FMSHRC ALJ decision Docket KENT 2001- 416 Decided November 22, 2002 Mixed result Judge Irwin Schroeder

Jordan Construction

Jordan Construction (FMSHRC KENT 2001- 416): Two auger-mining violations affirmed

Apply this to your situation

This order from 2002 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current MSHA standards and Commission precedent say, with citations.

Currency note: this decision dates from 2002
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final ALJ decision, not Commission precedent
This decision became final under the 40-day rule in 30 U.S.C. § 823(d)(1) because no later Commission review appears in the official index. It binds the parties but is not Commission precedent. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the agency's own release.
Read the official release (fmshrc.gov)

Plain-English summary

Jordan Construction operated a small auger-mining business with two employees. The ALJ found an overhang above the work area and found that the operator failed to follow its approved ground control plan by leaving inadequate web material between auger holes. The Secretary did not prove a violation involving the escape route between equipment and the highwall. The two proven violations resulted in a combined $750 civil penalty, payable within 40 days.

Decision snapshot

  • Cited standard(s): 30 C.F.R. § 77.1503(b), 30 C.F.R. § 77.1000, 30 C.F.R. § 77.1006(b)
  • Outcome: Two violations were affirmed and one escape-route allegation was dismissed, with a $750 penalty.
  • Key point: An approved ground control plan must be followed, and the Secretary must prove the required safety precautions were absent before an escape-route violation can be sustained.

Full text (FMSHRC public release)

FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION
OFFICE OF ADMINISTRATIVE LAW JUDGES
601 New Jersey Avenue, NW
Suite 9500
Washington, DC 20001

                                   November 22, 2002

SECRETARY OF LABOR, : CIVIL PENALTY PROCEEDING
MINE SAFETY AND HEALTH :
ADMINISTRATION (MSHA), : Docket No. KENT 2001- 416
Petitioner : A.C. No. 15-15851-03515
:
v. :
:
JORDAN CONSTRUCTION, :
Respondent : Mine No. 1

                                       DECISION

Before: Judge Schroeder

Appearances: Brian Dougherty, Esq., U.S. Department of Labor, Office of the Solicitor,
Nashville, Tennessee, for the Petitioner;
Larry Jordan, Owner, Jordan, Construction Company,
Box 230, Blaine, Kentucky, pro se.

    This case is before me on a Petition by the Secretary to assess a Civil Penalty for alleged

violations of mine safety regulations. The Petition alleges three violations for which the
Secretary seeks a total Civil Penalty of $4,000.00. After prehearing development, a hearing was
held in Prestonburg, Kentucky on March 12, 2002. An opportunity for post hearing written
arguments was given to the parties. After careful study of the record and arguments, I have
reached the factual and legal conclusions discussed below.

                                     Issues Presented

    The hearing held in this case concerned the alleged violation of safety regulations that are

directed at the segment of the mining industry known as auger mining. This is an activity in
which the extracted material is removed from the ground using a large rotating bit, usually driven
horizontally from a prepared work site that appears similar to a strip mine. The regulations at
issue are the following:

                                                1

30 C.F.R. § 77.1503(b) Overhangs

   (b) No work shall be done under any overhang and, when a crew is engaged in
   connecting or disconnecting auger sections under a highwall, at least one person
   shall be assigned to observe the highwall for possible movement. (Emphasis added)

30 C.F.R. § 77.1000 Ground Control Plan

   Each operator shall establish and follow a ground control plan for the safe control
   of all highwalls, pits and spoil banks to be developed after June 30, 1971, which
   shall be consistent with prudent engineering design and will insure safe working
   conditions. The mining methods employed by the operator shall be selected to
   insure highwall and spoil bank stability. (Emphasis added)

30 C.F.R. § 77.1006(b) Escape

   (b) Except as provided in paragraph (c) of this section, men shall not work
   between equipment and the highwall or spoil bank where the equipment may
   hinder escape from falls or slides. (Emphasis added)

   (c) Special safety precautions shall be taken when men are required to perform
   repair work between immobilized equipment and the highwall or spoil bank and
   such equipment may hinder escape from falls or slides. (Emphasis added)

    The basic jurisdictional facts were stipulated at the hearing. Exhibit JX-1 My task now

is to determine whether the Secretary has established in the record each of the elements of a
violation of one or more of these regulations and if so, the appropriate penalty for each such
violation. The issue of appropriate penalty amount raises the further issue of whether any
particular penalty sum would make it impossible for the Respondent to continue in business as
the Respondent now conducts it.

                                   Factual Findings

    Auger mining is generally defined as a mining method used by strip-mine operators

when the overburden gets too thick to be removed economically. Large-diameter, spaced holes
are drilled up to 200 feet into the coal bed by an auger. Like a bit used for drilling into wood,
this consists of a cutting head with screw like extensions. As the auger turns, the head breaks the
coal and the screw carriers the coal back into the open work area where it is loaded onto a truck
or a conveyor. (See, Dictionary of Mining, Mineral and related terms, Department of the Interior)

                                            2


    Auger coal mining as conducted by the Respondent is quite similar to this general

definition. Johnson Construction does not perform strip mining but has a long term relationship
with a strip miner. Johnson Construction has one drilling machine which requires two people to
operate. Johnson Construction has only two employees. The machine is not self propelled. It
must be pulled from place to place to drill successive holes into a coal seam. When operating,
the auger machine is typically located 10 to 15 feet from the highwall face. In this gap the coal is
carried away from the hole and the machine helper works to add or remove segments of auger.

     The auger process begins with removal of overburden to expose the coal seam and create

a bench upon which the auger machine can be operated. Removal of the overburden typically
involves drilling a line of holes to contain explosives to shatter the overburden. Testimony
differed significantly on the capability of the drill rig used here. The MSHA Inspector,
Ms. Wanda Hinkle, testified that the older model drill rig present could only drill perpendicular
holes since it did not have hydraulic lifts to tilt the drill. Mr. Johnson testified the use of jacks
and blocks enabled the drill to be offset a significant amount from the perpendicular. I credit
Mr. Johnson’s testimony because of his greater familiarity with the equipment and my experience
with the extent to which field ingenuity can expand the rated capacity of equipment. This issue
is of significance only because the ground control plan applicable to Johnson Construction
required the highwall to be inclined at 95 degrees, apparently an attempt to reduce overhangs on
the highwall. I will assume that the highwall observed by Ms. Hinkle during her inspection on
November 14, 2000, was created using drilled shot holes placed at approximately 95 degrees.

    Ms. Hinkle testified she arrived at the Johnson Construction site when no work was being

performed. She observed the auger machine in place at the bottom of the highwall. On the wall
she observed 18 drilled holes facing the machine and above these holes she observed an
overhang that she considered dangerous. She did not observe any large quantity of fallen rock at
the base of the highwall. She took the time to measure several of the web structures between the
holes. Tr. 27 - 30.

    Ms. Hinkle testified she observed an overhang of rocky materials about half way up the

40 foot highwall. The overhang seemed to her to protrude approximately 6 feet and to extend
across the highwall approximately 40 feet. Tr. 41 - 44. This overhang was observed to be
directly above approximately 18 auger holes drilled by Johnson Construction on a previous day.
Ms. Hinkle used a tape to measure the horizontal extent of the holes and measured several of the
webs between holes. She determined the 18 holes and the related 17 webs totaled 39 feet. She
determined the webs varied from 3 to 8 inches. These measurements apparently prompted her to
make reference to the Johnson Construction Ground Control Plan. Secretary’s Exhibit 7.

   Mr. Johnson’s testimony on the presence of an overhang differed from Ms. Hinkle’s

testimony only as a matter of emphasis. He indicated the highwall had been drilled and
excavated properly but that rock had fallen out of the highwall to create a cave inset into the
highwall. Accepting the testimony of either witness it is undisputed that a substantial mass of
material in the highwall had no vertical support, i.e the “cave” ceiling. Material above the work

                                             3

area without vertical support is the practical definition of an overhang. I find as a matter of fact
that a substantial overhang existed on the highwall at the place Johnson Construction conducted
auger mining operations.

    The presence of a substantial overhang on the highwall illustrates the importance of the

spacing of auger holes under the Ground Control Plan.1 As the auger holes are drilled, the
vertical support for the highwall is gradually weakened. Unless the spacing of the holes leaves
sufficient web material between the holes, the vertical support for the highwall will fail and
portions of the wall will fall. The Ground Control Plan is Secretary’s Exhibit 5. On page 6, the
Plan clearly specifies that 26" holes will be drilled so as to assure a minimum of 8" of web
material between holes. Mr. Johnson testified, and I accept this part of his testimony, that the
vibration encountered in boring a hole means that a hole bored with a 26" bit will be significantly
wider than 26". This enlargement of the auger hole will always be at the expense of the thickness
of the web material. This means that each hole and web requires three feet of the highwall (26" +
8" + 2" = 36"). At this rate, 18 holes with related web would consume 54 feet, not the 39 feet
measured by the MSHA inspector. This means one or both of two things would need to be true;
(1) the holes are less than 26", or (2) the webs average less than 8" thick. Mr. Johnson testified
that both things were true. In addition, Mr. Johnson testified the holes were drilled in a “fan”
pattern rather than parallel to each other. Resp. Ex. G. This had the effect of making the web
material thinner at the surface of the highwall but thickening farther into the highwall. The
justification for the “fan” pattern was to reduce the number of times the auger machine would
need to be moved rather than rotated. A consequence of this “rotation” of the auger would be
that for some holes the machine would have a significant incline to the face of the highwall.
Whether that incline would interfere with the opportunity to escape material falling from the
highwall is the subject of another claim.

    Mr. Johnson testified that at the time of the MSHA inspection his auger machine was

running a 22" bit rather than a 26" bit. He produced sales receipts for materials used in the
subsequent fabrication of a 26" bit. The sales receipts were dated after the MSHA inspection.
The MSHA inspector had measured the thickness of some of the webs between holes but did not
indicate she had measured the dimensions of the holes. The lack of direct evidence of the size of
the holes makes it necessary to examine credibility of the competing witnesses.

    The MSHA investigator relied upon the ground control plan for the size of the holes. Her

concern was to determine whether the web material was adequate to support the highwall,
particularly in light of her conclusion that the highwall contained an overhang. The industry
standard for web thickness is expressed in terms of a percentage of the diameter of the adjacent

   1
    The Ground Control Plan appears to be a regulatory control document whose function

and importance was largely lost as time past. Two entries on document are total duplication.
The plan used by Johnson Construction was approved by MSHA almost 6 years prior to the
events at issue here and never updated. Mr. Johnson testified many of the requirements of the
plan had been long forgotten.

                                              4

auger hole. The bigger the hole the thicker the web must be to meet the standard. To the
contrary, Mr. Johnson is motivated to find smaller auger holes since that would only require
thinner webs under the standard.

    Mr. Johnson is caught on the horns of a real dilemma. He must argue he has complied

with his Ground Control Plan. But his Plan contemplates the use of a 26" auger bit. If he
contends he has used a 26" bit then his webs are clearly too thin. If I accept the testimony of the
MSHA inspector on only the lateral measurement of 18 auger holes, i.e. 18 holes covered 39 feet,
then I must conclude that even if Mr. Johnson was using a 22" bit then the average web
dimension was less than 5". That probably means a few webs were more than 5" but many were
not that thick. On both grounds I conclude the Respondent was not complying with the terms of
the applicable Ground Control Plan. I believe the thinness of the webs at the entrance to the
holes was probably a result of the “fan” drill method, an issue not addressed in the Ground
Control Plan. Hence the webs were probably of adequate thickness within several feet of the
highwall surface. But those few feet are critical for stability of the highwall.

    On the issue of whether the placement of the auger machine constituted an unacceptable

impairment of the ability of the crew to escape a rock fall from the highwall, the testimony was
only ambiguous in small details. There is no dispute that the auger machine was placed so as to
form an acute angle with the highwall to perform repair work on the machine in the space
between the highwall and the machine. What is not clear is whether the repair work required the
efforts of one person or two. This is important because the regulation contemplates that when
such a machine placement is required, special safety precautions are required. These precautions
can be as simple as detailing one person to watch the highwall for signs of impending falls. If
Johnson Construction took such precautions, then no violation would have occurred. I find the
record is insufficient to resolve that question.

                                        Analysis

    It is well settled that the Secretary has the initial burden of proof of each element of a

claim for assessment of a Civil Penalty. Satisfaction of that burden of proof imposes upon the
Respondent the obligation of going forward with evidence in rebuttal or face judgment in favor
of the Secretary. Only when it has been determined that the Secretary has met that burden
without persuasive rebuttal does it become necessary to determine an appropriate amount of Civil
Penalty. With this framework in mind I will now consider each of the claims made by the
Secretary.

   1. Overhang under 30 C.F.R. § 77.1503(b)

    As discussed above, I have found as a fact that an overhang existed in the highwall above

the location at which Johnson Construction performed work as an auger miner. The Respondent
has offered no evidence in rebuttal of this charge other than to question the seriousness of the
risks involved for the two miners involved. The Secretary has proposed a Civil Penalty of

                                            5

$1,000.00 for this violation because of the direct supervision of the work by the owner, a mine
operator of significant experience.

    Mr. Johnson testified he has operated his auger mining business in essentially the same

way for 20 years without a serious accident. He appears to be more complacent with the risks
than willful in his violations. The Civil Penalty imposed for this violation should be no more
than the economic consequence necessary to call Mr. Johnson’s attention to the need for
compliance.

   2. Failure to Follow Ground Control Plan under 30 C.F.R. § 77.1000

    As discussed above, I have found as a fact that the Respondent failed to follow the

approved Ground Control Plan in failing to allow adequate web material between holes. That the
thickness of the web material several feet into the highwall may have satisfied applicable
industry standards is not rebuttal to the claimed violation. Support of the highwall at the point of
fracture for rock falls is the purpose and objective of the requirement for adequate web material.
The Secretary has proposed a Civil Penalty of $1,500.00 for this violation because of the direct
supervision of the work by the owner, a mine operator of significant experience.

   Mr. Johnson argued this violation amounts to no more than “paper work” technicality.

The consequences of this violation need to be severe enough to persuade Mr. Johnson that the
regulatory requirement to plan his work and work to his plan is significant and substantial.

   3. Failure to Secure Escape Route under 30 C.F.R. § 77.1006(b)

    As discussed above, I found that the Secretary has failed to prove that the Respondent

failed to take special precautions against hazards during maintenance work for which the auger
machine might represent an impairment of escape routes from a rock fall. Because of this failure
of proof, I will dismiss this claim.

                                 Amount of Civil Penalty

    Jordon Construction is a very small mine operator. Testimony was undisputed that total

net income from mine operations in the year 2000 was $37,500.00. Tr. 271. The Secretary has
proposed Civil Penalties that total $2,500.00 for the two violations I have accepted. If I agreed
with the Secretary’s proposal, the Civil Penalty would represent almost seven percent of net
income for that year. I consider that rate to be excessive. If applied to larger producers in this
industry it would be considered confiscatory.

    In that light I conclude that a Civil Penalty of $250.00 is appropriate for the Overhang

violation and a Civil Penalty of $500.00 is appropriate for a violation of the Ground Control Plan
requirement. This makes a total Civil Penalty in this case of $750.00.

                                             6


                                       ORDER

   For the reasons stated above, I find the Respondent has violated mine safety regulations

contained in 30 C.F.R. §§ 77.1000 and 77.1503(b) but has not been shown to have violated the
mine safety regulation in 30 C.F.R. § 77.1006(b). Respondent is directed to pay a Civil Penalty
of $750.00 for these violations within 40 days of the date of this Order.

                                        Irwin Schroeder
                                        Administrative Law Judge

Distribution:

Brian W. Dougherty, Esq., Office of the Solicitor, U.S. Department of Labor, 2002 Richard Jones
Rd., Suite B-201, Nashville, TN 37215 (Certified Mail)

Larry Jordan, Owner, Jordan Construction Company, HC 89, Box 230, Blaine, KY 41124
(Certified Mail)

/mh

                                           7

Get today's answer for your situation

You just read what one judge decided for one employer in 2002, and it binds only those parties. Ezel checks the current MSHA standards and Commission precedent and answers your specific situation, with citations.

Opens in Ezel Pro. Every answer cites the authority it relies on.