Cam Mining, LLC (ALJ decision, April 25, 2012)

Cam Mining, LLC (FMSHRC KENT 2009-955 and KENT 2009-1426): Hearing moved and continued after partial settlement

Decision type
ALJ decision
Dockets
KENT 2009-955, KENT 2009-1426
Decided
April 25, 2012
Presiding judge
Outcome
Procedural
Precedential status
Final order, not precedent
Checked against source
2026-08-03

Apply this to your situation

This order from 2012 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current MSHA standards and Commission precedent say, with citations.

Currency note: this decision dates from 2012
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Interlocutory ALJ notice, not Commission precedent
This notice rescheduled the hearing while two contested citations remained unresolved. It did not dispose of the proceedings or become a final decision under the 40-day rule in 30 U.S.C. § 823(d)(1). A later ALJ decision resolved both remaining citations in kent-2009-955-alj. This notice is not Commission precedent. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the agency's own release.
Read the official release (fmshrc.gov)

Plain-English summary

Cam Mining and the Secretary settled 44 of 46 citations carrying proposed penalties of $44,996. Two citations remained, one alleging float-coal-dust accumulations inside an electrical box and the other alleging an inadequate weekly electrical examination. Judge Jerold Feldman granted the Secretary's request for a continuance and moved the hearing from Kentucky to the Commission's Washington headquarters because the remaining settlement dispute persisted amid limited agency resources. He directed the parties to address whether the shallow accumulations and other circumstances supported an unwarrantable-failure designation. The notice set a May 22 settlement deadline and rescheduled the hearing for June 6, 2012.

Decision snapshot

  • Cited standards: 30 C.F.R. §§ 75.400 and 75.512-2
  • Outcome: A continuance was granted, the hearing was moved to Washington and reset for June 6, 2012, and a written-settlement deadline was imposed.
  • Key point: Prior violations are relevant to unwarrantable failure, but a shallow accumulation is not automatically unwarrantable without considering all aggravating factors.

Full text (FMSHRC public release)

FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION

OFFICE OF ADMINISTRATIVE LAW JUDGES

601 New Jersey Avenue, N.W., Suite 9500

Washington, D.C. 20001

April 25, 2012

SECRETARY OF LABOR,   

MINE SAFETY AND HEALTH    

ADMINISTRATION (MSHA),  

Petitioner 

v.

CAM MINING, LLC, 

Respondent 

:

:

:

:

:

:

:

:

:

:

:

CIVIL PENALTY PROCEEDINGS

Docket No. KENT 2009-955

A.C. No. 15-18911-181323

Docket No. KENT 2009-1426

A.C. No. 15-18911-192304 

Mine # 28

NOTICE OF RESCHEDULED HEARING

The hearing in these proceedings had been scheduled for May 1, 2012, in the vicinity of Pikeville, Kentucky. During an April 19, 2012, telephone conference, for the reasons discussed below, the parties were advised that the hearing would be moved to the Commission’s Headquarters in Washington, D.C. After being informed of the change in hearing location, the Secretary requested a continuance for the purpose of providing additional time to complete travel arrangements. Good cause having been shown, the Secretary’s request for continuance IS GRANTED. The parties have agreed that June 6, 2012, is a suitable revised hearing date.

These matters concern 46 violations for which the Secretary has proposed a total civil penalty of $44,996.00. During the course of several telephone conferences culminating in the April 19, 2012, conference, the parties advised that they have settled 44 of the 46 subject violations. The two citations that remain are 104(d)(2) Order No. 8222328 in Docket No. KENT 2009-1426 and 104(a) Citation 8222333 in Docket No. KENT 2009-955.

104(d)(2) Order No. 8222328 in Docket No. KENT 2009-1426, issued on February 10, 2009, concerns an alleged violation of 30 C.F.R. § 75.400 that prohibits accumulations of float coal dust on electrical equipment. The cited violation was initially attributed to a moderate degree of negligence. The citation was subsequently modified to a 104(d)(2) order that specified the negligence as high. The modification was based on the Respondent’s history of previous violations of section 75.400. The modified 104(d) order states, in pertinent part, “[t]hese accumulations are evident through the box[’s] inspection window and appear to be approximately 1/8 of an inch in depth and are deposited upon the energized components and the box[’s] floor.” The Secretary proposes a civil penalty of $6,224.00 for 104(d)(2) Order No. 8222328.

104(a) Citation 8222333 in Docket No. KENT 2009-955, issued on February 11, 2009, concerns an alleged violation of 30 C.F.R § 75.512-2 that requires weekly examinations of electrical equipment to ensure that electrical equipment is maintained in a safe condition. The cited violation was attributable to a moderate degree of negligence. The Secretary proposes a civil penalty of $585.00 for Citation No. 8222333. The Citation, in pertinent part, states:

The examination record indicates that the examination performed on 2-9-09
revealed no hazardous conditions. However, on 2-10-09 an MSHA inspector
observed accumulations of black float coal dust deposited on the inside, energized phase conductors and floor, which resulted in the issuance of a violation of 75.400
[104(d)(2) Order No. 8222328]. This condition was observed through the box[’s] provided inspection window and would be obvious to any reasonably prudent person familiar with the requirements of this type of examination.

During the telephone conferences, I expressed my recognition of the parties’ good faith efforts in reaching a settlement for the vast majority of the citations at issue in these proceedings. With regard to the subject accumulations, counsel for both parties agreed that the accumulations were observed through the window of an electrical box. The parties further agreed that the accumulations were neither objectively measured nor analyzed for combustible content.

With respect to the fact of the violations, counsel for the Respondent asserted that the cited 1/8 of an inch accumulations primarily consisted of inert rock dust. However,

I urged the parties to resolve the issue of the fact of the violations based on Commission case law that affords broad discretion to mine inspectors in determining whether accumulations violate section 75.400. See Old Ben Coal Company, 2 FMSHRC 2806, 2808 (October 1980); Amax Coal Co., 19 FMSHRC 846, 847, 849 (May 1997); Jim Walter Resources, Inc., 19 FMSHRC 480, 483 (Mar. 1997); Enlow Fork Mining Co., 19 FMSHRC 5, 19-20 (Jan. 1997) (Marks, concurring).

Turning to the issue of unwarrantable failure, the parties were requested to focus on whether the cited accumulations, only estimated to be between 1/16 and 1/8 of an inch in depth, were of sufficient magnitude to support an unwarrantable failure. In this regard, the parties were directed to consider in their settlement negotiations the indicia of an unwarrantable failure that include the extent of a violative condition, the length of time that it has existed, whether the violation is obvious, whether the violation poses a high degree of danger, whether the operator has been placed on notice that greater efforts are necessary for compliance, and the operator’s compliance efforts made prior to the issuance of the citation or order. Enlow Fork Mining Co., 19 FMSHRC 5, 11-12, 17 (Jan. 1997); Mullins & Sons Coal Co., 16 FMSHRC 192, 195 (Feb. 1994); Peabody Coal Co., 14 FMSHRC 1258, 1261 (Aug. 1992); Quinland Coals, Inc., 10 FMSHRC 705, 709 (June 1988); Kitt Energy Corp., 6 FMSHRC 1596, 1603 (July 1984).

The various factors considered in determining whether a violation is unwarrantable must be viewed in the context of the factual circumstances in a particular case, and some factors may be entitled to more weight in a particular factual scenario. See Consolidation Coal, 23 FMSHRC 588, 593 (June 2001) (citations omitted). While the history of previous violations is relevant, a subsequent violation of section 75.400 manifest by accumulations of no more than 1/8 of an inch is not per se unwarrantable. Thus, the parties should consider in any settlement negotiations, or in preparation for a hearing, whether there are any additional aggravating factors, given the de minimis extent of the subject accumulations. In this regard, the cited accumulations were originally attributed to a moderate degree of negligence. So too, the failure of the electrical examiner to note the accumulations was also attributed to moderate negligence reflecting that the accumulations may not have been conspicuous.

Although there do not appear to be irreconcilable differences with regard to the fact of the violations, the parties apparently have been unable to reach an agreement with respect to unwarrantable failure. In the absence of settlement, these matters shall proceed to hearing. However, in view of the circumstances discussed above reflecting the parties’ inability to reach a settlement, given the Commission’s limited resources and unprecedented case load, the hearing in these matters shall be moved from Pikeville, Kentucky to the Commission’s Headquarters. IT IS ORDERED that any settlement must be presented to me in writing on or before May 22, 2012. Any settlement thereafter must be presented on the record at the hearing. The hearing will commence at 10:00 a.m. on June 6, 2012, at the following location:

Federal Mine Safety and Health Review Commission

601 New Jersey Avenue, NW, Suite 9500

Backley Hearing Room, 9th Floor

Washington, DC 20001

Any person who plans to attend this hearing and requires special accessibility features and/or any auxiliary aids, such as sign language interpreters, must request them in advance

(subject to the limitations set forth in § 2706.160(d)).

/s/ Jerold Feldman  

Jerold Feldman

Administrative Law Judge     

Distribution:

Schean G. Belton, Esq., U.S. Department of Labor, Office of the Solicitor, 618 Church Street, Suite 230, Nashville, TN 37219

Mark E. Heath, Esq., Spilman, Thomas, & Battle, PLLC, 300 Kanawha Blvd., East,

P.O. Box 273, Charleston, WV 25321-0273

/jel

What applies to your situation today?

This order bound one employer. Ezel checks the current MSHA standards and Commission precedent against your facts, with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace