, the engine
was not approved, nor could it have any confidence that the engine had been approved.

                                    Conclusions of Law

     The ultimate issue in these cases is whether the approval marking required by 30 C.F.R.

§ 7.90 must be issued by the engine manufacturer. American Coal argues that the clear wording
of the regulation2 contains no such requirement, that the Secretary’s attempt to incorporate such
a requirement short of formal rulemaking must fail and that the identity of the entity that supplies
the approval marking is “irrelevant” and “superfluous to the need addressed by the regulation.”
The Secretary argues that the intent of the regulation, as determined from the regulatory scheme,
is that the marking must be issued by the manufacturer and that her interpretation of the

   2
           § 7.90         Approval marking.

          Each approved diesel engine shall be identified by a legible and
   permanent approval marking inscribed with the assigned MSHA approval number
   and securely attached to the diesel engine. The marking shall contain the
   following information:
          (a) Ventilation rate.
          (b) Rated power.
          (c) Rated speed.
          (d) High idle.
          (e) Maximum altitude before deration.
          (f) Engine model number.


                                            508

regulation is entitled to deference. The legal framework for resolving the issues was described
by the Commission in Island Creek Coal Co., 20 FMSHRC 14, 18-19 (January 1998):

           Where the language of a regulatory provision is clear, the terms of that
   provision must be enforced as they are written unless the regulator clearly
   intended the words to have a different meaning or unless such a meaning would
   lead to absurd results. Dyer v. United States, 832 F.2d 1062, 1066 (9th Cir. 1987)
   (citations omitted). See also Utah Power & Light Co., 11 FMSHRC 1926, 1930
   (Oct. 1989) (citations omitted); Consolidation Coal Co., 15 FMSHRC 1555, 1557
   (Aug. 1993). If, however, a standard is ambiguous, courts have deferred to the
   Secretary’s reasonable interpretation of the regulation. See Energy West Mining
   Co. v . FMSHRC, 40 F.3rd 457, 463 (D.C.Cir. 1994). Accord Secretary of Labor
   v. Western Fuels-Utah, Inc., 900 F.2d 318, 321 (D.C.Cir. 1990) (“agency’s
   interpretation . . . is ‘of controlling weight unless it is plainly erroneous or
   inconsistent with the regulation’”) (quoting Bowles v. Seminole Rock Co.,
   325 U.S. 410, 414 (1945) (other citations omitted)). The Secretary’s
   interpretation of a regulation is reasonable where it is “logically consistent with
   the language of the regulation [] and . . . serves a permissible regulatory
   function.” General Electric Co v. EPA, 53 F.3d 1324, 1327 (D.C.Cir. 1995)
   (citation omitted). The Commission’s review, like the courts’, involves an
   examination of whether the Secretary’s interpretation is reasonable. Energy West,
   40 F.3d at 463 (citing Secretary of Labor on behalf of Bushnell v. Cannelton
   Indus., Inc.,
   867 F.2d 1432, 1439 (D.C.Cir. 1989)). See also Consolidation Coal Co.,
   14 FMSHRC 956, 969 (June 1992) (examining whether Secretary’s interpretation
   was reasonable).

See also, Nolichuckey Sand Co., 22 FMSHRC 1057, 1059-61 (Sept. 2000).

Ambiguity

     The regulation requires that each approved diesel engine bear a permanent approval

marking showing the MSHA approval number and other information. American Coal correctly
notes that the clear wording § 7.90 contains no requirement that the marking be issued by the
manufacturer. However, neither does the regulation clearly state that the marking can be
fabricated by the engine’s owner, a supplier, or any other person or entity. The regulation itself,
is silent as to the source of the approval marking.

    The Secretary argues that the regulatory scheme discloses an intent that the marking must

be supplied by the manufacturer, and that Contestant’s interpretation would eviscerate the entire
enforcement scheme to the detriment of miners’ safety. As the Secretary points out, MSHA and
its predecessor agencies have historically required that applications for approval of equipment
for use in mines be submitted by the manufacturer. 30 C.F.R. Part 7 was originally promulgated
in 1988 to establish the application procedure and requirements for MSHA approval of certain

                                            509

products for use in underground mines. The preamble to the final rule for 30 C.F.R. Parts 7 and
18, specified that:

   Once MSHA has approved a product, the manufacturer is authorized to place an
   approval marking on the product that identifies it as approved for use in under
   ground mines. Use of the MSHA marking obligates the manufacturer to maintain
   the quality of the product. The MSHA marking indicates to the mining
   community that the product has been manufactured according to the drawings and
   specifications upon which the approval was based.

53 Fed. Reg. 23486 (June 22, 1988).

    Only the manufacturer can apply to MSHA for approval of a diesel engine. 30 C.F.R.

§ 7.2 defines applicant as: “An individual or organization that manufactures or controls the
assembly of a product and that applies to MSHA for approval of that product.” Approval is
defined as: “A document issued by MSHA which states that a product has met the requirements
of this part and which authorizes an approval marking identifying the product approved.” Id.

   Applications for approval of diesel engines for use in underground coal mines must

include extensive information on the engine’s design and specifications as well as testing data.
30 C.F.R. § 7.83. Each approved product is required to have an approval marking and applicants
are required to maintain records of the initial sale of each unit having an approval marking. Id.
§ 7.6. Once approval is obtained, an applicant, referred to as “the approval holder”, is
responsible for future quality assurance and for making the product available to MSHA for post-
approval audit. Id. §§ 7.7 and 7.8.

   Approvals are restricted to the specific design and specifications submitted by the

manufacturer. For example, the MSHA approval for the Isuzu’s model QD100-301 diesel
engine states:

   All engines of this type that are marketed as approved under 30 C.F.R., Part 7,
   must be manufactured in accordance with the drawings and specifications on file
   at the Mine Safety and Health Administration and maintained in strict accordance
   with the instructions set forth in the engine maintenance and service manual. Any
   change in the design must be accepted in writing by the Mine Safety and Health
   Administration before you are authorized to make any such change.

    While § 7.90 is silent as to the source of the approval marking, the regulatory scheme

envisions that the manufacturer, the approval-holder, and the only entity that can determine
whether a particular diesel engine satisfies the requirements of the MSHA approval, must issue
the approval marking. Ambiguity exists when a regulation is capable of being understood by
reasonably well-informed persons in two or more different senses. Island Creek Coal Co.,
supra, 20 FMSHRC at 19. The regulation’s silence creates ambiguity as to permissible sources
for the approval marking.

                                          510

The Secretary’s Interpretation - Deference

    It is well-established that the Secretary’s interpretation of her own regulations in the

complex scheme of mine health and safety is entitled to a high level of deference and must be
accepted if it is logically consistent with the language of the regulation and serves a permissible
regulatory function. Kerr-McGee Coal Corp. v. FMSHRC, 40 F.3d 1257, 121261-62 (D.C.Cir.
1994), cert. denied, 115 S.Ct. 2611 (1995); Island Creek Coal Co., supra, and cases cited
therein.

     For the reasons discussed above, the Secretary’s interpretation of the regulation, i.e., that

the approval marking must be issued by the manufacturer, is reasonable. There is also little
question but that the Secretary’s interpretation is more consistent with the safety promoting
purposes of the Act. The Secretary argues, forcefully, that allowing operators or others to
fabricate and affix approval plates would virtually nullify the Secretary’s enforcement efforts in
a critical area of safety and health. The operator cannot determine that a particular engine is
covered by an MSHA approval because it has no way of determining whether the engine was
manufactured according to the design drawings and specifications upon which the MSHA
approval was based. Only the manufacturer, the approval-holder, can make that determination.

   Even though American Coal could determine that engines of that model had been

approved, it could not determine whether its engines had been manufactured according to the
design and specifications upon which the approval was obtained. Consequently, it could not
determine whether its engines had, in fact, been approved and an MSHA inspector attempting to
determine whether a mine met applicable ventilation requirements for dissipating the emissions
of Contestant’s engines could not rely upon the marking fabricated by Contestant.

Due Process -- Fair Notice

           Where an agency imposes a fine based on its interpretation, a separate
   inquiry may arise concerning whether the respondent has received “fair notice” of
   the interpretation it was fined for violating. Energy West Mining Co.,
   17 FMSHRC 1313, 1317-18 (August 1995). “[D]ue process . . . prevents . . .
   deference from validating the application of a regulation that fails to give fair
   warning of the conduct it prohibits or requires.” Gates & Fox Co. v. OSHRC,
   790 F.2d 154, 156 (D.C.Cir. 1986).

Island Creek Coal Co., supra, 20 FMSHRC at 24.

    American Coal does not, nor could it reasonably, assert that it was not afforded sufficient

notice of the Secretary’s interpretation of the regulation prior to the issuance of the citations here
at issue. The Secretary’s interpretation is consistent with the long-standing approval scheme for
mining equipment, which contemplates that the manufacturer, as the approval-holder, is
authorized to place the approval marking on the engine. Moreover, American Coal and other

                                             511

operators were specifically put on notice of the Secretary’s interpretation of this particular
regulation. As the parties stipulated, there were extensive discussions between the Secretary and
Contestant during which the requirement that the approval marking be obtained from the
manufacturer was discussed. The issuance of the Procedure Instruction Letter, on April 1, 2000,
clearly apprized operators of the Secretary’s interpretation some two months prior to the
issuance of the citations.

   Based upon the foregoing, American Coal’s motion for summary decision is denied, the

Secretary’s motion is granted, Citations numbered 7572545 and 7572546 are affirmed and the
Notices of Contest are hereby Dismissed.

                                        Michael E. Zielinski
                                        Administrative Law Judge

Distribution:

Michael O. McKown, Esq., The American Coal Co., 29525 Chagrin Blvd., Suite 111, Pepper
Pike, OH 44112 (Certified Mail)

Sheila Cronan, Esq., Office of the Solicitor, U.S. Department of Labor, 4015 Wilson Blvd.,
Suite 516, Arlington, VA 22203 (Certified Mail)

/mh

                                          512

Find out what applies today

This decision wasn't the final word: the Commission reviewed the case, and its decision is the one that controls. Ezel starts from the controlling decision and answers your specific situation under current law, with citations.

Opens in Ezel Pro. Every answer cites the authority it relies on.