Martin County Coal Corporation
Martin County Coal Corporation (FMSHRC KENT 2002-42-R, et al.): Two impoundment-plan violations vacated on remand
Apply this to your situation
This order from 2007 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current MSHA standards and Commission precedent say, with citations.
Plain-English summary
After a 2000 slurry breakthrough, MSHA alleged that Martin County Coal violated its approved impoundment sealing plan in two ways. On remand from the Commission, Judge Michael E. Zielinski found that the company effectively covered the seepage barrier with settled fine refuse as the plan required, taking account of the plan's practical limits and its design as a whole. He also found that a 1999 increase in portal outflow resembled earlier fluctuations and lacked suspended solids or other signs that would have indicated unusual impoundment leakage. The Secretary therefore did not prove either plan violation. The judge sustained the company's contests, vacated Order No. 7144402 and Citation No. 7144401, and dismissed those claims.
Decision snapshot
- Cited standard: 30 C.F.R. § 77.216(d)
- Outcome: Both alleged impoundment-plan violations were vacated and dismissed.
- Key point: Compliance with an impoundment plan must be judged from the plan as a whole, and a flow increase is reportable only when the surrounding data would reasonably indicate possible leakage.
Full text (FMSHRC public release)
FMSRHC ALJ DECISION
FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION
OFFICE OF ADMINISTRATIVE LAW JUDGES
601 New Jersey Avenue, N.W., Suite 9500
Washington, D.C. 20001
November 13, 2007
MARTIN COUNTY COAL CORPORATION,
Contestant
v.
SECRETARY OF LABOR,
MINE SAFETY AND HEALTH
ADMINISTRATION (MSHA),
Respondent
SECRETARY OF LABOR,
MINE SAFETY AND HEALTH
ADMINISTRATION (MSHA),
Petitioner
v.
MARTIN COUNTY COAL
CORPORATION,
Respondent
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
CONTEST PROCEEDINGS
Docket No. KENT 2002-42-R
Citation No. 7144401: 10/17/01
Docket No. KENT 2002-43-R
Citation No. 7144402: 10/17/01
Preparation Plant
CIVIL PENALTY PROCEEDING
Docket No. KENT 2002-262
A.C. No. 15-05106-03571
Preparation Plant
DECISION
Appearances: James B. Crawford, Esq., Melissa Bowman, Esq., Office of the Solicitor,
U.S. Department of Labor, Arlington, Virginia, on behalf of the Secretary of
Labor;
Marco M. Rajkovich, Jr., Esq., Melanie J. Kilpatrick, Esq., Rajkovich, Williams,
Kilpatrick & True, PLLC, Lexington, Kentucky, on behalf of Martin County Coal
Corporation.
Before: Judge Zielinski
These cases are before me on Notices of Contest and a Petition for Assessment of Civil
Penalties filed by the Secretary of Labor (“Secretary”), pursuant to section 105 of the Federal
Mine Safety and Health Act of 1977, 30 U.S.C. § 815. The violations at issue here arose out of
the Secretary’s investigation of the October 11, 2000, slurry spill and breakthrough at Martin
County Coal’s (“MCC”) Big Branch Slurry Impoundment, near Inez, Kentucky. These violations
and several others, including violations alleged against Geo/Environmental Associates, were the
subject of a January 14, 2004, Decision by an Administrative Law Judge. Martin County Coal
Corp., 26 FMSHRC 35 (Jan. 2004) (ALJ). By Decision dated May 30, 2006, the Review
Commission vacated portions of that Decision and remanded the cases. Martin County Coal
Corp., 28 FMSHRC 247 (May 30, 2006). With the exception of the two violations at issue here,
all other issues involved in the earlier proceedings have been resolved by the ALJ Decision, the
Commission Decision, or through settlement. Remaining at issue are Citation No.7144401 and
Order No. 7144402, alleging significant and substantial (“S&S”) and unwarrantable failure
violations of 30 C.F.R. § 77.216(d) for MCC’s failure to follow its approved Impoundment
Sealing Plan.
Supplemental hearings were held in Pikeville and Louisville, Kentucky on January 16-18
and February 23, 2007.
The parties filed briefs after receipt of the transcripts. For the reasons
set forth below, I find that the Secretary has not proven the alleged violations, and vacate the
citation and order.
Findings of Fact - Conclusions of Law
Background
For a full discussion of the history of the impoundment and related developments, see the
Review Commission Decision. Briefly, in May 1994, slurry and water from the impoundment
broke through into MCC’s adjacent and largely inactive 1-C (Coalburg Seam) mine. Over
100 million gallons of material, mostly water, was discharged and flowed out of the mine at three
locations, including the South Mains Portal. MCC hired a geotechnical engineering consulting
firm, Ogden Environmental & Energy Services, and submitted plans designed to reduce the
potential for future breakthroughs and to enable MCC to use the impoundment for the forseeable
future. The Secretary’s Mine Safety and Health Administration (“MSHA”) approved MCC’s
Impoundment Sealing Plan (“Plan”) on October 20, 1994, after additional information was
provided clarifying certain aspects of the Plan.
The Plan called for construction of a “seepage barrier,” around the perimeter of the
impoundment above the outcrop of the Coalburg Seam, in areas where the 1-C mine workings
posed the potential for another breakthrough. The barrier was intended to reduce seepage into
the 1-C mine and to provide bulk that would fill and plug any breakthrough that might occur.
It was constructed using spoil material generated from surface mining of the Stockton Seam,
MCC’s 1-S mine, which lay about 100 feet above the Coalburg Seam. That material consisted
largely of highly permeable shot sandstone. The Plan contemplated that fine refuse would be
deposited on the barrier to decrease its permeability. As actually constructed, the barrier was
approximately 40 feet thick, measured horizontally, and extended 1.4 miles along the perimeter
of the impoundment. Construction of the seepage barrier was completed in late 1995 or early
1996. The Plan also called for monitoring of outflow at the South Mains Portal of the
1-C mine, and the reporting to MSHA of any unusual changes in flow quality or quantity that
would indicate possible impoundment leakage. In February 1996, MCC retained
Geo/Environmental Associates (“Geo”) to perform weekly impoundment monitoring.
On October 11, 2000, another breakthrough into the 1-C mine occurred. More than
300 million gallons of slurry-laden water rushed out through the mine and into adjacent streams.
An extensive investigation was conducted by MSHA. The violations at issue here allege that
MCC failed to comply with the Plan in two respects.
Order No. 7144402
Order No. 7144402 was issued on October 17, 2001, in conjunction with the release of
MSHA’s Report of Investigation of the October 11, 2000, impoundment failure. The Order was
issued pursuant to section 104(d)(1) of the Act, and alleges a S&S and unwarrantable failure
violation of 30 C.F.R. § 77.216(d), which requires that operators of mines with slurry
impoundments implement the design, construction and maintenance of such facilities in
accordance with plans approved by the MSHA District Manager. As described in the “Condition
or Practice” section of the Order, the violation is based upon MCC’s failure to “periodically
direct the fine refuse slurry discharge along the ‘seepage barrier,’” as required in the Plan.
Ex. Jt-4B.
The Order was vacated in the original ALJ decision, upon a finding that the Secretary
had failed to establish a prima facie case. The Commission reversed. Two of the three
Commissioners that heard the case concluded that, “[b]ased on its plain language, the plan
provision requires the operator to place or cause to move fine refuse over the length of the
seepage barrier by regularly changing the course of the slurry discharge.”
28 FMSHRC at 256.
The Commission found that “MCC does not sufficiently comply with the impoundment plan by
merely pumping fine slurry into the impoundment without ensuring that the fines have
accomplished the stated purpose, which is to adequately cover the seepage barrier ‘to reduce, to
the extent practical, seepage from the impoundment that could contribute to the occurrence of
another breakthrough.’” 28 FMSHRC at 257. It remanded the case for a determination of
“whether MCC provided effective coverage of the seepage barrier under the terms of the
Impoundment [Sealing] Plan.” 28 FMSHRC at 257.
The Plan
As the Commission emphasized, the Plan must be read as a whole. 28 FMSHRC at 256-57. There are several provisions of the Plan that bear on the question of whether MCC provided
effective coverage of the seepage barrier. Some were included in MCC’s original August 1994
submission, and others were included in its October 5, 1994, letter forwarding revisions in
response to concerns that had been raised by MSHA. Pertinent provisions include:
Following completion of the “seepage barrier” fine refuse shall be directed along
the barrier by periodically redirecting the discharge of fine refuse slurry. As fine
refuse settles and consolidates along the surface of the “seepage barrier,” seepage
should be further reduced due to the low permeability of consolidated fine refuse.
Also, to further reduce the seepage from the impoundment, the pool level in the
impoundment should be maintained as low as possible, thereby, reducing the
quantity of clear water in the impoundment and the hydraulic head. As the fine
refuse deposit progresses up the slope of the “seepage barrier,” the quantity of
seepage in the area of the mine workings in the Coalburg seam should
progressively reduce. After the impoundment level has increased to a level above
the Stockton mine bench, we believe the potential for a “breakthrough” in the
future is reduced considerably.
Ex. G-2 at 7, MCC-A1 at 012297.
The purpose of the “seepage barrier” is twofold. The primary purpose for the
barrier will be to reduce, to the extent practical, seepage from the impoundment
that could contribute to the occurrence of another “breakthrough.” Secondarily,
the barrier will provide bulk that will collapse into the subsided area in the event
another “breakthrough” occurs and should form a “plug,” limiting the amount of
fine coal refuse and water entering the mine.
Ex. G-2 at 4, MCC-A1 at 012294.
The function of the spoil material placed in the seepage barrier is to provide bulk
and sealing in the event of a collapse or breakthrough. The primary seepage
control is provided by fine refuse deposited in the impoundment against the fill as
operations progress. This control reduces the potential for piping of material from
the fill into openings and seams. A distinction should be made between flow
through a seam and flow through an opening. Water traveling through the barrier
into seams that intersect with the mine rooms is an expected event. Water
traveling through the barrier and openings in the natural ground is only a problem
if the flow carries fill material or fines with it into the mine. Over time, this
piping action could result in instability of the fill slope. It is intended that any
instability resulting from a collapse or breakthrough be “choked off” given the
expected gradation of the fill material.
Ex. G-2A.
The Parties’ Contentions
The Secretary argues that, because the seepage barrier consisted of highly permeable
material, in order to “reduce seepage from the impoundment,” a layer of fine refuse, which
provided “the primary seepage control,” had to be maintained at all times between any water in
the impoundment and the barrier.
The only way that could have been accomplished was by
discharging slurry onto the barrier at various points (“redirecting”) to establish a layer of fine
refuse above the pool level, so that as the pool rose water could not come into direct contact with
the barrier. The Secretary maintains that MCC did not provide effective coverage of the seepage
barrier because it did not discharge slurry onto the seepage barrier, which allowed water at the
top of the pool to come into contact with the barrier, i.e., where there was no primary seepage
control device in place. As a result, seepage was not reduced, and the October 2000 piping
related failure occurred.
MCC argues that over 99% of the seepage barrier was coated with settled and
consolidated fine refuse, thereby reducing seepage “to the extent practical,” and that once the
pool level “increased to a level above the Stockton mine bench,” the seepage barrier would have
been encapsulated with fine refuse, and “the potential for a ‘breakthrough’ in the future [would
have been] reduced considerably.”
It further contends that discharging slurry directly onto the
seepage barrier would not have been practical for a number of reasons: 1) it would have
contravened established impoundment management practices and Phase III of its impoundment
plan, which required that the slurry discharge line be located at the embankment; 2) there was not
enough fine refuse to both coat the seepage barrier above the pool level and the embankment; and
3) placement of fine refuse on the seepage barrier above the impoundment level would not have
formed an effective barrier to seepage because the fine refuse would have shrunk and cracked as
it dried out, and it would have been eroded by rain, wind and wave action.
Discussion
There is virtually no dispute that MCC redirected the flow of slurry into the
impoundment, and that the result was a fairly uniform deposit of settled fines throughout the
impoundment, including along the seepage barrier. The slurry discharge pipe was positioned at
different locations on the embankment. Trc. 41 (Fredland),
Trd. 47 (Betoney),
Trd. 363-63
(Bellamy);
ex. G-3. The pipe also had a pivot point about eight feet from the end, and was
occasionally rotated to change the direction of the slurry discharge. Trd. 435-36 (Muncie)
.
As MSHA inspector Robert H. Bellamy testified, “[t]here are ways of directing slurry without
moving the pipe, and a lot of it will be done naturally.” Trb. 640. As fines settle and create a
restriction to flow, the flow will change and slurry will be transported elsewhere. “So you can
manipulate the slurry placement from the embankment to a certain extent.” Trb. 640. Fine
refuse could be directed along the seepage barrier “by the natural deposition of the slurry . . .
basically what they were doing. And the thing they were doing was they were moving the pipe
from side to side of the embankment.” Trd. 362-63.
MCC and Geo personnel testified that it was apparent during their inspections of the
impoundment, both during its operation and after the breakthrough, that fine refuse was
deposited along the seepage barrier. Trb. 477, Trd. 404-06 (Johnson),
Trd. 208-09, 225-30
(Ballard),
Tra. 1170-73, Trd. 256, 271 (Muncie). Pictures taken shortly after the breakthrough
depict a uniform coating of fine refuse along the seepage barrier. Trb. 47 (Ballard); ex. MCC-O.
By October 2000, consolidated fine refuse in the impoundment pool extended 85-90 feet above
the Coalburg seam. Trc. 129 (Fredland). MCC’s expert, Christopher Lewis, testified that as
slurry was distributed throughout the impoundment, the layer of settled fine refuse rose
progressively, created a plug in the bottom of the impoundment and covered over 99% of the
seepage barrier, and progressively reduced seepage into the 1-C mine.
Tre. 20-21, 42 (Lewis).
MSHA’s witnesses agreed that fine refuse had been deposited along the length of the
seepage barrier, but not up to the top of the pool level, and that water at the top of the pool had
been in direct contact with the seepage barrier. Tra. 555 (Betoney); Tra. 963 (Owens).
The
Secretary’s expert, Richard G. Almes, agreed that the traditional method of pumping fines into
the impoundment would result in a layer of fines all over the impoundment, but that there would
be water against the seepage barrier.
Trb. 312-13. Approximately one month after the
breakthrough, Owens attempted to ascertain how much water had been in contact with the barrier
by measuring the vertical distance between what appeared to be a “high water mark” and the top
of the fine refuse cake. Using a ruler and a level, he determined that there had been 22 inches of
relatively clear water above the settled refuse. Trc. 258-59. He roughly calculated, using a three-to-one slope, that about six feet of the barrier had been in contact with water, which amounted to
.42 of an acre. Trc. 260-61.
MCC disputes Owen’s finding. Muncie testified that he was at the impoundment the day
before the breakthrough and there was “no chance” that there was two feet of water above the
fines cake. Trd. 268-69. MCC’s engineering department conducted regular surveys of the
impoundment pool level. A comparison of the October 9, 2000, survey of the pool level with a
December 2002 survey of the level of the top of the fines cake showed that the level of the settled
fine refuse was one inch below the surface of the pool two days before the breakthrough.
Trb. 476, 481-83, 497 (Johnson); ex. MCC-BB, MCC-O. Bellamy, who normally inspected the
impoundment for MSHA, testified that the fines cake was close to the top of the water during his
inspections, and that there was slurry in different consistencies above the fines cake and against
the seepage barrier. Trd. 371-73. He also testified that it would have been a problem if .42 of an
acre of the seepage barrier had been in contact with water, but that he never found such
conditions. Trd. 377-78. He was also “pretty well satisfied” with the water levels MCC
maintained in the impoundment, “as far as them pumping out what they could.”
Trd. 341.
It is doubtful that there was nearly two feet of clarified water in contact with the seepage
barrier, certainly not for any appreciable length of time. The difficulty of ascertaining a high
water mark, independent of wave action, one month after the breakthrough brings into question
Owens’ measurements.
Nevertheless, there would have been some amount of water in contact
with the seepage barrier. Experts testified, and common sense dictates, that the upper surface of
the slurry mixture, as it rose along the seepage barrier at the back of the impoundment, would be
almost entirely water. The slurry being pumped into the impoundment consisted of
approximately 20% solids. The coarser particles settled out first, helping to form a delta against
the embankment. Tra. 964. Coarser particles would continue to progressively settle as the
natural flow of the slurry traveled the 2,500 or so feet to the rear of the impoundment. The slurry
reaching the back bank would have contained a relatively small percentage of solids, the finest
particles, which according to the experts, would stay in suspension for a long time. Tra. 110,
Trc. 38 (Fredland), Tra. 561 (Betoney), Trc. 113 (Lewis), Trb. 500, 509 (Johnson). Johnson
agreed that there would be some water against the seepage barrier, that would have some fines in
it. Trd. 418. Muncie indicated that there was a high water mark above the fines level. Trd. 272.
The Secretary’s witnesses testified that in order to provide effective coverage of the
seepage barrier, a layer of fine refuse had to be maintained between the seepage barrier and any
water in the impoundment. Trc. 33-35, 42, 139; Tra. 46, 53 (Fredland); Tre. 199-201; Tra. 894
(Owens). The seepage barrier was composed of shot-rock, relatively course material, that is
highly permeable. As Betoney explained, it was not a barrier to seepage, but more of a seepage
drain. Trd. 38, Tra. 486. Water contacting the seepage barrier, saturated it, and transmitted the
hydrostatic pressure created by the impoundment to the natural soil cover over the 1-C mine.
MSHA concluded that with water in contact with the barrier, seepage into the 1-C mine was not
significantly restricted, nor was the potential for piping.
Several witnesses testified that the only way to maintain a layer of fine refuse between
impoundment water and the seepage barrier would have been to discharge slurry onto the
seepage barrier at various points, such that a layer of fine refuse was created above the
impoundment pool level – so that as the pool level rose water would not have any direct contact
with the seepage barrier. Trc. 43, 142-44, Tra. 201-02, 210 (Fredland); Trd. 40 (Betoney);
Trd. 103, 150-53, Trb. 308, 322, 452-53 (Almes).
As the Secretary’s witnesses described the process, slurry would have to be discharged
onto the seepage barrier at various points along its entire length. The discharge point would be
kept in one location until a delta of settled fines developed.
The slurry would flow “from the
top down” into the pool, where it would settle out and form a base, from which a delta would
build back up the slope to the discharge point. Tra. 201-02, Trc. 139-46, 334-36 (Owens). The
fines delta would be built up to about ten feet (vertical distance) above the pool level, or
approximately 35 feet along the slope of the barrier from the pool.
The discharge point would
then be moved to an adjacent location, and another delta would be deposited, abutting the first
one. The discharge point would then be progressively moved around the 1.4-mile seepage
barrier, until the entire length of the barrier had a coating of settled and consolidated fine refuse
extending above the pool level. Trc. 255, 319-20, 330-31, Tra. 964, 1096 (Owens); Tra. 488,
Trd. 40 (Betoney); Trd. 103, 150-53, Trb. 308, 452-53 (Almes); Trc. 43, 142-44, Tra. 201-02,
210 (Fredland). This process would be repeated as the pool level rose, until the entire barrier had
been coated.
Estimates of the time required to apply one 10-foot high coating of refuse varied.
Betoney believed it would take “somewhere over a year, a year or two years max.” Tra. 488.
Owens estimated one year. Trc. 255, Tra. 1096. The estimates were very rough. As Owens
explained, the only way to determine the spacing and number of discharge points would have
been to “do a couple of them . . . to see how it spread and how far apart they’d have to be to get
coverage.” Trc. 330-31. His estimate was based on a rough calculation of how long it would
take to accumulate a sufficient volume of fines to coat the entire length of the barrier to a vertical
height of ten feet above the pool level, assuming the slurry was 30% solids.
Trc. 319. There
are a number of unknowns about the calculation. Owens did not specify a thickness for the fines
layer. He first described a six-foot average thickness. Trc. 319. However, he then indicated that
the fines layer would have to have a minimum thickness of one-to-two feet, which he conceded
was a “little arbitrary [because a]s far as I know there was never any definitive analysis made to
set the required dimension of the thickness of the fines.”
Trc. 322. Also unknown is what
assumption, if any, was made as to the percentage of available solids that would be deposited, as
opposed to those remaining suspended and flowing out into the impoundment pool. Lewis
opined that it would be impossible to establish and maintain a coating of fine refuse above the
pool level, in part because there was a high percentage of very fine particles in MCC’s slurry, and
they would stay in suspension for lengthy periods of time. Tre. 43-44.
MCC’s arguments as to the impracticality of the Secretary’s position have considerable
persuasive value. There is no dispute that, in general, the most critical element of maintaining an
impoundment is to assure that the man-made portion, the dam or embankment, retains its
structural integrity. To that end, generally accepted engineering principles required that slurry
refuse be discharged at the embankment, so as to build and maintain a coating or delta of refuse.
Trc. 254 (Owens). A Department of Interior Engineering and Design Manual for Coal Refuse
Disposal Facilities describes discharging slurry at the upper end of an impoundment as being
“incorrect.” Ex. MCC-T. MSHA’s Coal Impoundment Inspection Procedures Handbook also
discourages depositing slurry at locations other than the embankment. Ex. MCC-U. MCC’s plan
for Phase III of the impoundment, which was approved by MSHA in 1998, specifies that slurry
discharge should be at the embankment. Ex. MCC A-2; Trd. 343 (Bellamy), Tra. 155-56
(Fredland).
MSHA’s witnesses testified that there was enough fine refuse being pumped into the
impoundment to both coat the seepage barrier above the pool level and protect the embankment.
Trc. 255 (Owens), Trc. 71 (Fredland). However, that testimony is not convincing. As
previously noted, there are many uncertainties surrounding MSHA’s estimate that it would take
about one year to coat the barrier to a vertical height of ten feet. Assuming that that estimate is
accurate, it is doubtful that slurry could also have been directed at the embankment. The pool
level rose about ten feet each year. Trb. 445 (Almes). Consequently, by the time a 10-foot high
band of fine refuse had been established over the length of the barrier, the pool level would have
risen to the top of the ten-foot fine refuse deposit at the first slurry discharge positions.
The
process would then have to have been immediately repeated. If not, water would come into
contact with the seepage barrier as it rose above the band of fine refuse coating. Trd. 197-99
(Ballard).
MCC’s witnesses also challenged the feasibility MSHA’s proposed establishment of a
fines layer above the pool level. Ballard testified that even though the slurry discharge pipe was
kept on the embankment, there were times when the pool level was higher than the fines delta,
which was normal for most impoundments. Trd. 196-97. Owens confirmed that MCC’s
impoundment inspection reports, at times, indicated that the pool level was above the delta.
Trc. 285-86. Ballard strongly questioned how a fine refuse deposit could be maintained above
the pool level around the 1.4 mile seepage barrier, when it couldn’t be maintained at the
embankment, which was a fraction of the length of the barrier. Trd. 197. Moving the slurry
discharge around the impoundment would also have created other problems, principally
interfering with the ability to recycle water by pumping it back to the plant. Muncie testified that
moving the discharge point around the seepage barrier would create agitation and prevent
pumping of clean water back to the plant. Trd. 272. Owens opined that by moving the pump
around the middle of the pool, pumping of clean water could be done. Trc. 267-68. Bellamy
testified that with slurry being discharged around the seepage barrier water could not be pumped
from the back of the impoundment, but if the pump was moved to the middle of the
impoundment, water could be pumped, although it would have been harder to do. Trd. 345-48.
In addition, it is highly questionable that a coating of fine refuse above the pool level
would have had the desired result of decreasing the permeability of the barrier. MCC presented
evidence that if fine refuse, saturated with water, had been placed above the pool level, it would
have dried out and cracked, rendering it ineffective as a barrier to seepage. A picture of the fine
refuse deposit in the impoundment, taken in September 2002 shows persistent cracking.
Ex. MCC-Z; Trd. 431 (Johnson), Tra. 950-51 (Owens), Tre. 27 (Lewis). As Lewis explained,
“as [the fines cake] dries, it tends to lose moisture and shrink, reduce in volume.” Tre. 27. Geo’s
expert, Donald J. Hagerty, professor of civil engineering at the University of Louisville, was
more descriptive.
“If you deposit this material [fines saturated with water] above the water
level on the sides of the impoundment, it’s going to dry up . . . . Inevitably it cracks. So as soon
as . . . the water drains down into the coarser materials around the impoundment, the water leaves
the slurry, the fines that are left behind don’t occupy nearly as much volume, there’s shrinkage
and cracking.” Trf. 37. “That 70 years of experience we’ve had with dams and impoundments
and piping problems, that pretty much says that if you try to stop a seepage problem by making a
barrier, the barrier has to be virtually perfect for it to really work.” Trf. 65. “If you have a
moisture content of 80 percent, when it dries out it shrinks and cracks, the same thing that
happens to the bottom of a farm pond. When it dries up, the mud cracks because of shrinkage.
Same mechanism.” Trf. 71. “I think as long as we had these fines deposited in a cake or layer
that had cracks in it, the cracks make any notion of a barrier simply nonsense.” Trf. 70.
I find this evidence persuasive. The photograph confirms that the fines cake shrank and
cracked as it dried out. While the picture was taken two years after the breakthrough, it seems
likely that significant drying would have occurred within days or weeks of creation of the fines
layer, certainly well within one year. I also accept Hagerty’s opinion that a barrier has to be
virtually perfect in order to restrict seepage, and that a dry, cracked fines layer would not be a
virtually perfect barrier. While the dried-out fines cake may have been restored somewhat as it
became re-saturated, as Lewis noted, there is no direct evidence rebutting Hagerty’s opinion that
it would not have performed effectively as a barrier to seepage.
I find that MCC effectively covered the seepage barrier with fine refuse under the terms
of the Plan. I accept the testimony of the Secretary’s witnesses to the effect that, in the absence
of a coating of fine refuse above the pool level, there would not have been a major reduction in
overall seepage. However, that condition would have ended when the pool level rose above the
Stockton bench, at which time the seepage barrier would have been completely coated and, as the
Plan stated, there would have been a “considerable reduction” in seepage and the potential for a
breakthrough. As the pool level rose, and the layer of fine refuse covered a greater area and
became thicker, reducing seepage through the bottom of the impoundment. The uniform deposit
of fine refuse in the impoundment created a “plug” that effectively restricted seepage in all areas
of the pool, including 99% of the seepage barrier. In testifying on Citation No. 7144401, Owens
and Fredland agreed that the thickening layer of settled fines did reduce seepage. See n. 35,
infra. It was only the few inches (measured vertically) of the seepage barrier nearest the top of
the pool that were not coated with refuse. While this small area permitted seepage, it would have
been highly impractical to have further reduced it in the “only way” it could have been done,
i.e., to have established a layer of fine refuse above the pool level, as the Secretary’s witnesses
described.
The Secretary argues that impracticality of complying with a mandatory standard or plan
provision is not a defense to non-compliance. Sec’y Br. at 16-17. While this may be an accurate
statement of law, MCC does not advance impracticality as a justification for non-compliance.
Here, the phrase “to the extent practical” is actually part of MCC’s Plan. Consequently,
consideration of practicalities must be included in determining whether MCC provided effective
coverage of the seepage barrier.
The Secretary also argues that expectations about reaching the Stockton bench should not
have diminished MCC’s efforts to comply with the primary purpose of the Plan in the
intervening years, i.e., to reduce seepage into the 1-C mine. Sec’y Br. at 8. She also argues that,
since a significant reduction in breakthrough potential was not anticipated until then, MCC
should have been especially careful to assure maintenance of fines coverage on the barrier.
The Secretary’s argument seems to bifurcate the various provisions of the Plan, and does
not address how the subject sentence
affects the reading of the Plan. What must be determined
is the significance of this language in deciding whether MCC effectively covered the seepage
barrier under the terms of the Plan as a whole. As Ballard explained, MCC’s approach to
distribution of fine refuse over the seepage barrier appears to be consistent with virtually all of
the provisions of the Plan, including the subject sentence. On the other hand, the Secretary’s
position appears inconsistent with the sentence. If effective coverage meant, as she contends,
depositing a layer of fine refuse above the pool level such that water in the impoundment was
never in contact with the seepage barrier, then the barrier would always have been completely
encapsulated as to any water in the impoundment, and no additional protection would have been
realized when the pool level rose above the Stockton bench.
It also strikes me that MCC’s position is more consistent with other provisions of the
Plan, i.e., “The primary seepage control is provided by fine refuse deposited in the impoundment
against the fill as operations progress. . . . As fine refuse settles and consolidates along the
surface of the seepage barrier . . . . As the fine refuse deposit progresses up the slope of the
seepage barrier . . . .” While the Secretary’s position can also be viewed as consistent with these
provisions, I find such constructions considerably more strained than when compared to what
MCC was doing to comply with the Plan.
I found Ballard’s testimony, as principle author of the Plan, particularly informative.
He explained MCC’s compliance with the Plan as follows:
[A]n impoundment fills up with slurry as it comes up, okay. So what I’m
discussing here is, okay, you’ve got the barrier. And the fact that the bulk
material was put there reduces seepage to some degree. It’s called a seepage
barrier. Then the fine refuse will progressively come up as you pump fines in
there. That’s what the word progressively means as the operations continue. As
those progressively come up, you’re gradually reducing the seepage because fine
refuse is a smaller part[icle] and will have a lower permeability. And what I
meant here by the last statement after impoundment level increases to a level
above the Stockton [seam], once that fine refuse [in the] impoundment got above
the Stockton level, then the entire barrier is encapsulated by the fine refuse. And
at that point, that’s what the statement means, that once it’s reached that point, we
believe the potential [for a] breakthrough [in the] future is reduced considerably,
but that’s after it’s totally encapsulated.
Trd. 194-96.
I find that, reading the Plan as a whole, MCC effectively covered the seepage barrier with
fine refuse.
Citation No. 7144401
Citation No. 7144401 also was issued on October 17, 2001, pursuant to section 104(d)(1)
of the Act, and alleges an S&S and unwarrantable failure violation of 30 C.F.R. § 77.216(d). As
described in the “Condition or Practice” section of the Citation, the violation is based upon
MCC’s failure to “immediately report to the MSHA District Manager any unusual change in flow
quantity or quality from the South Mains Portal that would indicate possible impoundment
leakage,” as required by the Plan. Ex. Jt-4A. The Order was upheld in the original ALJ decision,
but the Commission vacated that portion of the decision because the conclusion that the Plan had
been violated was not adequately supported. 28 FMSHRC at 259-63.
The South Mains entry was the primary exit point for water and slurry released during the
1994 breakthrough. For that reason, monitoring of the flow from the South Mains entry was
included in the May 1994, or Short Term Plan, which provided:
Flow from the South Mains entry will be monitored daily, until remedial work at
the seepage point is completed. Monitoring will be done during regular
impoundment inspections after that. Any unusual change in flow quantity or
quality that would indicate possible impoundment leakage will be reported
immediately to MSHA and the appropriate mine management. All necessary
remedial measures will be implemented.
MCC Ex. A1, App. 1. MCC challenged whether the monitoring requirement continued in effect.
However, its argument was rejected in the original ALJ decision, and the Commission agreed,
holding that the “requirement to monitor the South Mains and to report any unusual changes in
flow quality or quantity that would indicate possible impoundment leakage to MSHA was part of
the permanent Impoundment Sealing Plan.” 28 FMSHRC at 261.
The flow from the South Mains Portal of the mine was a few inches deep and ran through
a rocky shallow ditch into a sediment control pond located near the portal. Trd. 305 (Muncie).
That pond, which was designated Pond 200, and several others at the mine site, were covered by
a permit issued by the Kentucky Pollutant Discharge Elimination System (“KPDES”). A
corrugated steel pipe, 18 inches in diameter, set at a slightly descending angle, drained the pond
once its surface rose above a certain level. Ex. MCC-W. MCC retained Geo to conduct weekly
“regular impoundment inspections.”
The South Mains outflow was monitored, indirectly, by
observation and measurement of the outflow from Pond 200.
The measurement taken was the
depth of flow at the intake end of the drainage pipe, measured in inches from the bottom of the
pipe opening. The clarity of the outflow, the depth measurement, and several other readings and
observations made during the inspections, were recorded on “Refuse Impoundment Site Visit”
forms.
Ex. G-6, MCC-G. Once completed, the form was delivered to the preparation plant,
where the plant superintendent or a foreman in charge would sign it. Copies were given to
MCC’s engineering office, and to the Geo project manager. Pond 200 was also subject to
KPDES monitoring and reporting requirements. MCC retained Blackburn Contracting to
perform that function. Blackburn inspected the pond twice a month, measured or estimated the
quantity of outflow at the discharge end of the pipe and collected samples for further analysis,
including the amount of suspended solids. Blackburn’s inspection results were reported on a
monthly basis, and were forwarded to KPDES quarterly. Trd. 383 (Johnson); ex. MCC-L.
The Parties’ Positions
The Secretary contends that the impoundment site visit reports show that there was a
sustained doubling of the outflow from Pond 200 in September 1999, which occurred during a
period of drought, that there was no other explanation for the increase other than possible
impoundment leakage, and that it was an unusual change in flow quantity that indicated possible
impoundment leakage that was required to be reported under the Plan. MCC contends that the
Secretary’s arguments are based upon misleading averages of flow data, that the Pond 200
outflow quantity was well within the range of flows that would have been expected for the
impoundment as the pool level rose, and that the fluctuation in flow was not indicative of
possible impoundment leakage because it was not substantially dissimilar to prior fluctuations
and there were no other indications of possible leakage.
The Secretary’s “Averages” Argument
The Secretary’s argument on this alleged violation is based primarily on a chart included
in the Report of Investigation, Figure 38 (“Fig. 38"). Ex. G-1, fig. 38. The chart covers the
period from mid-1994 through October 2000, and shows the Pond 200 outflow depths, the
impoundment pool level, and monthly averages of rainfall in the general area.
Also displayed
are two average flow depths, represented by horizontal lines. One represents the average flow for
the period from August 1994 to September 1999, which was 5.5 inches. The other represents the
average flow for the period from September 1999 to October 2000, which was 8.6 inches.
Virtually all of the Secretary’s arguments on outflow quantity changes are based on comparisons
of the average flows displayed on Fig. 38, and the claim that the average flow increased by 56%,
which represents at least a doubling of flow volume. Sec’y Br. at 30, 33; Reply Br. at 17, 18, 20.
As stated in the Report of Investigation, “[d]uring this period [September 1999 to October 11,
2000] . . . the average flow rate from the South Main Portal more than doubled.” Ex. G-1 at 32.
MCC argues that such comparisons are misleading, because natural seepage from the
impoundment increased significantly as the pool level rose. Consequently, any comparison of
late 1999-2000 flows with the average of flows for the five years preceding September 1999
would be expected to show a significant increase, even if there was no problem at all with
impoundment leakage.
The issue was explained by Barry K. Thacker, Geo’s president and principal engineer,
who had over thirty years of experience in the design of coal slurry impoundments and is a
nationally recognized expert in the field. Trb. 685-91. Thacker described a principle known as
“Darcy’s law,” which is referenced in MSHA impoundment design materials, and dictates that
seepage from an impoundment will increase naturally as the impoundment pool level rises. The
theoretical relationship is discussed in a report he prepared on the breakthrough. Ex. Geo-13
at 6-9. He also prepared a chart, using the Pond 200 flow depicted on Fig. 38, and extended the
time line back to 1991, when the pool level was just below the Coalburg Seam.
Ex. Geo-14.
At that point, the seepage from the impoundment into the 1-C mine had to be zero, which he
called a critical data point, because it was the only time that the amount of impoundment seepage
into the 1-C mine was known for certain. Trb. 699-700. He then observed that the low points of
the South Mains flow diagram coincided with a straight line that rose from zero flow in 1991 to
6-inches of flow in October 2000, which, he opined, was the relationship that Darcy’s law
predicted. Trb. 701-02. He also testified that the 6-inch increase in depth of flow, as the
impoundment pool elevation rose nearly 100 feet over nine years, was the type of increase that he
had seen at other similar facilities with comparable increases in impoundment pool elevations.
Trb. 696-97, 702. He attributed the component of flow represented by the straight line to
expected increases in impoundment seepage, and opined that the fluctuations above that line do
not indicate unusual changes in flow.
Thacker’s analysis convincingly undercuts the Secretary’s comparisons of average
outflow depths.
The Secretary’s witnesses generally agreed with the proposition that seepage
into the 1-C mine would have increased as the impoundment level rose. Tra. 608 (Betoney);
Trc. 184, 235-38, Tra. 123, 228-29 (Fredland); Trc. 296-97, Tra. 971, 1006 (Owens).
The
proposition also appears to be reasonable. As the pool level rose, the surface area of the
impoundment increased, more ground surface was exposed to water and saturated fine refuse,
and increasing hydrostatic pressure forced more water through the various layers of shot rock,
soil, sandstone and coal, all of which had some degree of permeability. Water flow would also
have increased through any faults or defects in those layers, e.g., hillseams or joints in sandstone
or cleats in coal deposits. Trc. 100 (Fredland).
It seems obvious, then, that comparisons of outflows in the late 1999 – 2000 time frame
with an average of the previous five years’ measurements would yield skewed results, i.e.,
erroneously excessive increases.
Tre. 51 (Lewis). I have little difficulty in rejecting arguments
that are based on comparisons to the 1994-99 average flow.
The Importance of Outflow Quality
The Plan called for monitoring of the South Mains entry outflow and the reporting of any
unusual changes in quality or quantity that would indicate possible impoundment leakage. MCC
viewed outflow water quality as a more important indicator of leakage because it was a bright
line test, i.e., any discoloration or “black water” would be an unmistakable sign of impoundment
leakage. It viewed changes in quantity as less reliable indicators of leakage because there was
considerable uncertainty as to the influence of the impoundment on the quantity of flow.
Tre. 133, 137 (Lewis); Trd. 180-83, 212, Trb. 69, 77, 193 (Ballard); Trf. 51-52, 62, 80 (Hagerty).
The Secretary’s expert agreed that discoloration would mean that fines were being picked up
somewhere and that quantity changes called for a more subjective evaluation. Trb. 330, 394
(Almes).
Outflow quantity took precedence for MSHA’s investigators. While the Secretary’s
“piping” theory of failure is predicated upon particles being eroded by water leaking into the
1-C mine, MSHA’s witnesses testified that, because water from the impoundment would have
had to flow some 4,000 feet through the mine before reaching the South Mains portal, and
elevation changes in the mine workings created pools, solids eroded by the piping/leaking
process would have settled out before reaching Pond 200. Tra. 603 (Betoney); Trc. 78-79, 109,
114, Tra. 130 (Fredland); Trc. 301-04, Tra. 1101 (Owens).
However, as MCC’s expert pointed out, the mere fact that elevation variations were
reflected on mine maps did not mean that there was significant pooling of drainage within the
mine because it is likely that those depressions would have been filled with material during the
1994 breakthrough. Tre. 177 (Lewis). Betoney agreed that there was a “lot of material in the
mine” from the 94 breakthrough. Tra. 602-03. As Ballard stated, “I don’t know the storage
capacity of the mine and I don’t think anyone can quantify it.” Trd. 212. Lewis believed that if
piping had been occurring, suspended solids, or slurry, would definitely have been visible in the
South Mains flow. Tre. 133, Trb. 818-19. Ballard believed that suspended solids from any
significant piping would not have settled out, and would have been present in the Pond 200
outflow. Trd. 212. Hagerty also believed that if leakage had been occurring “something should
have been seen at South Mains.” Trf. 54. Johnston believed that if piping had been occurring,
that significant quantities of suspended solids would have been detected in the highly accurate
testing done on the KPDES samples. Trb. 471. Bellamy, MSHA’s impoundment inspector, also
believed that if there had been leakage from the impoundment, he would have seen fines or
suspended solids in the Pond 200 outflow. Trb. 609.
I find that, while some settlement would have occurred as water from the impoundment
flowed through the 1-C mine, it is highly unlikely that all, or virtually all, of the suspended solids
resulting from impoundment leakage or piping would have settled out before the flow reached
and exited Pond 200. Consequently, the quality of the Pond 200 outflow was an important factor
in assessing whether any change in outflow quantity indicated possible impoundment leakage.
Rainfall – Drought
Pond 200 outflow was definitely influenced by rainfall. Tra. 796, 811 (Owens); Tra. 123
(Fredland); Tra. 603-05 (Betoney). Rainfall at the site added water to the impoundment pool,
potentially increasing seepage, and could produce surface run-off into Pond 200 from its 10-acre
drainage area. Rainfall at the site and, possibly, in a wider area, percolated into the ground and
increased ground water infiltration into the 1-C mine. Owens attempted to correlate Pond 200
outflow with rainfall. His efforts were frustrated because there was no rain gauge at the
impoundment site, and the flow depth measurements had been taken only every seven days. He
plotted rainfall data from five sites in the general area. Ex. G-6B. However, despite preparation
of numerous spreadsheets, he was unable to correlate Pond 200 outflow with rainfall. Trc. 373-76.
Referencing Owens’ testimony, the Secretary argues that the period from “July to
September” was the driest such period on record. Trc. 278; Sec’y Br. at 33; Reply. Br. at 18.
However, Owens was relying upon an American Meteorological Society paper discussing state-wide conditions. Trc. 278, Tra. 812; ex. G-6C. While he maintained that the situation in Martin
County was described in the paper as severe drought, he acknowledged that weather patterns can
be very localized and that there was substantial rainfall in August 1999, including the highest
single day total in six years that caused flash flooding. Trc. 339, Tra. 1047-48.
The Appropriate Test
There were no parameters established in the Plan to determine whether a particular
change in flow quantity would be “unusual” or “would indicate possible impoundment leakage.”
Consequently, the determination was left to a subjective assessment of available data. Tre. 198-202 (Fredland). While the Commission agreed with the previous ALJ that information on South
Mains entry outflow had to be viewed “with a heightened degree of scrutiny given the prior
impoundment failure and the fact that ‘as the pool level rose the risk of failure rose,’” it was
critical of the fact that neither the test for determining whether the Plan was violated, nor the
test’s application were “clearly explained.” 28 FMSHRC at 261 (quoting ALJ decision).
Neither party has articulated a definitive “test” for determining whether the plan was
violated. The Secretary cites to a dictionary definition of the word “unusual,”
and argues that
the “doubling” of flow at the only monitoring point designated in the Plan was, “standing on its
own, an unusual change in flow signaling a possible impoundment leak.”
Sec’y Reply Br. at
- MCC argues that the Secretary’s view is overly restrictive because it focuses solely on
changes in quantity, whereas the Plan requires reporting of unusual changes in quantity that
indicate possible impoundment leakage. MCC contends that any changes in flow quantity had to
be considered in light of the totality of conditions at the impoundment, including the outflow
history, weather conditions, and other impoundment monitoring information, especially outflow
quality.
In construing broadly worded mandatory safety standards, the Commission has employed
a “reasonably prudent person” test, i.e., whether a reasonably prudent person, familiar with the
mining industry and the protective purpose of the standard, would have recognized the specific
prohibition or requirement of the standard. See BHP Minerals International, Inc., 18 FMSHRC
1342, 1345 (Aug. 1996); Ideal Cement Co., 12 FMSHRC 2409, 2416 (Nov. 1990). While the
Plan is applicable only at MCC’s impoundment, the specific provision at issue was intended to
apply to a potentially wide variety of conditions. Even though it is a Plan provision, as opposed
to a mandatory standard, it appears appropriate to apply a formulation of the reasonably prudent
person test. The Commission “agree[d] in large part with the basic approach” taken by the
previous ALJ, which included a reference to a “reasonably prudent mining engineer.”
28 FMSHRC at 261.
Several witnesses expressed opinions on factors that should have been considered in
evaluating whether changes in flow quantity indicated possible impoundment leakage. The
Secretary’s expert, Almes, believed that flow quantity should have been assessed in light of the
entire flow history over the years, that rainfall had a lot of relevance, and that other impoundment
conditions should have been considered, including flows at seepage outlets, observations of the
pool for swirls, and a visual examination of slope stability. Trb. 336-37, 359-60. Ballard agreed,
stating that flow should have been evaluated in light of flow over the years, and that he certainly
wouldn’t have relied only on South Mains flow data. Trb. 153, Trd. 190. Lewis, too,
emphasized that the person making the assessment should be familiar with impoundments in
general, MCC’s impoundment in particular, and all of the pertinent conditions. Tre. 44-47, 168.
Fredland testified that a person evaluating the flow information would have to be familiar with
the site. Tra. 248-49.
I find that the appropriate test is whether a reasonably prudent mine operator, or mining
engineer, familiar with impoundments in general and all of the conditions at MCC’s
impoundment, both current and historical, should have recognized that a particular change in
outflow quantity was outside the range of flows that would have been reasonably forseeable, such
that it indicated possible impoundment leakage. This evaluation had to be made with an
awareness heightened by knowledge of the 1994 breakthrough, and the fact that the pool level
was approximately 100 feet higher than it was at that time.
Was There an Unusual Change in the Quantity of South Mains Outflow?
Pond 200 outflow measurements were recorded in Geo’s impoundment inspection
reports. Reports for the period from January 1999 through October 5, 2000, were entered into
evidence. Ex. G-6, MCC-G. Evidence of flow measurements prior to 1999 are reflected only on
Fig. 38, prepared by MSHA, and charts prepared by Thacker.
Ex. Geo-14. Thacker prepared
two charts that I found helpful in analyzing Pond 200 outflow. One, in which he used the Fig. 38
data, and extended the time line back to 1991, has already been discussed. Because he was
critical of MSHA’s use of monthly rainfall averages in Fig. 38, he also prepared a chart that
displayed weekly Pond 200 outflow measurements, as compared to total rainfall recorded during
the seven-day period preceding the measurement.
The flow measurements are depicted as
small black squares, and the rainfall totals are depicted as small triangles. Trb. 704-05;
ex. Geo-14. He used rainfall data recorded at a weather station located at Paintsville, Kentucky,
which was about 15 miles from the impoundment. Ex. Geo 11.
The impoundment inspection reports for September 1999 show a rise in depth of flow
from 6.0 inches on September 9 to 8.5 inches on September 30. Ex. G-6. The flow stayed at the
8.5 to 9.0 inch level through February of 2000, dropped to the 7.0 to 7.5 inch range in April –
June 2000, and then returned to the 8.0 to 9.0 inch range from July through September of 2000.
Ex. G-6, MCC-G. Historically, while flows had been in the 5.5 to 6.5 inch range for most of
1999, the charts show that there had been consistently higher readings, particularly in 1998. Fig.
38 and Thacker’s chart show a generally rising pattern of flow measurements over the 1994-1999
time frame that appear to have averaged about 6.0 to 6.5 inches in the mid-1998 to mid-1999
time frame, with a number of readings of 7.0 inches in mid-1998.
More significantly, the charts show substantial fluctuations in outflow quantity. They
include occasional sharp spikes, of extremely short duration, which are apparently attributable to
rainfall. Trd. 131 (Almes), Trb. 701 (Thacker), Tre. 52 (Lewis). However, they also show
periods of increased flow spanning several months, some of which exhibit abrupt onsets, and
magnitudes approaching, if not exceeding, 100% increases. Thacker’s chart, displaying the
Fig. 38 outflow data, with the line slanting upward representing the increase in seepage due to the
rise in the impoundment pool level, represents, in my opinion, the context within which the
September 1999 data should be evaluated. Ex. Geo-14. Thacker opined that the slanted line
depicted the influence of impoundment seepage that was dictated by Darcy’s law, and that it is
the fluctuations above that line that would have to represent unusual flow increases. Trb. 702.
Virtually all witnesses agreed with the proposition that impoundment seepage would increase as
the pool level rose. None, except Thacker, attempted to quantify the increase. Accepting the
chart’s depiction as generally accurate, it is apparent that there were a number of increases in
flow measurements that were substantial and lasted for months. In mid-1995, there was an
abrupt increase of nearly double the depth of flow, which lasted approximately three to four
months. Another abrupt and substantial increase occurred in late 1995, again lasting about four
months. There was a more gradual, but substantial, rise beginning in mid-1996 and lasting to
mid-1977, and a similar rise extending from the beginning of 1998 until mid-1999.
As Lewis observed in support of his opinion that South Mains outflows were within
expected ranges, the charts showed a “two-fold increase in flow” in 1995, “jumps in 1997" and
“then it jumped again in 1998. That’s more than a two-fold increase.” He concluded that “if you
really evaluate that step [the September 1999 increase], it’s a pretty small step in the grand
scheme of the 68-acre impoundment, the 80-plus acres of surface area that drains down into the
mine, the seven to ten acres of property drained into Pond 200, [and] the perpetual seeps that
drain into Pond 200. . . . [I]t’s not a significant step.” Tre. 132-34.
The increase in September 1999, from 6.0 inches to 8.5 inches, when viewed in isolation,
as the Secretary urges, could be deemed out of the ordinary or significantly different than what
had occurred in the immediate past, and could be classified as unusual. However, when viewed
in light of the historical fluctuations in flow measurements, it appears much more like another
cycle of a repeating pattern of increases in flow depth that lasted for a few months and then
returned to lower levels. In fact, the flow depth measurements did drop to the 7.0 inch range
from April to June 2000, although that was well after the Secretary argues that the increase
should have been reported. The Secretary’s expert, Almes, was of the opinion that it would have
been appropriate to wait for some time to confirm the readings and see if the flow decreased. He
believed that the increase in flow should have been reported by January 2000. Trd. 158, Trb. 403.
Owens believed that it should have been reported after one month. Trc. 311.
MCC maintains that the fact that the flow depth stayed essentially the same from the end
of September through December 1999 indicates that no piping or leaking was occurring. If
piping had been occurring, there should have been a steady and unabated increase in flow.
Tre. 63-64, Trb. 832, 887 (Lewis). While there could have been short term decreases due to
plugging of the piping opening, piping generally occurs in a zone and quickly works around
obstructions. Decreases or level flows would be relatively brief, certainly not several months.
Trf. 48, 58-60, 126, Trb. 970-74 (Hagerty).
The Secretary was highly critical of what she viewed as MCC’s failure to evaluate the
available flow data, and it was the alleged failure to evaluate the data in a systematic way that
was the predicate for the unwarrantable failure designation. Trc. 310-11, Tra. 889 (Owens).
It is somewhat remarkable, then, that MSHA did not analyze the earlier increases in flow,
and
the Secretary offered no explanation of the historical flow patterns, which included several abrupt
and substantial increases that subsequently abated. The Secretary focused on a few weeks of
data, and did not attempt to show that it was significantly different than previous flow patterns,
or to explain why the increase to a depth of 8.5 inches should have been regarded with alarm
when there had been numerous readings of 7.0 inches approximately one year earlier when the
impoundment level was ten feet lower.
Because of their extensive experience and recognized expertise, I place considerable
weight on Thacker’s and Lewis’ testimony that the amount of flow from the South Mains entry
was within expected limits for that size facility and the pool elevation, i.e., there was no unusual
change in flow quantity that indicated possible impoundment leakage. Trb. 696-97, 702, 706,
742-43 (Thacker), Tre. 53-54, 70-71 (Lewis). Hagerty also testified that, considering rainfall
and the pool level, the increase in Pond 200 outflow was normal, and what would have been
expected. Trf. 81.
There is little disagreement that all of the other measures of impoundment performance
indicated that there was no impoundment leakage. The pool level had risen steadily. There were
no swirls observed that would have indicated a leak. The measurements at the piezometers,
seeps and drains, were all within normal limits, and there was no evidence of slope instability.
The most significant factor, however, was the virtual absence of suspended solids in the outflow.
As noted above, I find convincing the testimony of Lewis, Ballard, Johnson, Hagerty and
Bellamy, to the effect that if there had been piping or leakage, there would have been suspended
solids in the Pond 200 outflow. MSHA’s Owens testified that the September 1999 flow increase
was, most likely, evidence that something significant had happened with piping, i.e., the erosion
of solids by impoundment leakage. Trc. 296, 366. If so, there definitely should have been
suspended solids evident in the outflow. Not only were there no visible signs of suspended
solids, the KPDES reports establish that there were virtually no suspended solids in the Pond 200
outflow, from September 1999 through the October 2000 breakthrough.
Trb 471, 474-75
(Johnson); ex. MCC-L.
I find that the Secretary has failed to carry her burden of proof on this issue. For the
reasons stated above, I reject comparisons to the 1994-99 average flow figure. The change in
quantity of flow that occurred in September of 1999, when viewed in light of the historical
pattern of flow measurements and the other conditions at the impoundment site, would not have
been viewed by a reasonably prudent mine manager or engineer as an unusual increase in
quantity of flow that would indicate possible impoundment leakage, even when viewed with
heightened awareness because of the 1994 breakthrough and the increase in impoundment pool
elevation.
This conclusion is confirmed by the empirical evidence. As Lewis and MCC’s president,
Hatfield, pointed out, numerous individuals, virtually all of whom had extensive experience with
impoundments and were well aware of the 1994 breakthrough and the potential for another
breakthrough, made frequent observations of South Mains and the Pond 200 outflows, and
virtually every aspect of the impoundment. The same personnel had been monitoring the
impoundment for years, and had experienced the increases and decreases reflected in Fig. 38 and
Thacker’s charts.
None of them perceived the increase in Pond 200 outflow that occurred in
September 1999 as unusual, or indicative of possible impoundment leakage. Tre. 156-57
(Lewis); Tra. 1257, 1294 (Hatfield).
ORDER
MCC’s contests of Order No. 7144402 and Citation No. 7144401 are SUSTAINED.
Order No. 7144402 and Citation No. 7144401 are hereby VACATED, and the petition as to
those alleged violations is hereby DISMISSED.
Michael E. Zielinski
Administrative Law Judge
Distribution (Certified Mail):
James B. Crawford, Esq., Melissa Bowman, Esq., Office of the Solicitor, U.S. Department of
Labor, 1100 Wilson Blvd., 22nd Floor, Arlington, VA 22209
Marco M. Rajkovich, Jr., Esq., Melanie Kilpatrick, Esq., Rajkovich, Williams, Kilpatrick &
True, PLLC, 2333 Alumni Park Plaza, Suite 310, Lexington, KY 40517
/mh